Exhibit J10 Quality Assurance Surveillance Plan.docx

DOCX document 119 KB Posted

Attached to
Elevator Maintenance & Related Services Federal contract opportunity
Solicitation number
47PF0024R0108
Issued by
General Services Administration Public Buildings Service Region 5

About this file

This document is a Quality Assurance Surveillance Plan (QASP) for a federal contract for Elevator Maintenance and Related Services. The QASP sets forth the procedures and guidelines the General Services Administration (GSA) will use to ensure the required performance standards or service levels are achieved by the contractor.

The QASP details the roles and responsibilities of the Contracting Officer and Contracting Officer's Representative/Alternate, the methodologies for monitoring contractor performance including surveillance techniques and customer feedback, the quality assurance documentation requirements, the analysis of quality assurance monitoring results, and the follow-up actions. It also includes specific minimum acceptable performance quality levels standards for various elevator equipment and services. The QASP references the associated Performance Work Statement for Elevator Maintenance and Related Services. The document provides templates for required contract deliverables and a Customer Complaint Investigation form.

View the file

Other files for this federal contract opportunity

Other files attached to Elevator Maintenance & Related Services, newest first.
File Type Posted
SF30 47PF0024R0108 Amendment 0005.pdf PDF
Section B - 985 Elevator Electronic Offer Sheet 12-16-2024.xlsx XLSX spreadsheet
Q and A as of 12132024.pdf PDF
SF30 47PF0024R0108 Amendment 0004.pdf PDF
2024 Parking Garage Elev P1 QEI Report.pdf PDF
Q and As.pdf PDF
2021 5 Year Testing Results.pdf PDF
2024 Parking Garage Elev P2 QEI Report.pdf PDF
2021 F4.pdf PDF
2024 Semi for L5.pdf PDF
2024 Semi annual testing 1 2 3 6 7 8 and F1 2 3.pdf PDF
2024 Parking Garage Elev P3 QEI Report.pdf PDF
SF30 47PF0024R0108_0003.pdf PDF
SF30 47PF0024R0108 Amendment_0002.pdf PDF
Solicitation Amendment 47PF0024R0108_0001.pdf PDF
Section B 2024 10 29 Rev 1.xlsx XLSX spreadsheet
Exhibit J15 Wage Determination.pdf PDF
Exhibit J11 MechCCP.xls XLS spreadsheet
47PF0024R0108.pdf PDF
Exhibit J13 Electric Traction Elevator Checklist.pdf PDF
Section B 2024 08 19.xlsx XLSX spreadsheet
Exhibit J7 Elevator Inspection Form.pdf PDF
Exhibit J12 Model Subcontracting Plan Template.docx DOCX document
Exhibit J14 Asbestos Notification.docx DOCX document
Show all 24

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

@@NOTE TO COR/QASP WRITER

Please remove this page after reviewing Double “at sign” (@@) precede items requiring a determination. This is also intended to prompt removal of language or requirements not relevant to the location(s). It is important for you to read the entire QASP.

All @@ symbols should be removed prior to finalizing the QASP All blue text should be reformatted back to the QASP standard of Arial 11pt, black font. Any blue Italicized text should be changed to non-italics Ctrl+F allows you to type in a search for words or sections. It is an exact search and will help you to find specific items.

Any Numbered heading proceeded by the @@ symbol is optional; however, the heading needs to be kept for numbering purposes. These sections should be marked “Reserved” and the information that is contained under the heading should be fully deleted. Any items preceded by the @@ symbol requires input by the spec writer, is optional or may be deleted (information that is contained should be fully deleted).

Example:

If no asbestos “Delete” all cells.

The intent of this QASP is to align with the contract by having one document encompassing multiple locations that clearly establishes the requirements for each location on the contract. There should only be one contract level QASP that includes all CORs’ contact information that is shared with the contractor. After any updates, the revised QASP should be uploaded to EASi TAB 42, QASP folder, with the file name of QASP and the date in the file name.

Text in red font represents instructions to the author/s. All red text must be deleted prior to finalizing the QASP.

Additionally, throughout the QASP there is an option to choose @@BPA@@Contract. Use the Find and Replace feature to apply one to the entire document. For example, find @@BPA@@Contract and replace all with contract. MAS uses the term BPA, non-MAS uses the term contract.

Elevator Maintenance and Related Services Quality Assurance Surveillance Plan (QASP) for @@10 Locations

Use of this QASP template is mandatory for all R5 service contracts/BPAs. This QASP template must be used for all new service contracts awarded on or after November 1 , 2023. For contracts awarded prior to November 1, 2023, CORs are encouraged to update to the new QASP template as soon as practicable, and no later than September 30, 2024.

@@Note to Spec Writer: Insert or delete rows as necessary to reflect the appropriate number of locations for this contract.

After any updates, the revised QASP should be uploaded to EASi TAB 42, QASP folder, with the file name of QASP and the date in the file name.

QASP Review/Update Tracking

Use of this tracker satisfies the annual review/update documentation requirements.

Contractor Receipt

Period of Performance
Contractor Representative
Date Sent
COR Initials

Award

Option Year 1

Option Year 2

Option Year 3

Option Year 4

Option Year 5

Option Year 6

Option Year 7

Option Year 8

Option Year 9

Option to Extend

GSA CO Acceptance

Contracting Officer
Signature
Date

GSA COR Annual Reviews/Updates Log

Location
Initials & Date
Initials & Date
Initials & Date
Initials & Date
Initials & Date
Initials & Date
Initials & Date
Initials & Date
Initials & Date
Initials & Date

Location #1

Location #2

Location #3

Location #4

Location #5

Location #6

Location #7

Location #8

Location #9

Location #10

Table of Contents

QASP Review/Update Tracking2
1.0 @@CONTRACT/BPA INFORMATION SHEET5
Contract Information Sheet5
2.0 INTRODUCTION7
2.1 Purpose7
2.2 Performance Management Approach7
2.3 Performance Management Strategy7
3.0 ROLES AND RESPONSIBILITIES8
3.1 Contracting Officer8
3.2 Contracting Officer’s Representative/Alternate Contracting Officer’s Representative8
4.0 METHODOLOGIES TO MONITOR PERFORMANCE8
4.1 Surveillance Plans8
4.2 Surveillance Techniques9
4.3 Customer Feedback11
4.4 Acceptable Quality Levels11
5.0 QUALITY ASSURANCE DOCUMENTATION12
5.1 Performance Management Feedback Loop12
5.2 Monitoring Methods12
6.0 ANALYSIS OF QUALITY ASSURANCE MONITORING RESULTS12
6.1 Determining Performance12
6.2 Reporting12
6.3 Reviews and Resolution12
7.0 FOLLOW-UP ACTIONS13
8.0 MINIMUM ACCEPTABLE PERFORMANCE QUALITY LEVELS STANDARDS13
8.1 Elevator equipment13
Table 8.1 – Elevator Performance Requirements Summary14
Contract Deliverables Requirements Summary17
QUALITY ASSURANCE MONITORING FORM - CUSTOMER COMPLAINT INVESTIGATION27

@@Note to Spec Writer: Insert or delete rows as necessary to reflect the appropriate number of locations for your contract.

1.0 @@CONTRACT/BPA INFORMATION SHEET

Contract Information Sheet

1.1
Contract Number:
@@ Number
1.2
Service Type:
Elevator Maintenance and Related Services

Location Information

1.3
Location #1
@@ Building Name, Street Address/City/State/zip code, GSA building number
Location #2
@@ Building Name, Street Address/City/State/zip code, GSA building number
Location #3
@@ Building Name, Street Address/City/State/zip code, GSA building number
Location #4
@@ Building Name, Street Address/City/State/zip code, GSA building number
Location #5
@@ Building Name, Street Address/City/State/zip code, GSA building number
Location #6
@@ Building Name, Street Address/City/State/zip code, GSA building number
Location #7
@@ Building Name, Street Address/City/State/zip code, GSA building number
Location #8
@@ Building Name, Street Address/City/State/zip code, GSA building number
Location #9
@@ Building Name, Street Address/City/State/zip code, GSA building number
Location #10
@@ Building Name, Street Address/City/State/zip code, GSA building number
1.4
Issue Date:
@@ Month/day/year
1.5
Expiration Date:
@@ Month/day/year

Contractor Information

1.6
Contractor:

@@ Company Name

@@ Street address

@@ City/State/zip code

1.7
Contractor Contact:

@@ Name

@@ Office: phone number

@@ email address

1.8
Contractor On-Site Project Manager:
@@ Name

@@ Office: phone number

@@ email address

GSA Information

1.9
Contracting Officer:

@@ Name

@@ Office: phone number

@@ email address

1.10
Contracting Officer's Representative (COR)
Location #1
@@ Name, Office: phone number, email address
Location #2
@@ Name, Office: phone number, email address
Location #3
@@ Name, Office: phone number, email address
Location #4
@@ Name, Office: phone number, email address
Location #5
@@ Name, Office: phone number, email address
Location #6
@@ Name, Office: phone number, email address
Location #7
@@ Name, Office: phone number, email address
Location #8
@@ Name, Office: phone number, email address
Location #9
@@ Name, Office: phone number, email address
Location #10
@@ Name, Office: phone number, email address
1.11
Alternate Contracting Officer's Representative (ACOR)
Location #1
@@ Name, Office: phone number, email address
Location #2
@@ Name, Office: phone number, email address
Location #3
@@ Name, Office: phone number, email address
Location #4
@@ Name, Office: phone number, email address
Location #5
@@ Name, Office: phone number, email address
Location #6
@@ Name, Office: phone number, email address
Location #7
@@ Name, Office: phone number, email address
Location #8
@@ Name, Office: phone number, email address
Location #9
@@ Name, Office: phone number, email address
Location #10
@@ Name, Office: phone number, email address

2.0 INTRODUCTION

This @@BPA@@Contract level Quality Assurance Surveillance Plan (QASP) sets forth the procedures and guidelines the General Services Administration will use in ensuring the required performance standards or services levels are achieved by the contractor.

After any updates, the revised QASP should be uploaded to EASi TAB 42, QASP folder, with the file name of QASP and the date in the file name.

The contract requires the Contractor to comply with all applicable federal, state and local codes, laws, standards and regulations that relate to the maintenance and operation of equipment and systems within the scope of the contract (PWS) and to maintain a comprehensive reference library. The codes, standards and regulations referenced in the QASP are to assist the COR with references that support the minimum performance quality levels stated in QASP section 8.0. Resources where the COR may find these references may include but not limited to: GSA forms Library, FMSP InSite page and MADCAD Codes & Standards Library.

2.1 Purpose

The purpose of the QASP is to describe the systematic methods used to monitor @@BPA@@Contract performance and to identify the required documentation and the resources to be employed. The QASP provides a means for evaluating whether the contractor is meeting the performance standards identified in Performance Requirements Summary Tables.

This QASP defines the roles and responsibilities of all members of the Integrated Project Team (IPT), identifies the minimum performance objectives, defines the methodologies used to monitor and evaluate the contractor’s performance, establishes quality assurance documentation minimum requirements, and provides means and methods for analyzing quality assurance monitoring results.

2.2 Performance Management Approach

This QASP defines the performance management approach taken by GSA to monitor the contractor’s performance to ensure the minimum performance standards achieved. Performance management rests on developing a capability to review and analyze information generated through performance assessment. The ability to make decisions based on the analysis of performance data is the cornerstone of performance management; this analysis yields information that indicates whether acceptable performance under the @@BPA@@Contract is being achieved by the contractor.

2.3 Performance Management Strategy

The contractor is responsible for ensuring that all work performed meets the minimum quality standards. The contractor measures that quality through the contractor’s own Quality Control Program (QCP). QC is work output, not workers, and therefore includes all work performed under this @@BPA@@Contract regardless of whether the work is performed by contractor employees, teaming partners, or subcontractors.

The government representative(s) will monitor performance and review performance reports furnished by the contractor to determine how the contractor is performing against the minimum performance standards. The contractor is responsible for making required changes in processes and practices to ensure performance is managed effectively.

3.0 ROLES AND RESPONSIBILITIES

3.1 Contracting Officer

The Contracting Officer (CO) is responsible for monitoring @@BPA@@Contract compliance and administration and for resolving any differences between the observations documented by the GSA Contracting Officer's Representative (COR)/Alternate Contracting Officer’s Representative (ACOR) and the contractor. The CO will designate a COR/ACOR as the government authority for performance management.

3.2 Contracting Officer’s Representative/Alternate Contracting Officer’s Representative

The COR/ACOR is designated in writing by the CO to act as their authorized representative to assist in administering the @@BPA@@Contract. COR/ACOR limitations are contained in the written appointment letter. The COR/ACOR is responsible for technical administration of the project and ensures proper government surveillance of the contractor’s performance.

The COR/ACOR is not empowered to make any contractual commitments or to authorize any contractual changes on the government’s behalf. Any changes that the contractor deems may affect price, terms, or conditions shall be referred to the CO for action. COR/ACOR are responsible for completing and documenting inspections and evaluations of the contractor’s work performance. The ACOR assists the COR in implementing the QASP and performing contract administration duties. In the absence of a COR, ACORs assume primary contract administration responsibilities.

4.0 METHODOLOGIES TO MONITOR PERFORMANCE

Methods of surveillance for GSA to identify quality levels in accordance with FAR Part 46.401(b) (2). Government contract quality assurance shall be performed at such times (including any stage of performance of services) as may be necessary to determine that the services conform to contract requirements. Quality assurance surveillance plans should be prepared in conjunction with the preparation of the statement of work. The plans should specify all work requiring surveillance and the method of surveillance.

4.1 Surveillance Plans

The COR plans to inspect standard and above standard services in accordance with the minimums established in Table 4.1 Quality Assurance Inspection Plan. The percentage listed for standard services represents the percentage of the total standard services work completed during the period of performance for each location to be inspected.

Example: The COR plans to inspect 10% of standard services work orders each month for location 1. There were 200 standard services work orders completed for the month. The COR must inspect at a minimum the work for 20 work orders by either using the QA Pass/Fail work order statuses on individual work orders, or by generating a standalone GSAI-type work order to record the inspection. Refer to R5 QA Work Order Inspection Process.

The percentage listed for above standard services represents the percentage of the total above standard services work orders scheduled and completed during the period of performance to be inspected. This percentage represents the work order count to be inspected. If a work order lists multiple locations, then the percentage to be inspected carries through to the location count. If there are 10 areas/locations, and you QA 10%, that is 1 area/location.

Example: The COR plans to inspect 100% of above standard services work orders each month. The contractor completed 10 above standard services work orders for the month. The COR must inspect at a minimum the work for 1 work order by either using the QA Pass/Fail work order statuses on individual work orders, or by generating a standalone GSAI-type work order to record the inspection. Refer to R5 QA Work Order Inspection Process.

@@Complete Table 4.1 to document planned inspection minimums for standard services requests and above standard services work each month for each location.

Table 4.1 – Quality Assurance Inspection Plan

Location
Standard Services Work

Minimum Inspection QA Per Month Above Standard Services Minimum Inspection QA Per Line Item Ordered

@@Location #1
@@10%@@15%@@25%@@33%@@Other
100%
@@Location #2
@@10%@@15%@@25%@@33%@@Other
100%
@@Location #3
@@10%@@15%@@25%@@33%@@Other
100%
@@Location #4
@@10%@@15%@@25%@@33%@@Other
100%
@@Location #5
@@10%@@15%@@25%@@33%@@Other
100%
@@Location #6
@@10%@@15%@@25%@@33%@@Other
100%
@@Location #7
@@10%@@15%@@25%@@33%@@Other
100%
@@Location #8
@@10%@@15%@@25%@@33%@@Other
100%
@@Location #9
@@10%@@15%@@25%@@33%@@Other
100%
@@Location #10
@@10%@@15%@@25%@@33%@@Other
100%

4.2 Surveillance Techniques

In an effort to minimize the performance management burden, simplified surveillance methods and other methods as available may be used by the government to evaluate contractor performance when appropriate.

Table 4.2 Surveillance Methods & Techniques

Surveillance Method
Surveillance Technique
Documentation
Inspection/Acceptance of Delivery Order/Additional Service Request (ASR)
100% inspections will be completed on all delivery orders (GSA Form 300) issued by the CO and documented on GSA Form 220 and submitted for partial or full payment for work completed.
GSA Form 300 (Issued by the CO).

NCMMS Work Order

GSA Form 220

Periodic Surveillance Inspection
This method consists of selected surveillance tasks by the Government that do not require 100 percent inspection or are performed on a random basis. The CO or their designee will evaluate the Contractor’s reports, surveys, etc. on at least a monthly basis.

Remote and Virtual Inspections can be used when onsite inspections cannot be accomplished. Visual evidence shall be provided of non-sensitive areas to ensure services have been performed per the contract requirements.

Visual evidence could be in the form of photographs, videos and/or virtual technologies such as Google Hangouts Meet™, Facetime™ and Zoom™ etc.

Surveillance also includes reviewing documents, submittals, work orders and other NCMMS records for accuracy and completion.

Use work order statuses (QA Pass/QA Fail).

Vertical Transportation Maintenance Checklist within NCMMS (INS-Vertical Job Plan) - Refer to R5 NCMMS COR Inspections Standard Operating Procedures for additional guidance.

Contractor Evaluation - Short Form within NCMMS (INS-CONT-EVAL-SHORT Job Plan) - Refer to R5 NCMMS COR Evaluations Standard Operating Procedures for additional guidance.

Service Request Documentation
This method of surveillance will provide information to the CO or designee, such as identification of the types of service requests received, the frequencies of service requests, corrective action taken, timeliness of completion, and any other pertinent data. At a minimum, this method shall be performed on a monthly basis based upon inspecting the percentage of work performed identified in Table 4.1.
CORs review NCMMS Work Orders.

1. Use work order statuses (QA Pass/QA Fail).

Safety Inspection Schedule
All tests, as required by ASME A17.1, shall be performed as stated below and witnessed by an independent certified inspector. The schedule for Safety Inspections is spelled out in the contract. This is not a recommendation and must be adhered to.

Review to ensure that the inspection was carried out at the appropriate schedule, completed by QEI, and ensure that Corrective Maintenance (CM) work orders are created within NCMMS for all deficiencies identified in the report.

CORs have the option to either:

1. Create standalone inspection work orders (Work Type GSAI) to verify that safety inspections have been completed.

2. Use work order statuses (QA Pass/QA Fail).

Review Contractor’s Quality Control Practices (Task/Activities)
COR will review completed NCMMS QC to ensure the contractor is adhering to their approved QCP (Quantity, Frequency, Documentation). Contractor should be entering start and completion times of their QC inspections in their QC reports. This will assist the COR in evaluating if adequate effort/time is being implemented.
Monthly Contractor Evaluations - “Quality”
Review Customer Satisfaction Information/Data
COR will review/monitor NCMMS bounce back survey data to track customer complaints or dissatisfaction with contractor performance, workmanship, professionalism, etc.

COR may also contact customers and ask about the quality of contractor performance.

Review/monitor stand alone non-work order supported/recorded customer complaints.

COR will take/document appropriate corrective action.

Review NCMMS Work Order, respond to unsatisfactory feedback.

Quality Assurance Monitoring Form - Customer Complaint Investigation.

Monthly Contractor Evaluations - “Other”

4.3 Customer Feedback

The contractor is expected to establish and maintain professional communication between its employees and customers. The primary objective of this communication is customer satisfaction. Customer satisfaction is the most significant external indicator of the success and effectiveness of all services provided and can be measured through customer complaints and surveys.

Performance management drives the contractor to be customer focused through initially and internally addressing customer complaints and investigating the issues and/or problems but the customer always has the option to communicate complaints to the COR or ACOR, as opposed to the contractor.

Customer feedback may also be obtained either from the results of formal customer satisfaction surveys or from random customer complaints.

Any customer complaints will be investigated by the COR or ACOR using the Customer Complaint Investigation, identified in Attachment A1.

GSA regularly conducts Tenant Satisfaction Surveys (TSS) for all tenants in Government-owned buildings. These surveys gather important data in many areas, including specific categories pertaining to the operation and maintenance of elevators in GSA's buildings. The surveys provide GSA with satisfaction scores that can be further evaluated to determine if there are any weaknesses within the various programs. There are various measures that can be taken, such as reviewing the survey’s comments, obtaining further feedback from the tenants, or sharing the scores with the Contractor to establish a plan of action.

GSA also conducts transaction/work order level surveys (NCMMS Bounce Back Surveys) of tenant-initiated work completed by the service contractors. Bounce back surveys require minimal setup in NCMMS. Tenants may choose at their own discretion whether to respond to each survey.

Bounce Back Surveys are monitored nationally by the Office of Facilities Management (OFM) Facilities Operations Division. Unsatisfactory ratings are flagged triggering a corrective action email to the Regional NCMMS Program Manager, Service Center Leadership, and CORs. CORs must follow up with tenants, take appropriate corrective action, and report back to OFM.

4.4 Acceptable Quality Levels

The minimum acceptable quality levels (AQLs) included in Performance Requirements Summary Tables are structured to allow the contractor to manage how the work is performed.

5.0 QUALITY ASSURANCE DOCUMENTATION

5.1 Performance Management Feedback Loop

The performance management feedback loop begins with the communication of expected outcomes. Performance standards are expressed in and assessed using the performance monitoring techniques shown in Performance Requirements Summary Tables.

5.2 Monitoring Methods

The government’s QA surveillance, performed by the COR or ACOR, may be reported using any of the following: Vertical Transportation Maintenance Checklist within NCMMS, letters, performance meeting minutes. The documents, when completed, will document the government’s assessment of the contractor’s performance under the @@BPA@@Contract to ensure that the required results are being achieved. The Contractor will be informed of any unacceptable work within @@24 hours.

The COR will retain a copy in EASi of all completed QA surveillance forms.

6.0 ANALYSIS OF QUALITY ASSURANCE MONITORING RESULTS

6.1 Determining Performance

Government shall use the monitoring methods cited to determine whether the performance standards/service levels/AQLs have been met. If the contractor has not met the minimum requirements, it may be asked to develop a corrective action plan to show how and by what date it intends to bring performance up to the required levels.

6.2 Reporting

The COR will inform the CO in writing of any performance or schedule failure by the contractor. This summarization should be detailed enough to provide the CO a clear picture of the performance or schedule failure by the contractor. If appropriate, the CO may investigate further to determine if all the facts and circumstances surrounding the performance or schedule failure are accurate. The CO may discuss with the contractor any performance or schedule failure that indicates unacceptable performance and the government’s remedies, including payment reductions as allowed by the FAR.

6.3 Reviews and Resolution

The COR may require the contractor project manager, or contractor designated alternate, to meet with the CO and other government IPT (Integrated Project Team) personnel as deemed necessary to discuss performance evaluation. The CO or COR will define a frequency of in-depth reviews with the contractor. If the need arises, the contractor will meet with the CO or COR as often as required or per the contractor’s request. The agenda of the reviews may include:

· Quarterly performance assessment data and trend analysis

· Issues and concerns of both parties

· Projected outlook for upcoming months and progress against expected trends, including a corrective action plan analysis

· Recommendations for improved efficiency and/or effectiveness

· Issues arising from the performance monitoring processes.

The COR must coordinate and communicate with the contractor to resolve issues and concerns regarding marginal or unacceptable performance. If unable to resolve, COR will inform CO per section 6.2.

The COR and contractor should jointly formulate tactical and long-term courses of action. Decisions regarding changes to metrics, thresholds, or service levels should be clearly documented. Changes to service levels, procedures, and metrics will be incorporated into the contractor’s QCP as well as to the QASP as appropriate. Changes to service levels and contract terms will require contract modifications.

7.0 FOLLOW-UP ACTIONS

Follow-up action may include correction by the onsite Contractor, a proposed deduction for services not received or the work may be performed by other means (other contractor). Costs for performing services that are the responsibility of the incumbent Contractor, which may include the Government’s administrative costs, will be deducted from the Contractor’s monthly payment pending approval by the Contracting Officer.

8.0 MINIMUM ACCEPTABLE PERFORMANCE QUALITY LEVELS STANDARDS

The minimum performance quality levels are for the contractor to use as a foundation to build on and meet the minimum performance quality level standards of GSA in accordance with “Performance-Based Statement of Work (PBSOW) for Elevator Maintenance and Related Services” section of the contract.

8.1 Elevator equipment

@@Location #1
@@Location #2
@@Location #3
@@Location #4
@@Location #5
@@Location #6
@@Location #7
@@Location #8
@@Location #9
@@Location #10

@@ Date

Maintained in accordance with ASME Safety Code requirements, the manufacturer’s recommendations, the Elevator Industry Field Employees’ Safety Handbook, National Electrical Code and all other applicable laws, regulations, rules, ordinances, codes. If a conflict arises between these standards, the Authority Having Jurisdiction (GSA) will determine the appropriate application.

Table 8.1 – Elevator Performance Requirements Summary

Required Services (Tasks)
Minimum Performance Quality Level Standard
Methods of Surveillance
Follow up Action
@@Asbestos Containing Material (ACM) or Presumed Asbestos Containing Material (PACM)
May be present on the elevators. The contractor is responsible to maintain the existing asbestos containing material if present, in an intact and/or non-friable condition. Locations of asbestos containing material may include the following:
a.Floor tiles or resilient flooring material inside of the car.
b.Adhesive flooring mastic inside of the car.
c.Sound proofing and waterproofing application on the exterior of the car.
d.Brakes and cable stops.
e.Circuit boards

f. Fire rated car and hoist-way doors

@@ Check Box For Applicable Locations. If the task is applicable to that location, there will be an “✔” in the box by that location.

·
Location #1
·
Location #2
·
Location #3
·
Location #4
·
Location #5
·
Location #6
·
Location #7
·
Location #8
·
Location #9
·
Location #10

Periodic Surveillance Inspection/Remote and Virtual Inspections

Correction by the Contractor/Proposed deduction for services not received/Work may be performed by other means.

Egress
Exit pathways will be free from storage and obstruction
Periodic Surveillance Inspection
Correction by the Contractor/Work may be performed by other means.
Electrical
All electrical equipment and wiring will be properly installed and maintained per the current NEC and NETA Maintenance Testing Specification for Electrical Power Distribution Equipment and Systems. Electrical conductors and wires that are no longer in service will be removed to the nearest junction box or panel. Extension cords will not be used in place of permanent wiring. All covers for junction boxes, raceways, outlets will be replaced immediately after completion of any work or if found missing. Clearances from electrical equipment will be maintained as required by NFPA 70, the National Electrical Code.
Periodic Surveillance Inspection

Correction by the Contractor/Proposed deduction for services not received/Work may be performed by other means.

Elevator Certificates
Required elevator certifications will be maintained, current, posted in the elevator car/cab and visual at all times. The contractor will be responsible for obtaining the signed GSA Form 55, Certificate of Elevator Inspection, and GSA Form 55A, Acknowledgment of Elevator Inspection Certification from the elevator inspector. Copies of the signed GSA Forms 55 and 55A will be provided to the CO or designee within 10 business days after the inspection. GSA Form 55 will be displayed in the elevator car. GSA will provide the certificate forms required for the elevators upon request. @@Alternate Certificate of Elevator Inspection forms are available from FMSP if needed to fit the frame in the elevator cab.
Periodic Surveillance Inspection/Safety Inspection Schedule

Correction by the Contractor/Proposed deduction for services not received/Work may be performed by other means.

Elevator Emergency phones
Emergency elevator phones will be tested monthly, and a log of the test results will be maintained for each elevator. These logs shall be kept in each elevator machine room
Periodic Surveillance Inspection

Correction by the Contractor/Proposed deduction for services not received/Work may be performed by other means.

Elevator Fire Recall
Fireman’s Emergency Operation will be maintained and tested. This testing will be conducted monthly, and results must be documented. Such tests will be conducted in a manner that they do not interfere with the normal operation of the building as determined by the CO or designee. These tests will not result in any additional costs to GSA. The Contractor will maintain a written inspection test log for each group tested and a log of test results will be maintained in the machine room and made available to the CO or their designee and elevator inspection personnel upon request. Each month, the Contractor will subject all elevators provided with firefighters’ emergency operation to Phase I recall. Phase I recall will be conducted by use of the key switch, and a minimum of one-floor operation on Phase II. The Contractor will correct all deficiencies immediately and provide a report to the CO or designee, detailing the actions taken to correct the deficiencies
Periodic Surveillance Inspection/Safety Inspection Schedule

Correction by the Contractor/Proposed deduction for services not received/Work may be performed by other means.

Elevator Machine Rooms
Elevator Hoist ways and Elevator Cabs: Machine rooms, elevator cabs, elevator equipment and elevator hoist ways will be inspected during the monthly inspections and during normal walk through
Periodic Surveillance Inspection/Remote and Virtual Inspections

Correction by the Contractor/Proposed deduction for services not received/Work may be performed by other means.

Elevator Operation
Door dwell times will be maintained within the parameters which comply with the Americans with Disabilities Act. The door operation will be quiet and positive with smooth checking at the extremes of travel. The door closing force of each elevator will operate as recommended in ASME A17.2. The ride quality will maintain a comfortable elevator ride with smooth acceleration, deceleration and a soft stop. The elevators stopping accuracy will stop within +/- ½ inch of the floor.
Periodic Surveillance Inspection
Correction by the Contractor/Proposed deduction for services not received/Work may be performed by other means.
Equipment access doors/panels
All seals on elevator equipment access doors/panels will be properly maintained and replaced as needed when the seal fails or leaks. Latches and hinges will be properly maintained to ensure they function correctly. Care will be taken with secured panels to ensure that proper type screws are used/provided and are not cross threaded or mismatched. Tamper proof screws will not be replaced with non-tamper proof screws
Periodic Surveillance Inspection/Remote and Virtual Inspections

Correction by the Contractor/Proposed deduction for services not received/Work may be performed by other means.

Flammable and combustible liquid and material
Containers will be properly marked and only be stored in approved flammable cabinet and will never be left unattended in any machine rooms. Oily rags will only be disposed of in oily rag containers and emptied at the end of the day. Any supplies to be stored on site such as lubricants, rags, cleaners, etc. will be properly secured in cabinets and labeled as appropriate. Storage will not negatively impact the means of egress, fire protection systems, and emergency lighting; nor, will it significantly increase the amount of combustible material in the machinery space. The Contractor will provide approved metal waste and metal storage containers for flammable and combustible waste associated with the performance of this contract at the contract start. Flammable and combustible waste will be removed from the premises daily. Storage of flammable and combustible liquids will be limited as much as possible and will conform to the latest edition of NFPA 30, Flammable and Combustible Liquids Code.
Periodic Surveillance Inspection

Correction by the Contractor/Proposed deduction for services not received/Work may be performed by other means.

Housekeeping
Elevator machinery spaces, hoist ways, elevator cabs, elevator equipment, shops and storage areas will be maintained in a clean (free of grease and oil) and orderly manner. When work is performed in these areas, the Contractor's personnel will clean up all debris and leave the area in a safe and presentable condition. All equipment located within the machinery rooms will be painted as needed to provide a professional and uniform appearance. Painting of equipment will conform to industry standards in terms of color coding and identification. Equipment identification and numbering will be maintained as directed by the CO or designee.
Periodic Surveillance Inspection/ Remote and Virtual Inspections

Correction by the Contractor/Proposed deduction for services not received/Work may be performed by other means.

Lighting
All lighting will be kept in good order and operational at all times in elevator spaces (cars, hoist ways/pits, tops and bottoms of cars). Lighting will also be cleaned periodically as needed or when the light bulbs require replacement, or the fixture requires service. All lighting will be building standard @@T-8 Philips 25 watt, 4100K. Lighting will be uniformed in tone/appearance. The Contractor’s lamping and ballasts recycling program for fluorescent tubes and light bulbs (incandescent, halogen, LED) will be in accordance with Environmental Protection Agency (EPA) and GSA standards and will be checked monthly.
Periodic Surveillance Inspection
Correction by the Contractor/Proposed deduction for services not received/Work may be performed by other means.
Safety
All safety cages, guards, fencing will be kept in good condition and will only be removed for service when the equipment has been properly shut off locked out/tagged out. Breakers will be turned off and will be locked out/tagged out when maintenance is being completed on any elevator equipment with an electrical supply.
Periodic Surveillance Inspection
Correction by the Contractor/Proposed deduction for services not received/Work may be performed by other means.
Signage
All equipment identification, data plates, and safety warnings will be properly maintained and in good condition at all times. All signage must be in compliance with the requirements of the ASME A17.1 Safety Code for Elevators and Escalators. Paper signage will only be authorized for a short period of time and must be replaced with an approved permanent sign. The contractor is responsible for the installation of appropriate signage or barricades related to the elevator equipment and/or systems outage, based on best practices of the industry or as directed by the COR. In the event an elevator is shutdown, an "Out of Service" sign will be placed at each call button on all floors when the elevator is the only one servicing that area.
Periodic Surveillance Inspection
Correction by the Contractor/Proposed deduction for services not received/Work may be performed by other means.
Storage
Nothing unrelated to the repair and maintenance of the elevator equipment is permitted to be stored in the elevator machine rooms. Parts and supplies may be stored, but only if appropriate cabinets are used.
Periodic Surveillance Inspection
Correction by the Contractor/Work may be performed by other means.

Contract Deliverables Requirements Summary

Deliverable
Contract Reference Section
Deliverable Due
Standard
Residence of Deliverable
Follow-up Action
Maintenance Control Plan
Exhibits – Definitions - Maintenance Control Plan (MCP)
15 Days After Award or by Contract Start whichever is earlier
MCP is a written plan that details all of the maintenance tasks which must be performed and the frequencies with which they are performed. It takes into consideration a variety of criteria, including the type of equipment, its age and condition, the type of use, environmental conditions, and any other special concerns surrounding that elevator. It is not a generic document but is intended to be a specific set of instructions designed to address all of the particular maintenance issues relating to a particular elevator.
QCP/copy of the MCP shall be located in each elevator machine room, with a master copy kept in the building maintenance office.
Withhold monthly payment until received
Listing of Equipment or systems not operational by the official start time of the occupants
Description, Specifications and Statement of Work - Scope of Work - Operation of Equipment
8:00 a.m. that day
Report will include the reason for the outage, corrective action proposed and estimated date the elevator will be returned to service. If the outage is of a recurring nature, the reporting requirement must be repeated daily.
CO or designee
Withhold monthly payment until received
Firefighter’s Emergency Operating Test
Description, Specifications and Statement of Work - Scope of Work - Elevators with Firefighter’s Emergency Operation
Monthly
Subject all elevators provided with firefighters’ emergency operation to Phase I recall. Phase I recall will be conducted by use of the key switch, and a minimum of one-floor operation on Phase II
Maintain a log of test results in the machine room and make it available to the CO or their designee and elevator inspection personnel upon request
Withhold monthly payment until received/ Correction by the Contractor/Proposed deduction for services not received/Work may be performed by other means.
Emergency Phone Operating Test
Description, Specifications and Statement of Work - Inspection and Testing Services - Adjustments and Tests, Paragraph d
Monthly
Emergency phones will be tested monthly, and a log of the test results will be maintained for each elevator
Logs shall be kept in each elevator machine room.
Withhold monthly payment until received/ Correction by the Contractor/Proposed deduction for services not received/Work may be performed by other means.
Subcontracting Plan
Section – Evaluation Factors for Award - Special Standard(s) of Responsibility - Subcontracting Plan
Prior to Award
Subcontracting plan that complies with all the requirements of this solicitation
QCP/COR file
Withhold monthly payment until received

Resumes for Contract Managers, Supervisors and Employees

Description, Specifications and Statement of Work - Personnel

Prior to Assignment to Contract, but No Later Than 5 Days After Award

All new personnel must meet all qualifications as stipulated and resumes for all new personnel must be submitted to the CO and or designee prior to any reassignment of personnel on this contract
QCP/COR file
Withhold monthly payment until received
Resumes for Replacement Employees
Description, Specifications and Statement of Work - Personnel
Prior to Reassignment of Personnel
All new personnel must meet all qualifications as stipulated and resumes for all new personnel must be submitted to the CO and or designee prior to any reassignment of personnel on this contract
QCP/COR file
Withhold monthly payment until received
License for Elevator Mechanic
Description, Specifications and Statement of Work - Personnel

Prior to Assignment to Contract, but No Later Than 5 Days After Award

All personnel must meet all qualifications as stipulated
QCP/COR file
Withhold monthly payment until received
Communication System
Description, Specifications and Statement of Work - Items to be Supplied by the Contractor - Communication Systems
5 Days After Award
Communication system(s), to enable the Government to communicate with the Contractor on a 24 hour a day, 7 days a week basis
Contractor
Withhold monthly payment until received
Metal Waste Containers
Description, Specifications and Statement of Work - Items to be Supplied by the Contractor - Metal Waste Containers
Start of contract
Metal storage cabinets for flammable materials associated with the performance of this contract. Storage of flammable and combustibles liquids shall be limited as much as possible and shall conform to the latest edition of NFPA 30, Flammable and Combustible Liquids Code.
On-site/elevator machine room
Withhold monthly payment until received/ Proposed deduction for services not received/Work may be performed by other means.
Safety Data Sheets
Description, Specifications and Statement of Work - Items to be Supplied by the Contractor - Materials, Supplies and Equipment
5 Days After Award
Safety Data Sheets (SDS) for any material used in the performance of this contract that fall under the OSHA 1910.1200 standard as a hazardous chemical. All new hazardous chemicals used during the life of the contract must have SDS provided
Location both readily available and accessible to all employees (in accordance with 29 CFR §1910.1200) and shall advise the CO or their designee of its location
Withhold monthly payment until received
Inventory of Products
Description, Specifications and Statement of Work - Items to be Supplied by the Contractor - Materials, Supplies and Equipment
5 Days After Award
Supplies and/or products to be used under this contract must contain recycled materials, "environmentally preferable" products, and bio-based products to the maximum extent feasible
QCP/COR file
Withhold monthly payment until received
Accounting of Government Property
Description, Specifications and Statement of Work - Items to be Supplied by the Government - Government Property
5 Days After Request or at expiration or termination of contract
Government property shall be used only in direct operations of providing contract services
QCP/COR file
Withhold monthly payment until received
Name of Inspector and Evidence of Certification
Description, Specifications and Statement of Work - Inspection and Testing Services - Elevator/Escalator Safety Inspections
5 workdays prior to inspection
Inspections accomplished by individuals certified and qualified in accordance with the requirements of the latest edition of ASME QEI-1, Standard for the Qualification of Elevator Inspectors. The maintenance contractor must subcontract for the performance of the safety inspections with individuals/firms independent of the maintenance contractor's organization.
QCP/COR file
Withhold monthly payment until received
Notification of Upcoming Inspection
Description, Specifications and Statement of Work - Inspection and Testing Services - Elevator/Escalator Safety Inspections
5 workdays prior to inspection
Inspections and tests are to be performed at six (6) month intervals. The schedule must be strictly adhered to without exception
COR/CO
Withhold monthly payment until received
Written Report of Inspection
Description, Specifications and Statement of Work - Inspection and Testing Services - Elevator/Escalator Safety Inspections
10 Days After inspection
Report for each elevator individually and a report provided for each inspection performed. Consolidated reports are not acceptable. Each report will consist of the appropriate checklist for the type of equipment inspected along with a separate written report listing any deficiencies found. The documentation of test results may utilize forms provided by local or state jurisdictions, or the following GSA provided checklists from the ASME 17.2 Appendix A: (refer to Section J, Exhibit 13) GSA R5 Electric Traction Elevator Checklist, GSA R5 Escalator Checklist, GSA R5 Hydraulic Elevator Checklist, as appropriate. Each inspection report shall include a written list of deficiencies.
COR file
Withhold monthly payment until received
Signed GSA Form 55 (Certificate of Elevator Inspection) and GSA Form 55A (Acknowledgement of Elevator Inspection (or forms that are equivalent)
Description, Specifications and Statement of Work - Inspection and Testing Services - Elevator/Escalator Safety Inspections
10 Days After inspection
Signed GSA Form 55, Certificate of Elevator Inspection, and GSA Form 55A, Acknowledgment of Elevator Inspection Certification (or forms that are equivalent) from the elevator inspector. GSA Form 55 will be displayed in the elevator car.
COR file
Withhold monthly payment until received
Results of all Tests Performed
Description, Specifications and Statement of Work - Inspection and Testing Services - Elevator/Escalator Safety Inspections
10 Days After Inspection/Test
Report for each elevator individually and a report provided for each inspection performed. Consolidated reports are not acceptable. Each report will consist of the appropriate checklist for the type of equipment inspected along with a separate written report listing any deficiencies found. The documentation of test results may utilize forms provided by local or state jurisdictions, or the following GSA provided checklists from the ASME 17.2 Appendix A: (refer to Section J, Exhibit 13) GSA R5 Electric Traction Elevator Checklist, GSA R5 Escalator Checklist, GSA R5 Hydraulic Elevator Checklist, as appropriate. Each inspection report shall include a written list of deficiencies.
COR file
Withhold monthly payment until received/ Proposed deduction for services not received/Work may be performed by other means.
Uniforms
Description, Specifications and Statement of Work - Uniforms
Start of Contract
Uniform shall have the contractor's company name and the employee’s name affixed thereon in a permanent or semi-permanent manner such as a badge or monogram. The contractor employees must be in uniform while on site and present a clean and professional appearance at all times.
Employee
Withhold monthly payment until received/ Proposed deduction for services not received/Work may be performed by other means.
Service Call Log
Description, Specifications and Statement of Work - Emergency Call-Back - Service Call Log (Routine/Emergency)
5 workdays after end of month
Service call logs for each elevator
Machine room(s)/COR File
Withhold monthly payment until received
Monthly Progress Report
Description, Specifications and Statement of Work - Work Scheduling and Report Accomplishments, Paragraph d
5 workdays after end of month
Work order, repair order or a form (in hard copy or electronic format) which will furnish the following information:

Name and address of the Contractor Name of Contractor’s employee in charge of the work Date(s) work performed, and hours expended per employee.

Brief description of work performed including equipment identification List any parts removed and replaced.

COR file
Withhold monthly payment until received
Quality Control Plan (QCP)
Description, Specifications and Statement of Work - Quality Control/Quality Assurance Surveillance - Quality Control Plan
With Initial Offer and As Updated
QCP shall include, but not be limited to: Task and Frequencies, Inspection Methods and Frequencies, Roles and Responsibilities of Key Personnel, Records and Files, Progress Report, Strike Contingency Plan (SCP), Contractor Emergency Plan (CEP)
COR file
Withhold monthly payment until received
Roles and Responsibilities of Key Personnel and Roster
Description, Specifications and Statement of Work - Quality Control/Quality Assurance Surveillance - Quality Control Plan

- Roles and Responsibilities of Key Personnel

With QCP
Staffing levels (including supervision) depicting various job classifications (e.g., 2 journeyman elevator mechanics, 1 supervisor). A roster by name and job title
QCP/COR file
Withhold monthly payment until received

Quality Control Inspection Reports and Other Documentation

Description, Specifications and Statement of Work - Quality Control/Quality Assurance Surveillance - Quality Control Plan

- Records and Files

With Monthly Reports

Description and/or samples of the forms, records, reports, and files the Contractor intends to utilize and keep on-site, which will indicate both the inspections conducted by the Contractor and necessary corrective action taken (as appropriate).
Monthly Report/COR file
Withhold monthly payment until received
QCP Progress Report (Self Evaluation)
Description, Specifications and Statement of Work - Quality Control/Quality Assurance Surveillance - Quality Control Plan

- Progress Report

Within 5 days of end of quarter
Report shall include as a minimum the result of the quality control inspections, an explanation of efforts taken in the prior quarter to improve service and efforts planned for the present quarter to improve quality.
Monthly Report/COR file
Withhold monthly payment until received
Strike Contingency Plan
Description, Specifications and Statement of Work - Quality Control/Quality Assurance Surveillance - Quality Control Plan -

Strike Contingency Plan

With QCP
Strike Contingency Plan to be used in the event of a strike by his employees. At a minimum, the SCP shall include the following information: Support Personnel, License and Certifications
QCP/COR file
Withhold monthly payment until received
Contractor Emergency Plan
Description, Specifications and Statement of Work - Quality Control/Quality Assurance Surveillance - Quality Control Plan -

Contractor Emergency Plan

With QCP
CEP shall include at a minimum, the following: Procedures, Employee Information, Employee’s Duties, Temporary or Subcontractor Employees.
QCP/COR file
Withhold monthly payment until received
Contract Close-Out Examination

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .