Exhibit J Master TICS Table.xlsx

XLSX spreadsheet 440 KB Posted

Attached to
X1DB--Amendment to Extend Submission Deadline
Solicitation number
36C25025R0020
Issued by

About this file

The file is a Tenant Improvements Cost Summary (TICS) Excel spreadsheet for a federal contract opportunity, specifically Solicitation Number 36C25023R0113. However, the document appears to be a blank or template worksheet with no actual cost data populated, showing zero values across all construction divisions and cost categories. The spreadsheet is structured to capture detailed construction costs for shell and tenant improvement (TI) work, broken down by 32 CSI MasterFormat divisions including general requirements, site work, concrete, electrical, HVAC, plumbing, and other construction elements. The document includes sections for material and labor costs, general contractor fees, architectural and engineering fees, and a comprehensive cost impact analysis with percentage allocations for various construction aspects such as structural upgrades, HVAC, electrical systems, and accessibility improvements.

The accompanying federal contract opportunity details a Department of Veterans Affairs (VA) solicitation for leasing medical office space, though the specific details do not directly match the TICS spreadsheet. The solicitation (36C25025R0020) seeks approximately 11,241 ABOA square feet for a Community Based Outpatient Clinic (CBOC) in the Georgetown and Mt. Orab, Ohio area. The lease is set aside for Service-Disabled Veteran Owned Small Businesses and will consider both existing buildings and multi-tenant construction. While the TICS document is relevant to potential tenant improvements, it is currently a blank template without specific cost information for this particular VA lease opportunity.

View the file

Other files

Show all 22

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TICS

TENANT IMPROVEMENTS COST SUMMARY (TICS)
for36C25023R0113ABOA SF=- 0
Agency:VHA 610TIA PER ABOA SF=$ - 0
December 31, 1899Location:Warsaw, INTOTAL TIA$ - 0
RU FactorERROR:#DIV/0!RSF=- 0
Masterformat CSISystem ElementsTI*SHELL**
Div 1General Requirements$ - 0$ - 0
Div 2Site work & Demolition$ - 0$ - 0
Div 3Concrete$ - 0$ - 0
Div 4Foundations / Masonry$ - 0$ - 0
Div 5Metals$ - 0$ - 0
Div 6Woods & Plastics$ - 0$ - 0
Div 7Thermal & Moisture$ - 0$ - 0
Div 8Doors & Windows$ - 0$ - 0
Div 9Finishes$ - 0$ - 0
Div 10Specialties$ - 0$ - 0
Div 11Equipment$ - 0$ - 0
Div 12Furnishings$ - 0$ - 0
Div 13Special Construction$ - 0$ - 0
Div 15General Construction$ - 0$ - 0
Div 21Fire Suppression$ - 0$ - 0
Div 22Plumbing$ - 0$ - 0
Div 23HVAC$ - 0$ - 0
Div 26.1Electrical$ - 0$ - 0
Div 26.2Lighting$ - 0$ - 0
Div 27Communications, Security & Other Elec. Systems$ - 0$ - 0
Div 28.1Electrical safety & Security$ - 0$ - 0
Div 28.2Security$ - 0$ - 0
Div 32Exterior$ - 0$ - 0
SubtotalTrade Costs$ - 0$ - 0
General Contractor FeePercent$ - 0$ - 0
SubtotalConstruction Costs$ - 0$ - 0
Architectural & Engineering Fees (NIC DID costs)lump sum$ - 0$ - 0
Other Lessor Costs Established Under the Lease$ - 0$ - 0
SubtotalLessor's Costs:$ - 0$ - 0
Lessor's Project Management FeePercent$ - 0
TotalPrice to Government:GRAND TOTAL$ - 0
Cost per ABOA SFERROR:#DIV/0!ERROR:#DIV/0!
Notes:Cost per RSFERROR:#DIV/0!ERROR:#DIV/0!
*Include all subcontractors' costs.
**Shell and core work items within tenant space will include those items for a warm lit shell. Please refer to the SHELL DEFINITIONS tab, and the lease for further information.

&"Arial,Bold"

Page &P

Impact

HIGH IMPACT PERCENTAGE COST ANALYSIS

Cost Impact DescriptionCalculation
ApproximateResulting
% ImpactCost Impact
StructureERROR:#REF!
Structural Upgrades33.0%ERROR:#REF!
foundation workERROR:#REF!
New Constr Additions (e.g.In-fill)ERROR:#REF!
ExteriorERROR:#REF!
Façade Upgrade & ReconditioningERROR:#REF!
Window repairERROR:#REF!
Window replacementERROR:#REF!
RoofERROR:#REF!
RepairERROR:#REF!
ReplacementERROR:#REF!
InteriorERROR:#REF!
Vacant space recaptureERROR:#REF!
Lobby upgradesERROR:#REF!
Tenant FitoutERROR:#REF!
Common Areas/lobbiesERROR:#REF!
ElevatorERROR:#REF!
Shaft UpgradesERROR:#REF!
MachineryERROR:#REF!
CabsERROR:#REF!
PlumbingERROR:#REF!
Central Equipment10.0%ERROR:#REF!
PipingERROR:#REF!
FixturesERROR:#REF!
HVACERROR:#REF!
Upgrades (Chillers, Boilers, Air Handlers)10.0%ERROR:#REF!
ReplacementsERROR:#REF!
DuctworkERROR:#REF!
Piping systemsERROR:#REF!
ElectricalERROR:#REF!
TransformersERROR:#REF!
SwitchgearERROR:#REF!
PanelsERROR:#REF!
Bus duct & WiringERROR:#REF!
Fire ProtectionERROR:#REF!
sprinklers5.0%ERROR:#REF!
alarm/detectionERROR:#REF!
StandpipeERROR:#REF!
SiteworkERROR:#REF!
RoadwaysERROR:#REF!
Parking repairs/upgradesERROR:#REF!
Plaza repairs/upgradesERROR:#REF!
Historic Restoration5.0%ERROR:#REF!
Security/Blast/Glass Frag.ERROR:#REF!
ADA10.0%ERROR:#REF!
SeismicERROR:#REF!
EnergyERROR:#REF!
Hazmat7.0%ERROR:#REF!
Asbestos20.0%ERROR:#REF!
LeadERROR:#REF!
PCB'sERROR:#REF!
Other Special RequirementsERROR:#REF!
Balance Not Accounted for >>>ERROR:#REF!ERROR:#REF!
ECCA100.0%ERROR:#REF!

Class

PROJECT CLASSIFICATION

The following cost assignments proportion estimated total project costs to reflect
project focus and character. Entries are based upon the primary purpose behind
work item development.

CATEGORY COST

1. General Repair $0.00

2. FireSafety

3. Asbestos

4. Seismic Safety

5. Historic Preservation

6. Accessibility

7. Courts Space

8. Energy Conservation

Estimated Total Project Cost: $0.00

Date Prepared:
ERROR:#REF!ERROR:#REF!

Code

New Construction2
Repair and Alterations

INPUT PROJECT INFO

INFORMATION NEEDED TO COMPLETE TICS TABLEFALSE
TRUE
LEASE GS-XXX-XXXXX or Project36C25023R0113FALSE
AgencyVHA 610TRUE
Location: City, StateWarsaw, INTRUE
FALSE
ABOA SF =General contractor fee, A/E Fee and Lessor's Project Management Fee fields are structured to allow you to choose percentage or a lump sum.
TENANT IMPROVEMENT ALLOWANCE PER ABOA SF =
RSF=
DATE:
Tenant Improvement General Contractor Feepercent
Shell General Contractor Feepercent
Tenant Improvement A/E Fees (per Lease)lump sumFor A/E fees established as a cost per ABOA sf, convert rate to lump sum.
Shell A/E Feeslump sum
Lessor's TI Project Management Fee (per Lease)percentpercent
Other Lessor Costs Established Under the Leaselump sum

TI Shell

TOTAL $ - 0 $ - 0

INSTRUCTIONS

INSTRUCTIONS

Read and understand SHELL DEFINITION tab.

Input project specific information as appropriate in the INPUT PROJECT INFO worksheet, in order to auto-populate the TICS worksheet. This includes ANSI-BOMA Office Area (ABOA) square footage, General Contractor Fee, Lessor's Project Management Fee, and A/E Fees. Note that some of these fees are already established under the lease agreement and must be used when completing this worksheet.

Fill in each line for all Shell and TI items in the corresponding division tabs included in the Tenant Improvement Cost Summary (TICS). Include all subcontractors' soft costs. Example shown below.

Material
Description Accurately describe each item being priced.
Quantity List the quantity e.g., 1,2, 3, etc.
Unit (Example) LS,EA,GAL,LF, SF, etc.
Cost Amount
Total Total cost of all material.
Labor
HoursTime projected to perform the task.
Labor RateCost per hour of labor.
Total Cost of labor.
TOTAL Combines overall materials and labor.
Shell

1. Fill out light green fields titled (SHELL), inputting only cost associated with shell as defined in the SHELL DEFINITION'S tab.

2. Fill each division tab 1-32 as needed for the construction to be preformed under the (SHELL) cost as indicated above.

Tenant Improvements (TI)

TIs include the finishes and fixtures that take space from the shell condition to a finished, usable condition.

1. Fill out fields titled (TI), inputting only costs associated with (TI).

2. Fill each division tab 1-32 as needed for the construction to be performed under the (TI) costs as indicated above.

DATE PREPARED
CONSTRUCTION COST ESTIMATEJanuary 0, 1900
DIVISION 9 - FINISHES (TI)
MATERIALLABOR
DESCRIPTIONQUAN.UNITCOSTTOTALHOURSLabor RateTOTAL
XYZ Paint1GAL.$25.00$25.002.5$36.25$90.63
$0.00$0.00
$0.00$0.00
Total$25.00Total$90.63
TOTAL$115.63
DIVISION 9 - FINISHES (SHELL)
ABC Paint10GAL.$27.00$270.006.0$36.25$217.50
$0.00$0.00
$0.00$0.00
Total$270.00Total$217.50
TOTAL$487.50

SHELL DEFINITIONS

Per GSA Pricing Desk Guide, 4th Edition.

GSA Pricing Desk Guide's reference to minimum power distribution of 7 watts per USF is outdated; lease requirement is minimum of 4 watts per ABOA SF

COST SUMMARY

CONSTRUCTION COST ESTIMATEMaterials
TIShell
DIVISION 1 GENERAL REQUIREMENTS$ - 0$ - 0$ - 0
DIVISION 2 SITE WORK AND DEMOLITION$ - 0$ - 0$ - 0
DIVISION 3 CONCRETE$ - 0$ - 0$ - 0
DIVISION 4 MASONRY$ - 0$ - 0$ - 0
DIVISION 5 METALS$ - 0$ - 0$ - 0
DIVISION 6 WOOD AND PLASTICS$ - 0$ - 0$ - 0
DIVISION 7 THERMAL & MOISTURE$ - 0$ - 0$ - 0
DIVISION 8 DOORS AND WINDOWS$ - 0$ - 0$ - 0
DIVISION 9 FINISHES$ - 0$ - 0$ - 0
DIVISION 10 SPECIALTIES$ - 0$ - 0$ - 0
DIVISION 11 EQUIPMENT$ - 0$ - 0$ - 0
DIVISION 12 FURNISHINGS & EQUIPMENT$ - 0$ - 0$ - 0
DIVISION 13 SPECIAL CONSTRUCTION$ - 0$ - 0$ - 0
DIVISION 15 GEN CONSTRUCTION$ - 0$ - 0$ - 0
DIVISION 21 FIRE SUPPRESSION SYSTEMS$ - 0$ - 0$ - 0
DIVISION 22 PLUMBING$ - 0$ - 0$ - 0
DIVISION 23 HEATING VENTILATION AND AIR CONDITIONING$ - 0$ - 0$ - 0
DIVISION 26.1 ELECTRICAL$ - 0$ - 0$ - 0
DIVISION 26.2 LIGHTING$ - 0$ - 0$ - 0
DIVISION 27 COMMUNICATIONS$ - 0$ - 0$ - 0
DIVISION 28.1 ELECTRONIC, SAFETY$ - 0$ - 0$ - 0
DIVISION 28.2 SECURITY$ - 0$ - 0$ - 0
DIVISION 32 EXTERIOR$ - 0$ - 0$ - 0

TOTAL $ - 0 $ - 0 $ - 0

Div 1 - GENERAL REQUIREMENTS

DATE PREPARED
CONSTRUCTION COST ESTIMATEDecember 31, 1899
DIVISION 1 - GENERAL REQUIREMENTS (TI)
MATERIALLABOR
DESCRIPTIONQUAN.UNITCOSTTOTALHOURSLabor RateTOTAL
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
TOTAL$0.00TOTAL$0.00
DIVISION 1 - GENERAL REQUIREMENTS (SHELL)TOTAL$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
TOTAL$0.00TOTAL$0.00
TOTAL$0.00

Div 2 - SITE WORK AND DEMO

DATE PREPARED
CONSTRUCTION COST ESTIMATEDecember 31, 1899
DIVISION 2 - SITE WORK AND DEMOLITION (TI)
MATERIALLABOR
DESCRIPTIONQUAN.UNITCOSTTOTALHOURSLabor RateTOTAL
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
TOTAL$0.00TOTAL$0.00
DIVISION 2 - SITE WORK AND DEMOLITION (SHELL)TOTAL$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
TOTAL$0.00TOTAL$0.00
TOTAL$0.00

Div 3 - CONCRETE

DATE PREPARED
CONSTRUCTION COST ESTIMATEDecember 31, 1899
DIVISION 3 - CONCRETE (TI)
MATERIALLABOR
DESCRIPTIONQUAN.UNITCOSTTOTALHOURSLabor RateTOTAL
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
TOTAL$0.00TOTAL$0.00
DIVISION 3 - CONCRETE (SHELL)TOTAL$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
TOTAL$0.00TOTAL$0.00
TOTAL$0.00

Div 4 - MASONRY

DATE PREPARED
CONSTRUCTION COST ESTIMATEDecember 31, 1899
DIVISION 4 - MASONRY (TI)
MATERIALLABOR
DESCRIPTIONQUAN.UNITCOSTTOTALHOURSLabor RateTOTAL
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
TOTAL$0.00TOTAL$0.00
DIVISION 4 - MASONRY (SHELL)TOTAL$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
TOTAL$0.00TOTAL$0.00
TOTAL$0.00

Div 5 - METAL

DATE PREPARED
CONSTRUCTION COST ESTIMATEDecember 31, 1899
DIVISION 5 - METALS (TI)
MATERIALLABOR
DESCRIPTIONQUAN.UNITCOSTTOTALHOURSLabor RateTOTAL
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
TOTAL$0.00TOTAL$0.00
DIVISION 5 - METALS (SHELL)TOTAL$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
TOTAL$0.00TOTAL$0.00
TOTAL$0.00

Div 6 - WOOD & PLASTICS

DATE PREPARED
CONSTRUCTION COST ESTIMATEDecember 31, 1899
DIVISION 6 - WOOD AND PLASTICS (TI)
MATERIALLABOR
DESCRIPTIONQUAN.UNITCOSTTOTALHOURSLabor RateTOTAL
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
TOTAL$0.00TOTAL$0.00
DIVISION 6 - WOOD AND PLASTICS (SHELL)TOTAL$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
TOTAL$0.00TOTAL$0.00
TOTAL$0.00

Div 7 - THERMAL & MOISTURE

DATE PREPARED
CONSTRUCTION COST ESTIMATEDecember 31, 1899
DIVISION 7 - THERMAL & MOISTURE (TI)
MATERIALLABOR
DESCRIPTIONQUAN.UNITCOSTTOTALHOURSLabor RateTOTAL
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
TOTAL$0.00TOTAL$0.00
DIVISION 7 - THERMAL & MOISTURE (SHELL)TOTAL$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
TOTAL$0.00TOTAL$0.00
TOTAL$0.00

Div 8 - DOORS & WINDOWS

DATE PREPARED
CONSTRUCTION COST ESTIMATEDecember 31, 1899
DIVISION 8 - DOORS & WINDOWS (TI)
MATERIALLABOR
DESCRIPTIONQUAN.UNITCOSTTOTALHOURSLabor RateTOTAL
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
TOTAL$0.00TOTAL$0.00
DIVISION 8 - DOORS & WINDOWS (SHELL)TOTAL$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
TOTAL$0.00TOTAL$0.00
TOTAL$0.00

Div 9 - FINISHES

DATE PREPARED
CONSTRUCTION COST ESTIMATEDecember 31, 1899
DIVISION 9 - FINISHES (TI)
MATERIALLABOR
DESCRIPTIONQUAN.UNITCOSTTOTALHOURSLabor RateTOTAL
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
TOTAL$0.00TOTAL$0.00
DIVISION 9 - FINISHES (SHELL)TOTAL$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
TOTAL$0.00TOTAL$0.00
TOTAL$0.00

Div 10 - SPECIALTIES

DATE PREPARED
CONSTRUCTION COST ESTIMATEDecember 31, 1899
DIVISION 10 - SPECIALTIES (TI)
MATERIALLABOR
DESCRIPTIONQUAN.UNITCOSTTOTALHOURSLabor RateTOTAL
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
TOTAL$0.00TOTAL$0.00
DIVISION 10 - SPECIALTIES (SHELL)TOTAL$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
TOTAL$0.00TOTAL$0.00
TOTAL$0.00

Div 11 - EQUIPMENT

DATE PREPARED
CONSTRUCTION COST ESTIMATEDecember 31, 1899
DIVISION 11 - EQUIPMENT (TI)
MATERIALLABOR
DESCRIPTIONQUAN.UNITCOSTTOTALHOURSLabor RateTOTAL
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
TOTAL$0.00TOTAL$0.00
DIVISION 11 - EQUIPMENT (SHELL)TOTAL$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
TOTAL$0.00TOTAL$0.00
TOTAL$0.00

Div 12 - FURNISHINGS & EQUIP

DATE PREPARED
CONSTRUCTION COST ESTIMATEDecember 31, 1899
DIVISION 12 - FURNISHINGS & EQUIPMENT (TI)
MATERIALLABOR
DESCRIPTIONQUAN.UNITCOSTTOTALHOURSLabor RateTOTAL
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
TOTAL$0.00TOTAL$0.00
DIVISION 12 - FURNISHINGS & EQUIPMENT (SHELL)TOTAL$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
TOTAL$0.00TOTAL$0.00
TOTAL$0.00

Div 13 - SPECIAL CONSTRUCTION

DATE PREPARED
CONSTRUCTION COST ESTIMATEDecember 31, 1899
DIVISION 13 - SPECIAL CONSTRUCTION (TI)
MATERIALLABOR
DESCRIPTIONQUAN.UNITCOSTTOTALHOURSLabor RateTOTAL
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
TOTAL$0.00TOTAL$0.00
DIVISION 13 - SPECIAL CONSTRUCTION (SHELL)TOTAL$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
TOTAL$0.00TOTAL$0.00
TOTAL$0.00

Div 15 - GEN CONSTRUCTION

DATE PREPARED
CONSTRUCTION COST ESTIMATEDecember 31, 1899
DIVISION 15 - GENERAL CONSTRUCTION (TI)
MATERIALLABOR
DESCRIPTIONQUAN.UNITCOSTTOTALHOURSLabor RateTOTAL
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
TOTAL$0.00TOTAL$0.00
DIVISION 15 - GENERAL CONSTRUCTION (SHELL)TOTAL$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
TOTAL$0.00TOTAL$0.00
TOTAL$0.00

Div 21 - FIRE SUPPRESSION

DATE PREPARED
CONSTRUCTION COST ESTIMATEDecember 31, 1899
DIVISION 21 - FIRE SUPPRESSION SYSTEMS (TI)
MATERIALLABOR
DESCRIPTIONQUAN.UNITCOSTTOTALHOURSLabor RateTOTAL
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
TOTAL$0.00TOTAL$0.00
DIVISION 21 - FIRE SUPPRESSION SYSTEMS (SHELL)TOTAL$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
TOTAL$0.00TOTAL$0.00
TOTAL$0.00

Div 22 - PLUMBING

DATE PREPARED
CONSTRUCTION COST ESTIMATEDecember 31, 1899
DIVISION 22 - PLUMBING (TI)
MATERIALLABOR
DESCRIPTIONQUAN.UNITCOSTTOTALHOURSLabor RateTOTAL
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
TOTAL$0.00TOTAL$0.00
DIVISION 22 - PLUMBING (SHELL)TOTAL$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
TOTAL$0.00TOTAL$0.00
TOTAL$0.00

Div 23 - HVAC

DATE PREPARED
CONSTRUCTION COST ESTIMATEDecember 31, 1899
DIVISION 23 - HVAC (TI)
MATERIALLABOR
DESCRIPTIONQUAN.UNITCOSTTOTALHOURSLabor RateTOTAL
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
TOTAL$0.00TOTAL$0.00
DIVISION 23 - HVAC (SHELL)TOTAL$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
TOTAL$0.00TOTAL$0.00
TOTAL$0.00

Div 26.1 - ELECTRICAL

DATE PREPARED
CONSTRUCTION COST ESTIMATEDecember 31, 1899
DIVISION 26.1 - ELECTRICAL (TI)
MATERIALLABOR
DESCRIPTIONQUAN.UNITCOSTTOTALHOURSLabor RateTOTAL
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
TOTAL$0.00TOTAL$0.00
DIVISION 26.2 - ELECTRICAL (SHELL)TOTAL$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
TOTAL$0.00TOTAL$0.00
TOTAL$0.00

Div 26.2 - LIGHTING

DATE PREPARED
CONSTRUCTION COST ESTIMATEDecember 31, 1899
DIVISION 26.2 - LIGHTING (TI)
MATERIALLABOR
DESCRIPTIONQUAN.UNITCOSTINC. O & PTOTALHOURSLabor RateTOTAL
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
TOTAL$0.00TOTAL$0.00
DIVISION 26.2 - LIGHTING (SHELL)TOTAL$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
TOTAL$0.00TOTAL$0.00
TOTAL$0.00

Div 27 - COMMUNICATIONS

DATE PREPARED
CONSTRUCTION COST ESTIMATEDecember 31, 1899
DIVISION 27 - COMMUNICATIONS (TI)
MATERIALLABOR
DESCRIPTIONQUAN.UNITCOSTTOTALHOURSLabor RateTOTAL
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
TOTAL$0.00TOTAL$0.00
DIVISION 27 - COMMUNICATIONS (SHELL)TOTAL$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
TOTAL$0.00TOTAL$0.00
TOTAL$0.00

Div 28.1 - ELECTRIC, SAFETY

DATE PREPARED
CONSTRUCTION COST ESTIMATEDecember 31, 1899
DIVISION 28.1- ELECTRICAL SAFETY (TI),
MATERIALLABOR
DESCRIPTIONQUAN.UNITCOSTTOTALHOURSLabor RateTOTAL
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
TOTAL$0.00TOTAL$0.00
DIVISION 28.1 - ELECTRICAL, SAFETY (SHELL)TOTAL$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
TOTAL$0.00TOTAL$0.00
TOTAL$0.00

Div 28.2 - SECURITY

DATE PREPARED
CONSTRUCTION COST ESTIMATEDecember 31, 1899
DIVISION 28.2 - SECURITY (TI)
MATERIALLABOR
DESCRIPTIONQUAN.UNITCOSTTOTALHOURSLabor RateTOTAL
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
TOTAL$0.00TOTAL$0.00
DIVISION 28.2 - SECURITY (SHELL)TOTAL$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
TOTAL$0.00TOTAL$0.00
TOTAL$0.00

Div 32 - EXTERIOR

DATE PREPARED
CONSTRUCTION COST ESTIMATEDecember 31, 1899
DIVISION 32 - EXTERIOR (TI)
MATERIALLABOR
DESCRIPTIONQUAN.UNITCOSTTOTALHOURSLabor RateTOTAL
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
TOTAL$0.00TOTAL$0.00
DIVISION 32 - EXTERIOR (SHELL)TOTAL$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
TOTAL$0.00TOTAL$0.00
TOTAL$0.00

image1.jpeg image2.jpeg image3.png

File details come from the government source that posted it. Updated .