Exhibit_G_-_Bid_Price_Sheet_26-B-59IF_-_REVISION_1_-_REPLACES_ALL_PREVIOUS_VERSIONS_-_USE_THIS_FORM_ONLY.xlsx
XLSX spreadsheet 17 KB Posted
- Attached to
- El Portal Vehicular Beach Access Ramp
- Solicitation number
- 26-B-59IF
- Issued by
- Volusia County, Florida
About this file
This is a Bid Price Sheet (Exhibit G) for Invitation for Bid 26-B-59IF issued by Volusia County, Florida for the reconstruction of the El Portal Vehicular Beach Access Ramp in Daytona Beach Shores. The project involves demolition of hurricane-damaged infrastructure and reconstruction of composite sheet pile seawall panels, concrete caps, reinforced concrete vehicular ramp, curbing, pedestrian sidewalk, and site restoration. Line items include mobilization/demobilization, demolition, excavation and grading, 64 linear feet of sheet-pile toe-wall with concrete cap, 104 linear feet of sheet-pile wall with concrete cap, concrete plugs and chemical grout, 324 square yards of reinforced concrete ramp, 312 square yards of unreinforced concrete ramp, 89 square yards of sidewalk, 96 linear feet of FDOT Type "D" curb, pavement markings and signage, as-built survey, and site restoration. A non-mandatory pre-bid meeting is scheduled for March 16, 2026, at 10:30 a.m., questions must be submitted by March 26, 2026, at 11:59 p.m., and sealed bids are due April 9, 2026, at 3:00 p.m. through the County's eProcurement Portal. The project has a 150-day completion period with 120 days required for substantial completion, and award will be made to the lowest responsive and responsible bidder based on combined pricing for all line items.
The bid price sheet contains line-item pricing fields for all 13 work items, a subtotal, Payment and Performance Bond amount, and total bid price, with all pricing currently showing as zero pending contractor submission. Bidders must submit a bid bond equal to 5 percent of total bid price and, upon award, provide Payment and Performance Bonds equal to 100 percent of contract price. The estimated construction cost is $1,464,420.00, and the contract is subject to FEMA federal compliance requirements including Davis-Bacon Act wage standards, Clean Air Act compliance, and domestic preference for materials. The project is funded through FEMA and includes no local preference provisions due to federal funding restrictions. Contractors are required to comply with federal requirements to make affirmative efforts to contract with small and minority businesses, women's business enterprises, and labor surplus area firms. Liquidated damages are assessed at $1,000 per day for failure to meet completion deadlines, and payment will be made within 20 to 25 days of invoice receipt in accordance with Florida Statute 218.735.
View the file
Other files
Show all 27
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Exhibit G - Bid Price Sheet 26-B-59IF - REVISION 1 |
| El Portal Vehicular Beach Access Ramp |
Name:
| Item | Description | Quantity | ERROR:#REF! | Unit Price | ERROR:#REF! | Cost |
| 1 | Mobilization/Demobilization | 1 | LS | $ - 0 | LS | $ - 0 |
| 2 | Demolition | 1 | LS | $ - 0 | LS | $ - 0 |
| 3 | Excavation, Grading, and Compaction | 1 | LS | $ - 0 | LS | $ - 0 |
| 4 | Sheet-Pile Toe-Wall with Concrete Cap | 64 | LF | $ - 0 | LF | $ - 0 |
| 5 | Sheet-Pile Wall with Concrete Cap | 104 | LF | $ - 0 | LF | $ - 0 |
| 6 | Concrete Plugs & Chemical Grout | 1 | LS | $ - 0 | LS | $ - 0 |
| 7 | Reinforced Concrete Ramp | 324 | SY | $ - 0 | SY | $ - 0 |
| 8 | Unreinforced Concrete Ramp | 312 | SY | $ - 0 | SY | $ - 0 |
| 9 | Sidewalk | 89 | SY | $ - 0 | SY | $ - 0 |
| 10 | FDOT Type "D" Curb | 96 | LF | $ - 0 | LF | $ - 0 |
| 11 | Pavement Markings & Signage | 1 | LS | $ - 0 | LS | $ - 0 |
| 12 | As-Built Survey | 1 | LS | $ - 0 | LS | $ - 0 |
| 13 | Site Restoration | 1 | LS | $ - 0 | LS | $ - 0 |
| Subtotal | $ - 0 | |||||
| Payment and Performance Bond | $ - 0 | |||||
| Total Bid Price (inclusive of payment and performance bond) | $ - 0 | |||||
| Award for this project will be determined based on the lowest responsive and responsible bidder using the combined pricing submitted for El Portal Vehicular Beach Access Ramp listed above. |
| Flood Insurance Policy Pricing* | $ - 0 |
| *Pricing for Flood Insurance is required for this project; however, it will not be included as part of the evaluation. |