About this file
This is a Prime/Subcontractor Form (Contract No. C-2014, ITB No. 25-B-##XX) issued by a Florida county government for the El Portal Vehicular Beach Access Ramp project. The project involves reconstructing a beach access vehicular ramp destroyed during Hurricane Nicole in 2022, including composite sheet pile seawall panels, concrete cap, reinforced concrete vehicular ramp, curbing, pedestrian sidewalk, and site restoration. Bidders must complete and return this form as a requirement for a responsive bid, listing all proposed subcontractors and their respective work scopes. The prime contractor is responsible for ensuring all subcontractors maintain appropriate licenses, and any subcontractor changes during project execution require prior approval from the County Project Manager. The form designates specific anticipated subcontractor disciplines (such as electrical, HVAC, and plumbing) with blank rows available for additional disciplines as needed.
Bidders must allocate the total bid price between the prime contractor and all subcontractors, with each entity assigned a dollar value and corresponding percentage of work that must total 100 percent. All bidders must complete cells shaded in green, representing dollar values for each contractor (prime and subs), while remaining cells are automatically calculated. The County reserves the right to seek clarification regarding subcontractors but will not permit changes to the total submitted base bid pricing. Laydown areas, equipment, and materials must remain within the County right-of-way, and vehicular access and parking to two adjacent properties must be maintained throughout project completion.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Contract No. C-2014 | ITB No. 25-B-##XX | ||||
| PRIME/SUBCONTRACTOR FORM | |||||
| FAILURE TO COMPLETE AND RETURN THIS FORM MAY RESULT IN A NON-RESPONSIVE BID | |||||
| Bidders are to list ALL Subcontractors that he/she proposed to perform scope of work for this project. The bidder hereby states that he/she proposes, if awarded the contract to hire the following Subcontractor(s) for this project. Prime Contractor is responsible for ensuring that all Subcontractors hold the appropriate license(s). Any change to the Subcontractors during the completion of this project shall receive prior approval from the County Project Manager. The County reserves the right to seek clarification regarding subcontractors but will not allow change to the total submitted base bid pricing. | |||||
| TOTAL BID | $ - 0 | This number should match the Total Bid Price |
(inclusive of performance/payment bond, if applicable) as listed on Bid Form/Exhibit ?/Attachment ? - Bid Price Sheet
| PRIME CONTRACTOR | Company name and complete address | Dollar Value performed by Prime Contractor | % of Work performed by Contractor | |||
| $ - 0 | 0.00% | |||||
| List appropriate sub contractors to be used for each displine listed below, if prime is self performing note self performing in the box under company name and address and submit $0.00 to equal 0 % as this should be included in the green box above. If additional subcontractors are required and their discipline is not listed below they may be added in the blank rows. This form will also be used to determine local preference in accordance with Section 2.8, D. Local Bid Preference in the solicitation. | ||||||
| Anticipated Subcontractor Disciplines required for this project. | Company name and complete address | Dollar Value performed by Subcontractor(s) | % of Work performed by Subcontractor | |||
| (Examples: Electrical, HVAC, Plumbing, | ||||||
| Landscaping, etc. for your project) | $ - 0 | 0.00% | ||||
| $ - 0 | 0.00% | |||||
| $ - 0 | 0.00% | |||||
| $ - 0 | 0.00% | |||||
| $ - 0 | 0.00% | |||||
| $ - 0 | 0.00% | |||||
| $ - 0 | 0.00% | |||||
| $ - 0 | 0.00% | |||||
| $ - 0 | 0.00% | |||||
| $ - 0 | 0.00% | |||||
| $ - 0 | 0.00% | |||||
| $ - 0 | 0.00% | |||||
| $ - 0 | 0.00% | |||||
| $ - 0 | 0.00% | |||||
| Bidders shall complete the areas shaded in GREEN, which shall be the dollar values assigned to each Contractor (Prime and Subs). All other cells shall be automatically calculated. The total listed in the GREY cell must equal 100% | $ - 0 | 0% |