EXHIBIT E SURETY FORM.docx

DOCX document 31 KB Posted

Attached to
6115--520-21-1-7039-0001 Project No 520-22-101 Generator Controls Upgrade
Solicitation number
36C25621R0040
Issued by

About this file

This document contains a federal contract opportunity solicitation for generator controls upgrade work. The Gulf Coast Veterans Health Care System is seeking proposals for Generator Controls Upgrade services under project number 520-22-101, with a 100% set-aside for Service-Disabled Veteran-Owned Small Businesses. Proposals are due around February 10, 2021, and award is anticipated within 30 days thereafter. The performance period is 120 days from notice to proceed. The work location is at the Gulf Coast Veterans Health Care System facility in Biloxi, Mississippi and involves providing all labor, materials, tools, equipment and other resources to complete the generator controls upgrade as defined in project drawings and specifications. NAICS code 238210 for electrical contractors applies. The contract value is estimated between $500,000 to $1 million.

View the file

Other files

File Type Posted
36C25621R0040 0005.docx DOCX document
Dwg Site Plan - Overall Facility Layout.pdf PDF
36C25621R0040 0004.docx DOCX document
36C25621R0040 0003.docx DOCX document
WD General Decision No MS20210050 02-12-2021.pdf PDF
Register containing all RFI Inquiries _ Responses.docx DOCX document
36C25621R0040 0002.docx DOCX document
(2) Site Visit Sign-In Sheets - Proj 520-22-101.pdf PDF
36C25621R0040 0001.docx DOCX document
Generator Yard Plan sheet 2 of 2 dated 6-17-2020.pdf PDF
EXHIBIT F REQUEST FOR INFORMATION FORM.docx DOCX document
263214 ENGINE GENERATORS - 2000 KW.pdf PDF
EXHIBIT A PERFORMANCE RELEVANCY SURVEY.docx DOCX document
013323 SHOP DRAWINGS.doc DOC document
263623 AUTOMATIC TRANSFER SWITCHES.pdf PDF
DIAGRAM SINGLE-LINE UTILITY-TIE-FEEDER B dated 1-10-2011.pdf PDF
DIMENSION PRINT OUTLINE DRAWING KOHLER POWER SYSTEMS dated 11-5-2010.pdf PDF
DIMENSION PRINT OUTLINE DRAWING dated 11-5-2010.pdf PDF
EXHIBIT B PAST AND PRESENT PERFORMANCE QUESTIONNAIRE.docx DOCX document
EXHIBIT D CONTRACTOR EVALUATION FORM CONSTRUCTION SAFETY.docx DOCX document
DIAGRAM SINGLE-LINE OVERVIEW E1 OF 330 dated 1-10-2011.pdf PDF
DIMENSION PRINT STRUCTURE-BREAKER DATA dated 1-15-2010.pdf PDF
262726 WIRING DEVICES.doc DOC document
010000 GENERAL REQUIREMENTS.docx DOCX document
Location Plan sheet 1 of 2 dated 6-16-2020.pdf PDF
SUPPLEMENTAL INFORMATION - POWER COMMAND CONTROLLERS.pdf PDF
ICRA - Project 520-22-101.pdf PDF
017419 CONSTRUCTION WASTE MANAGEMENT.doc DOC document
VA CATEX - 520-22-101 GENERATOR SWITCH GEAR July 2020.pdf PDF
Drawing ES _ 102 PARTIAL SITE GUIDE PLAN _ NORTH.pdf PDF
36C25621R0040_2.docx DOCX document
Drawing ES _ 111 ELECTRICAL SERVICE EQUIPMENT YARD.pdf PDF
WD General Decision No. MS20210050 01-01-2021.docx DOCX document
260511 REQUIREMENTS FOR ELECTRICAL INSTALLATIONS.doc DOC document
EXHIBIT C SUBCONTRACTOR INFORMATION AND CONSENT.docx DOCX document
SITE VISIT MAP - Biloxi VA.pdf PDF
MP 110 FUEL OIL SYSTEM FOR SERVICE YARD AREA F.pdf PDF
DIAGRAM SINGLE-LINE GENS 1 _ 2 EXISTING dated 7-08-2009.pdf PDF
270511 REQ FOR COM INSTALL.doc DOC document
260526 GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS.doc DOC document
260521 LOW VOLT CONDUCTORS.doc DOC document
Show all 41

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FOR OFFICIAL USE ONLY

Source Selection Sensitive Information—See FAR 2.101 & 3.104 520-22-101 Generator Controls Upgrade, Biloxi 36C25621R0040

EXHIBIT E

SURETY FORM

OFFEROR INSTRUCTIONS: To be completed by Surety and SUBMITTED BY OFFEROR AS A PART OF THE TECHNICAL PROPOSAL PACKAGE.

Contractor Name:

Address:

Telephone: Email:

Please complete below and return no later than:

Surety Name:

Surety Address:

POC:Title:
Telephone:Email:

How long have you provided bonding for the above contractor? YEARS What is the contractor’s rating?

Bonding Limit for a single project?$
Aggregate amount?$

Have you ever had to complete a project for the contractor? [ ] YES [ ] NO Has liability insurance ever been refused? [ ] YES [ ] NO Have there been complaints of non-payment by subcontractor/suppliers? [ ] YES [ ] NO Has the surety had to pay subcontractors/suppliers? [ ] YES [ ] NO

File details come from the government source that posted it. Updated .