270511 REQ FOR COM INSTALL.doc

DOC document 39 KB Posted

Attached to
6115--520-21-1-7039-0001 Project No 520-22-101 Generator Controls Upgrade
Solicitation number
36C25621R0040
Issued by

About this file

This document includes a solicitation for generator controls upgrade work and requirements for communications installations on federal contracts. The solicitation requests proposals for generator controls upgrade projects at the Gulf Coast Veterans Health Care System in Biloxi, Mississippi, with an anticipated contract value between $500,000 and $1,000,000. Proposals are due around February 10, 2021 with contract award targeted within 30 days thereafter. The performance period is 120 days from notice to proceed. The solicitation is designated as a 100% small business set-aside for service-disabled veteran-owned small businesses. Subcontracting limitations and small business eligibility requirements are specified. The communications installations requirements document outlines qualifications, submittal processes, identification standards, and other technical specifications applicable to federal communication system contracts.

View the file

Other files

File Type Posted
36C25621R0040 0005.docx DOCX document
Dwg Site Plan - Overall Facility Layout.pdf PDF
36C25621R0040 0004.docx DOCX document
36C25621R0040 0003.docx DOCX document
WD General Decision No MS20210050 02-12-2021.pdf PDF
Register containing all RFI Inquiries _ Responses.docx DOCX document
36C25621R0040 0002.docx DOCX document
(2) Site Visit Sign-In Sheets - Proj 520-22-101.pdf PDF
36C25621R0040 0001.docx DOCX document
Generator Yard Plan sheet 2 of 2 dated 6-17-2020.pdf PDF
EXHIBIT F REQUEST FOR INFORMATION FORM.docx DOCX document
263214 ENGINE GENERATORS - 2000 KW.pdf PDF
EXHIBIT A PERFORMANCE RELEVANCY SURVEY.docx DOCX document
013323 SHOP DRAWINGS.doc DOC document
263623 AUTOMATIC TRANSFER SWITCHES.pdf PDF
DIAGRAM SINGLE-LINE UTILITY-TIE-FEEDER B dated 1-10-2011.pdf PDF
DIMENSION PRINT OUTLINE DRAWING KOHLER POWER SYSTEMS dated 11-5-2010.pdf PDF
EXHIBIT E SURETY FORM.docx DOCX document
DIMENSION PRINT OUTLINE DRAWING dated 11-5-2010.pdf PDF
EXHIBIT B PAST AND PRESENT PERFORMANCE QUESTIONNAIRE.docx DOCX document
EXHIBIT D CONTRACTOR EVALUATION FORM CONSTRUCTION SAFETY.docx DOCX document
DIAGRAM SINGLE-LINE OVERVIEW E1 OF 330 dated 1-10-2011.pdf PDF
DIMENSION PRINT STRUCTURE-BREAKER DATA dated 1-15-2010.pdf PDF
262726 WIRING DEVICES.doc DOC document
010000 GENERAL REQUIREMENTS.docx DOCX document
Location Plan sheet 1 of 2 dated 6-16-2020.pdf PDF
SUPPLEMENTAL INFORMATION - POWER COMMAND CONTROLLERS.pdf PDF
ICRA - Project 520-22-101.pdf PDF
017419 CONSTRUCTION WASTE MANAGEMENT.doc DOC document
VA CATEX - 520-22-101 GENERATOR SWITCH GEAR July 2020.pdf PDF
Drawing ES _ 102 PARTIAL SITE GUIDE PLAN _ NORTH.pdf PDF
36C25621R0040_2.docx DOCX document
Drawing ES _ 111 ELECTRICAL SERVICE EQUIPMENT YARD.pdf PDF
WD General Decision No. MS20210050 01-01-2021.docx DOCX document
260511 REQUIREMENTS FOR ELECTRICAL INSTALLATIONS.doc DOC document
EXHIBIT C SUBCONTRACTOR INFORMATION AND CONSENT.docx DOCX document
SITE VISIT MAP - Biloxi VA.pdf PDF
MP 110 FUEL OIL SYSTEM FOR SERVICE YARD AREA F.pdf PDF
DIAGRAM SINGLE-LINE GENS 1 _ 2 EXISTING dated 7-08-2009.pdf PDF
260526 GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS.doc DOC document
260521 LOW VOLT CONDUCTORS.doc DOC document
Show all 41

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

11-09

SECTION 27 05 11

REQUIREMENTS FOR COMMUNICATIONS INSTALLATIONS

PART 1 ‑ GENERAL

1.1 DESCRIPTION

A.

This Section, Requirements for Communications Installations, applies to all sections of Division 27.

B.

Furnish and install communications cabling, systems, equipment, and accessories in accordance with the specifications and drawings. Capacities and ratings of transformers, cable, and other items and arrangements for the specified items are shown on drawings.

1.2 MINIMUM REQUIREMENTS

A.

References to industry and trade association standards and codes are minimum installation requirement standards.

B.

Drawings and other specification sections shall govern in those instances where requirements are greater than those specified in the above standards.

1.3 QUALIFICATIONS (PRODUCTS AND SERVICES)

A.

Manufacturers Qualifications: The manufacturer shall regularly and presently produce, as one of the manufacturer's principal products, the equipment and material specified for this project, and shall have manufactured the item for at least three years.

B.

Product Qualification:

1.

Manufacturer's product shall have been in satisfactory operation, on three installations of similar size and type as this project, for approximately three years.

2.

The Government reserves the right to require the Contractor to submit a list of installations where the products have been in operation before approval.

C.

Service Qualifications: There shall be a permanent service organization maintained or trained by the manufacturer which will render satisfactory service to this installation within eight hours of receipt of notification that service is needed. Submit name and address of service organizations.

1.4 MANUFACTURED PRODUCTS

A.

Materials and equipment furnished shall be of current production by manufacturers regularly engaged in the manufacture of such items, for which replacement parts shall be available.

B.

When more than one unit of the same class of equipment is required, such units shall be the product of a single manufacturer.

C.

Equipment Assemblies and Components:

1.

Components of an assembled unit need not be products of the same manufacturer.

2.

Manufacturers of equipment assemblies, which include components made by others, shall assume complete responsibility for the final assembled unit.

3.

Components shall be compatible with each other and with the total assembly for the intended service.

4.

Constituent parts which are similar shall be the product of a single manufacturer.

D.

Factory wiring shall be identified on the equipment being furnished and on all wiring diagrams.

E.

When Factory Testing Is Specified:

1.

The Government shall have the option of witnessing factory tests. The contractor shall notify the VA through the Contracting Officer Representative a minimum of 15 working days prior to the manufacturers making the factory tests.

2.

Four copies of certified test reports containing all test data shall be furnished to the Contracting Officer Representative prior to final inspection and not more than 90 days after completion of the tests.

3.

When equipment fails to meet factory test and re-inspection is required, the contractor shall be liable for all additional expenses, including expenses of the Government.

1.5 EQUIPMENT REQUIREMENTS

Where variations from the contract requirements are requested in accordance with the GENERAL CONDITIONS and Section 01 33 23, SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES, the connecting work and related components shall include, but not be limited to additions or changes to branch circuits, circuit protective devices, conduits, wire, feeders, controls, panels and installation methods.

1.6 EQUIPMENT PROTECTION

A.

Equipment and materials shall be protected during shipment and storage against physical damage, dirt, moisture, cold and rain:

1.

During installation, enclosures, equipment, controls, controllers, circuit protective devices, and other like items, shall be protected against entry of foreign matter; and be vacuum cleaned both inside and outside before testing and operating and repainting if required.

2.

Damaged equipment shall be, as determined by the Contracting Officer Representative, placed in first class operating condition or be returned to the source of supply for repair or replacement.

3.

Painted surfaces shall be protected with factory installed removable heavy kraft paper, sheet vinyl or equal.

4.

Damaged paint on equipment and materials shall be refinished with the same quality of paint and workmanship as used by the manufacturer so repaired areas are not obvious.

1.7 WORK PERFORMANCE

A.

Job site safety and worker safety is the responsibility of the contractor.

B.

For work on existing stations, arrange, phase and perform work to assure communications service for other buildings at all times. Refer to Article OPERATIONS AND STORAGE AREAS under Section 01 00 00, GENERAL REQUIREMENTS.

C.

New work shall be installed and connected to existing work neatly and carefully. Disturbed or damaged work shall be replaced or repaired to its prior conditions, as required by Section 01 00 00, GENERAL REQUIREMENTS.

D.

Coordinate location of equipment and pathways with other trades to minimize interferences. See the GENERAL CONDITIONS.

1.8 EQUIPMENT INSTALLATION AND REQUIREMENTS

A.

Equipment location shall be as close as practical to locations shown on the drawings.

B.

Inaccessible Equipment:

1.

Where the Government determines that the Contractor has installed equipment not conveniently accessible for operation and maintenance, the equipment shall be removed and reinstalled as directed at no additional cost to the Government.

2.

"Conveniently accessible" is defined as being capable of being reached without the use of ladders, or without climbing or crawling under or over obstacles such as, but not limited to, motors, pumps, belt guards, transformers, piping, ductwork, conduit and raceways.

1.9 EQUIPMENT IDENTIFICATION

A.

Install an identification sign which clearly indicates information required for use and maintenance of equipment.

B.

Nameplates shall be laminated black phenolic resin with a white core with engraved lettering, a minimum of 6 mm (1/4 inch) high. Secure nameplates with screws. Nameplates that are furnished by manufacturer as a standard catalog item, or where other method of identification is herein specified, are exceptions.

1.10 SUBMITTALS

A.

Submit in accordance with Section 01 33 23, SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES.

B.

The Government's approval shall be obtained for all equipment and material before delivery to the job site. Delivery, storage, or installation of equipment or material which has not had prior approval will not be permitted at the job site.

C.

All submittals shall include adequate descriptive literature, catalog cuts, shop drawings, and other data necessary for the Government to ascertain that the proposed equipment and materials comply with specification requirements. Catalog cuts submitted for approval shall be legible and clearly identify equipment being submitted.

D.

Submittals for individual systems and equipment assemblies which consist of more than one item or component shall be made for the system or assembly as a whole. Partial submittals will not be considered for approval.

1.

Mark the submittals, "SUBMITTED UNDER SECTION__________________".

2.

Submittals shall be marked to show specification reference including the section and paragraph numbers.

3.

Submit each section separately.

E.

The submittals shall include the following:

1.

Information that confirms compliance with contract requirements. Include the manufacturer's name, model or catalog numbers, catalog information, technical data sheets, shop drawings, pictures, nameplate data and test reports as required.

2.

Elementary and interconnection wiring diagrams for communication and signal systems, control system and equipment assemblies. All terminal points and wiring shall be identified on wiring diagrams.

3.

Parts list which shall include those replacement parts recommended by the equipment manufacturer, quantity of parts, current price and availability of each part.

F.

Manuals: Submit in accordance with Section 01 00 00, GENERAL REQUIREMENTS.

1.

Maintenance and Operation Manuals: Submit as required for systems and equipment specified in the technical sections. Furnish four copies, bound in hardback binders, (manufacturer's standard binders) or an approved equivalent. Furnish one complete manual as specified in the technical section but in no case later than prior to performance of systems or equipment test, and furnish the remaining manuals prior to contract completion.

2.

Inscribe the following identification on the cover: the words "MAINTENANCE AND OPERATION MANUAL," the name and location of the system, equipment, building, name of Contractor, and contract number. Include in the manual the names, addresses, and telephone numbers of each subcontractor installing the system or equipment and the local representatives for the system or equipment.

3.

Provide a "Table of Contents" and assemble the manual to conform to the table of contents, with tab sheets placed before instructions covering the subject. The instructions shall be legible and easily read, with large sheets of drawings folded in.

4.

The manuals shall include:

a.

Internal and interconnecting wiring and control diagrams with data to explain detailed operation and control of the equipment.

b.

A control sequence describing start-up, operation, and shutdown.

c.

Description of the function of each principal item of equipment.

d.

Installation and maintenance instructions.

e.

Safety precautions.

f.

Diagrams and illustrations.

g.

Testing methods.

h.

Performance data.

i.

Pictorial "exploded" parts list with part numbers. Emphasis shall be placed on the use of special tools and instruments. The list shall indicate sources of supply, recommended spare parts, and name of servicing organization.

j.

Appendix; list qualified permanent servicing organizations for support of the equipment, including addresses and certified qualifications.

G.

Approvals will be based on complete submission of manuals together with shop drawings.

H.

After approval and prior to installation, furnish the Contracting Officer Representative with one sample of each of the following:

1.

A 300 mm (12 inch) length of each type and size of wire and cable along with the tag from the coils of reels from which the samples were taken.

2.

Each type of conduit and pathway coupling, bushing and termination fitting.

3.

Raceway and pathway hangers, clamps and supports.

4.

Duct sealing compound.

1.11 SINGULAR NUMBER

Where any device or part of equipment is referred to in these specifications in the singular number (e.g., "the switch"), this reference shall be deemed to apply to as many such devices as are required to complete the installation as shown on the drawings.

1.12 TRAINING

A.

Training shall be provided in accordance with Article, INSTRUCTIONS, of Section 01 00 00, GENERAL REQUIREMENTS.

B.

Training shall be provided for the particular equipment or system as required in each associated specification.

C.

A training schedule shall be developed and submitted by the contractor and approved by the Contracting Officer Representative at least 30 days prior to the planned training.

- ‑ ‑ E N D ‑ ‑ ‑