EXHIBIT B PAST AND PRESENT PERFORMANCE QUESTIONNAIRE.docx

DOCX document 28 KB Posted

Attached to
6115--520-21-1-7039-0001 Project No 520-22-101 Generator Controls Upgrade
Solicitation number
36C25621R0040
Issued by

About this file

This document contains a past and present performance questionnaire for a federal contract opportunity to provide generator controls upgrades at the Gulf Coast Veterans Health Care System in Biloxi, Mississippi. The solicitation will be issued as a 100% set-aside for Service-Disabled Veteran-Owned Small Businesses through request for proposal procedures. Interested offerors are asked to review the RFP and associated documents in their entirety prior to submitting any questions. The RFP number is 36C25620R0040 and will be posted on beta.SAM.gov, where any amendments will also be posted. Offerors are responsible for obtaining the RFP and acknowledging amendments. The contract performance period is 120 calendar days from notice to proceed. The estimated construction cost range is between $500,000 and $1,000,000.

View the file

Other files

File Type Posted
36C25621R0040 0005.docx DOCX document
Dwg Site Plan - Overall Facility Layout.pdf PDF
36C25621R0040 0004.docx DOCX document
36C25621R0040 0003.docx DOCX document
WD General Decision No MS20210050 02-12-2021.pdf PDF
Register containing all RFI Inquiries _ Responses.docx DOCX document
36C25621R0040 0002.docx DOCX document
(2) Site Visit Sign-In Sheets - Proj 520-22-101.pdf PDF
36C25621R0040 0001.docx DOCX document
Generator Yard Plan sheet 2 of 2 dated 6-17-2020.pdf PDF
EXHIBIT F REQUEST FOR INFORMATION FORM.docx DOCX document
263214 ENGINE GENERATORS - 2000 KW.pdf PDF
EXHIBIT A PERFORMANCE RELEVANCY SURVEY.docx DOCX document
013323 SHOP DRAWINGS.doc DOC document
263623 AUTOMATIC TRANSFER SWITCHES.pdf PDF
DIAGRAM SINGLE-LINE UTILITY-TIE-FEEDER B dated 1-10-2011.pdf PDF
DIMENSION PRINT OUTLINE DRAWING KOHLER POWER SYSTEMS dated 11-5-2010.pdf PDF
EXHIBIT E SURETY FORM.docx DOCX document
DIMENSION PRINT OUTLINE DRAWING dated 11-5-2010.pdf PDF
EXHIBIT D CONTRACTOR EVALUATION FORM CONSTRUCTION SAFETY.docx DOCX document
DIAGRAM SINGLE-LINE OVERVIEW E1 OF 330 dated 1-10-2011.pdf PDF
DIMENSION PRINT STRUCTURE-BREAKER DATA dated 1-15-2010.pdf PDF
262726 WIRING DEVICES.doc DOC document
010000 GENERAL REQUIREMENTS.docx DOCX document
Location Plan sheet 1 of 2 dated 6-16-2020.pdf PDF
SUPPLEMENTAL INFORMATION - POWER COMMAND CONTROLLERS.pdf PDF
ICRA - Project 520-22-101.pdf PDF
017419 CONSTRUCTION WASTE MANAGEMENT.doc DOC document
VA CATEX - 520-22-101 GENERATOR SWITCH GEAR July 2020.pdf PDF
Drawing ES _ 102 PARTIAL SITE GUIDE PLAN _ NORTH.pdf PDF
36C25621R0040_2.docx DOCX document
Drawing ES _ 111 ELECTRICAL SERVICE EQUIPMENT YARD.pdf PDF
WD General Decision No. MS20210050 01-01-2021.docx DOCX document
260511 REQUIREMENTS FOR ELECTRICAL INSTALLATIONS.doc DOC document
EXHIBIT C SUBCONTRACTOR INFORMATION AND CONSENT.docx DOCX document
SITE VISIT MAP - Biloxi VA.pdf PDF
MP 110 FUEL OIL SYSTEM FOR SERVICE YARD AREA F.pdf PDF
DIAGRAM SINGLE-LINE GENS 1 _ 2 EXISTING dated 7-08-2009.pdf PDF
270511 REQ FOR COM INSTALL.doc DOC document
260526 GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS.doc DOC document
260521 LOW VOLT CONDUCTORS.doc DOC document
Show all 41

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FOR OFFICIAL USE ONLY

Source Selection Sensitive Information—See FAR 2.101 & 3.104 Project 520-22-101 Generator Controls Upgrade, Biloxi 36C25621R0040

EXHIBIT B

PAST AND PRESENT PERFORMANCE QUESTIONNAIRE

INSTRUCTIONS TO CONTRACTOR

Complete the CONTRACTOR INFORMATION section, below (type answers into light blue shaded boxes). Save the document. Send an electronic or hard copy print of the form to each of your reference contacts, asking them to please complete the form and submit it according to the instructions, below.

INSTRUCTIONS TO REFERENCE CONTACT

The contractor named below is submitting an offer for a United States Department of Veterans Affairs contract requirement, and has sent this form to you, in your role as a past performance reference contact. Please complete this form in full (all areas shaded in light yellow, below). Once completed, please send the form to the Contract Specialist via postal mail or email, directly to:

Department of Veterans Affairs Gulf Coast Veterans Health Care System (NCO 16) ATTN: Cynthia Kinsman, Contracting Officer - REF: 36C25621R0040 400 Veterans Ave, Bldg T102 RM A110 Biloxi, MS 39531 Email Address: Cynthia.Kinsman@va.gov

Please return the completed form no later than the time set for receipt of proposals. If you have any questions, please contact Mrs. Cynthia Kinsman via email. Thank you for your assistance in this matter.

GENERAL INFORMATION [completed by Contractor]

Contractor Company Name

Street Address

Contractor Point of Contact Name

City

Point of Contact Phone Number

State

Reference Project Title

Zip Code

Contract Period of Performance (start to finish):

Email

Contract Number

Contract Dollar Value

Description of Work

Role of Contractor on This Project (check appropriate box) ☐ Prime Contractor ☐ Sub-contractor ☐ Key Personnel

RESPONDENT INFORMATION [completed by Reference Contact]

Company Name

Street Address

POC Name

City

Phone Number

State

Fax Number

Zip Code

Email

PERFORMANCE INFORMATION: Choose the number on the scale of 1 to 6 that most accurately describes the contractor’s performance or situation. PLEASE PROVIDE A NARRATIVE EXPLANATION FOR ANY RATINGS OF 1 OR 2 in the Remarks section, below (text box will expand to whatever extent is necessary).

1
2
3
4
5
6
UNSATISFACTORY
MARGINAL
SATISFACTORY
VERY GOOD
EXCEPTIONAL
NEUTRAL
Performance did not meet most contractual requirements. There were serious problems and the contractor’s corrective actions were ineffective.
Performance did not meet some contractual requirements. There were problems, some of a serious nature, for which corrective action was only marginally effective.
Performance met contractual requirements. There were some minor problems and corrective actions taken by the contractor were satisfactory.
Performance met all contract requirements and exceeded some to the government’s benefit. There were a few minor problems, which the contractor resolved in a timely, effective manner.
Performance met all contract requirements and exceeded many to the government’s benefit. Problems, if any, were negligible and were resolved in a timely, highly effective manner.
No record of past performance or the record is inconclusive.[endnoteRef:1] [1: ]
The Contractor …
1
2
3
4
5
6
1.
Provided experienced managers and supervisors with the technical and administrative abilities needed to meet contract requirements.
☐☐☐☐☐☐
2.
Demonstrated ability to hire, maintain, and replace, if necessary, qualified personnel during the contract period.
☐☐☐☐☐☐
3.
Delegated authority to project managers and supervisors commensurate with contract requirements.
☐☐☐☐☐☐
4.
Home office participated in solving significant local problems.
☐☐☐☐☐☐
5.
Followed approved quality control plan.
☐☐☐☐☐☐
6.
Provided effective quality control and/or inspection procedures to meet contract requirements.
☐☐☐☐☐☐
7.
Corrected deficiencies in timely manner and pursuant to their quality control procedures.
☐☐☐☐☐☐
8.
Provided timely resolution of contract discrepancies
☐☐☐☐☐☐
9.
Identified problems as they occurred.
☐☐☐☐☐☐
10.
Suggested alternative approaches to problems.
☐☐☐☐☐☐
11.
Displayed initiative to solve problems.
☐☐☐☐☐☐
12.
Developed realistic progress schedules.
☐☐☐☐☐☐
13.
Met established project schedules.
☐☐☐☐☐☐
14.
Provided timely resolution of warranty defects.
☐☐☐☐☐☐
15.
Was responsive to contract changes.
☐☐☐☐☐☐
16.
Provided adequate project supervision.
☐☐☐☐☐☐
17.
Obtained consent of surety for increases in bonding as work-in-progress increased.
☐☐☐☐☐☐
18.
Paid subcontractors/suppliers in a timely manner.
☐☐☐☐☐☐
19.
Provided accurate and complete line item cost proposals including all aspects of work required for each task.
☐☐☐☐☐☐
20.
Cooperated with Government personnel after award.
☐☐☐☐☐☐
21.
How would you rate the contractor's overall performance?
☐☐☐☐☐☐
22.
Was the contractor ever issued a cure or show cause notice under the referenced contract? If yes, explain outcome in “remarks.”
☐YES
☐NO
23
Would you award another contract to this contractor? If not, please explain in “remarks.”
☐YES
☐NO
24
To the best of your knowledge, is the contractor rated in CPARS?
☐YES
☐NO

REMARKS (Please use as much space as is needed – the box will expand as you type).

File details come from the government source that posted it. Updated .