EXHIBIT C SUBCONTRACTOR INFORMATION AND CONSENT.docx

DOCX document 44 KB Posted

Attached to
6115--520-21-1-7039-0001 Project No 520-22-101 Generator Controls Upgrade
Solicitation number
36C25621R0040
Issued by

About this file

This document includes an exhibit for a federal solicitation requesting proposals for generator controls upgrade work. The solicitation will be issued as a 100% set-aside for Service-Disabled Veteran-Owned Small Businesses. The Gulf Coast Veterans Health Care System requires generator controls upgrade services under Project 520-22-101. Proposals are due around February 10, 2021 with anticipated award by mid-March 2021. The performance period is 120 days from the notice to proceed. The work location is at the Gulf Coast Veterans Health Care System facility in Biloxi, Mississippi. Offerors must meet SDVOSB eligibility requirements and be registered in the Vendor Information Pages and System for Award Management databases. The prime contractor must perform a minimum of 15-25% of the work cost using its own employees or other eligible SDVOSBs depending on the construction specialty.

View the file

Other files

File Type Posted
36C25621R0040 0005.docx DOCX document
Dwg Site Plan - Overall Facility Layout.pdf PDF
36C25621R0040 0004.docx DOCX document
36C25621R0040 0003.docx DOCX document
WD General Decision No MS20210050 02-12-2021.pdf PDF
Register containing all RFI Inquiries _ Responses.docx DOCX document
36C25621R0040 0002.docx DOCX document
(2) Site Visit Sign-In Sheets - Proj 520-22-101.pdf PDF
36C25621R0040 0001.docx DOCX document
Generator Yard Plan sheet 2 of 2 dated 6-17-2020.pdf PDF
EXHIBIT F REQUEST FOR INFORMATION FORM.docx DOCX document
263214 ENGINE GENERATORS - 2000 KW.pdf PDF
EXHIBIT A PERFORMANCE RELEVANCY SURVEY.docx DOCX document
013323 SHOP DRAWINGS.doc DOC document
263623 AUTOMATIC TRANSFER SWITCHES.pdf PDF
DIAGRAM SINGLE-LINE UTILITY-TIE-FEEDER B dated 1-10-2011.pdf PDF
DIMENSION PRINT OUTLINE DRAWING KOHLER POWER SYSTEMS dated 11-5-2010.pdf PDF
EXHIBIT E SURETY FORM.docx DOCX document
DIMENSION PRINT OUTLINE DRAWING dated 11-5-2010.pdf PDF
EXHIBIT B PAST AND PRESENT PERFORMANCE QUESTIONNAIRE.docx DOCX document
EXHIBIT D CONTRACTOR EVALUATION FORM CONSTRUCTION SAFETY.docx DOCX document
DIAGRAM SINGLE-LINE OVERVIEW E1 OF 330 dated 1-10-2011.pdf PDF
DIMENSION PRINT STRUCTURE-BREAKER DATA dated 1-15-2010.pdf PDF
262726 WIRING DEVICES.doc DOC document
010000 GENERAL REQUIREMENTS.docx DOCX document
Location Plan sheet 1 of 2 dated 6-16-2020.pdf PDF
SUPPLEMENTAL INFORMATION - POWER COMMAND CONTROLLERS.pdf PDF
ICRA - Project 520-22-101.pdf PDF
017419 CONSTRUCTION WASTE MANAGEMENT.doc DOC document
VA CATEX - 520-22-101 GENERATOR SWITCH GEAR July 2020.pdf PDF
Drawing ES _ 102 PARTIAL SITE GUIDE PLAN _ NORTH.pdf PDF
36C25621R0040_2.docx DOCX document
Drawing ES _ 111 ELECTRICAL SERVICE EQUIPMENT YARD.pdf PDF
WD General Decision No. MS20210050 01-01-2021.docx DOCX document
260511 REQUIREMENTS FOR ELECTRICAL INSTALLATIONS.doc DOC document
SITE VISIT MAP - Biloxi VA.pdf PDF
MP 110 FUEL OIL SYSTEM FOR SERVICE YARD AREA F.pdf PDF
DIAGRAM SINGLE-LINE GENS 1 _ 2 EXISTING dated 7-08-2009.pdf PDF
270511 REQ FOR COM INSTALL.doc DOC document
260526 GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS.doc DOC document
260521 LOW VOLT CONDUCTORS.doc DOC document
Show all 41

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FOR OFFICIAL USE ONLY

Source Selection Sensitive Information—See FAR 2.101 & 3.104 Project 520-22-101 Generator Controls Upgrade, Biloxi 36C25621R0040

EXHIBIT C – SUBCONTRACTOR INFORMATION AND CONSENT FORM

Subcontractor and/or Teaming Partner Consent for the Release of Past Performance Information to the Prime Contractor and Reference Information

Past performance information concerning subcontractors and teaming partners cannot be disclosed to a private party without the subcontractor’s or teaming partner’s consent. Because a prime contractor is a private party, the Government will need that consent before disclosing subcontractor/teaming partner past and present performance information to the prime during exchanges. In an effort to assist the Government in assessing your past performance relevancy we request that the following consent form be completed by the major subcontractors/teaming partners identified in your proposal. The completed consent forms should be submitted to the offering contractor for submission with past performance volume.

(NAME OF FIRM)

is currently planning on participating as a subcontractor and or a teaming partner with

(PRIME CONTRACTOR OR NAME OF ENTITY PROVIDING PROPOSAL)

in responding to the Request for Proposal No. 36C25621R0040 for Project 520-22-101 Generator Controls Upgrade, Biloxi

We understand that the Government is placing increased emphasis on past performance in order to obtain best value in source selections. In order to facilitate the performance confidence assessment process we are signing this consent form to allow you to discuss our past and present performance information with the prime contractor during the source selection process.

(Signature)(Title of Individual with authority to sign for and
Legally bind the company)

Company Name: Telephone #

Address:

City/State/Zip Code: Date:

Reference List (required):

1.Contract No. And Title:
Describe role (Prime/Sub) and work Performed:
Reference POC NamePhone:Fax:
Email address:
2.Contract No. And Title:
Describe role (Prime/Sub) and work Performed:
Reference POC NamePhone:Fax:
Email address:
3.Contract No. And Title:
Describe role (Prime/Sub) and work Performed:
Reference POC NamePhone:Fax:
Email address:

File details come from the government source that posted it. Updated .