Exhibit D Bldg_326_6-3-52-AE_SOW.pdf
PDF 251 KB Posted
- Attached to
- Architect/Engineer Design Services for Site 39, Building 326, and Building 327 HVAC Replacement
- Solicitation number
- ISD_361238_DA
About this file
This Statement of Work (SOW) outlines Architectural and Engineering (A/E) services for the HVAC replacement in Building 326 at Fermi National Accelerator Laboratory. The project stems from an existing oversized Roof Top Unit (RTU) that causes inefficient temperature and humidity control, leading to frequent start/stop cycles and premature equipment failure. The design task is divided into two phases: Construction Documents and Construction Administration.
The SOW requires comprehensive deliverables across multiple stages, including 60%, 90%, and 100% Construction Documents, with specific requirements like HVAC load calculations, electrical infrastructure analysis, technical specifications, and design drawings. The project schedule mandates the work to commence upon agreement execution, with a kickoff meeting within four weeks, 60% Construction Documents due within 60 calendar days, and subsequent phases at 30-day intervals. The final deliverables include complete design drawings, specifications, cost estimates, and construction administration services such as submittal reviews, RFI responses, commissioning plans, and functional performance tests.
View the file
Other files
Show all 21
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Statement of Work (SOW) – Building 326 HVAC Replacement
Architectural and Engineering (A/E) Services in support of Infrastructure Services Division (ISD)
16 January 2025
Revision 0
1.0 INTRODUCTION AND BACKGROUND
Building 326 was originally built in 2000, concurrent with Building 327. When originally built, bid options were included to investigate how large of a building could be built on budget. Each option extended the building by 20’ in length. After selecting the appropriate bid, the HVAC system wasn’t adjusted for the new building length. This, in combination with changes to planned usage, led to an oversized RTU being installed to serve the building. This oversized RTU reacted too quickly to changes in building load, leading to frequent start/stop cycles. Which in turn, prevent adequate dehumidification of the building. The frequent start/stop cycles have led to an early end of life determination on the unit, and due to frequent occupant complaints about fluctuating temperatures and inadequate humidity control have led Facilities Management to pursue replacing the existing system with a new one.
2.0 SCOPE
This design task shall be split into two phases: Construction Documents, and Construction Administration.
During the Construction Documents phase, prepare HVAC load calculations based on the existing space conditions to determine capacity for the system proposed in the attached Project Definition Report. Analyze the existing electrical infrastructure to determine what improvements need to be performed to allow for a heat pump installation. Also, prepare technical specifications and drawings for a subcontractor’s use in constructing the project. The final documents shall comply with the FFDG policies, procedures, and standards for A/E Consultants.
During the Construction Administration phase, review Requests for Information (RFIs), Submittals, and provide commissioning services. Commissioning services shall include developing functional performance tests for the equipment installed and work with the contractor and Fermilab staff to perform the functional performance tests.
3.0 DELIVERABLES
• Kickoff meeting to confirm understanding of project scope
• 60% Construction Documents o Design drawings showing:
▪ Locations of equipment
▪ General ductwork distribution layout
▪ General ductwork main trunk sizes
▪ Updated panel schedules
▪ Equipment schedules in development
▪ Details in development o Technical specifications for each section planned to be included
▪ Sections may still require specific editing
• 90% Construction Documents o Design drawings showing:
▪ Final locations of equipment
▪ Ductwork/piping layout with all sizes labelled
▪ Equipment schedules for major equipment completed
▪ Panel schedules and conductor sizes completed
▪ Details completed o Technical specifications for each section, edited for review
• 100% Construction Documents o Final design drawings packaged for submission to subcontractors for bidding o Final design specifications packaged for submission to subcontractors for bidding o Final construction cost estimate complete o Complete record set of design drawings in PDF and AutoCAD formats o Complete record set of technical specifications in PDF and Microsoft Word formats
• Construction Administration o Submittal Reviews o RFI Responses o Commissioning plan o Functional Performance Tests o Final Commissioning Report o Field Visit Reports
4.0 SCHEDULE:
The work shall commence upon receipt of an executed agreement. Kickoff meeting shall be scheduled withing four weeks of executed agreement. 60% Construction Documents deliverables to be issued within 60 calendar days of commencing work. 90% Construction Document sub-phases shall be issued within 30 calendar days of the previous phase. 100% Construction Documents shall be issued within 30 calendar days of the previous phase. The A/E shall consider a 5 working day review period by Fermilab following each submission as part of the overall schedule, overlapping the following design phase.
5.0 ATTACHMENTS:
• Existing building plans
• Project Definition Report