This document is a Past Performance Questionnaire that is to be completed by a reference contact for a contractor submitting a proposal for a Department of Veterans Affairs contract.

The questionnaire covers the contractor's performance in areas such as quality, timeliness, business practices, compliance, and overall customer satisfaction on a previous project. The reference contact is asked to rate the contractor's performance on a scale of 0 to 5 and provide explanations for the ratings. The completed questionnaire is to be returned directly to the Contracting Officer, John Mignogna, no later than 4:30 pm local time on November 25th, 2024. This appears to be a day prior to the proposal due date for the related federal contract opportunity.

The related federal contract opportunity is a Request for Proposal (RFP) issued by the Department of Veterans Affairs, Regional Procurement Office, Network #04 (VISN 4) Contracting Office. The RFP is for a Multiple Award Task Order Contract (MATOC) for construction projects in the Pittsburgh, Butler, and Erie areas. The MATOC will have a 5-year period of performance or a maximum value of $250 million. The NAICS code is 236220 with a $45 million small business size standard. The procurement will utilize a tiered evaluation approach starting with SDVOSB, followed by VOSB, then small business concerns.

View the file

Other files

File Type Posted
36C24425R0009 0006 12.12.24.pdf PDF
Physical Security Design Manual- July2022.pdf PDF
Alternate Clin.pdf PDF
64619112 Addendum1 11222024.pdf PDF
36C24425R0009 0005 12.9.2024.pdf PDF
Final Answers 12.9.24.xlsx XLSX spreadsheet
36C24425R0009 0004.pdf PDF
Sign in sheet 2.jpeg JPEG file
Sign in sheet 1.jpeg JPEG file
UD ED Entry RFI Questions and Answers 11.25.2024.xlsx XLSX spreadsheet
GAI Geotechnical Report CB29 Nov 2006.pdf PDF
64619112 UD ED Entry RFI Questions and Answers 11.25.2024.pdf PDF
36C24425R0009 0003 11.25.2024.pdf PDF
VHA VAPHS ICRA 1.2 Oct 1 2024 FILLABLE.pdf PDF
36C24425R0009 0002 11.20.2024.pdf PDF
36C24425R0009 0001 .pdf PDF
64619112 Specifications Vol1 12222021.pdf PDF
Seed Project Task Order Package 10.24.2024.pdf PDF
64619112 Drawings 01142022.pdf PDF
EXHIBIT D Sample Transmittal Letter for Past Performance Evaluation Questionnaire 10.24.2024.pdf PDF
36C24425R0009 10.24.2024.pdf PDF
Butler MATOC Documents.pdf PDF
WG PAPA20240001 10.18.2024.pdf PDF
64619112 Specifications Vol2 12222021.pdf PDF
EXHIBIT A - Statement of Prior Experience 10.24.2023.pdf PDF
36C24425R0009_2.docx DOCX document
ERIE MATOC DOCUMENTS.pdf PDF
EXHIBIT B Subcontractor Information and Consent Form 10.24.2024.pdf PDF
Pittsburgh MATOC Documents.pdf PDF
Show all 29

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Department of Veterans Affairs Network Contracting Office 4

1010 Delafield Road Pittsburgh, PA 15215

1 | P a g e

Past Performance Questionnaire for: 646-19-112 UD Emergency Dept Access Reno

INSTRUCTIONS TO OFFEROR

Complete the CONTRACTOR INFORMATION section, below (type answers into light blue shaded boxes). Save the document. Send an electronic or hard copy print of the form to each of your reference contacts, asking them to please complete the form and submit it a ccording to the instructions, below.

Company Name Street

Address

Point of Contact

(POC)

City

POC Phone Number State

Reference Project Title

Zip Code

Contract Period of Performance (start to finish):

Email

Contract Number Contract Dollar

Value

Description of Work

Role of Contractor on This Project

(check appropriate box)

Prime Contractor Sub-contractor Key Personnel

INSTRUCTIONS TO REFERENCE CONTACT

The contractor named above is submitting a proposal for a United States Department of Veterans Affairs contract, and has sent this form to you as a past performance reference contact. Please complete the following pages in full (all areas shaded in light yellow, below). Once completed, please send the form to the Contracting Officer via postal mail or email directly to:

John.Mignogna@va.gov

Please return the completed form ASAP, but no later than 4:30 pm local time, November 25th 2024. (Due a day before the RFP) If you have any questions, please contact the Contracting Officer: John.Mignogna@va.gov mailto:John.Mignogna@va.gov

RESPONDENT INFORMATION [completed by Reference Contact]

Company Name Street Address

POC Name City

Phone Number State

Email Zip Code

PERFORMANCE INFORMATION: Choose the number on the scale of 0 (Neutral) to 5 (Exceptional) that most accurately describes the contractor’s performance or situation . PLEASE PROVIDE AN EXPLANATION FOR THE OVERALL RATING in the Remarks section, below.

0 1 2 3 4 5

NEUTRAL UNACCEPTABLE MARGINAL ACCEPTABLE VERY GOOD OUTSTANDING

No record of past performance, or not applicable or the record is inconclusive.

Performance did not meet most contractual requirements. There were serious problems and the contractor’s corrective actions were ineffective.

Performance did not meet some contractual requirements.

There were problems, some of a serious nature, for which corrective action was only marginally effective.

Performance met most contractual requirements.

There were some minor problems and corrective actions taken by the contractor were satisfactory.

Performance met all contract requirements and exceeded some to the government’s benefit. There were a few minor problems, which the contractor resolved in a timely, effective manner.

Performance exceeded all contract requirements. There were no problems.

The Contractor … 0 1 2 3 4 5

QUALITY – MANAGEMENT & WORKMANSHIP

1.

Provided experienced managers and supervisors with the technical and administrative abilities needed to meet contract requirements.

2.

Demonstrated ability to hire, maintain, and replace, if necessary, qualified construction personnel during the contract period.

3.

Provided and followed approved quality control plan and/or inspection procedures to meet contract requirements.

4.

Corrected deficiencies in timely manner and pursuant to their quality control procedures.

5.

Submittals clearly identified the proposed item IAW the specifications and drawings.

6. Suggested alternative approaches to problems.

TIMELINESS AND ADHERENCE TO SCHEDULE

0 1 2 3 4 5

7.

Contractor provided timely notices of possible delays/schedule revisions.

REMARKS:

8.

Timeliness in submitting submittals and reports and responding to agency inquiries, RFP's, etc.

REMARKS:

9. Developed realistic and met approved progress schedules.

BUSINESS PRACTICES/CUSTOMER RELATIONSHIP AND ABILITY TO PERFORM

10.

Displayed initiative to solve problems.

REMARKS:

11.

How well did the contractor work independent of Government guidance, oversight and assistance?

REMARKS:

12.

Subcontractors / tradesmen were adequately managed and coordinated. Explain any subcontracting issues (positive or negative) that impacted the performance of your contract(s).

REMARKS:

13.

For contract changes, contractor provided timely and realistic change order proposals.

COMPLIANCE & SAFETY

0 1 2 3 4 5

14.

Reports (i.e., daily, test, logs) / records were submitted completely and accurately satisfy the requirement.

15.

Applicable to Federal Contracts –Contractor complied with applicable Federal Laws and Regulations such as Construction Wage Rate

Requirements – timely payrolls and compliance; Drug-Free Workplace; Environmental Regulations and Use of Recovered Materials; Executive Order 13101 Greening the Government.

16.

Contractor’s safety program was in compliance with federa l regulations. Contractor implemented and followed their safety plan and ran a “safe jobsite”.

INFECTION CONTROL

17.

Contractor had an Infection Control Process in place and complied with agency Infection Control Requirements.

REMARKS:

OVERALL CUSTOMER SATISFACTION

18. Demonstrated reasonableness in modifications cost proposal.

19.

Was the contractor ever issued a cure or show cause notice under the referenced contract? If yes, explain outcome in “remarks.”

YES NO

20.

Would you award another contract to this contractor? If not, please explain in “remarks.”

YES NO

OVERALL PERFORMANCE RATING:

REMARKS (Please use as much space as is needed – the box will expand as you type).

I hereby certify that the information that I have reported above is accurate to the best of my knowledge.

Printed Name E-mail address

Business Title Signature Date

File details come from the government source that posted it. Updated .