EXHIBIT A - Statement of Prior Experience 10.24.2023.pdf

PDF 115 KB Posted

Attached to
Z1DA--Pittsburgh-Butler-Erie Construction MATOC
Solicitation number
36C24425R0009
Issued by

About this file

This document is an Exhibit A - Statement of Prior Experience for a federal contract opportunity. It requires offerors to provide details on up to 3 relevant prior projects, including the contract title, type (prime or subcontractor), value, completion dates, and a description of the work performed. It also requests information on any subcontractors or teaming partners to be used.

The related federal contract opportunity is a Request for Proposal (RFP) for a Multiple Award Task Order Contract (MATOC) for construction services in the Pittsburgh, Butler, and Erie areas. The contract has a 5-year period of performance or $250 million maximum value. The procurement is set aside for Service-Disabled Veteran-Owned Small Businesses (SDVOSBs) first, then Veteran-Owned Small Businesses (VOSBs), and finally Small Businesses (SBs). The NAICS code is 236220 with a $45 million size standard. A pre-proposal conference will be held on October 30, 2024.

View the file

Other files

File Type Posted
36C24425R0009 0006 12.12.24.pdf PDF
Physical Security Design Manual- July2022.pdf PDF
Alternate Clin.pdf PDF
64619112 Addendum1 11222024.pdf PDF
36C24425R0009 0005 12.9.2024.pdf PDF
Final Answers 12.9.24.xlsx XLSX spreadsheet
36C24425R0009 0004.pdf PDF
Sign in sheet 2.jpeg JPEG file
Sign in sheet 1.jpeg JPEG file
UD ED Entry RFI Questions and Answers 11.25.2024.xlsx XLSX spreadsheet
GAI Geotechnical Report CB29 Nov 2006.pdf PDF
64619112 UD ED Entry RFI Questions and Answers 11.25.2024.pdf PDF
36C24425R0009 0003 11.25.2024.pdf PDF
VHA VAPHS ICRA 1.2 Oct 1 2024 FILLABLE.pdf PDF
36C24425R0009 0002 11.20.2024.pdf PDF
36C24425R0009 0001 .pdf PDF
64619112 Specifications Vol1 12222021.pdf PDF
Seed Project Task Order Package 10.24.2024.pdf PDF
64619112 Drawings 01142022.pdf PDF
EXHIBIT D Sample Transmittal Letter for Past Performance Evaluation Questionnaire 10.24.2024.pdf PDF
36C24425R0009 10.24.2024.pdf PDF
Butler MATOC Documents.pdf PDF
WG PAPA20240001 10.18.2024.pdf PDF
64619112 Specifications Vol2 12222021.pdf PDF
36C24425R0009_2.docx DOCX document
EXHIBIT C Past Performance Questionnaire 10.24.2024.pdf PDF
ERIE MATOC DOCUMENTS.pdf PDF
EXHIBIT B Subcontractor Information and Consent Form 10.24.2024.pdf PDF
Pittsburgh MATOC Documents.pdf PDF
Show all 29

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

EXHIBIT A STATEMENT OF PRIOR EXPERIENCE

PART 1: Prepare no more than three (3) Part 1 forms:

Provide the following information requested in this format for each of the projects/contracts being described. Projects may be on going and cannot have been completed any later than 5 years prior to the solicitation issue date. Provide frank, concise comments regarding YOUR

PERFORMANCE on the contracts you identify. Use additional space as required.

A. Offeror (Your) Name (Company/Division):

B. Project/Contract Title:

C. Contract Specifics:

1. Description of Effort as Prime or _Subcontractor

2. Contract Number

3. Original Contract $ Value Current/Final Contract $ Value

4. If amounts in 3 above are different, provide a brief description of the reason:

5. Completion Date:

1. Original Date:

2. Current Schedule: _____________________

3. Estimate/Final Completion Date:

4. Primary cause for Contract Modifications

D. Provide detailed description of the work performed under the contract and describe why you believe the work is very relevant, relevant or semi-relevant to this solicited project.

(Use as much space as necessary)

In addition, address the following

1. Describe the specific elements of the work performed by your firm.

2. Indicate what elements of work were performed by your major subcontractors and indicate if those same subcontractors will be used on projects awarded under this solicitation. Should you intend to use these same subcontractors, please list their company names and described their principal areas of work that they will perform.

3. Address any technical areas about this project you consider uniquely relevant to this solicitation.

E. Point of Contact for Owner/Government agency Contracting Officer and or inspector

(COR); include a current phone number and email address for each.

End of Part 1- Questionnaire Requirements – Prepare and send Exhibit C Package to the reference(s) for each of the no more than three Construction Projects, or Specialty Trade if applicable provided in Exhibit A, Part 1. See below for Exhibit A, Part 2.

Part 2 - Additional offeror information required.

A. Name subcontractors and/or Teaming Partners to be utilized on this contract. Multiple subcontractors may be named for the same discipline but are limited to a maximum of three (3) subcontractors per discipline. As a minimum, provide the name(s) of subcontractors to be utilized in the following areas:

(Specialty Trades will address their specific trade for any major subcontractor or Teaming partner)

File details come from the government source that posted it. Updated .