64619112 Addendum1 11222024.pdf
PDF 3 MB Posted
- Attached to
- Z1DA--Pittsburgh-Butler-Erie Construction MATOC
- Solicitation number
- 36C24425R0009
About this file
This file contains architectural construction drawings and specifications for an Emergency Department Access Renovations project at a VA facility in Pittsburgh, PA (Project #646-19-112). The drawings include a site plan showing new work such as an anti-ram fence and gate, concrete bollards, concrete ramp with railing, new vestibule, concrete curb and gutter, decontamination storage tank, monument directional sign, and parking striping modifications. The package also contains interior elevation drawings showing details for triage areas, vestibule, and dressing rooms, with specifications for finishes, millwork, and equipment installation.
The drawings indicate multiple construction phases for asphalt replacement and include detailed notes regarding coordination with civil, structural, plumbing and electrical systems. Technical specifications cover items like handrails, crash rails, door hardware, room signage, and staff workstation details. The drawings are marked as "Issue for Bid - Not for Construction" dated 10/31/2022, suggesting these are bid documents rather than final construction documents. The project appears to focus on security and access improvements while maintaining emergency department operations.
View the file
Other files
Show all 29
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
X
X X
X X
X X
X X
X X
XXXXXXXXX
X
AS401
AS401
NEW FENCE AND
GATE
AS501
AS501
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
K:
\C
C G
_P R
O
JE
C
TS
\2
6\
-1
_V A2
-1
7- D
-0
9_ Pi tts bu rg h_
ID
IQ
\6
- U
D E m D ep t.
Ac es ss \4
- D es ig n D oc um en ts
\4
- D ra w in gs \W
O R
KI
N
G \6
-1
9-
2-
AS
1.
dw g
/2
0/
:3 8:
P
M
CONSTRUCTION DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
UD EMERGENCY DEPARTMENT ACCESS
RENOVATIONS
PITTSBURGH, PA
646-19-112
Project Director
Revisions: Date:
www. bancroft-ae.com
BAE PROJECT NO. 16-128
700 Nicholas Blvd. Suite 300 Elk Grove Village, IL 60007
T: 847.952.9362
VA CONTRACT NO. VA244-17-D-002925% SCHEMATIC DESIGN SUBMISSION 12/21/2020
50% DESIGN DEVELOPMENT SUBMISSION 03/18/2021
75% DESIGN DEVELOPMENT SUBMISSION 05/21/2021
100% CONSTRUCTION DOCUMENTS SUBMISSION 10/01/2021
10/31/2022
ISSUE FOR BID - NOT FOR CONSTRUCTION
USER GROUP REVIEW 02/15/2021
ISSUE FOR BID 12/22/2021
ISSUE FOR BID 10/31/2022
0 2' 4' 8' 16'1/8"=1'-0"1 PARTIAL SITE PLAN
NORTH
ARCHITECTURAL - SITE PLAN - NEW
WORK
CZ LH AS101
AREA OF WORK
A. REVIEW THIS DRAWING IN CONJUNCTION WITH CORRESPONDING CIVIL, STRUCTURAL, PLUMBING AND ELECTRICAL
DRAWINGS.
B. REFER TO CIVIL DRAWINGS FOR EXISTING CONDITIONS, DEMOLITION PLAN, SITE GRADING PLAN, SITE UTILITY PLAN, AND
EROSION CONTROL PLAN.
C. REFER TO STRUCTURAL DRAWINGS FOR EXTERIOR CONCRETE FOUNDATION WALLS AND RELATED WORK.
EXISTING CONSTRUCTION TO REMAIN
1. EXISTING RAILING TO REMAIN. CONTRACTOR TO SCRAPE OFF EXISTING RUST, AND CLEAN WITH WIRE BRUSH PRIOR TO APPLYING
PRIMER AND PAINT, TYP.
2. NEW CONCRETE BOLLARDS. BASIS OF DESIGN: PETERSEN MANUFACTURING CO. MODEL: BLT34
3. NEW ANTI-RAM FENCE AND GATE. BASIS OF DESIGN: AMERISTAR, STALWART
4. NEW CONCRETE RAMP W/ RAILING. REFER TO CIVIL DRAWINGS FOR ADDITIONAL INFORMATION.
5. NEW VESTIBULE - REFER TO STRUCTURAL DRAWINGS FOR ADDITIONAL INFORMATION
6. NEW CONCRETE CURB & GUTTER
7. LOCATION OF NEW DECONTAMINATION STORAGE TANK. REFER TO CIVIL AND PLUMBING DRAWINGS FOR ADDITIONAL
INFORMATION.
8. NEW MONUMENT DIRECTIONAL SIGN. REFER TO CIVIL, STRUCTURAL AND ELECTRICAL DRAWINGS FOR ADDITIONAL INFORMATION.
9. CONTRACTOR TO PROVIDE LANDSCAPING AROUND MONUMENT SIGN. COORDINATE WITH STATION FOR PLANTING TYPES. FOR
BIDDING PURPOSES ASSUME QUANTITY OF (8)
10. NEW PARKING STRIPING.
11. EXISTING BOLLARDS TO REMAIN, PROTECT DURING CONSTRUCTION
12. NEW CONCRETE SIDEWALK.
13. LINE OF CANOPY ABOVE.
14. NEW 8" PIPE BOLLARD, PAINTED TYP.
15. NEW STRUCTURAL COLUMNS, REFER TO STRUCTURAL DRAWINGS.
16. NEW METAL ANGLE EDGE AT THE NORTHEAST AND SOUTHEAST CORNERS OF THE NEW PLATFORM.
17. NEW EMERGENCY POLE, CONTRACTOR TO PROVIDE CONCRETE FOUNDATION FOR POLE PER MANUFACTURER'S INSTALLATION
INSTRUCTIONS. REFER TO ELECTRICAL DRAWINGS FOR ADDITIONAL INFORMATION.
GENERAL SITE NOTES
SITE PLAN LEGEND
SITE PLAN KEY NOTES
AREA OF ASPHALT REPLACEMENT, PHASE 1
AREA OF ASPHALT REPLACEMENT, PHASE 2
AREA OF ASPHALT REPLACEMENT, PHASE 3
X
ADDENDUM #1 11/21/2024
AutoCAD SHX Text
KEY PLAN
AutoCAD SHX Text N
0 4'2'1' 6'3/8"=1'-0"9 DRESSING ROOM ELEVATION
0 4'2'1' 6'3/8"=1'-0"1 TRIAGE ELEVATION
0 4'2'1' 6'3/8"=1'-0"2 TRIAGE ELEVATION
0 4'2'1' 6'3/8"=1'-0"3 TRIAGE ELEVATION
0 4'2'1' 6'3/8"=1'-0"4 TRIAGE ELEVATION
0 4'2'1' 6'3/8"=1'-0"10 DRESSING ROOM ELEVATION
0 4'2'1' 6'3/8"=1'-0"11 DRESSING ROOM ELEVATION
0 4'2'1' 6'3/8"=1'-0"12 DRESSING ROOM ELEVATION
0 4'2'1' 6'3/8"=1'-0"5 VESTIBULE ELEVATION
0 4'2'1' 6'3/8"=1'-0"6 VESTIBULE ELEVATION
0 4'2'1' 6'3/8"=1'-0"7 VESTIBULE ELEVATION
0 4'2'1' 6'3/8"=1'-0"8 VESTIBULE ELEVATION
2'- 6"
4" 4"
P-1
P-1
VB-1
SS-1
B/ SOFFIT
7'-6"
T/ FLOOR
0'- 0"
B/ CEILING
8'- 0"
3'- 4 1
/2"
WP-5
A5180 A5180
WP-1
P-3
SS-1
T/ FLOOR
0'- 0"
B/ CEILING
8'- 0"
T/ FLOOR
0'- 0"
B/ CEILING
8'- 0"
T/ FLOOR
0'- 0"
B/ CEILING
8'- 0"
T/ FLOOR
0'- 0"
B/ CEILING
8'- 0"
T/ FLOOR
0'- 0"
B/ CEILING
8'- 0"
T/ FLOOR
0'- 0"
B/ CEILING
8'- 0"
T/ FLOOR
0'- 0"
B/ CEILING
8'- 0"
T/ FLOOR
0'- 0"
B/ CEILING
8'- 0"
T/ FLOOR
0'- 0"
B/ CEILING
8'- 0"
T/ FLOOR
0'- 0"
B/ CEILING
8'- 0"
M4255
M4255 M4266
2'-4" 4'-8" 1'-3"
WP-1
P-3
VB-1VB-1 VB-1 VB-1
VB-1VB-1VB-1VB-1
VB-1VB-1 VB-1
U7415
A5080
A5075 U5075
P3100
U0102
A5107 P3100
P-3
WP-1
SS-1
P3100
F3200
PL-1
M1801
U1802
A5107M4655
F0310
M2050
P-1
P-1 P-1 P-1 P-1 P-1
P-1P-1P-1
WP-5 WP-5
WP-5
SS-1
PL-1
PL-1
A5080
A5075
U5075
T/ FLOOR
0'- 0"
B/ CEILING
8'- 0"
3'- 0 5
/8" 4"
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
K:
\C
C G
_P R
O
JE
C
TS
\2
6\
-1
_V A2
-1
7- D
-0
9_ Pi tts bu rg h_
ID
IQ
\6
- U
D E m D ep t.
Ac es ss \4
- D es ig n D oc um en ts
\4
- D ra w in gs \W
O R
KI
N
G \6
-1
9-
2- A4
.d w g
/3
1/
1:
:5
AM
CONSTRUCTION DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
UD EMERGENCY DEPARTMENT ACCESS
RENOVATIONS
PITTSBURGH, PA
646-19-112
Project Director
Revisions: Date:
www. bancroft-ae.com
BAE PROJECT NO. 16-128
700 Nicholas Blvd. Suite 300 Elk Grove Village, IL 60007
T: 847.952.9362
VA CONTRACT NO. VA244-17-D-002925% SCHEMATIC DESIGN SUBMISSION 12/21/2020
50% DESIGN DEVELOPMENT SUBMISSION 03/18/2021
75% DESIGN DEVELOPMENT SUBMISSION 05/21/2021
100% CONSTRUCTION DOCUMENTS SUBMISSION 10/01/2021
10/31/2022
ISSUE FOR BID - NOT FOR CONSTRUCTION
USER GROUP REVIEW 02/15/2021
ISSUE FOR BID 12/22/2021
ISSUE FOR BID 10/31/2022
ARCHITECTURAL - INTERIOR
ELEVATIONS
CZ LH A403
INTERIOR ELEVATION GENERAL NOTES
A. REFER TO SHEET Q601 FOR FULL EQUIPMENT SCHEDULE.
B. COORDINATE WALL BLOCKING LOCATIONS WITH VA/COR.
C. MILLWORK TO HAVE A FINISHED EDGE.
D. MILLWORK FINISH TO BE PLASTIC LAMINATE (PL-1). REFER TO FINISH LEGEND.
E. MILLWORK LOCKS:
E.A. ALL MILLWORK WITHIN A SINGLE PATIENT ROOM TO BE KEYED ALIKE.
E.B. EACH PATIENT ROOM TO BE KEYED DIFFERENTLY.
E.C. REMAINING MILLWORK (OUTSIDE OF PATIENT ROOMS) TO BE KEYED ALIKE.
1. PROVIDE HANDRAIL & ASSOCIATED SUPPORTS,
REFER TO DETAIL 3/A502.
2. PROVIDE NEW CRASH RAIL AND ASSOCIATED
SUPPORTS, REFER TO 4/A502.
3. NEW DOOR, HARDWARE AND FRAME. REFER TO
DOOR SCHEDULE.
4. EXISTING DOOR, FRAME & HARDWARE TO REMAIN.
PAINT FRAME.
5. ROOM SIGNAGE TO BE INSTALLED BY VA MEDICAL
MEDIA DEPARTMENT. REFER TO I101 AND IG602 FOR
ADDITIONAL INFORMATION.
6. STAFF WORKSTATION, REFER TO SHEET A503 FOR
DETAILS.
7. NEW RECESSED CABINET UNIT HEATER, REFER
DETAIL 8/A502 AND MECHANICAL DRAWINGS FOR
ADDITIONAL INFORMATION.
ELEVATION KEY NOTES##
ADDENDUM #1 11/21/2024
AutoCAD SHX Text
OXY
AutoCAD SHX Text
AIR
AutoCAD SHX Text
VAC
AutoCAD SHX Text
OXY
AutoCAD SHX Text
AIR
AutoCAD SHX Text
VAC
| 646-19-112-AS101-AS101 |
| AS101 |
| 646-19-112-A401-A403 |
| A403 |
| E601 |
| EL101 |
File details come from the government source that posted it. Updated .