64619112 Specifications Vol1 12222021.pdf
PDF 8 MB Posted
- Attached to
- Z1DA--Pittsburgh-Butler-Erie Construction MATOC
- Solicitation number
- 36C24425R0009
About this file
This document is a set of specifications for the "UD Emergency Department Access Renovations" project at the University Drive Campus Veterans Affairs Pittsburgh Healthcare System. The key details are:
The project will renovate approximately 871 GSF of interior space in the existing emergency department on the 1st floor, including a new 208 GSF entrance vestibule. It will also modify the existing parking lot to create new pedestrian access to the emergency department and decontamination room, install new site lighting and signage, and replace asphalt in phases. The contract includes a base bid and three deduct alternates related to the asphalt work. The project is being procured under Contract No. VA244-17-D-0029 for Station Project No. 646-19-112. The solicitation will be issued as a Request for Proposal (RFP) under a Multiple Award Task Order Contract (MATOC) for the Pittsburgh, Butler, and Erie area, with an anticipated period of performance of 5 years or a $250 million cumulative contract ceiling.
View the file
Other files
Show all 29
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Specifications
University Drive Campus VA Pittsburgh Healthcare System
4100 Allequippa St | Pittsburgh, Pennsylvania 15213
UD Emergency Department Access Renovations
Building 1
VA Contract No. VA244-17-D-0029
Station Project No. 646-19-112
Bancroft-AE Project No. 16-128
Issue for Bid Submission
Volume 1 of 2
Divisions 01 - 22
12/22/2021
DIVISION 00
SPECIAL SECTIONS
University Campus Drive Campus VA Pittsburgh Healthcare System
Pittsburgh, Pennsylvania
UD Emergency Department Access Renovations
Bancroft Architects + Engineers
09-01-20
Contract No. VA244-17-D-0029
Bancroft-AE Project No. 16-128 12/22/2021
00 01 10-1
DEPARTMENT OF VETERANS AFFAIRS
VHA MASTER SPECIFICATIONS
TABLE OF CONTENTS
Section 00 01 10
SECTION NO. DIVISION AND SECTION TITLES DATE
DIVISION 00 - SPECIAL SECTIONS
00 01 15 List of Drawing Sheets 05-20
DIVISION 01 - GENERAL REQUIREMENTS
01 00 00 General Requirements 03-20
01 32 16.15 Project Schedules (Small Projects – Design/Bid/Build 03-20
01 33 23 Shop Drawings, Product Data, and Samples 05-17
01 35 26 Safety Requirements 07-20
01 42 19 Reference Standards 09-19
01 45 00 Quality Control 03-19
01 45 29 Testing Laboratory Services 11-18
01 45 35 Special Inspections 03-19
01 57 19 Temporary Environmental Controls 01-11
01 58 16 Temporary Interior Signage 07-15
01 74 19 Construction Waste Management 09-13
DIVISION 02 – EXISTING CONDITIONS
02 41 00 Demolition 08-17
02 82 11 Traditional Asbestos Abatement 04-19
DIVISION 03 – CONCRETE
03 30 00 Cast-in-Place Concrete 07-19
DIVISION 04 – MASONRY (NOT USED)
DIVISION 05 – METALS
05 12 00 Structural Steel Framing 11-18
05 31 00 Steel Decking 02-16
05 36 00 Composite Metal Decking 10-15
05 50 00 Metal Fabrications 08-18
DIVISION 06 – WOOD, PLASTICS AND COMPOSITES
06 10 00 Rough Carpentry 10-17
06 20 00 Finish Carpentry 08-16
UD Emergency Department Access Renovations
Bancroft Architects + Engineers
09-01-20
Contract No. VA244-17-D-0029
00 01 10-2
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
07 22 00 Roof and Deck Insulation 02-16
07 40 00 Roofing and Siding Panels 10-15
07 60 00 Flashing and Sheet Metal 07-14
07 71 00 Roof Specialties 10-15
07 72 00 Roof Accessories 10-15
07 81 00 Applied Fireproofing 10-17
07 84 00 Firestopping 02-16
07 92 00 Joint Sealants 10-17
DIVISION 08 - OPENINGS
08 11 13 Hollow Metal Doors and Frames 08-16
08 14 00 Interior Wood Doors 02-16
08 31 13 Access Doors and Frames 02-16
08 41 13 Aluminum-Framed Entrances and Storefronts 08-16
08 71 00 Door Hardware 04-20
08 71 13 Automatic Door Operators 02-16
08 71 13.11 Low Energy Power Assist Door Operators 08-16
08 80 00 Glazing 10-15
DIVISION 09 – FINISHES
09 05 16 Subsurface Preparation for Floor Finishes 02-15
09 22 16 Non-Structural Metal Framing 06-18
09 29 00 Gypsum Board 04-20
09 51 00 Acoustical Ceilings 12-18
09 65 13 Resilient Base and Accessories 02-16
09 65 16 Resilient Sheet Flooring 05-18
09 67 23.30 Resinous (Epoxy Resin Composition) Mortar Flooring
(RES-3)
07-14
09 68 00 Carpeting 10-15
09 72 16 Vinyl-Coated Fabric Wall Covering 10-15
09 91 00 Painting 01-16
DIVISION 10 – SPECIALTIES
10 13 00 Directories 05-15
10 14 00 Signage 10-15
10 21 23 Cubicle Curtain Tracks 05-15
10 26 00 Wall and Door Protection 10-15
10 44 13 Fire Extinguisher Cabinets 08-18
DIVISION 11 – EQUIPMENT (NOT USED)
DIVISION 12 – FURNISHINGS
UD Emergency Department Access Renovations
Bancroft Architects + Engineers
09-01-20
Contract No. VA244-17-D-0029
00 01 10-3
12 24 00 Window Shades 08-17
12 32 00 Manufactured Wood Casework 09-15
12 36 00 Countertops 12-18
DIVISION 13 - SPECIAL CONSTRUCTION (NOT USED)
DIVISION 14– CONVEYING EQUIPEMENT (NOT USED)
DIVISION 21- FIRE SUPPRESSION
21 13 13 Wet-Pipe Sprinkler Systems 06-15
DIVISION 22 – PLUMBING
22 05 11 Common Work Results for Plumbing 09-20
22 05 23 General-Duty Valves for Plumbing Piping 09-20
22 07 11 Plumbing Insulation 09-19
22 11 00 Facility Water Distribution 11-19
22 13 00 Facility Sanitary and Vent Piping 09-20
22 40 00 Plumbing Fixtures 09-15
22 62 00 Vacuum Systems for Laboratory and Healthcare Facilities 09-15
22 63 00 Gas Systems for Laboratory and Healthcare Facilities 09-15
DIVISION 23 – HEATING, VENTILATING, AND AIR
CONDITIONING (HVAC)
23 05 11 Common Work Results for HVAC 02-20
23 05 12 General Motor Requirements for HVAC and Steam
Generation Equipment
02-20
23 05 93 Testing, Adjusting, and Balancing for HVAC 02-20
23 07 11 HVAC and Boiler Plant Insulation 02-20
23 09 23 Direct-Digital Control System for HVAC 09-11
23 21 13 Hydronic Piping 02-20
23 31 00 HVAC Ducts and Casings 02-20
23 37 00 Air Outlets and Inlets 02-20
23 82 00 Convection Heating and Cooling Units 03-20
23 82 16 Air Coils 03-20
DIVISION 25 – INTEGRATED AUTOMATION (NOT USED)
DIVISION 26 – ELECTRICAL
26 05 11 Requirements for Electrical Installations 01-16
26 05 19 Low-Voltage Electrical Power Conductors and Cables 01-17
UD Emergency Department Access Renovations
Bancroft Architects + Engineers
09-01-20
Contract No. VA244-17-D-0029
00 01 10-4
26 05 26 Grounding and Bonding for Electrical Systems 01-17
26 05 33 Raceway and Boxes for Electrical Systems 01-18
26 05 41 Underground Electrical Construction 01-17
26 09 23 Lighting Controls 01-18
26 24 16 Panelboards 01-18
26 27 26 Wiring Devices 01-18
26 29 11 Motor Controllers 01-18
26 43 13 Surge Protective Devices 01-17
26 51 00 Interior Lighting 01-18
26 56 00 Exterior Lighting 01-18
DIVISION 27 – COMMUNICATIONS
27 05 11 Requirements for Communications Installations 09-19
27 05 26 Grounding and Bonding for Communications Systems 06-15
27 05 33 Raceways and Boxes for Communications Systems 10-18
27 10 00 Control, Communication and Signal Wiring 06-15
27 15 00 Communications Structured Cabling 01-16
27 51 16 Public Address and Mass Notification Systems 10-18
27 51 23 Intercommunications and Program Systems 06-15
27 52 23 Nurse Call and Code Blue Systems 10-18
DIVISION 28 – ELECTRONIC SAFETY AND SECURITY
28 05 00 Common Work Results for Electronic Safety and Security 04-18
28 05 13 Conductors and Cables for Electronic Safety and
Security
10-18
28 05 26 Grounding and Bonding for Electronic Safety and
Security
09-11
28 05 28.33 Conduits and Backboxes for Electronic Safety and
Security
09-11
28 13 00 Physical Access Control System 10-11
28 23 00 Video Surveillance 09-11
28 26 00 Electronic Personal Protection System 09-11
28 31 00 Fire Detection and Alarm 10-11
28 52 31 Emergency Call System 06-15
DIVISION 31 – EARTHWORK
31 20 00 Earthwork 07-16
31 62 00 Driven Piles 10-12
DIVISION 32 – EXTERIOR IMPROVEMENTS
32 05 23 Cement and Concrete for Exterior Improvements 08-16
32 12 16 Asphalt Paving 09-15
32 17 23 Pavement Markings 08-16
32 31 13 Chain Link Fences and Gates 06-18
UD Emergency Department Access Renovations
Bancroft Architects + Engineers
09-01-20
Contract No. VA244-17-D-0029
00 01 10-5
32 31 40 High Security Fences and Gates 08-16
32 90 00 Planting 08-16
DIVISION 33 – UTILITIES
33 10 00 Water Utilities 03-17
33 30 00 Sanitary Sewer Utilities 06-13
33 40 00 Storm Sewer Utilities 12-17
33 46 13 Foundation Drainage 10-11
DIVISION 34 – TRANSPORTATION
34 71 13 Passive Vehicle Barriers 04-18
DIVISION 48 – Electrical Power Generation (NOT USED)
APPENDIX A
Schedule of Special Inspections
UD Emergency Department Access Renovations
Bancroft Architects + Engineers
05-01-20
Contract No. VA244-17-D-0029
Station Project No. 646-19-112
Bancroft-AE Project No. 16-128 12/22/2021
00 01 15 - 1
SECTION 00 01 15
LIST OF DRAWING SHEETS
The drawings listed below accompanying this specification form a part of the contract.
Drawing No. Title
GENERAL
G001 GENERAL - COVER SHEET
G002 GENERAL - SHEET INDEX
GI001 GENERAL - CONTRACTOR AND BASIS-OF-DESIGN
PROTOCOL NOTES
GI002 GENERAL - PROTECTION PROTOCOL, SCOPE OF WORK
AND MISC. NOTES
GI003 GENERAL - DEMOLITION NOTES
GI004 GENERAL - ABBREVIATIONS, SYMBOLS LEGEND, AND
STANDARD MOUNTING HEIGHTS
GI101 GENERAL - CODE AND BUILDING INFORMATION
GI201 GENERAL - BUILDING ORIENTATION MAP, SITE PLAN
GI202 GENERAL - BUILDING ORIENTATION MAP, 1ST FLOOR
GI 301 GENERAL – LIFE SAFETY PLAN, 1ST FLOOR
GI401 GENERAL - INFECTION CONTROL PLAN, 1ST FLOOR
GI402A GENERAL - ICRA GUIDELINES
GI402B GENERAL – ICRA GUIDELINES
GI403 GENERAL - ICRA DRAWING CLASS III
GI404 GENERAL - ICRA DRAWING CLASS IV
GC101 GENERAL - CONSTRUCTION SEQUENCE OF WORK PLAN
SURVEYS
V101 TOPOGRAPHIC SURVEY
UD Emergency Department Access Renovations
Bancroft Architects + Engineers
05-01-20
Contract No. VA244-17-D-0029
Station Project No. 646-19-112
Bancroft-AE Project No. 16-128 12/22/2021
00 01 15 - 2
CIVIL
C001 GENERAL NOTES
CD101 DEMOLITION PLAN
CG101 GRADING PLAN
CU101 UTILITY PLAN
CE101 EROSION CONTROL PLAN
STRUCTURAL
S0-001 GENERAL NOTES
S0-002 GENERAL NOTES
S0-003 SPECIAL INSPECTIONS
S0-005 GENERAL LAP SPLICE SCHEDULES
S1-100 FOUNDATION PLAN
S1-200 ROOF FRAMING PLAN
S2-100 TYPICAL FOUNDATION DETAILS
S2-101 FOUNDATION SECTIONS & DETAILS
S5-100 TYPICAL STEEL DECK DETAILS
S5-101 TYPICAL STEEL COLUMN DETAILS
S5-200 TYPICAL STEEL BEAM SHEAR CONNECTIONS
S6-100 MASONRY SECTIONS AND DETAILS
ARCHITECTURAL
ASD101 ARCHITECTURAL -PARTIAL SITE DEMOLITION PLAN
AD101 ARCHITECTURAL -PARTIAL DEMOLITION PLAN,1ST
FLOOR
ACD101 ARCHITECTURAL - PARTIAL DEMOLITION CEILING
PLAN, 1ST FLOOR
AS101 ARCHITECTURAL - SITE PLAN - NEW WORK
AS401 ARCHITECTURAL – ENLARGED SITE PLAN
AS501 ARCHITECTURAL – TYPICAL SITE DETAILS
AS601 ARCHITECTURAL – EXTERIOR SIGNAGE TYPES
A101 ARCHITECTURAL - PARTIAL FLOOR PLAN,1ST FLOOR
AC101 ARCHITECTURAL - PARTIAL CEILING PLAN,1ST FLOOR
AR102 ARCHITECTURAL - ROOF PLAN
A201 ARCHITECTURAL - BUILDING ELEVATIONS
A202 ARCHITECTURAL – BUILDING ELEVATIONS
UD Emergency Department Access Renovations
Bancroft Architects + Engineers
05-01-20
Contract No. VA244-17-D-0029
Station Project No. 646-19-112
Bancroft-AE Project No. 16-128 12/22/2021
00 01 15 - 3
A301 ARCHITECTURAL – WALL AND BUILDING SECTIONS
A401 ARCHITECTURAL – ENLARGED FLOOR PLAN, 1ST FLOOR
A402 ARCHITECTURAL – INTERIOR ELEVATIONS
A403 ARCHITECTURAL – INTERIOR ELEVATIONS
A404 ARCHITECTURAL – INTERIOR ELEVATIONS
A501 ARCHITECTURAL - TYPICAL WALL TYPES
A502 ARCHITECTURAL - TYPICAL DETAILS
A503 ARCHITECTURAL - TYPICAL DETAILS
A521 ARCHITECTURAL - TYPICAL CEILING DETAILS
A601 ARCHITECTURAL - DOOR SCHEDULES, FRAME TYPES AND
TYPICAL DETAILS
A801 ARCHITECTURAL - ROOF DETAILS
INTERIORS / EQUIPMENT
I101 INTERIORS – FINISH PLAN, 1ST FLOOR
I601 INTERIORS - ROOM FINISH SCHEDULE
I611 INTERIORS - ROOM FINISH LEGEND
IG602 INTERIORS – SIGNAGE TYPES AND MOUNTING HEIGHTS
Q101 INTERIORS – EQUIPMENT PLAN
Q601 INTERIORS – EQUIPMENT SCHEDULE
UD Emergency Department Access Renovations
Bancroft Architects + Engineers
05-01-20
Contract No. VA244-17-D-0029
Station Project No. 646-19-112
Bancroft-AE Project No. 16-128 12/22/2021
00 01 15 - 4
FIRE PROTECTION
FX001 FIRE PROTECTION - GENERAL NOTES, SYMBOLS AND
ABBREVIATIONS
FD101 FIRE PROTECTION - FIRE SUPPRESSION DEMOLITION
PLAN, 1ST FLOOR
FP101 FIRE PROTECTION - PARTIAL FLOOR PLAN,1ST FLOOR
FP501 FIRE PROTECTION DETAILS
PLUMBING
P001 PLUMBING - GENERAL NOTES, SYMBOLS AND
ABBREVIATIONS
PD100 PLUMBING - PARTIAL DEMOLITION PLAN, GROUND
FLOOR
PD101 PLUMBING - DEMOLITION PLAN,1ST FLOOR
P100 PLUMBING - PARTIAL FLOOR PLAN, GROUND FLOOR
P101 PLUMBING - PARTIAL FLOOR PLAN,1ST FLOOR
P501 PLUMBING DETAILS
P601 PLUMBING SCHEDULES
MG001 MEDICAL GAS SYMBOLS, ABBREVIATIONS, AND NOTES
MG101 MEDICAL GAS - PARTIAL FLOOR PLAN,1ST FLOOR
MG501 MEDICAL GAS DETAILS
HEATING, VENTILATING, AIR CONDITIONING
M001 MECHANICAL - GENERAL NOTES, SYMBOLS AND
ABBREVIATIONS
MHD101 MECHANICAL - VENTILATION DEMOLITION PLAN,1ST
FLOOR
MPD101 MECHANICAL - PIPING DEMOLITION PLAN,1ST FLOOR
MH101 MECHANICAL VENTILATION - PARTIAL FLOOR PLAN,
1ST FLOOR
MP101 MECHANICAL PIPING - PARTIAL FLOOR PLAN,1ST
FLOOR
M501 MECHANICAL DETAILS
M502 MECHANICAL DETAILS
M601 MECHANICAL SCHEDULES
UD Emergency Department Access Renovations
Bancroft Architects + Engineers
05-01-20
Contract No. VA244-17-D-0029
Station Project No. 646-19-112
Bancroft-AE Project No. 16-128 12/22/2021
00 01 15 - 5
ELECTRICAL
E001 ELECTRICAL - GENERAL NOTES, AND TABLES
E002 ELECTRICAL - SYMBOLS AND ABBREVIATIONS
EPD101 ELECTRICAL - POWER DEMOLITION PLAN,1ST FLOOR
ELD101 ELECTRICAL -LIGHTING DEMOLITION PLAN,1ST FLOOR
EFD101 ELECTRICAL - PARTIAL FIRE ALARM DEMOLITION
PLAN, 1ST FLOOR
ETD101 ELECTRICAL - COMMUNICATION AND TECHNOLOGY
DEMOLITION PLAN, 1ST FLOOR
ES101 ELECTRICAL - SITE PLAN
EP101 ELECTRICAL - PARTIAL POWER PLAN,1ST FLOOR
EL101 ELECTRICAL - LIGHTING PLAN,1ST FLOOR
EF101 ELECTRICAL - FIRE ALARM AND SECURITY PLAN, 1ST
FLOOR
EF101A ELECTRICAL – FIRE ALARM OVERAL PLAN, 1ST FLOOR
ET101 ELECTRICAL - COMM AND TECHNOLOGY PLAN - 1ST
FLOOR
E601 ELECTRICAL – SCHEDULES
E602 ELECTRICAL - SCHEDULES
E701 ELECTRICAL - DETAILS
E702 ELECTRICAL - DETAILS
E703 ELECTRICAL - DETAILS
E704 ELECTRICAL - DETAILS
- - - E N D - - -
DIVISION 01
GENERAL REQUIREMENTS
UD Emergency Department Access Renovations
Bancroft Architects + Engineers
03-01-20
Contract No. VA244-17-D-0029
Station Project No. 646-19-112
Bancroft-AE Project No. 16-128 12/22/2021
01 00 00 - 1
SECTION 01 00 00
GENERAL REQUIREMENTS
TABLE OF CONTENTS
1.1 SAFETY REQUIREMENTS
1.2 GENERAL INTENTION
1.3 STATEMENT OF BID ITEM(S)
1.4 SPECIFICATIONS AND DRAWINGS FOR CONTRACTOR
1.5 CONSTRUCTION SECURITY REQUIREMENTS
1.6 OPERATIONS AND STORAGE AREAS
1.7 ALTERATIONS
1.8 DISPOSAL AND RETENTION
1.9 PROTECTION OF EXISTING VEGETATION, STRUCTURES, EQUIPMENT,
UTILITIES, AND IMPROVEMENTS
1.10 RESTORATION
1.11 PHYSICAL DATA
1.12 PROFESSIONAL SURVEYING SERVICES
1.13 LAYOUT OF WORK
1.14 AS-BUILT DRAWINGS
1.15 WARRANTY MANAGEMENT
1.16 USE OF ROADWAYS
1.17 CONTRACTING OFFICER’S REPRESENTATIVE FIELD OFFICE
1.18 TEMPORARY USE OF MECHANICAL AND ELECTRICAL EQUIPMENT
1.19 TEMPORARY USE OF EXISTING ELEVATORS
1.20 TEMPORARY USE OF NEW ELEVATORS
UD Emergency Department Access Renovations
Bancroft Architects + Engineers
03-01-20
Contract No. VA244-17-D-0029
Station Project No. 646-19-112
Bancroft-AE Project No. 16-128 12/22/2021
01 00 00 - 2
1.21 TEMPORARY TOILETS
1.22 AVAILABILITY AND USE OF UTILITY SERVICES
1.23 NEW TELEPHONE EQUIPMENT
1.24 TESTS
1.25 INSTRUCTIONS
1.26 GOVERNMENT-FURNISHED PROPERTY
1.27 RELOCATED // EQUIPMENT // ITEMS //
1.28 STORAGE SPACE FOR DEPARTMENT OF VETERANS AFFAIRS EQUIPMENT
1.29 CONSTRUCTION SIGN
1.30 SAFETY SIGN
1.31 PHOTOGRAPHIC DOCUMENTATION
1.32 FINAL ELEVATION Digital Images
1.33 HISTORIC PRESERVATION
1.34 VA TRIRIGA CPMS
Bancroft Architects + Engineers
03-01-20
Contract No. VA244-17-D-0029
Station Project No. 646-19-112
Bancroft-AE Project No. 16-128 12/22/2021
01 00 00 -1
SECTION 01 00 00
GENERAL REQUIREMENTS
1.1 SAFETY REQUIREMENTS
Refer to section 01 35 26, SAFETY REQUIREMENTS for safety and infection control requirements.
1.2 GENERAL INTENTION
A. Contractor shall completely prepare site for building operations, including demolition and removal of existing structures, and furnish labor and materials and perform work for the project “UD Emergency
Department Access Renovations” for the University Drive Campus Veterans
Affairs Pittsburgh Healthcare System as required by drawings and specifications.
B. Visits to the site by Bidders may be made only by appointment with the
Medical Center Engineering Officer.
C. Offices of Bancroft Architects + Engineers , as Architect-Engineers, will render certain technical services during construction. Such services shall be considered as advisory to the Government and shall not be construed as expressing or implying a contractual act of the
Government without affirmations by Contracting Officer or his duly authorized representative.
D. Before placement and installation of work subject to tests by testing laboratory retained by Department of Veterans Affairs, the Contractor shall notify the COR in sufficient time to enable testing laboratory personnel to be present at the site in time for proper taking and testing of specimens and field inspection. Such prior notice shall be not less than three work days unless otherwise designated by the COR.
E. All employees of general contractor and subcontractors shall comply with VA security management program and obtain permission of the VA police, be identified by project and employer, and restricted from unauthorized access.
Station Project No. 646-19-112
01 00 00 -2
1.3 STATEMENT OF BID ITEM(S)
A. BASE BID: All work shown or specified within the drawings and specifications:
1. RENOVATE APPROXIMATELY 871 GSF OF INTERIOR SPACE IN THE EXISTING
EMERGENCY DEPARTMENT ON THE 1ST FLOOR.
2. THE SCOPE OF THIS PROJECT WILL INCLUDE A NEW ENTRANCE VESTIBULE,
APPROXIMATELY 208 GSF.
3. MODIFICATION OF THE EXISTING PARKING LOT TO CREATE NEW PEDESTRIAN
ACCESS TO THE EMERGENCY DEPARTMENT AND DECONTAMINATION ROOM.
4. INSTALLATION OF NEW SITE LIGHTING AND SIGNAGE.
5. ASPHALT REPLACEMENT AND ASSOCIATED SITE REPAIRS / UPGRADES.
B. General Construction work includes general construction, alterations, necessary removal of existing structures and construction, and certain other items as graphically illustrated on the contract drawings, narratively described in the contract specifications, and officially amended/modified by the VA Medical Center.
C. Electrical Work: Work includes all labor, material, equipment and supervision to perform the required electrical construction work on this project as graphically illustrated on the contract drawings, narratively described in the contract specifications, and officially amended/modified by the VA Medical Center.
D. Mechanical Work: Work includes all labor, material, equipment and supervision to perform the required Mechanical construction work as graphically illustrated on the contract drawings, narratively described in the contract specifications, and officially amended/modified by the
VA Medical Center.
Station Project No. 646-19-112
Bancroft-AE Project No. 16-128 12/22/2021
01 00 00 -3
E. DEDUCT ALTERNATE NO.1:
1. DELETE ALL WORK FOR PHASE 2 ASPHALT REPLACEMENT. DELETED WORK
INCLUDES REMOVAL AND REPLACEMENT OF THE AREA OF ASPHALT IDENTIFIED
AS PHASE 2.
F. DEDUCT ALTERNATE NO. 2:
1. DELETE ALL WORK FOR PHASE 3 ASPHALT REPLACEMENT. DELETED WORK
INCLUDES REMOVAL AND REPLACEMENT OF THE AREA OF ASPHALT IDENTIFIED
AS PHASE 3.
G. DEDUCT ALTERNATE NO. 3:
1. EXCEPT DELETE ALL WORK FOR REMOVAL AND REPLACEMENT OF THE EXISTING
CHAIN LINK GATE AND FENCE.
1.4 SPECIFICATIONS AND DRAWINGS FOR CONTRACTOR
A. Drawings and contract documents may be obtained from the website where the solicitation is posted. Additional copies will be at Contractor's expense.
1.5 CONSTRUCTION SECURITY REQUIREMENTS
A. Security Plan:
1. The security plan defines both physical and administrative security procedures that will remain effective for the entire duration of the project.
2. The General Contractor is responsible for assuring that all sub-contractors working on the project and their employees also comply with these regulations.
B. Security Procedures:
Station Project No. 646-19-112
Bancroft-AE Project No. 16-128 12/22/2021
01 00 00 -4
1. General Contractor’s employees shall not enter the project site without appropriate badge. They may also be subject to inspection of their personal effects when entering or leaving the project site.
2. Before starting work the General Contractor shall give one week’s notice to the Contracting Officer so that security can be provided for the employees. This notice is separate from any notices required for utility shutdown described later in this section.
3. No photography of VA premises is allowed without written permission of the Contracting Officer.
4. VA reserves the right to close down or shut down the project site and order General Contractor’s employees off the premises in the event of a national emergency. The General Contractor may return to the site only with the written approval of the Contracting Officer.
C. Guards: (Not Used)
D. Key Control:
1. The General Contractor shall provide duplicate keys and lock combinations to the Contracting officers representative (COR) for the purpose of security inspections of every area of project including tool boxes and parked machines and take any emergency action.
2. The General Contractor shall turn over all permanent lock cylinders to the VA locksmith for permanent installation. See Section 08 71
00, DOOR HARDWARE and coordinate.
E. Document Control:
1. Before starting any work, the General Contractor/Sub Contractors shall submit an electronic security memorandum describing the approach to following goals and maintaining confidentiality of
“sensitive information”.
Station Project No. 646-19-112
Bancroft-AE Project No. 16-128 12/22/2021
01 00 00 -5
2. The General Contractor is responsible for safekeeping of all drawings, project manual and other project information. This information shall be shared only with those with a specific need to accomplish the project.
3. Certain documents, sketches, videos or photographs and drawings may be marked “Law Enforcement Sensitive” or “Sensitive Unclassified”.
Secure such information in separate containers and limit the access to only those who will need it for the project. Return the information to the Contracting Officer upon request.
4. These security documents shall not be removed or transmitted from the project site without the written approval of Contracting
Officer.
5. All paper waste or electronic media such as CD’s and diskettes shall be shredded and destroyed in a manner acceptable to the VA.
6. Notify Contracting Officer and Site Security Officer immediately when there is a loss or compromise of “sensitive information”.
7. All electronic information shall be stored in specified location following VA standards and procedures using an Engineering Document
Management Software (EDMS).
a. Security, access and maintenance of all project drawings, both scanned and electronic shall be performed and tracked through the
EDMS system.
b. “Sensitive information” including drawings and other documents may be attached to e-mail provided all VA encryption procedures are followed.
F. Motor Vehicle Restrictions
1. Vehicle authorization request shall be required for any vehicle entering the site and such request shall be submitted 24 hours
Station Project No. 646-19-112
Bancroft-AE Project No. 16-128 12/22/2021
01 00 00 -6 before the date and time of access. Access shall be restricted to picking up and dropping off materials and supplies.
2. A limited number of (2 to 5) permits shall be issued for General
Contractor and its employees for parking in designated areas only.
1.6 OPERATIONS AND STORAGE AREAS
A. The Contractor shall confine all operations (including storage of materials) on Government premises to areas authorized or approved by the Contracting Officer. The Contractor shall hold and save the
Government, its officers and agents, free and harmless from liability of any nature occasioned by the Contractor's performance.
B. Temporary buildings (e.g., storage sheds, shops, offices) and utilities may be erected by the Contractor only with the approval of the
Contracting Officer and shall be built with labor and materials furnished by the Contractor without expense to the Government. The temporary buildings and utilities shall remain the property of the
Contractor and shall be removed by the Contractor at its expense upon completion of the work. With the written consent of the Contracting
Officer, the buildings and utilities may be abandoned and need not be removed.
C. The Contractor shall, under regulations prescribed by the Contracting
Officer, use only established roadways, or use temporary roadways constructed by the Contractor when and as authorized by the Contracting
Officer. When materials are transported in prosecuting the work, vehicles shall not be loaded beyond the loading capacity recommended by the manufacturer of the vehicle or prescribed by any Federal, State, or local law or regulation. When it is necessary to cross curbs or sidewalks, the Contractor shall protect them from damage. The
Contractor shall repair or pay for the repair of any damaged curbs, sidewalks, or roads.
Station Project No. 646-19-112
Bancroft-AE Project No. 16-128 12/22/2021
01 00 00 -7
D. Working space and space available for storing materials shall be as determined by the COR .
E. Workers are subject to rules of Medical Center applicable to their conduct.
F. Execute work so as to interfere as little as possible with normal functioning of Medical Center as a whole, including operations of utility services, fire protection systems and any existing equipment, and with work being done by others. Use of equipment and tools that transmit vibrations and noises through the building structure, are not permitted in buildings that are occupied, during construction, jointly by patients or medical personnel, and Contractor's personnel, except as permitted by COR where required by limited working space.
1. Do not store materials and equipment in other than assigned areas.
2. Schedule delivery of materials and equipment to immediate construction working areas within buildings in use by Department of
Veterans Affairs in quantities sufficient for not more than two work days. Provide unobstructed access to Medical Center areas required to remain in operation.
3. Where access by Medical Center personnel to vacated portions of buildings is not required, storage of Contractor's materials and equipment will be permitted subject to fire and safety requirements.
F. Utilities Services: Where necessary to cut existing pipes, electrical wires, conduits, cables, etc., of utility services, or of fire protection systems or communications systems (except telephone), they shall be cut and capped at suitable places where shown; or, in absence of such indication, where directed by COR. All such actions shall be coordinated with the COR or Utility Company involved:
1. Whenever it is required that a connection fee be paid to a public utility provider for new permanent service to the construction project, for such items as water, sewer, electricity, gas or steam, Station Project No. 646-19-112
Bancroft-AE Project No. 16-128 12/22/2021
01 00 00 -8 payment of such fee shall be the responsibility of the Government and not the Contractor.
G. Phasing:
The Medical Center must maintain its operation 24 hours a day 7 days a week. Therefore, any interruption in service must be scheduled and coordinated with the COR to ensure that no lapses in operation occur.
It is the CONTRACTOR'S responsibility to develop a work plan and schedule detailing, at a minimum, the procedures to be employed, the equipment and materials to be used, the interim life safety measure to be used during the work, and a schedule defining the duration of the work with milestone subtasks. The work to be outlined shall include, but not be limited to:
To ensure such executions, Contractor shall furnish the COR with a schedule of approximate dates on which the Contractor intends to accomplish work in each specific area of site, building or portion thereof. In addition, Contractor shall notify the COR two weeks in advance of the proposed date of starting work in each specific area of site, building or portion thereof. Arrange such dates to ensure accomplishment of this work in successive phases mutually agreeable to
Medical Center Director, COR and Contractor, as follows:
Phase I: TBD by the Contractor utilizing suggested phasing information contained in the contract documents and with the approval of the
COR.
Phase II:TBD by the Contractor utilizing suggested phasing information contained in the contract documents and with the approval of the
COR.
H. Building No.(1) will be occupied during performance of work.
1. Contractor shall take all measures and provide all material necessary for protecting existing equipment and property in affected areas of construction against dust and debris, so that equipment and affected areas to be used in the Medical Centers operations will not
Station Project No. 646-19-112
Bancroft-AE Project No. 16-128 12/22/2021
01 00 00 -9 be hindered. Contractor shall permit access to Department of
Veterans Affairs personnel and patients through other construction areas which serve as routes of access to such affected areas and equipment. These routes whether access or egress shall be isolated from the construction area by temporary partitions and have walking surfaces, lighting etc to facilitate patient and staff access.
Coordinate alteration work in areas occupied by Department of
Veterans Affairs so that Medical Center operations will continue during the construction period.
I. Construction Fence: Before construction operations begin, Contractor shall provide a chain link construction fence, 2.1m (seven feet) minimum height, around the construction area indicated on the drawings.
Provide gates as required for access with necessary hardware, including hasps and padlocks. Fasten fence fabric to terminal posts with tension bands and to line posts and top and bottom rails with tie wires spaced at maximum 375mm (15 inches). Bottom of fences shall extend to 25mm
(one inch) above grade. Remove the fence when directed by COR.
J. When a building and/or construction site is turned over to Contractor, Contractor shall accept entire responsibility including upkeep and maintenance therefore:
1. Contractor shall maintain a minimum temperature of 4 degrees C (40 degrees F) at all times, except as otherwise specified.
2. Contractor shall maintain in operating condition existing fire protection and alarm equipment. In connection with fire alarm equipment, Contractor shall make arrangements for pre-inspection of site with Fire Department or Company (Department of Veterans Affairs or municipal) whichever will be required to respond to an alarm from
Contractor's employee or watchman.
K. Utilities Services: Maintain existing utility services for Medical
Center at all times. Provide temporary facilities, labor, materials, Station Project No. 646-19-112
Bancroft-AE Project No. 16-128 12/22/2021
01 00 00 -10 equipment, connections, and utilities to assure uninterrupted services.
Where necessary to cut existing water, steam, gases, sewer or air pipes, or conduits, wires, cables, etc. of utility services or of fire protection systems and communications systems (including telephone), they shall be cut and capped at suitable places where shown; or, in absence of such indication, where directed by COR.
1. No utility service such as water, gas, steam, sewers or electricity, or fire protection systems and communications systems may be interrupted without prior approval of COR. Electrical work shall be accomplished with all affected circuits or equipment de-energized.
When an electrical outage cannot be accomplished, work on any energized circuits or equipment shall not commence without a detailed work plan, the Medical Center Director’s prior knowledge and written approval. Refer to specification Sections 26 05 11, REQUIREMENTS FOR ELECTRICAL INSTALLATIONS, 27 05 11 REQUIREMENTS FOR
COMMUNICATIONS INSTALLATIONS and 28 05 00, COMMON WORK RESULTS FOR
ELECTRONIC SAFETY AND SECURITY for additional requirements.
2. Contractor shall submit a request to interrupt any such services to
COR, in writing, 7 days in advance of proposed interruption. Request shall state reason, date, exact time of, and approximate duration of such interruption.
3. Contractor will be advised (in writing) of approval of request, or of which other date and/or time such interruption will cause least inconvenience to operations of Medical Center. Interruption time approved by Medical Center may occur at other than Contractor's normal working hours.
4. Major interruptions of any system must be requested, in writing, at least 15 calendar days prior to the desired time and shall be performed as directed by the COR.
Station Project No. 646-19-112
Bancroft-AE Project No. 16-128 12/22/2021
01 00 00 -11
5. In case of a contract construction emergency, service will be interrupted on approval of COR. Such approval will be confirmed in writing as soon as practical.
6. Whenever it is required that a connection fee be paid to a public utility provider for new permanent service to the construction project, for such items as water, sewer, electricity, gas or steam, payment of such fee shall be the responsibility of the Government and not the Contractor.
L. Abandoned Lines: All service lines such as wires, cables, conduits, ducts, pipes and the like, and their hangers or supports, which are to be abandoned but are not required to be entirely removed, shall be sealed, capped or plugged at the main, branch or panel they originate from. The lines shall not be capped in finished areas, but shall be removed and sealed, capped or plugged in ceilings, within furred spaces, in unfinished areas, or within walls or partitions; so that they are completely behind the finished surfaces.
M. To minimize interference of construction activities with flow of
Medical Center traffic, comply with the following:
1. Keep roads, walks and entrances to grounds, to parking and to occupied areas of buildings clear of construction materials, debris and standing construction equipment and vehicles. \
2. Method and scheduling of required cutting, altering and removal of existing roads, walks and entrances must be approved by the COR.
N. Coordinate the work for this contract with other construction operations as directed by COR. This includes the scheduling of traffic and the use of roadways, as specified in Article, USE OF ROADWAYS.
O. Coordination of Construction with Cemetery Director: The burial activities at a National Cemetery shall take precedence over construction activities. The Contractor must cooperate and coordinate
Station Project No. 646-19-112
Bancroft-AE Project No. 16-128 12/22/2021
01 00 00 -12 with the Cemetery Director, through the COR, in arranging construction schedule to cause the least possible interference with cemetery activities in actual burial areas. Construction noise during the interment services shall not disturb the service. Trucks and workers shall not pass through the service area during this period:
1. The Contractor is required to discontinue his work sufficiently in advance of Easter Sunday, Mother's Day, Father's Day, Memorial Day, Veteran's Day and/or Federal holidays, to permit him to clean up all areas of operation adjacent to existing burial plots before these dates.
2. Cleaning up shall include the removal of all equipment, tools, materials and debris and leaving the areas in a clean, neat condition.
1.7 ALTERATIONS
A. Survey: Before any work is started, the Contractor shall make a thorough survey with the COR and a representative of VA Supply Service, of areas of buildings in which alterations occur and areas which are anticipated routes of access, and furnish a report, signed by all three, to the Contracting Officer. This report shall list by rooms and spaces:
1. Existing condition and types of resilient flooring, doors, windows, walls and other surfaces not required to be altered throughout affected areas of building.
2. Existence and conditions of items such as plumbing fixtures and accessories, electrical fixtures, equipment, venetian blinds, shades, etc., required by drawings to be either reused or relocated, or both.
3. Shall note any discrepancies between drawings and existing conditions at site.
Station Project No. 646-19-112
Bancroft-AE Project No. 16-128 12/22/2021
01 00 00 -13
4. Shall designate areas for working space, materials storage and routes of access to areas within buildings where alterations occur and which have been agreed upon by Contractor and COR.
B. Any items required by drawings to be either reused or relocated or both, found during this survey to be nonexistent, or in opinion of
COR, to be in such condition that their use is impossible or impractical, shall be furnished and/or replaced by Contractor with new items in accordance with specifications which will be furnished by
Government. Provided the contract work is changed by reason of this subparagraph B, the contract will be modified accordingly, under provisions of clause entitled "DIFFERING SITE CONDITIONS" (FAR 52.236-
2) and "CHANGES" (FAR 52.243-4).
C. Re-Survey: Thirty days before expected partial or final inspection date, the Contractor and COR together shall make a thorough re-survey of the areas of buildings involved. They shall furnish a report on conditions then existing, of resilient flooring, doors, windows, walls and other surfaces as compared with conditions of same as noted in first condition survey report:
1. Re-survey report shall also list any damage caused by Contractor to such flooring and other surfaces, despite protection measures; and, will form basis for determining extent of repair work required of
Contractor to restore damage caused by Contractor's workers in executing work of this contract.
D. Protection: Provide the following protective measures:
1. Wherever existing roof surfaces are disturbed they shall be protected against water infiltration. In case of leaks, they shall be repaired immediately upon discovery.
2. Temporary protection against damage for portions of existing structures and grounds where work is to be done, materials handled and equipment moved and/or relocated.
Station Project No. 646-19-112
Bancroft-AE Project No. 16-128 12/22/2021
01 00 00 -14
3. Protection of interior of existing structures at all times, from damage, dust and weather inclemency. Wherever work is performed, floor surfaces that are to remain in place shall be adequately protected prior to starting work, and this protection shall be maintained intact until all work in the area is completed.
1.8 DISPOSAL AND RETENTION
A. Materials and equipment accruing from work removed and from demolition of buildings or structures, or parts thereof, shall be disposed of as follows:
1. Reserved items which are to remain property of the Government are // identified by attached tags or noted on drawings or in specifications as items to be stored. Items that remain property of the Government shall be removed or dislodged from present locations in such a manner as to prevent damage which would be detrimental to re-installation and reuse. Store such items where directed by COR.
2. Items not reserved shall become property of the Contractor and be removed by Contractor from Medical Center.
3. Items of portable equipment and furnishings located in rooms and spaces in which work is to be done under this contract shall remain the property of the Government. When rooms and spaces are vacated by the Department of Veterans Affairs during the alteration period, such items which are NOT required by drawings and specifications to be either relocated or reused will be removed by the Government in advance of work to avoid interfering with Contractor's operation.
1.9 PROTECTION OF EXISTING VEGETATION, STRUCTURES, EQUIPMENT, UTILITIES, AND
IMPROVEMENTS (NOT USED)
1.10 RESTORATION
A. Remove, cut, alter, replace, patch and repair existing work as necessary to install new work. Except as otherwise shown or specified, do not cut, alter or remove any structural work, and do not disturb any
Station Project No. 646-19-112
Bancroft-AE Project No. 16-128 12/22/2021
01 00 00 -15 ducts, plumbing, steam, gas, or electric work without approval of the
COR. Existing work to be altered or extended and that is found to be defective in any way, shall be reported to the COR before it is disturbed. Materials and workmanship used in restoring work, shall conform in type and quality to that of original existing construction, except as otherwise shown or specified.
B. Upon completion of contract, deliver work complete and undamaged.
Existing work (walls, ceilings, partitions, floors, mechanical and electrical work, lawns, paving, roads, walks, etc.) disturbed or removed as a result of performing required new work, shall be patched, repaired, reinstalled, or replaced with new work, and refinished and left in as good condition as existed before commencing work.
C. At Contractor's own expense, Contractor shall immediately restore to service and repair any damage caused by Contractor's workers to existing piping and conduits, wires, cables, etc., of utility services or of fire protection systems and communications systems (including telephone) which are not scheduled for discontinuance or abandonment.
D. Expense of repairs to such utilities and systems not shown on drawings or locations of which are unknown will be covered by adjustment to contract time and price in accordance with clause entitled "CHANGES"
(FAR 52.243-4) and "DIFFERING SITE CONDITIONS" (FAR 52.236-2).
1.11 PHYSICAL DATA (NOT USED)
1.12 PROFESSIONAL SURVEYING SERVICES (NOT USED)
1.13 LAYOUT OF WORK (NOT USED)
1.14 AS-BUILT DRAWINGS
A. The contractor shall maintain two full size sets of as-built drawings which will be kept current during construction of the project, to include all contract changes, modifications and clarifications.
Station Project No. 646-19-112
Bancroft-AE Project No. 16-128 12/22/2021
01 00 00 -16
B. All variations shall be shown in the same general detail as used in the contract drawings. To ensure compliance, as-built drawings shall be made available for the COR review, as often as requested.
C. Contractor shall deliver two approved completed sets ofas-built drawings in the electronic version (scanned PDF) to the COR within 15 calendar days after each completed phase and after the acceptance of the project by the COR.
D. Paragraphs A, B, & C shall also apply to all shop drawings.
1.15 WARRANTY MANAGEMENT
A. Warranty Management Plan: Develop a warranty management plan which contains information relevant to FAR 52.246-21 Warranty of Construction in at least 30 days before the planned pre-warranty conference, submit one set of the warranty management plan. Include within the warranty management plan all required actions and documents to assure that the
Government receives all warranties to which it is entitled. The plan must be in narrative form and contain sufficient detail to render it suitable for use by future maintenance and repair personnel, whether tradesman, or of engineering background, not necessarily familiar with this contract. The term “status” as indicated below must include due date and whether item has been submitted or was approved. Warranty information made available during the construction phase must be submitted to the Contracting Officer for approval prior to each monthly invoice for payment. Assemble approved information in a binder and turn over to the Government upon acceptance of the work. The construction warranty period will begin on the date of the project acceptance and continue for the product warranty period. A joint 4 month and 9 month warranty inspection will be conducted, measured from time of acceptance, by the Contactor and the Contracting Officer. Include in the warranty management plan, but not limited to, the following:
1. Roles and responsibilities of all personnel associated with the warranty process, including points of contact and telephone numbers
Station Project No. 646-19-112
Bancroft-AE Project No. 16-128 12/22/2021
01 00 00 -17 within the company of the Contractor, subcontractors, manufacturers or suppliers involved.
2. Furnish with each warranty the name, address and telephone number of each of the guarantor’s representatives nearest project location.
3. Listing and status of delivery of all Certificates of Warranty for extended warranty items, to include roofs, HVAC balancing, pumps, motors, transformers and for all commissioned systems such as fire protection and alarm systems, sprinkler systems and lightning protection systems, etc.
4. A list for each warranted equipment item, feature of construction or system indicating:
a. Name of item.
b. Model and serial numbers.
c. Location where installed.
d. Name and phone numbers of manufacturers and suppliers.
e. Name and phone numbers of manufacturers or suppliers.
f. Names, addresses and phone numbers of sources of spare parts.
g. Warranties and terms of warranty. Include one-year overall warranty of construction, including the starting date of warranty of construction. Items which have extended warranties must be indicated with separate warranty expiration dates.
h. Starting point and duration of warranty period.
i. Summary of maintenance procedures required to continue the warranty in force.
j. Cross-reference to specific pertinent Operation and Maintenance manuals.
Station Project No. 646-19-112
Bancroft-AE Project No. 16-128 12/22/2021
01 00 00 -18
k. Organizations, names and phone numbers of persons to call for warranty service.
l. Typical response time and repair time expected for various warranted equipment.
5. The plans for attendance at the 4 and 9-month post construction warranty inspections conducted by the government.
6. Procedure and status of tagging of all equipment covered by extended warranties.
7. Copies of instructions to be posted near selected pieces of equipment where operation is critical for warranty and/or safety reasons.
B. Performance Bond: The Performance Bond must remain effective throughout the construction period.
1. In the event the Contractor fails to commence and diligently pursue any construction warranty work required, the Contracting Officer will have the work performed by others, and after completion of the work, will charge the remaining construction warranty funds of expenses incurred by the Government while performing the work, including, but not limited to administrative expenses.
2. In the event sufficient funds are not available to cover the construction warranty work performed by the Government at the contractor’s expenses, the Contracting Officer will have the right to recoup expenses from the bonding company.
3. Following oral or written notification of required construction warranty repair work, the Contractor shall respond in a timely manner. Written verification will follow oral instructions. Failure to respond will be cause for the Contracting Officer to proceed against the Contractor.
Station Project No. 646-19-112
Bancroft-AE Project No. 16-128 12/22/2021
01 00 00 -19
C. Pre-Warranty Conference: Prior to contract completion, and at a time designated by the Contracting Officer, the Contractor shall meet with the Contracting Officer to develop a mutual understanding with respect to the requirements of this section. Communication procedures for
Contractor notification of construction warranty defects, priorities with respect to the type of defect, reasonable time required for
Contractor response, and other details deemed necessary by the
Contracting Officer for the execution of the construction warranty will be established/ reviewed at this meeting. In connection with these requirements and at the time of the Contractor’s quality control completion inspection, furnish the name, telephone number and address of a licensed and bonded company which is authorized to initiate and pursue construction warranty work action on behalf of the Contractor.
This point of contract will be located within the local service area of the warranted construction, be continuously available and be responsive to Government inquiry on warranty work action and status. This requirement does not relieve the Contractor of any of its responsibilities in conjunction with other portions of this provision.
D. Contractor’s Response to Construction Warranty Service Requirements:
Following oral or written notification by the Contracting Officer, the
Contractor shall respond to construction warranty service requirements in accordance with the “Construction Warranty Service Priority List” and the three categories of priorities listed below. Submit a report on any warranty item that has been repaired during the warranty period.
Include within the report the cause of the problem, date reported, corrective action taken, and when the repair was completed. If the
Contractor does not perform the construction warranty within the timeframe specified, the Government will perform the work and back charge the construction warranty payment item established.
1. First Priority Code 1. Perform onsite inspection to evaluate situation, and determine course of action within 4 hours, initiate work within 6 hours and work continuously to completion or relief.
Station Project No. 646-19-112
Bancroft-AE Project No. 16-128 12/22/2021
01 00 00 -20
2. Second Priority Code 2. Perform onsite inspection to evaluate situation, and determine course of action within 8 hours, initiate work within 24 hours and work continuously to completion or relief.
3. Third Priority Code 3. All other work to be initiated within 3 work days and work continuously to completion or relief.
4. The “Construction Warranty Service Priority List” is as follows:
Code 1-Life Safety Systems
a. Fire suppression systems.
b. Fire alarm system(s).
Code 1-Air Conditioning Systems
a. Air conditioning leak in part of the building, if causing damage.
b. Air conditioning system not cooling properly.
Code 1 Doors
a. Overhead doors not operational, causing a security, fire or safety problem.
b. Interior, exterior personnel doors or hardware, not functioning properly, causing security, fire or safety problem.
Code 3-Doors
a. Overhead doors not operational.
b. Interior/exterior personnel doors or hardware not functioning properly.
Code 1-Electrical
Station Project No. 646-19-112
Bancroft-AE Project No. 16-128 12/22/2021
01 00 00 -21
a. Power failure (entire area or any building operational after 1600 hours).
b. Security lights.
c. Smoke detectors.
Code 2-Electrical
a. Power failure (no power to a room or part of building).
b. Receptacles and lights not operational (in a room or part of building).
Code 3-Electrical
a. Exterior lights not operational.
Code 1-Gas
a. Leaks and pipeline breaks.
Code 1-Heat
a. Power failure affecting heat.
Code 1-Plumbing
a. Hot water heater failure.
b. Leaking water supply pipes.
Code 2-Plumbing
a. Flush valves not operating properly
b. Fixture drain, supply line or any water pipe leaking.
c. Toilet leaking at base.
Code 3- Plumbing
Station Project No. 646-19-112
Bancroft-AE Project No. 16-128 12/22/2021
01 00 00 -22
a. Leaky faucets.
Code 3-Interior
a. Floors damaged.
b. Paint chipping or peeling.
c. Casework damaged.
Code 1-Roof Leaks
a. Damage to property is occurring.
Code 2-Water (Exterior)
a. No water to facility.
Code 2-Water (Hot)
a. No hot water in portion of building listed.
Code 3
a. All work not listed above.
E. Warranty Tags: At the time of installation, tag each warranted item with a durable, oil and water-resistant tag approved by the Contracting
Officer. Attach each tag with a copper wire and spray with a silicone waterproof coating.
This is the start of the file's text. The full file is on GovTribe.