Exhibit C.pdf

PDF 591 KB Posted

Attached to
USS CURTIS WILBUR (DDG 54) FY22 Dry-Dock Selected Restricted Availability (DSRA)
Solicitation number
N55236-21-R-0010
Issued by

About this file

This document contains a Contract Data Requirements List (CDRL) and details of a related federal contract opportunity. The CDRL outlines two data items required under contract number N55236-21-R-0010: COTS Equipment Manual Support and Tech Manual Contract Requirements. Delivery of the COTS manual is due concurrently with other provisioning documentation, while the tech manual requirements are to be submitted within 10 days of equipment receipt with final approval within 30 days.

The related federal contract opportunity is solicitation number N55236-21-R-0010 for the USS CURTIS WILBUR (DDG 54) FY22 Dry-Dock Selected Restricted Availability scheduled from August 2022 to September 2023. The solicitation seeks a contractor to complete ship maintenance, repair, and modernization. The competition is open to all responsible sources on a coast-wide basis. Interested parties must register in SAM and monitor beta.SAM.gov for the solicitation and amendments. Pricing attachments will require restricted access on beta.SAM.gov. The Navy anticipates a single award by 12 November 2021 for work to be performed at contractor facilities on the West Coast.

View the file

Other files

File Type Posted
N55236-21-R-0010 Amendment 0009.pdf PDF
N55236-21-R-0010 Conformed Through A0009.pdf PDF
N55236-21-R-0010 Conformed Through A0008.pdf PDF
N55236-21-R-0010 Amendment 0008.pdf PDF
N55236-21-R-0010 Conformed Through A0007.pdf PDF
N55236-21-R0010 Amendment 0007.pdf PDF
N55236-21-R-0010 Amendment 0006.pdf PDF
N55236-21-R-0010 Conformed Through A0006.pdf PDF
N55236-21-R-0010 Conformed Through A0005.pdf PDF
N55236-21-R-0010 Amendment 0005.pdf PDF
N55236-21-R-0010 Conformed Through A0004.pdf PDF
N55236-21-R-0010 Amendment 0004.pdf PDF
N55236-21-R-0010 Conformed Through A0003.pdf PDF
N55236-21-R-0010 Amendment 0003.pdf PDF
J-6 Fill-In Clauses REV1.docx DOCX document
N55236-21-R-0010 Conformed Through A0002.pdf PDF
N55236-21-R-0010 Amendment 0002.pdf PDF
CDRL A016 Encl (1) End of Avail Report Template.xls XLS spreadsheet
N55236-21-R-0010 Amendment 0001.pdf PDF
N55236-21-R-0010 Conformed Through A0001.pdf PDF
CDRL A017 Encl (1) Monthly Manning Report Template.xls XLS spreadsheet
RFP N55236-21-R-0010.pdf PDF
J-8 Government Furnished Material (GFM) List.xlsx XLSX spreadsheet
J-4 Quality Assurance Surveillance Plan (QASP).pdf PDF
J-6 Fill-In Clauses.docx DOCX document
S-1 Pre-Proposal Information (PPI) Form.doc DOC document
Exhibit B.pdf PDF
J-12 Progress Payments Tracker.xlsx XLSX spreadsheet
J-9 Representations and Certifications.docx DOCX document
J-7 Work Package Execution Review and Schedule Model Review.pdf PDF
Exhibit A.pdf PDF
Exhibit C.pdf PDF
Exhibit B.pdf PDF
CDRL A017 Encl (1) Monthly Manning Report Template.xlsx XLSX spreadsheet
S-1 (PPI Form).doc DOC document
J-4 (QASP).pdf PDF
J-6 (Fill-In Clauses).docx DOCX document
J-9 (Representations and Certifications).docx DOCX document
J-8 (GFM List).xlsx XLSX spreadsheet
CDRL A016 Encl (1) End of Avail Report Template.xlsx XLSX spreadsheet
RFP No. N55236-21-R-0010.pdf PDF
Exhibit A.pdf PDF
J-12 (Progress Payments Tracker).xlsx XLSX spreadsheet
J-7 (Work Package Execution Review and Schedule Model Review).pdf PDF
Show all 44

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DD FORM 1423-1, FEB 2001

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

PREVIOUS EDITION MAY BE USED.

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ________ TM _______ OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ

8. APP CODE

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

11. AS OF DATE

12. DATE OF FIRST SUBMISSION

13. DATE OF SUBSEQUENT

SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

Draft Final

Reg Repro

15. TOTAL

16. REMARKS

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

Page of Pages

0002 C OTHER

SUPPLIES/SERVICES N55236-21-R-0010 TBD

C001 COMMERCIAL OFF THE SHELF (COTS) EQUIPMENT

MANUAL SUPPORT

DI-TMSS-81815 SOW, PARA 1.5 NSWCPD

DD

N/A (BLK 16)

ASREQ

N/A

(BLK 16)

(BLK 16)

NSWCPD C94 0 1 0

RMC C300 0 0 1

(BLK 16)

0 1 1

(BLK 9) - DISTRIBUTION STATEMENT A. APPROVED FOR PUBLIC RELEASE:

DISTRIBUTION IS UNLIMITED; UNLESS PROPRIETARY OR CLASSIFIED

INFORMATION APPLIES THEN DISTRIBUTION STATEMENT B. APPLIES. OTHER

REQUESTS FOR THE DOCUMENT SHALL BE REFERRED TO THE PRIME

PROVISIONING ACTIVITY (PPA)

(BLK 10/13) - REVISIONS SHALL BE SUBMITTED WITHIN 30 DAYS AFTER

APPROVAL OF A CHANGE BY THE GOVERNMENT, OR IF GOVERNMENT

APPROVAL IS NOT REQUIRED, WITH 30 DAYS AFTER INCORPORATION OF A

CHANGEWHEN ANY CHANGE IS MADE.

(BLK 12/13) - DELIVERY SHALL BE CONCURRENT WITH THE DELIVERY OF

THE PROVISIONING PARTS DATA (PPD) AND THE ENGINEERING DATA FOR

PROVISIONING (EDFP) DELIVERABLES.

(BLOCK 14) - REPORTS SHALL BE IN APPROVED TRANSFERABLE MEDIA.

Adobe Professional 8.0

1 2

DD FORM 1423-1, FEB 2001

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

PREVIOUS EDITION MAY BE USED.

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ________ TM _______ OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ

8. APP CODE

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

11. AS OF DATE

12. DATE OF FIRST SUBMISSION

13. DATE OF SUBSEQUENT

SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

Draft Final

Reg Repro

15. TOTAL

16. REMARKS

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

Page of Pages

0002 C

SUPPLIES/SERVICES N55236-21-R-0010 TBD

C002 TECH MANUAL CONTRACT REQUIREMENTS (TMCR)

HULL, MECH & ELEC EQUIPMENT TECH MAN REQ

SI 009-41: TMCR FOR A TOPICALLY

STRUCTURED TECH MANUAL

DI-TMSS-81815/81816 SOW, PARA 1.5 PMS 407

SS

A

ASREQ

N/A

(BLK 16)

(BLK 16)

RMC C300 0 0 1

NSWCPD C94 3 1 0

(BLK 16)

3 1 1

(BLK 8) - Approval will be for technical content and format.

(BLK 10/12/13) - Submit NLT 10 days after receipt of equipment. Final copy is due 30 days after receipt of Government approval.

Adobe Professional 8.0

2 2

C001 COTS Equipment Manual Suprt
C002 Tech Manual Rqmts
2021-02-01T11:00:37-0800
WONG.CINDY.PING.1595307410
2021-02-01T11:00:56-0800
WONG.CINDY.PING.1595307410
2021-02-23T14:55:36-0800
HEINRICH.LINDE.Y.1515197326
2021-02-23T14:56:51-0800
HEINRICH.LINDE.Y.1515197326

File details come from the government source that posted it. Updated .