Exhibit B ILSC Supplemental SOW.pdf
PDF 2 MB Posted
- Attached to
- G2R Open Season
- Solicitation number
- DLA-G2R-Solicitation
About this file
This is a Supplemental Statement of Work (SOW) for the C5ISR Gateway to Sustainment (G2S) Exhibit B for ILSC (Integrated Logistics Support Contract) requirements supporting U.S. Army Communications-Electronics Command (CECOM) systems and equipment. The document establishes technical and administrative requirements that apply when referenced in individual delivery orders issued under the G2S contract.
The SOW covers three primary service categories: Hardware maintenance and support, Services (repair, engineering, and depot maintenance), and Software support. Hardware requirements include test and evaluation reporting, environmental stress screening, failure analysis and corrective action systems (FRACAS), training development, Line Replaceable Unit (LRU) inspection and testing, reliability and maintainability programs, configuration control, engineering change proposals, First Article Testing (FAT), production acceptance testing, obsolescence management with a five-year rolling technology refreshment plan, and quality assurance programs. Services requirements encompass LRU repair with specified turn-around times (RTAT), overhaul reporting, maintenance documentation, help desk support available 24/7, field engineer support, depot-level maintenance and deep cleaning operations, and Public-Private Partnership (P3) coordination with Tobyhanna Army Depot for transition to government depot support. The SOW mandates extensive technical documentation deliverables through Contract Data Requirements Lists (CDRLs), including test procedures, reliability predictions, technical manuals in interactive electronic format, configuration management plans, bills of materials with obsolescence tracking, and performance reports. All government property must be tracked through the Total Asset Visibility-Contractor (TAV-C) system. The document applies configuration management standards per EIA-649-C, requires compliance with ISO 9001:2015 quality standards, and mandates counterfeit parts detection and avoidance procedures consistent with SAE standards.
View the file
Other files
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
September 1, 2021 G2S Exhibit B – ILSC Supplemental Statement of Work Page 1 of 182
C5ISR Gateway to Sustainment (G2S)
Exhibit B
ILSC Supplemental Statement of Work
September 1, 2021 G2S Exhibit B – ILSC Supplemental Statement of Work Page 2 of 182
Table of Contents
1.0 Scope
2.0 Applicable Documents
3.0 Requirements
3.1 Hardware
3.1.1 Test and Evaluation and Report
3.1.2 System or Item Specific Obsolescence Monitoring, Reporting
3.1.3 Training
3.1.4 LRU Inspection and Test
3.1.5 Failure Reporting, Analyses, and Corrective Action System (FRACAS)
3.1.6 Cosmetic Defects
3.1.7 Workmanship Warranty
3.1.8 Engineering Change Proposal
3.1.9 FMECA
3.1.10 Corrosion Prevention and Control Plan
3.1.11 Shipping
3.1.12 Mission Critical Computer Resources
3.1.13 Storage Test Procedure
3.1.14 Defense Automatic Addressing System
3.1.15 Obsolescence
3.1.16 Product Drawings/Models and Associated Lists
3.1.17 Storage Test Procedure
3.1.18 Reliability and Maintainability Program
3.1.19 Supply Chain Management
3.1.20 Supplier Surge and Sustainment Plan
3.1.21 Counterfeit Electronics Part Detection and Avoidance
3.1.22 Packaging
3.1.23 Item Number Marking (Gov’t Detailed Design Items)
3.1.24 Transportation
3.1.25 Configuration Control
3.1.26 Drawing (Revisions)
3.1.27 Contractor Performed First Article Testing
3.1.28 Production Acceptance Test
3.1.29 Additional Higher-Level Quality
September 1, 2021 G2S Exhibit B – ILSC Supplemental Statement of Work Page 3 of 182
3.1.30 Life of Type Procurement for Future Requirements
3.1.31 Obsolescence Status Report
3.2 Services
3.2.1 Repair
3.2.2 Engineering Services
3.2.3 Depot Maintenance
3.2.4 Total Asset Visibility-Contractor (TAV-C)
3.3 Software
3.3.1 System Software
3.3.2 Software Problem Report
Appendix A – Initial List of CECOM’s NSNs, End Item Applications and Technical POCs
Appendix B – List of Items Requiring FAT
Appendix C – Contract Deliverable Requirements List (CDRL List)
Appendix D – CDRL Item 14 Distribution: Addressee Information Sheet
Appendix E – Instructions for Completing DD Form 1423
Appendix F – SINCGARS Installation Kit FAT & Production Acceptance Test Requirements172
September 1, 2021 G2S Exhibit B – ILSC Supplemental Statement of Work Page 4 of 182
1.0 Scope.
The purpose of the Supplemental SOW for C5ISR requirements is to capture the overarching requirements that may be supported under the contract. The applicable sections of the Supplemental SOW, to include applicable CDRLs, will be referenced at time of order RFP and within the subsequent order.
Additional within scope supplemental requirements may be solicited within the order RFP that are not included within this document.
This Statement of Work (SOW) supplement includes technical requirements in addition to the base C5ISR G2S SOW, and shall be treated as part of the contract when required at the order RFP and subsequent order. The applicable sections of the Supplemental SOW will be referenced at time of order RFP and subsequent order. This document is applicable when indicated in Attachment X, “Supplemental Requirements.” This document shall govern any conflicts between the requirements of the base contract SOW, drawings for the item(s) on contract, and the requirements of this document.
2.0 Applicable Documents.
The following documents are in addition to the documents listed in the C5ISR G2S SOW, and are applicable to the extent cited. The most recent version of the documents shall be used at the time of the individual order unless otherwise specified.
Other Documents
MIL-HDBK-344:
https://quicksearch.dla.mil/qsSearch.aspx
Environmental Stress Screening (ESS) of Electronic Equipment
DoD Instruction 4151.21, as amended:
https://www.esd.whs.mil/Directives/issuances/dodi/
Public-Private Partnerships for Product Support
MIL-PRF-32070A:
https://quicksearch.dla.mil/qsSearch.aspx
Performance Specification Test Program Sets
MIL-PRF-49503C:
https://quicksearch.dla.mil/qsSearch.aspx
Performance Specification Test Program Sets for Automatic Test Equipment
DLM 4000.25, Volume 2, Chapter 17:
https://www.dla.mil/HQ/InformationOperations/DLMS/eLibrary/Manuals/publications/dlm/
Supply Discrepancy Reporting
MIL-HDBK-2155:
https://quicksearch.dla.mil/qsSearch.aspx
Failure Reporting, Analysis and Corrective Action Taken
ANSI/AIAA S-102.2.4-2015:
https://www.aiaa.org/publications/Standards
Capability-Based Product Failure Mode, Effects and Criticality Analysis (FMECA) Requirements
ASTM D3951-15:
https://www.astm.org/
Standard Practice for Commercial Packaging
MIL-STD-129R:
https://quicksearch.dla.mil/qsSearch.aspx https://www.dla.mil/HQ/InformationOperations/DLMS/elibrary/manuals/milstds/
Department of Defense Standard Practice: Military
September 1, 2021 G2S Exhibit B – ILSC Supplemental Statement of Work Page 5 of 182
Marking for Shipment and Storage
EIA-649-C:
https://quicksearch.dla.mil/qsSearch.aspx
National Consensus Standard for Configuration Management
MIL-STD-882E:
https://quicksearch.dla.mil/qsSearch.aspx
Standard Practice for System Safety
SD-22:
https://quicksearch.dla.mil/qsSearch.aspx
Diminishing Manufacturing Sources and Material Shortages (DMSMS): A Guidebook of Best Practices and Tools for Implementing a Robust DMSMS Management Program
MIL-STD-31000B:
https://quicksearch.dla.mil/qsSearch.aspx
Military Standard: Technical Data Package
SAE AS6174A:
https://www.sae.org/standards/
Counterfeit Materiel:
Assuring Acquisition of Authentic & Conforming Materiel
SAE AS5553C:
https://www.sae.org/standards/
Counterfeit Electrical, Electronic, and Electromechanical (EEE) Parts, Avoidance, Detection, Mitigation, and Disposition
SAE ARP6328:
https://www.sae.org/standards/
Guideline for Development of Counterfeit Electronic Parts, Avoidance, Detection, Mitigation, and Disposition Systems
ASTM D4169:
https://www.astm.org/
Standard Practice for Performance Testing of Shipping Containers and Systems
MIL-STD-3010:
https://quicksearch.dla.mil/qsSearch.aspx
Department of Defense Test Method Standard: Test Procedures for Packaging Materials
ASTM D4919:
https://www.astm.org/
Standard Guide for Testing of Hazardous Materials (Dangerous Goods) Packaging
MIL-STD-2073/1E:
https://www.dla.mil/HQ/InformationOperations/DLMS/elibrary/manuals/milstds/
Department of Defense Standard Practice for Military Packaging
SAE AS6500:
https://www.sae.org/standards/
Manufacturing Management Program
September 1, 2021 G2S Exhibit B – ILSC Supplemental Statement of Work Page 6 of 182
TR 350-70:
https://adminpubs.tradoc.army.mil/regulations.html
Training: Army Learning Policy and Systems
DoD Instruction 1322.26:
https://www.esd.whs.mil/Directives/issuances/dodi/
Distributed Learning
AR 350-1:
https://armypubs.army.mil/ProductMaps/PubForm/Details.aspx?PUB_ID=1002540
Army Training and Leader Development
TP 350-70-12:
https://adminpubs.tradoc.army.mil/pamphlets.html
Training and Education: The Army Distributed Learning Guide
ASME Y14.1:
https://www.asme.org/codes-standards/find-codes-standards/y14-1-decimal-inch-drawing-sheet-size-format
Decimal Inch Drawing Sheet Size and Format
TRADOC REG 350-70:
https://tdc.army.mil/ (access request required).
Supports New Equipment Training (NET), Instructor and Key Personnel Training (IKPT), institutional training, sustainment training for all skill and maintenance levels using the US Army Training Development Capability
Corrosion Prevention and Control Planning Guidebook for Military Systems and Equipment:
https://www.dau.edu/tools/t/CPC-Guidebook
Corrosion Prevention and Control Plan
International Maritime Organization – International Maritime Dangerous Goods Code (IMO – IMDGC):
https://www.imo.org/en
Performance Oriented Packaging - Shipping of Regulated Hazardous Material
International Civil Aviation Organization – Technical Instructions for Safe Transportation of Dangerous Goods by Air (ICAO-TDGA):
https://www.icao.int/Pages/default.aspx
Performance Oriented Packaging - Shipping of Regulated Hazardous Material
MIL-HDBK-61A:
https://quicksearch.dla.mil/qsSearch.aspx
Configuration Management Guidance
SAE EIA-649-1:
https://www.sae.org/standards/
Configuration Management Requirements for Defense Contracts
3.0 Requirements.
The Contractor shall produce the items in the quantity set forth in Section B of the schedule and delivery orders issued by the Procurement Contracting Officer (PCO) in accordance with documents listed above and this SOW. In the event of a conflict between the requirements of this SOW and any drawings for the item on contract, the requirements of this SOW shall govern.
3.1 Hardware
3.1.1 Test and Evaluation and Report.
September 1, 2021 G2S Exhibit B – ILSC Supplemental Statement of Work Page 7 of 182
3.1.1.1 Data Accession List.
The Contractor shall establish a single, centralized system for management of all data required under this contract. The Contractor shall ensure availability of and provide an on-line demonstration of the system established for the Shared Data Environment (SDE) within thirty
(30) calendar days after contract award. Government personnel shall have the capability to view, handle, print, download, and annotate information in the SDE. The Contractor shall provide the Data Accession List (DAL) in accordance with (IAW) CDRL Exhibit A002, DI-MGMT- 81453B.
The Contractor shall ensure availability and provide an on-line demonstration of the system established for the Shared Data Environment (SDE) within thirty (30) calendar days after contract award. Government personnel shall have the capability to view, handle, print, download, and annotate information in the SDE.
September 1, 2021 G2S Exhibit B – ILSC Supplemental Statement of Work Page 8 of 182
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Original Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
PER CONTRACT A TDP TM OTHER MGMT
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
C5ISR EQUIPMENT PER CONTRACT PER CONTRACT
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP
A002 Data Accession List
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
TOTAL PRICE
DI-MGMT-81453B ILSC SOW Para 3.1.1.1 FCDD-ISP-TR / FCDD-ISP-CS /
FCDD-ISP-GE
INSERT
7. DD 250 REQ 9.DIST STATEMENT
REQUIRED
10. FREQUENCY 12. DATE OF FIRST
SUBMISSION
14. DISTRIBUTION IN
DD QRTLY SEE ITEM 16 b. COPIES SECT. B
8. APP CODE N/A 11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
a. ADDRESSEE Draft
Final
SEE ITEM 16
Reg
Repro
16. REMARKS:
Block 12: As required Government review: 30 days
Block 13: 15 days after Government review Government review: 30 days
FCDD-ISP-TR
FCDD-ISP-CS
FCDD-ISP-GE
QAR
PCO
CONTRACTING
OFFICER
CONTRACT
SPECIALIST
COR
All deliveries shall be in digital format, compatible with Microsoft Office software and Adobe Acrobat and delivered via DoD SAFE (https://safe.apps.mil/) with a notification email to the Government personnel listed in the distribution list. Alternative delivery media may be discussed with the Contracting Officer prior to delivery.
The Government personnel listed in the distribution list shall receive a copy of the submittals. See Appendix D for the name and electronic address of Government personnel for CDRL distribution addressee.
If the CDRL Data Deliverable is priced and is not NSP (Not Separately Priced), then an electronic DD Form 250 will be required via the Wide Area Workflow website in order for the Contractor to receive payment for the data deliverable (see section G of the Contract). E-mail notification is required with any electronic submission.
15. TOTAL 0 8 0
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
Wayne F. Rush
FCDD-ISP-SM
Systems Engineer
11/24/2020 Adrienne H. Hughes
FCDD-ISP-SM
Chief, Systems Maintenance Concept Engineering Branch
11/24/2020
3.1.1.2 Reliability Test Procedure.
September 1, 2021 G2S Exhibit B – ILSC Supplemental Statement of Work Page 9 of 182
The Reliability Test Procedure provides detailed technical directions for implementing an individual reliability test (e.g. conventional reliability growth test, highly accelerated life test, accelerated life test, environmental stress screening, reliability qualification test, production reliability acceptance test) at the equipment, subsystem, and system levels during the integrated test program. The procedure contains step-by-step instructions of how the equipment, including software, is utilized during the reliability test. This document will be used by the procuring activity for review and approval of the Contractor’s procedure for conducting the reliability test and in the subsequent surveillance of the test and evaluation of the results. The Contractor shall prepare and submit a Reliability Test Procedure IAW CDRL Exhibit A003, DI-SESS-81629B.
September 1, 2021 G2S Exhibit B – ILSC Supplemental Statement of Work Page 10 of 182
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
PER CONTRACT B TDP TM OTHER SESS
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
C5ISR EQUIPMENT PER CONTRACT PER CONTRACT
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP
A003 Reliability Test Procedure
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
TOTAL PRICE
DI-SESS-81629B ILSC SOW Para. 3.1.1.2 FCDD-ISP-TR / FCDD-ISP-CS /
FCDD-ISP-GE
INSERT
7. DD 250 REQ 9.DIST STATEMENT
REQUIRED
10. FREQUENCY 12. DATE OF FIRST
SUBMISSION 14. DISTRIBUTION IN
DD ONE/P SEE ITEM 16 b. COPIES
SECT. B
8. APP CODE N/A 11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
a. ADDRESSEE Draft
Final
A SEE ITEM 16
Block 12: 30 days after contract award Government review: 45 days
Block 13: 30 days after Government review Government review: 30 days
Submit draft via LT.
All deliveries shall be in digital format, compatible with Microsoft Office software and Adobe Acrobat and delivered via DoD SAFE (https://safe.apps.mil/) with a notification email to the Government personnel listed in the distribution list. Alternative delivery media may be discussed with the Contracting Officer prior to delivery. The Government personnel listed in the distribution list shall receive a copy of the submittals. See Appendix D for the name and electronic address of Government personnel for CDRL distribution addressee.
If the CDRL Data Deliverable is priced and is not NSP (Not Separately Priced), then an electronic DD Form 250 will be required via the Wide Area Workflow website in order for the Contractor to receive payment for the data deliverable.
FCDD-ISP-TR
FCDD-ISP-CS
FCDD-ISP-GE
QAR
PCO
CONTRACTING
OFFICER
CONTRACT
SPECIALIST
COR
15. TOTAL 8 8 0
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
Wayne F. Rush
FCDD-ISP-SM
Systems Engineer
11/24/2020 Adrienne H. Hughes
FCDD-ISP-SM
Chief, Systems Maintenance
September 1, 2021 G2S Exhibit B – ILSC Supplemental Statement of Work Page 11 of 182
3.1.1.3 Environmental Stress Screening.
The Contractor shall perform an Environmental Stress Screening (ESS) Procedure IAW the latest USG-approved LRU-level ESS Procedures and Implementation Plans, consistent with the Government’s Environmental Stress Screening (ESS) Guide/Handbook for Electronic Equipment. The Contractor shall successfully complete ESS testing on all Line Replaceable Units (LRUs) prior to final acceptance testing and delivery to the USG, or as specified in test program planning. The Contractor shall develop and maintain a current set of Government-approved Environmental Stress Screening Procedures and Implementation Plan IAW CDRL Exhibit A004, DI-ENVR-81014A. The Contractor shall provide Environmental Stress Screening (ESS) Report IAW CDRL Exhibit A005, DI-ENVR-81663.
September 1, 2021 G2S Exhibit B – ILSC Supplemental Statement of Work Page 12 of 182
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
PER CONTRACT B TDP TM OTHER ENVR
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
C5ISR EQUIPMENT PER CONTRACT PER CONTRACT
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP
A004 Environmental Stress Screening Procedures and Implementation Plan
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
TOTAL PRICE
DI-ENVR-81014A ILSC SOW Para. 3.1.1.3 FCDD-ISP-TR / FCDD-ISP-CS /
FCDD-ISP-GE
INSERT
7. DD 250 REQ 9.DIST STATEMENT
REQUIRED
10. FREQUENCY 12. DATE OF FIRST
SUBMISSION 14. DISTRIBUTION IN
DD ONE/P SEE ITEM 16 b. COPIES
SECT. B
8. APP CODE N/A 11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
a. ADDRESSEE Draft
Final
Block 12: 30 days after contract award Government review: 45 days
Block 13: 30 days after Government review Government review: 30 days
Submit draft via LT.
All deliveries shall be in digital format, compatible with Microsoft Office software and Adobe Acrobat and delivered via DoD SAFE (https://safe.apps.mil/) with a notification email to the Government personnel listed in the distribution list. Alternative delivery media may be discussed with the Contracting Officer prior to delivery. The Government personnel listed in the distribution list shall receive a copy of the submittals. See Appendix D for the name and electronic address of Government personnel for CDRL distribution addressee.
If the CDRL Data Deliverable is priced and is not NSP (Not Separately Priced), then an electronic DD Form 250 will be required via the Wide Area Workflow website in order for the Contractor to receive payment for the data deliverable.
FCDD-ISP-TR
FCDD-ISP-CS
FCDD-ISP-GE
QAR
PCO
CONTRACTING
OFFICER
CONTRACT
Wayne F. Rush
FCDD-ISP-SM
Systems Engineer
11/24/2020 Adrienne H. Hughes
FCDD-ISP-SM
Chief, Systems Maintenance
September 1, 2021 G2S Exhibit B – ILSC Supplemental Statement of Work Page 13 of 182
Form Approved
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
PER CONTRACT B TDP TM OTHER ENVR
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
C5ISR EQUIPMENT PER CONTRACT PER CONTRACT
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP
A005 Environmental Stress Screening Report
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
DI-ENVR-81663 ILSC SOW Para. 3.1.1.3 FCDD-ISP-TR / FCDD-ISP-CS /
FCDD-ISP-GE
INSERT
7. DD 250 REQ 9.DIST STATEMENT
REQUIRED
10. FREQUENCY 12. DATE OF FIRST
SUBMISSION 14. DISTRIBUTION IN
DD ASREQ SEE ITEM 16 b. COPIES
SECT. B
8. APP CODE N/A 11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
a. ADDRESSEE Draft
Final
Block 12: 30 days after contract award Government review: 45 days
Block 13: 30 days after Government review Government review: 30 days
Submit draft via LT.
All deliveries shall be in digital format, compatible with Microsoft Office software and Adobe Acrobat and delivered via DoD SAFE (https://safe.apps.mil/) with a notification email to the Government personnel listed in the distribution list. Alternative delivery media may be discussed with the Contracting Officer prior to delivery. The Government personnel listed in the distribution list shall receive a copy of the submittals. See Appendix D for the name and electronic address of Government personnel for CDRL distribution addressee.
If the CDRL Data Deliverable is priced and is not NSP (Not Separately Priced), then an electronic DD Form 250 will be required via the Wide Area Workflow website in order for the Contractor to receive payment for the data deliverable.
FCDD-ISP-GE
QAR
PCO
CONTRACTING
OFFICER
CONTRACT
15. TOTAL 0 8 0
Wayne F. Rush
FCDD-ISP-SM
Systems Engineer
11/24/2020 Adrienne H. Hughes
FCDD-ISP-SM
Chief, Systems Maintenance
September 1, 2021 G2S Exhibit B – ILSC Supplemental Statement of Work Page 14 of 182
3.1.1.4 Failure Analysis and Corrective Action Reports.
The Contractor shall establish and utilize a closed-loop Failure Reporting, Analysis, and Corrective Action Systems (FRACAS) as its mechanism for monitoring and communicating (throughout the organization) descriptions of: test and field failures, analyses of failure modes and root cause failure mechanisms, the status of design and/or process corrective actions, risk-mitigation decisions, the effectiveness of corrective actions, and lessons learned. The Contractor shall address all failure modes found on assemblies and subassemblies, to include, but not limited to, Commercial Off The Shelf (COTS), Non-Developmental Item (NDI), Government Furnished Equipment (GFE), and software as applicable. The FRACAS shall include all failure modes, from initial modeling and analysis through the fielding of the system. The Contractor shall aggressively address and mitigate failure modes in a timely manner, consistent with their impact on safety, reliability, performance, and total life cycle cost. The Contractor shall mitigate failure modes to ensure that reliability requirements are met, and reliability does not degrade during production or in the field. The Contractor shall provide the Government with Failure Analysis and Corrective Action Reports IAW CDRL Exhibit A006, DI-SESS-81315B.
September 1, 2021 G2S Exhibit B – ILSC Supplemental Statement of Work Page 15 of 182
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
PER CONTRACT B TDP TM OTHER SESS
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
C5ISR EQUIPMENT PER CONTRACT PER CONTRACT
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP
A006 Failure Analysis and Corrective Action Reports
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
DI-SESS-81315B ILSC SOW Para 3.1.1.4 FCDD-ISP-TR / FCDD-ISP-CS /
FCDD-ISP-GE
INSERT
7. DD 250 REQ 9.DIST STATEMENT
REQUIRED
10. FREQUENCY 12. DATE OF FIRST
SUBMISSION
14. DISTRIBUTION IN
TBD ONE/R SEE ITEM 16 b. COPIES SECT. B
8. APP CODE D 11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
a. ADDRESSEE Draft
Final
Block 4: Section - Applicable Forms, change to read as follows Test Incident Report (TIR) interactive web Corrective Action submittal form, Army Test Incident Reporting System (ATIRS) approved format/transfer method for Army Test Command (ATC) Vision Digital Library System (VDLS), or other approved incident reporting method as described in the contract.
Block 4: Section - Use/Relationship, change to read as follows: “Provides immediate reporting of failure and subsequent details failure analysis results and corrective action recommendation. This Data Item Description (DID) contains the format and content preparation instructions for the data resulting from all identified sources of reliability testing.”
Block 8: Government comments or approval will be provided within 30 days after receipt of the initial submission. The revised version of the report shall be submitted within 30 days after receipt of Government comments.
Block 12: Initial submission provided 10 days after first test incident.
Block 13: Revisions provided upon update to report content with final report provided 90 days after final test incident. Submit report quarterly for the first year and submit report as required for the out-years.
FCDD-ISP-GE
QAR
PCO
CONTRACTING
OFFICER
CONTRACT
SPECIALIST
COR
All deliveries shall be in digital format, compatible with Microsoft Office software and Adobe Acrobat and delivered via DoD SAFE (https://safe.apps.mil/) with a notification email to the Government personnel listed in the distribution list.
Alternative delivery media may be discussed with the Contracting Officer prior to delivery. The Government personnel listed in the distribution list shall receive a copy of the submittals. See Appendix D for the name and electronic address of Government personnel for CDRL distribution addressee.
If the CDRL Data Deliverable is priced and is not NSP (Not Separately Priced), then an electronic DD Form 250 will be required via the Wide Area Workflow website in order for the Contractor to receive payment for the data deliverable (see section G of the Contract). E-mail notification is required with any electronic submission.
15. TOTAL 0 8 0
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
Wayne F. Rush
FCDD-ISP-SM
Systems Engineer
11/24/2020 Adrienne H. Hughes
FCDD-ISP-SM
Chief, Systems Maintenance
September 1, 2021 G2S Exhibit B – ILSC Supplemental Statement of Work Page 16 of 182
3.1.1.5 Failure Review Board.
The Contractor shall hold regular Failure Review Board (FRB) meetings with designated Government representatives to discuss failure data analysis and corrective action activities, plans, and status. The Contractor may include key Subcontractors as appropriate in the FRB meeting. The Contractor shall update online Shared Data Environment (SDE) data analysis and corrective action information for viewing by the Government representatives, at least 3 working days prior to a FRB meeting. The Contractor shall submit FRB Meeting Minutes IAW CDRL Exhibit A007, DI-ADMN-81505.
September 1, 2021 G2S Exhibit B – ILSC Supplemental Statement of Work Page 17 of 182
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
PER CONTRACT B TDP TM OTHER ADMIN
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
C5ISR EQUIPMENT PER CONTRACT PER CONTRACT
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP
A007 Record of Meeting/Minutes Report Failure Review Board Meeting Minutes
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
DI-ADMIN-81505 ILSC SOW Para 3.1.1.5 FCDD-ISP-TR / FCDD-ISP-CS /
FCDD-ISP-GE
INSERT
7. DD 250 REQ 9.DIST STATEMENT
REQUIRED
10. FREQUENCY 12. DATE OF FIRST
SUBMISSION
14. DISTRIBUTION IN
DD QRTLY SEE ITEM 16 b. COPIES SECT. B
8. APP CODE N/A 11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
a. ADDRESSEE Draft
Final
Block 12: As required Government review: 30 days
Block 13: 15 days after Government review Government review: 30 days
FCDD-ISP-TR
FCDD-ISP-CS
FCDD-ISP-GE
QAR
PCO
CONTRACTING
OFFICER
CONTRACT
SPECIALIST
COR
All deliveries shall be in digital format, compatible with Microsoft Office software and Adobe Acrobat and delivered via DoD SAFE (https://safe.apps.mil/) with a notification email to the Government personnel listed in the distribution list. Alternative delivery media may be discussed with the Contracting Officer prior to delivery.
The Government personnel listed in the distribution list shall receive a copy of the submittals. See Appendix D for the name and electronic address of Government personnel for CDRL distribution addressee.
If the CDRL Data Deliverable is priced and is not NSP (Not Separately Priced), then an electronic DD Form 250 will be required via the Wide Area Workflow website in order for the Contractor to receive payment for the data deliverable (see section G of the Contract). E-mail notification is required with any electronic submission.
15. TOTAL 0 8 0
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
Wayne F. Rush
FCDD-ISP-SM
Systems Engineer
11/24/2020 Adrienne H. Hughes
FCDD-ISP-SM
Chief, Systems Maintenance
September 1, 2021 G2S Exhibit B – ILSC Supplemental Statement of Work Page 18 of 182
3.1.2 System or Item Specific Obsolescence Monitoring, Reporting.
3.1.2.1 Item Availability Forecast.
In the special case of items which meet the FAR definition of commercial or a COTS item, the Contractor shall work with the design owner to forecast when the item will no longer be available and provide a single line entry on the Bill of Material (BOM) for the item.
3.1.2.2 10-year Rolling Technology Refreshment Plan.
The Contractor shall perform technology refreshment planning based on the systems DMSMS Roadmap and Documented and Projected DMSMS Issues. In this regard, the Contractor shall propose to the Government a plan of technology refresh events to occur over a ten-year planning horizon. This plan will be optimized to maximize system readiness and minimize Life Cycle Cost (LCC). This plan shall include, for each recommended refresh event, a summary of the DMSMS Issues to be mitigated, the estimated cost to execute, and an estimate of the projected benefits to the Government in terms of both cost and improved system readiness. Technology refreshment planning will be coordinated with any planned capability upgrade to allow for an integrated system Technology Refreshment plan. This plan will include both hardware and software system components. The Contractor shall deliver this plan IAW the CDRL Exhibit B002, DI-MISC-80508B, Technical Report, Study-Services: 10-year Rolling Technology Refreshment Plan and this SOW. Key details of the Technology Refreshment Plan will be an agenda item for the Operations Working Group (OWG), and a proposed agenda item for any design reviews or contract In Process Reviews (IPR’s).
September 1, 2021 G2S Exhibit B – ILSC Supplemental Statement of Work Page 19 of 182
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
PER CONTRACT B TDP TM OTHER MISC
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
C5ISR EQUIPMENT PER CONTRACT PER CONTRACT
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP
B002 Technical Report – Study/Services 10-year Rolling Technology Refreshment Plan
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
DI-MISC-80508B ILSC SOW Para 3.1.2.2 FCDD-ISP-TR / FCDD-ISP-CS /
FCDD-ISP-GE
INSERT
7. DD 250 REQ 9.DIST STATEMENT
REQUIRED
10. FREQUENCY 12. DATE OF FIRST
SUBMISSION 14. DISTRIBUTION IN
DD
SEMIA SEE ITEM 16 b. COPIES
SECT. B
8. APP CODE 11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
a. ADDRESSEE Draft
Final
Block 12: 180 days after contract award Government review: 30 days
Block 13: 30 days prior to the scheduled date of each Obsolescence Working Group meeting Government review: 45 days
Submit draft via LT.
The plan shall indicate the OEM's recommended optimum time to conduct a periodic technology refreshment such as to proactively mitigate those DMSMS issues which require redesign as the recommended mitigation strategy at minimal cost and readiness impact. In each recommended technology refreshment event, the plan shall indicate the assemblies and subsystems to be redesigned, the scope of the DMSMS issues necessitating this action and an estimate of the cost and benefits to the Government which shall be continually updated as the tech refresh event draws closer to planned implementation date.
All deliveries shall be in digital format, compatible with Microsoft Office software and Adobe Acrobat and delivered via DoD SAFE (https://safe.apps.mil/) with a notification email to the Government personnel listed in the distribution list.
Alternative delivery media may be discussed with the Contracting Officer prior to delivery. The Government personnel listed in the distribution list shall receive a copy of the submittals. See Appendix D for the name and electronic address of Government personnel for CDRL distribution addressee.
If the CDRL Data Deliverable is priced and is not NSP (Not Separately Priced), then an electronic DD Form 250 will be required via the Wide Area Workflow website in order for the Contractor to receive payment for the data deliverable (see section G of the Contract). E-mail notification is required with any electronic submission.
FCDD-ISP-TR
FCDD-ISP-CS
FCDD-ISP-GE
QAR
PCO
CONTRACTING
OFFICER
CONTRACT
SPECIALIST
COR
15. TOTAL 8 8 0
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
Wayne F. Rush
FCDD-ISP-SM
Systems Engineer
11/30/2020 Adrienne H. Hughes
FCDD-ISP-SM
Chief, Systems Maintenance
11/30/2020
September 1, 2021 G2S Exhibit B – ILSC Supplemental Statement of Work Page 20 of 182
3.1.3 Training
The Contractor shall develop and maintain battle-focused, task-oriented, scenario-driven Operator, System Administrator, and Field Maintenance Training Support Packages (TSPs) in accordance with TRADOC REG 350-70 that supports New Equipment Training (NET), Instructor and Key Personnel Training (IKPT), institutional training, sustainment training for all skill and maintenance levels using the US Army Training Development Capability at https://tdc.army.mil/ (access request required). Task analysis and individual task development will be performed using the TDC database or its replacement. The Government will review all training products developed by the Contractor for completeness, content, and applicability to military instruction and training in accordance with Service-specific standards. The Contractor shall prepare a Course Conduct Information Package IAW CDRL Exhibit C002, DI-PSSS- 81523.
The Contractor shall develop and maintain battle-focused, task-oriented, scenario-driven Sharable Content Object Reference Model (SCORM)-conformant Operator Interactive Multimedia Instructions (IMI) levels 2 to 3 and Immersive Learning Simulation (ILS) in accordance with level 4 in accordance with DoD Instruction 1322.26, AR 350-1, and TP 350-70- 12 that supports NET, IKPT, institutional training, sustainment, and self-development training for all skill levels to be hosted on the Army Learning Management System and system embedded using a common development framework. The Contractor shall develop IMI and package learning content in multiple formats to include Advanced Distributed Learning (ADL) SCORM Versions 1.2 and 2004 3rd and 4th editions, Flash (.SWF)., HTML 5, and the latest version the native Android app (.apk). The Contractor shall develop learning products that can be published into the Army Learning Management Systems (ALMS), standalone CD/DVD, webserver, or system embedded. The Contractor shall develop and maintain Quick Reference Card Sets based on the multiple variations of setup and configuration. The Contractor shall develop and maintain blended training strategies that incorporate the use of the IMI and Interactive Electronic Technical Manuals (IETMs) in the classroom. The Contractor shall develop IMI to be compatible with the latest version of the Army Golden Master standard browser. The Contractor shall prepare a Training Conduct Support Document IAW CDRL Exhibit C001, DI-PSSS-81522.
https://tdc.army.mil/
September 1, 2021 G2S Exhibit B – ILSC Supplemental Statement of Work Page 21 of 182
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
PER CONTRACT B TDP TM OTHER MGMT
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
C5ISR EQUIPMENT PER CONTRACT PER CONTRACT
C001 Training Conduct Support Document
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
DI-PSSS-81522 ILSC SOW Para. 3.1.3 FCDD-ISP-TR / FCDD-ISP-CS /
FCDD-ISP-GE
INSERT
7. DD 250 REQ 9.DIST STATEMENT
REQUIRED
10. FREQUENCY 12. DATE OF FIRST
SUBMISSION 14. DISTRIBUTION IN
DD ASREQ SEE ITEM 16 b. COPIES
SECT. B
8. APP CODE N/A 11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
a. ADDRESSEE Draft
Final
Block 12: As required Government review: 30 days
Block 13: 15 days after Government review Government review: 30 days
The Contractor shall prepare and submit Repair Procedure via DD 250 in accordance with the SOW section for Training when requested by the Government.
All deliveries shall be in digital format, compatible with Microsoft Office software and Adobe Acrobat and delivered via DoD SAFE (https://safe.apps.mil/) with a notification email to the Government personnel listed in the distribution list. Alternative delivery media may be discussed with the Contracting Officer prior to delivery. The Government personnel listed in the distribution list shall receive a copy of the submittals. See Appendix D for the name and electronic address of Government personnel for CDRL distribution addressee.
If the CDRL Data Deliverable is priced and is not NSP (Not Separately Priced), then an electronic DD Form 250 will be
FCDD-ISP-GE
QAR
PCO
CONTRACTING
OFFICER
CONTRACT
Wayne F. Rush
FCDD-ISP-SM
Systems Engineer
12/14/2020 Adrienne H. Hughes
FCDD-ISP-SM
Chief, Systems Maintenance
12/14/2020
September 1, 2021 G2S Exhibit B – ILSC Supplemental Statement of Work Page 22 of 182
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
PER CONTRACT B TDP TM OTHER MGMT
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
C5ISR EQUIPMENT PER CONTRACT PER CONTRACT
C002 Course Conduct Information Package
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
DI-PSSS-81523 ILSC SOW Para. 3.1.3 FCDD-ISP-TR / FCDD-ISP-CS /
FCDD-ISP-GE
INSERT
7. DD 250 REQ 9.DIST STATEMENT
REQUIRED
10. FREQUENCY 12. DATE OF FIRST
SUBMISSION 14. DISTRIBUTION IN
DD ASREQ SEE ITEM 16 b. COPIES
SECT. B
8. APP CODE N/A 11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
a. ADDRESSEE Draft
Final
Block 12: As required Government review: 30 days
Block 13: 15 days after Government review Government review: 30 days
The Contractor shall prepare and submit Repair Procedure via DD 250 in accordance with the SOW section for Training when requested by the Government.
All deliveries shall be in digital format, compatible with Microsoft Office software and Adobe Acrobat and delivered via DoD SAFE (https://safe.apps.mil/) with a notification email to the Government personnel listed in the distribution list. Alternative delivery media may be discussed with the Contracting Officer prior to delivery. The Government personnel listed in the distribution list shall receive a copy of the submittals. See Appendix D for the name and electronic address of Government personnel for CDRL distribution addressee.
If the CDRL Data Deliverable is priced and is not NSP (Not Separately Priced), then an electronic DD Form 250 will be
FCDD-ISP-GE
QAR
PCO
CONTRACTING
OFFICER
CONTRACT
Wayne F. Rush
FCDD-ISP-SM
Systems Engineer
12/14/2020 Adrienne H. Hughes
FCDD-ISP-SM
Chief, Systems Maintenance
September 1, 2021 G2S Exhibit B – ILSC Supplemental Statement of Work Page 23 of 182
3.1.4 LRU Inspection and Test.
A. LRU Test Procedures: Upon contract award, the Contactor shall develop LRU acceptance test plans and procedures for the items noted requiring procedures in Appendix A to be provided to the Government for approval within 30 calendar days – IAW CDRL Exhibit (D001), Data Item DI-SESS-81704. The Government shall have ownership rights of these test procedures after development.
September 1, 2021 G2S Exhibit B – ILSC Supplemental Statement of Work Page 24 of 182
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
PER CONTRACT B TDP TM OTHER SESS
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
C5ISR EQUIPMENT PER CONTRACT PER CONTRACT
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP
D001 Test Plans/Test Procedures LRU Test Procedures
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
TOTAL PRICE
DI-SESS-81704 ILSC SOW Para. 3.1.4 FCDD-ISP-TR / FCDD-ISP-CS /
FCDD-ISP-GE
INSERT
7. DD 250 REQ 9.DIST STATEMENT
REQUIRED
10. FREQUENCY 12. DATE OF FIRST
SUBMISSION 14. DISTRIBUTION IN
DD ONE/P SEE ITEM 16 b. COPIES
SECT. B
8. APP CODE N/A 11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
a. ADDRESSEE Draft
Final
Block 4 change to read as follows:
-Page 4, Section: 3.3.10.4.2. Phase Procedural Information, strike
Block 12: As required Government review: 45 days
Block 13: 30 days after Government review Government review: 30 days
Submit draft via LT.
All deliveries shall be in digital format, compatible with Microsoft Office software and Adobe Acrobat and delivered via DoD SAFE (https://safe.apps.mil/) with a notification email to the Government personnel listed in the distribution list. Alternative delivery media may be discussed with the Contracting Officer prior to delivery. The Government personnel listed in the distribution list shall receive a copy of the submittals. See Appendix D for the name and electronic address of Government personnel for CDRL distribution addressee.
If the CDRL Data Deliverable is priced and is not NSP (Not Separately Priced), then an electronic DD Form 250 will be required via the Wide Area Workflow website in order for the Contractor to receive payment for the data deliverable.
FCDD-ISP-TR
FCDD-ISP-CS
FCDD-ISP-GE
QAR
PCO
CONTRACTING
OFFICER
CONTRACT
SPECIALIST
COR
Wayne F. Rush
FCDD-ISP-SM
Systems Engineer
11/30/2020 Adrienne H. Hughes
FCDD-ISP-SM
Chief, Systems Maintenance
September 1, 2021 G2S Exhibit B – ILSC Supplemental Statement of Work Page 25 of 182
B. Preliminary Induction Inspection. An inspection and induction shall be performed by the Contractor. The Government reserves the right to witness these as deemed necessary by the COR, on each LRU based on quantities of LRUs sent as follows: 1 – 10 (5 calendar days), 11 – 25 (10 calendar days), 26 – 50 (20 calendar days) and 51+ (30 calendar days). Period may be extended at the request of the Contractor and approval of the PCO.
C. Inspection shall include the below, and provided to the Government IAW CDRL S006
a. Property identity (Description/NSN/Part Number/Serial Number).
b. Damaged or mishandled items.
c. Completeness of items.
d. Completeness and accuracy of accompanying paperwork / Documentation
e. Determine and document if LRUs were received in reusable packaging material and/or containers. If so, packaging materials (to include container, if applicable) from original returns shall be utilized in the repackaging of LRUs.
f. The Government reserves the right to verify any deficiencies found as a result of the above joint as needed. Also, the Contractor shall report these deficiencies and submit a Supply Discrepancy Report (SDR), SF 364, in accordance with DLM 4000.25, Volume 2, Chapter 17, Supply Discrepancy Reporting . The SDR shall be submitted to the Government within 24 hours of the inspection. Items to be repaired which have discrepancies and/or damage shall be held until the Government Representative approval (SF Form 364) is received.
g. Visual Inspection for Repair. The Contractor shall conduct a visual inspection to determine if the equipment is defective due to such things as: loose wires or components, broken or missing parts, burned resistors, corrosion, or…
This is the start of the file's text. The full file is on GovTribe.