Exhibit B - Deliverables Schedule.pdf

PDF 83 KB Posted

Attached to
General Pest Control, Ft Riley, KS Federal contract opportunity
Solicitation number
W911RX-25-Q-A008
Issued by
Department of the Army Materiel Command Mission and Installation Contracting Command Fort Hood

About this file

This file is Exhibit B - Deliverables Schedule for a pest control services contract at Fort Riley, KS. The schedule outlines required contractor submissions including a Contractor Work Plan, lists of materials, vehicles, and major equipment that must be submitted within 15 days of contract award. Vehicle lists must detail identification numbers, make, model, year, license tags, color, and contractor ID numbers. Equipment lists must specify make, model, capacities, and intended use.

The contractor must also submit Safety Data Sheets and sample labels for all pesticides and associated chemicals, maintain appropriate licenses and certifications, provide a Quality Control Plan, submit Pesticide Usage Reporting Forms, furnish Termite Treatment Warranties, and provide monthly schedules. Any changes to vehicles, equipment, or chemicals must be submitted to the Contracting Officer or COR within 7 calendar days. This solicitation (W911RX-25-Q-A008) is a 100% small business set-aside under NAICS 561710, with a site visit scheduled for February 4, 2025 at Fort Riley.

View the file

Other files for this federal contract opportunity

Other files attached to General Pest Control, Ft Riley, KS, newest first.
File Type Posted
Attachment 11 - Final Solicitation Questions.pdf PDF
Exhibit D - Wage Determination KS 2015-5343 rev 26_Updated.pdf PDF
Attachment 9 Sign In Photoscan_Redacted.pdf PDF
Combined Synopsis-Solicitation__W911RX25QA008_Gen Pest_Amended_2.pdf PDF
Attachment 10 - Solicitation Questions - General Pest FO.pdf PDF
Attachment 8 - Site Visit Information_Amended.pdf PDF
Combined Synopsis-Solicitation__W911RX25QA008_Gen Pest_Amended.pdf PDF
Attachment 8 - Site Visit Information.pdf PDF
Combined Synopsis-Solicitation___W911RX25QA008_Gen Pest.pdf PDF
Exhibit F - Performance Work Statement.pdf PDF
Attachment 7 - Current Pest Management Record.xlsx XLSX spreadsheet
Exhibit E - General Pest Control PWS.pdf PDF
Exhibit E - Performance Work Statement.pdf PDF
Attachment 2- Child Development Center SOP.pdf PDF
Attachment 5 - SOP Spill Containment-Clean-Up-Disposal.pdf PDF
Attachment 1 - Pesticide Use Proposal.pdf PDF
Attachment 3- Scheduled Services Facilities.pdf PDF
Attachment 4- Installation Pest Security.pdf PDF
Exhibit A - Performance Requirements Summary.pdf PDF
Attachment 6 - Fort Riley Reference Map.pdf PDF
Combined Synopsis-Solicitation__W911RX25QA008_Gen Pest.pdf PDF
Exhibit C - Price Schedule.xlsx XLSX spreadsheet
Exhibit D - Wage Determination KS 2015-5337 rev 24.pdf PDF
Show all 23

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

8.2 Exhibit B – Deliverables Schedule.

8.2.1 Contractor Work Plan: See Paragraph 5.1.22.

8.2.2 List of Materials. The Contractor shall submit a list of major materials, along with descriptive literature for newer material, to be used to complete the work stated herein.

The Contractor may include this submittal as part of the CWP.

8.2.3 List of Vehicles. The Contractor shall submit a list of vehicles to be used on this contract within 15 calendar days of contract award. The list shall include the vehicle identification number, make, model, year, current license tag number, vehicle color, and contractor identification number, if applicable. The Contractor shall submit changes to this list to the KO or COR seven (7) calendar days of any changes.

8.2.4 List of Major Equipment. The Contractor shall submit a list of major equipment to be used on this contract within 15 days of contract award. The list shall include the make and model of the equipment, capacities, if applicable, and the major use for the equipment. The Contractor shall submit changes to this list to the KO or COR within seven (7) calendar days of any changes.

8.2.5 Safety Data Sheets and Sample Labels. The Contractor shall submit Safety Data Sheets (SDSs) and sample labels for each pesticide and pesticide associated chemical to be used on this contract. The Contractor must include the initial submittal as post of the CWP. The Contractor shall submit updates and changes to the KO or COR seven

(7) calendar days before the requested use date of a different chemical or label change.

8.2.6 License and Certification. See paragraph 5.1.7.

8.2.7 Quality Control Plan. See paragraph 5.1.22.4.

8.2.8 Pesticide Usage Reporting Forms. See paragraph 5.1.5.

8.2.9 Termite Treatment Warranties. See paragraph 5.1.16.2.4

8.2.10 Monthly Schedule. See paragraph 5.1.22.1.2

File details come from the government source that posted it. Updated .