Exhibit B - Deliverables Schedule.pdf
PDF 83 KB Posted
- Attached to
- General Pest Control, Ft Riley, KS Federal contract opportunity
- Solicitation number
- W911RX-25-Q-A008
About this file
This file is Exhibit B - Deliverables Schedule for a pest control services contract at Fort Riley, KS. The schedule outlines required contractor submissions including a Contractor Work Plan, lists of materials, vehicles, and major equipment that must be submitted within 15 days of contract award. Vehicle lists must detail identification numbers, make, model, year, license tags, color, and contractor ID numbers. Equipment lists must specify make, model, capacities, and intended use.
The contractor must also submit Safety Data Sheets and sample labels for all pesticides and associated chemicals, maintain appropriate licenses and certifications, provide a Quality Control Plan, submit Pesticide Usage Reporting Forms, furnish Termite Treatment Warranties, and provide monthly schedules. Any changes to vehicles, equipment, or chemicals must be submitted to the Contracting Officer or COR within 7 calendar days. This solicitation (W911RX-25-Q-A008) is a 100% small business set-aside under NAICS 561710, with a site visit scheduled for February 4, 2025 at Fort Riley.
View the file
Other files for this federal contract opportunity
Show all 23
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
8.2 Exhibit B – Deliverables Schedule.
8.2.1 Contractor Work Plan: See Paragraph 5.1.22.
8.2.2 List of Materials. The Contractor shall submit a list of major materials, along with descriptive literature for newer material, to be used to complete the work stated herein.
The Contractor may include this submittal as part of the CWP.
8.2.3 List of Vehicles. The Contractor shall submit a list of vehicles to be used on this contract within 15 calendar days of contract award. The list shall include the vehicle identification number, make, model, year, current license tag number, vehicle color, and contractor identification number, if applicable. The Contractor shall submit changes to this list to the KO or COR seven (7) calendar days of any changes.
8.2.4 List of Major Equipment. The Contractor shall submit a list of major equipment to be used on this contract within 15 days of contract award. The list shall include the make and model of the equipment, capacities, if applicable, and the major use for the equipment. The Contractor shall submit changes to this list to the KO or COR within seven (7) calendar days of any changes.
8.2.5 Safety Data Sheets and Sample Labels. The Contractor shall submit Safety Data Sheets (SDSs) and sample labels for each pesticide and pesticide associated chemical to be used on this contract. The Contractor must include the initial submittal as post of the CWP. The Contractor shall submit updates and changes to the KO or COR seven
(7) calendar days before the requested use date of a different chemical or label change.
8.2.6 License and Certification. See paragraph 5.1.7.
8.2.7 Quality Control Plan. See paragraph 5.1.22.4.
8.2.8 Pesticide Usage Reporting Forms. See paragraph 5.1.5.
8.2.9 Termite Treatment Warranties. See paragraph 5.1.16.2.4
8.2.10 Monthly Schedule. See paragraph 5.1.22.1.2