Exhibit A PPDS CDRL Portfolio 080824.pdf

PDF 7 MB Posted

Attached to
Prime Power Distribution Systems (PPDS) Request for Proposal (RFP)
Solicitation number
W909MY24R0005_RFP
Issued by

About this file

This document is a Contract Data Requirements List (CDRL) that provides details on data items required under a federal contract for the Prime Power Distribution System (PPDS). The CDRL lists 11 separate data items the contractor must provide, including a Configuration Audit Summary Report, Instructional Media Package, OPSEC Standard Operating Procedures, Provisioning Technical Documentation, Safety Assessment Report, and various plans and reports related to logistics, maintenance, and engineering. For each data item, the CDRL specifies the title, delivery schedule, distribution, and other requirements. The data items are required to support the PPDS contract, which is a Firm Fixed-Price Indefinite Delivery Indefinite Quantity (IDIQ) contract with the Department of the Army Materiel Command. Key dates and delivery requirements are provided for each data item.

The attached federal contract opportunity is a Request for Proposal (RFP) for the Prime Power Distribution System (PPDS) contract. This planned effort will be a Firm Fixed-Price (FFP) IDIQ contract with a five-year base period and one five-year optional ordering period, and it is a 100% Small Business Set-Aside. The RFP includes the Statement of Work, attachments, and an exhibit that provide details on the required products and services. Prospective offerors are instructed to submit questions using a provided template by 3 September 2024.

View the file

Other files

Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

For the best experience, open this PDF portfolio in

Acrobat X or Adobe Reader X, or later.

Get Adobe Reader Now!

http://www.adobe.com/go/reader

DD FORM 1423-1, FEB 2001

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

PREVIOUS EDITION MAY BE USED.

Form Approved OMB No. 0704-0188 OMB Approval Expires 20221130

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ________ TM _______ OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ

8. APP CODE

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

11. AS OF DATE

12. DATE OF FIRST SUBMISSION

13. DATE OF SUBSEQUENT

SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

Draft Final

Reg Repro

15. TOTAL

16. REMARKS

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

Page of Pages

16. REMARKS (Continued)

DD FORM 1423-1, FEB 2001 Page of Pages

INSTRUCTIONS FOR COMPLETING DD FORM 1423

(See DoD 5010.12-M for detailed instructions.)

FOR GOVERNMENT PERSONNEL

Item A. Self-explanatory.

Item B. Self-explanatory.

Item C. Mark (X) appropriate category: TDP - Technical Data Package;

TM - Technical Manual; Other - other category of data, such as "Provisioning,""Configuration Management," etc.

Item D. Enter name of system/item being acquired that data will support.

Item E. Self-explanatory (to be filled in after contract award).

Item F. Self-explanatory (to be filled in after contract award).

Item G. Signature of preparer of CDRL.

Item H. Date CDRL was prepared.

Item I. Signature of CDRL approval authority.

Item J. Date CDRL was approved.

Item 1. See DoD FAR Supplement Subpart 4.71 for proper numbering.

Item 2. Enter title as it appears on data acquisition document cited in Item 4.

Item 3. Enter subtitle of data item for further definition of data item (optional entry).

Item 4. Enter Data Item Description (DID) number, military specification number, or military standard number listed in DoD 5010.12-L (AMSDL), or one-time DID number, that defines data content and format requirements.

Item 5. Enter reference to tasking in contract that generates requirement for the data item (e.g., Statement of Work paragraph number).

Item 6. Enter technical office responsible for ensuring adequacy of the data item.

Item 7. Specify requirement for inspection/acceptance of the data item by the Government.

Item 8. Specify requirement for approval of a draft before preparation of the final data item.

Item 9. For technical data, specify requirement for contractor to mark the appropriate distribution statement on the data (ref. DoDD 5230.24).

Item 10. Specify number of times data items are to be delivered.

Item 11. Specify as-of date of data item, when applicable.

Item 12. Specify when first submittal is required.

Item 13. Specify when subsequent submittals are required, when applicable.

Item 14. Enter addressees and number of draft/final copies to be delivered to each addressee. Explain reproducible copies in Item 16.

Item 15. Enter total number of draft/final copies to be delivered.

Item 16. Use for additional/clarifying information for Items 1 through 15.

Examples are: Tailoring of documents cited in Item 4; Clarification of submittal dates in Items 12 and 13; Explanation of reproducible copies in Item 14.; Desired medium for delivery of the data item.

FOR THE CONTRACTOR

Item 17. Specify appropriate price group from one of the following groups of effort in developing estimated prices for each data item listed on the DD Form 1423.

a. Group I. Definition - Data which is not otherwise essential to the contractor's performance of the primary contracted effort (production, development, testing, and administration) but which is required by DD Form 1423.

Estimated Price - Costs to be included under Group I are those applicable to preparing and assembling the data item in conformance with Government requirements, and the administration and other expenses related to reproducing and delivering such data items to the Government.

b. Group II. Definition - Data which is essential to the performance of the primary contracted effort but the contractor is required to perform additional work to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, or quality of the data item.

Estimated Price - Costs to be included under Group II are those incurred over and above the cost of the essential data item without conforming to Government requirements, and the administrative and other expenses related to reproducing and delivering such data item to the Government.

c. Group III. Definition - Data which the contractor must develop for his internal use in performance of the primary contracted effort and does not require any substantial change to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, and quality of the data item.

Estimated Price - Costs to be included under Group III are the administrative and other expenses related to reproducing and

d. Group IV. Definition - Data which is developed by the contractor as part of his normal operating procedures and his effort in supplying these data to the Government is minimal.

Estimated Price - Group IV items should normally be shown on the DD Form 1423 at no cost.

Item 18. For each data item, enter an amount equal to that portion of the total price which is estimated to be attributable to the production or development for the Government of that item of data.

These estimated data prices shall be developed only from those costs which will be incurred as a direct result of the requirement to supply the data, over and above those costs which would otherwise be incurred in performance of the contract if no data were required. The estimated data prices shall not include any amount for rights in data. The Government's right to use the data shall be governed by the pertinent provisions of the contract.

DD FORM 1423-1 (BACK), FEB 2001

data_item: A021 title: Scientific and Technical Reports sub: XML Source File / ETMs auth: DI-MISC-80508B ref: SEE ITEM 16 req_ofc: AMEL-LCW-EP dd250: DD appcode: A dist: E freq: SEE ITEM 16 asof: SEE ITEM 16 firstsub: SEE ITEM 16 subsub: SEE ITEM 16 addressee1: SFAE-CSS-E2-L draft1: 7 reg1: 2 repro1:

addressee2: AMEL-LCW-EP draft2: 7 reg2: 2 repro2:

addressee3: CCAP-CCV draft3: 7 reg3: 2 repro3:

addressee4:

draft4:

reg4:

repro4:

addressee5:

draft5:

reg5:

repro5:

addressee6:

draft6:

reg6:

repro6:

addressee7:

draft7:

reg7:

repro7:

addressee8:

draft8:

reg8:

repro8:

addressee9:

draft9:

reg9:

repro9:

addressee10:

draft10:

reg10:

repro10:

addressee11:

draft11:

reg11:

repro11:

addressee12:

draft12:

reg12:

repro12:

addressee13:

draft13:

reg13:

repro13:

addressee14:

draft14:

reg14:

repro14:

addressee15:

draft15:

reg15:

repro15:

addressee16:

draft16:

reg16:

repro16:

addressee17:

draft17:

reg17:

repro17:

addressee18:

draft18:

reg18:

repro18:

addressee19:

draft19:

reg19:

repro19:

addressee20:

draft20:

reg20:

repro20:

addressee21:

draft21:

reg21:

repro21:

addressee22:

draft22:

reg22:

repro22:

addressee23:

draft23:

reg23:

repro23:

addressee24:

draft24:

reg24:

repro24:

addressee25:

draft25:

reg25:

repro25:

addressee26:

draft26:

reg26:

repro26:

addressee27:

draft27:

reg27:

repro27:

addressee28:

draft28:

reg28:

repro28:

addressee29:

draft29:

reg29:

repro29:

addressee30:

draft30:

reg30:

repro30:

addressee31:

draft31:

reg31:

repro31:

addressee32:

draft32:

reg32:

repro32:

addressee33:

draft33:

reg33:

repro33:

addressee34:

draft34:

reg34:

repro34:

addressee35:

draft35:

reg35:

repro35:

addressee36:

draft36:

reg36:

repro36:

addressee37:

draft37:

reg37:

repro37:

addressee38:

draft38:

reg38x:

repro38:

total_draft: 21 total_reg: 6 total_repro: 0 remarks: The -12 manual will be developed using MIL-PRF-32216A and delivered in MS Word and Adobe PDF. The -20P manual will be developed using MIL- STD 400051-2C and delivered in .GENT XML Source Digital Files and Adobe PDF. Each work package will require delivery as its own .gent file. No .gent file will contain more than one work package. The -12 manual will be developed IAW MIL-PRF-32216A, Performance Specification, Evaluation of Commercial Off-the-Shelf (COTS) Manuals and Preparation of Supplemental Data, 17 October 2006 as the requirement.

ETM Submissions: (SOW 3.20.6.2.2)

1st ETM submission,(30%) of the -12 and -20 P is to be delivered at 90 DAW (TM1). The Government requires thirty (30) days to review/comment (120 DAW).

2nd ETM submission (70%) of the -12 and -20P is to be delivered at 180 DAW (TM2). The Government requires thirty (30) days for review/comment (210 DAW).

3rd ETM submission (100%) of the -12 and 20P is to be delivered at 360 DAW (TM3). The Government will review and provide comment at 390 DAW. The Government will be notified of 100% validation of the draft for each individual (-12 and -20P) ETM . The -12 submission is to be in MS Word and Adobe PDF (with graphics and text) MAC, RPSTL. The -20P submission is to l be in , .GENT XML Source Digital Files and Adobe PDF. This submission will be used for Government verification.

4th and Final ETM Submission of the -12 and -20P) is to be delivered at 540 DAW . The Government requires thirty (30) days for review/comment (570 DAW). This ETM will constitute the Final Reproducible Copy (FRC). The document will be ready for reproduction and publication as an authenticated TM’s, including all necessary changes made as a result of validation/verification and acquisition activity conditions of acceptance or approval.

CONTINUATION PAGE FOLLOWS

group:

total_price:

prep_name: Albert Lyou (FCDD-ISR-HFE) line_item: 9999/A021 exhibit: A xtdp: Off xtm: Off othercat: MISC system: Prime Power Distribution System ctr_no: SOL W909MY-24-R-0005 contr:

remarksb: RPSTL Submissions: (SOW 3.20.7.2)

1st RPSTL submission (30%) will be delivered at 120 DAW. The Government will take thirty (30) days to review and provide comments (150 DAW).

2nd RPSTL submission (70%) will be delivered at 210 DAW. The Government will take thirty (30) days to review and provide comments (240 DAW)

3rd and final RPSTL submission (100%) will be delivered at 270 DAW. The Government will take thirty (30) days to review and provide comments (300 DAW).

See SOW Paragraph 3.7 for Data Submission Requirements.

Distribution Statement E: Distribution authorized to DoD components only; Documents may contain proprietary or procurement sensitive information. Other requests for this information shall be referred to SFAE-CSS-E2-L.

Page2:

Reset:

2024-03-28T13:29:46-0400

LYOU.ALBERT.1538487704

prep_date: 28 MAR 2024 app_by: Rob Maline, Acting TMD, LPS

2024-03-28T13:54:58-0400

MALINE.ROBERT.L.1228557249

app_date: 28 MAR 2024

Page:

of_pages:

app: Adobe Professional 8.0

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the conformance with Government requirements, and the required to perform additional work to conform to Government without conforming to Government requirements, and the contracted effort and does not require any substantial change to conform to Government requirements with regard to depth of otherwise be incurred in performance of the contract if no data were required. The estimated data prices shall not include any data_item: A022 title: Scientific and Technical Reports sub: Technical Manuals (ETM) Development Plan auth: DI-MISC-80711A ref: SOW Para 3.20.6.2 req_ofc: AMEL-LCW-EP dd250: LT appcode: A dist: E freq: SEE ITEM 16 asof: SEE ITEM 16 firstsub: SEE ITEM 16 subsub: SEE ITEM 16 addressee1: SFAE-CSS-E2-L draft1: 1 reg1: 1 repro1:

addressee2: AMEL-LCW-EP draft2: 1 reg2: 1 repro2:

addressee3: CCAP-CCV draft3: 1 reg3: 1 repro3:

addressee4:

draft4:

reg4:

repro4:

addressee5:

draft5:

reg5:

repro5:

addressee6:

draft6:

reg6:

repro6:

addressee7:

draft7:

reg7:

repro7:

addressee8:

draft8:

reg8:

repro8:

addressee9:

draft9:

reg9:

repro9:

addressee10:

draft10:

reg10:

repro10:

addressee11:

draft11:

reg11:

repro11:

addressee12:

draft12:

reg12:

repro12:

addressee13:

draft13:

reg13:

repro13:

addressee14:

draft14:

reg14:

repro14:

addressee15:

draft15:

reg15:

repro15:

addressee16:

draft16:

reg16:

repro16:

addressee17:

draft17:

reg17:

repro17:

addressee18:

draft18:

reg18:

repro18:

addressee19:

draft19:

reg19:

repro19:

addressee20:

draft20:

reg20:

repro20:

addressee21:

draft21:

reg21:

repro21:

addressee22:

draft22:

reg22:

repro22:

addressee23:

draft23:

reg23:

repro23:

addressee24:

draft24:

reg24:

repro24:

addressee25:

draft25:

reg25:

repro25:

addressee26:

draft26:

reg26:

repro26:

addressee27:

draft27:

reg27:

repro27:

addressee28:

draft28:

reg28:

repro28:

addressee29:

draft29:

reg29:

repro29:

addressee30:

draft30:

reg30:

repro30:

addressee31:

draft31:

reg31:

repro31:

addressee32:

draft32:

reg32:

repro32:

addressee33:

draft33:

reg33:

repro33:

addressee34:

draft34:

reg34:

repro34:

addressee35:

draft35:

reg35:

repro35:

addressee36:

draft36:

reg36:

repro36:

addressee37:

draft37:

reg37:

repro37:

addressee38:

draft38:

reg38x:

repro38:

total_draft: 3 total_reg: 3 total_repro: 0 remarks: The 1st submission of the ETM Development Plan will be delivered to the Government NLT 60 DAW. Contractors will submit a draft ETM development plan together with two ETM, plus coinciding .docx source files as digital reproducible ETMs. The sample work packages shall consist of one troubleshooting work package and one maintenance procedure work package. In addition, one theory of operations system sample .pdf and .docx source files, including narrative and supporting schematic, shall be included. Government requires fifteen (15) days to review and provide comments.

The 2nd and final ETM Development Plan will be delivered to the Government NLT 90 DAW. Contractor shall have incorporated comments/corrections and submit a revised ETM Development Plan with two ETM sample work packages and Theory of Operation System sample. The Government requires thirty (30) days to review (120 DAW).

See SOW Paragraph 3.7 for Data Submission Requirements.

Distribution Statement E: Distribution authorized to DoD components only; Documents may contain proprietary or procurement sensitive information. Other requests for this information shall be referred to SFAE-CSS-E2-L.

group:

total_price:

prep_name: Albert Lyou (FCDD-ISR-HFE) line_item: 9999/A022 exhibit: A xtdp: Off xtm: Off othercat: MISC system: Prime Power Distribution System ctr_no: SOL W909MY-24-R-0005 contr:

remarksb:

Page2:

Reset:

2024-03-28T13:30:00-0400

LYOU.ALBERT.1538487704

prep_date: 28 MAR 2024 app_by: Rob Maline, Acting TMD, LPS

2024-03-28T13:55:17-0400

MALINE.ROBERT.L.1228557249

app_date: 28 MAR 2024

Page:

of_pages:

app: Adobe Professional 8.0

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the conformance with Government requirements, and the required to perform additional work to conform to Government without conforming to Government requirements, and the contracted effort and does not require any substantial change to conform to Government requirements with regard to depth of otherwise be incurred in performance of the contract if no data were required. The estimated data prices shall not include any data_item: A023 title: Scientific and Technical Reports sub: ETM ID1 Technical Data Incorporation auth: DI-MISC-80711A ref: SOW Para 3.20.6.9.1 req_ofc: AMEL-LCW-EP dd250: LT appcode: A dist: E freq: SEE ITEM 16 asof: SEE ITEM 16 firstsub: SEE ITEM 16 subsub: SEE ITEM 16 addressee1: SFAE-CSS-E2-L draft1: 1 reg1: 1 repro1:

addressee2: AMEL-LCW-EP draft2: 1 reg2: 1 repro2:

addressee3: CCAP-CCV draft3: 1 reg3: 1 repro3:

addressee4:

draft4:

reg4:

repro4:

addressee5:

draft5:

reg5:

repro5:

addressee6:

draft6:

reg6:

repro6:

addressee7:

draft7:

reg7:

repro7:

addressee8:

draft8:

reg8:

repro8:

addressee9:

draft9:

reg9:

repro9:

addressee10:

draft10:

reg10:

repro10:

addressee11:

draft11:

reg11:

repro11:

addressee12:

draft12:

reg12:

repro12:

addressee13:

draft13:

reg13:

repro13:

addressee14:

draft14:

reg14:

repro14:

addressee15:

draft15:

reg15:

repro15:

addressee16:

draft16:

reg16:

repro16:

addressee17:

draft17:

reg17:

repro17:

addressee18:

draft18:

reg18:

repro18:

addressee19:

draft19:

reg19:

repro19:

addressee20:

draft20:

reg20:

repro20:

addressee21:

draft21:

reg21:

repro21:

addressee22:

draft22:

reg22:

repro22:

addressee23:

draft23:

reg23:

repro23:

addressee24:

draft24:

reg24:

repro24:

addressee25:

draft25:

reg25:

repro25:

addressee26:

draft26:

reg26:

repro26:

addressee27:

draft27:

reg27:

repro27:

addressee28:

draft28:

reg28:

repro28:

addressee29:

draft29:

reg29:

repro29:

addressee30:

draft30:

reg30:

repro30:

addressee31:

draft31:

reg31:

repro31:

addressee32:

draft32:

reg32:

repro32:

addressee33:

draft33:

reg33:

repro33:

addressee34:

draft34:

reg34:

repro34:

addressee35:

draft35:

reg35:

repro35:

addressee36:

draft36:

reg36:

repro36:

addressee37:

draft37:

reg37:

repro37:

addressee38:

draft38:

reg38x:

repro38:

total_draft: 3 total_reg: 3 total_repro: 0 remarks: IAW the SOW Para 3.20.6.9.1 (ETM List), the contractor shall distribute an outline of the TMs at 210 DAW. The Government requires 30 days to review/comment (240 DAW).

The contractor shall: complete an outline of each Section, Chapter, Work Package IAW MIL-STD 40051-1C/2C using .docx source files. Complete all applicable technical content (i.e. complete all Front rear cover data, Warning Summary details, How to Use, TOC, Title Block Page, Chapter 1, MAC and RPSTL introduction, PMCS and maintenance tasks work packages, etc).

See SOW Paragraph 3.7 for Data Submission Requirements.

Distribution Statement E: Distribution authorized to DoD components only; Documents may contain proprietary or procurement sensitive information. Other requests for this information shall be referred to SFAE-CSS-E2-L.

group:

total_price:

prep_name: Albert Lyou (FCDD-ISR-HFE) line_item: 9999/A023 exhibit: A xtdp: Off xtm: Off othercat: MISC system: Prime Power Distribution System ctr_no: SOL W909MY-24-R-0005 contr:

remarksb:

Page2:

Reset:

2024-03-28T13:30:12-0400

LYOU.ALBERT.1538487704

prep_date: 28 MAR 2024 app_by: Rob Maline, Acting TMD, LPS

2024-03-28T13:55:40-0400

MALINE.ROBERT.L.1228557249

app_date: 28 MAR 2024

Page:

of_pages:

app: Adobe Professional 8.0

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the conformance with Government requirements, and the required to perform additional work to conform to Government without conforming to Government requirements, and the contracted effort and does not require any substantial change to conform to Government requirements with regard to depth of otherwise be incurred in performance of the contract if no data were required. The estimated data prices shall not include any data_item: A024 title: Logistics Management Information (LMI) Data Product(s) sub: Provisioning Parts List LSA 36 auth: DI-SESS-81758A ref: SOW Para 3.20.9 req_ofc: AMEL-LCW-EP dd250: DD appcode: A dist: E freq: SEE ITEM 16 asof: SEE ITEM 16 firstsub: SEE ITEM 16 subsub: SEE ITEM 16 addressee1: SFAE-CSS-E2-L draft1: 1 reg1: 1 repro1:

addressee2: AMEL-LCW-EP draft2: 1 reg2: 1 repro2:

addressee3: CCAP-CCV draft3: 1 reg3: 1 repro3:

addressee4:

draft4:

reg4:

repro4:

addressee5:

draft5:

reg5:

repro5:

addressee6:

draft6:

reg6:

repro6:

addressee7:

draft7:

reg7:

repro7:

addressee8:

draft8:

reg8:

repro8:

addressee9:

draft9:

reg9:

repro9:

addressee10:

draft10:

reg10:

repro10:

addressee11:

draft11:

reg11:

repro11:

addressee12:

draft12:

reg12:

repro12:

addressee13:

draft13:

reg13:

repro13:

addressee14:

draft14:

reg14:

repro14:

addressee15:

draft15:

reg15:

repro15:

addressee16:

draft16:

reg16:

repro16:

addressee17:

draft17:

reg17:

repro17:

addressee18:

draft18:

reg18:

repro18:

addressee19:

draft19:

reg19:

repro19:

addressee20:

draft20:

reg20:

repro20:

addressee21:

draft21:

reg21:

repro21:

addressee22:

draft22:

reg22:

repro22:

addressee23:

draft23:

reg23:

repro23:

addressee24:

draft24:

reg24:

repro24:

addressee25:

draft25:

reg25:

repro25:

addressee26:

draft26:

reg26:

repro26:

addressee27:

draft27:

reg27:

repro27:

addressee28:

draft28:

reg28:

repro28:

addressee29:

draft29:

reg29:

repro29:

addressee30:

draft30:

reg30:

repro30:

addressee31:

draft31:

reg31:

repro31:

addressee32:

draft32:

reg32:

repro32:

addressee33:

draft33:

reg33:

repro33:

addressee34:

draft34:

reg34:

repro34:

addressee35:

draft35:

reg35:

repro35:

addressee36:

draft36:

reg36:

repro36:

addressee37:

draft37:

reg37:

repro37:

addressee38:

draft38:

reg38x:

repro38:

total_draft: 3 total_reg: 3 total_repro: 0 remarks: 1st submittal (30%) of the LSA-036 Report/ PPL (in TXT file format) shall be based on the 3rd drawing delivery and delivered at 120 DAW. The Government requires thirty (30) days for review/comment (150 DAW).

2nd submittal (70%) of the LSA-036 Report/ PPL shall be delivered at 210 DAW. The Government requires thirty (30) days for review/comment (240 DAW).

3rd and final submittal (100%) of the LSA-036 Report/PPL shall be delivered at 270 DAW. The Government requires thirty (30) days for review/comment.

Final screening results shall be submitted as part of the LSA-036 Report/ PPL delivery.

Delivery of the J and K Card (RPSTL Data) shall be thirty (30) days after the acceptance of the final RPSTL.

All digital files will be provided both by electronic submission, e.g., e-mail, FTP, etc., as arranged with the requiring office, and also by CD ROM or DVD readable by computers running Microsoft Windows in plain text (.txt) format.

See Appendix I to SOW entitled “Provisioning Data Element Definitions” and SOW Paragraph 3.20.9 for preparation of LSA-036 Report/ PPL.

See SOW Paragraph 3.7 for Data Submission Requirements.

Distribution Statement E: Distribution authorized to DoD components only; Documents may contain proprietary or procurement sensitive information. Other requests for this information shall be referred to SFAE-CSS-E2-L.

group:

total_price:

prep_name: Albert Lyou (FCDD-ISR-HFE) line_item: 9999/A024 exhibit: A xtdp: Off xtm: Off othercat: SESS system: Prime Power Distribution System ctr_no: SOL W909MY-24-R-0005 contr:

remarksb:

Page2:

Reset:

2024-03-28T13:30:26-0400

LYOU.ALBERT.1538487704

prep_date: 28 MAR 2024 app_by: Rob Maline, Acting TMD, LPS

2024-03-28T13:56:02-0400

MALINE.ROBERT.L.1228557249

app_date: 28 MAR 2024

Page:

of_pages:

app: Adobe Professional 8.0

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the conformance with Government requirements, and the required to perform additional work to conform to Government without conforming to Government requirements, and the contracted effort and does not require any substantial change to conform to Government requirements with regard to depth of otherwise be incurred in performance of the contract if no data were required. The estimated data prices shall not include any data_item: A025 title: Logistics Management Information (LMI) Data Product(s) sub: Design Change Notice (DCN) auth: DI-SESS-81759A ref: SOW Para 3.20.10 req_ofc: AMEL-LCW-EP dd250: LT appcode: A dist: E freq: SEE ITEM 16 asof: SEE ITEM 16 firstsub: SEE ITEM 16 subsub: SEE ITEM 16 addressee1: SFAE-CSS-E2-L draft1: 1 reg1: 1 repro1:

addressee2: AMEL-LCW-EP draft2: 1 reg2: 1 repro2:

addressee3: CCAP-CCV draft3: 1 reg3: 1 repro3:

addressee4:

draft4:

reg4:

repro4:

addressee5:

draft5:

reg5:

repro5:

addressee6:

draft6:

reg6:

repro6:

addressee7:

draft7:

reg7:

repro7:

addressee8:

draft8:

reg8:

repro8:

addressee9:

draft9:

reg9:

repro9:

addressee10:

draft10:

reg10:

repro10:

addressee11:

draft11:

reg11:

repro11:

addressee12:

draft12:

reg12:

repro12:

addressee13:

draft13:

reg13:

repro13:

addressee14:

draft14:

reg14:

repro14:

addressee15:

draft15:

reg15:

repro15:

addressee16:

draft16:

reg16:

repro16:

addressee17:

draft17:

reg17:

repro17:

addressee18:

draft18:

reg18:

repro18:

addressee19:

draft19:

reg19:

repro19:

addressee20:

draft20:

reg20:

repro20:

addressee21:

draft21:

reg21:

repro21:

addressee22:

draft22:

reg22:

repro22:

addressee23:

draft23:

reg23:

repro23:

addressee24:

draft24:

reg24:

repro24:

addressee25:

draft25:

reg25:

repro25:

addressee26:

draft26:

reg26:

repro26:

addressee27:

draft27:

reg27:

repro27:

addressee28:

draft28:

reg28:

repro28:

addressee29:

draft29:

reg29:

repro29:

addressee30:

draft30:

reg30:

repro30:

addressee31:

draft31:

reg31:

repro31:

addressee32:

draft32:

reg32:

repro32:

addressee33:

draft33:

reg33:

repro33:

addressee34:

draft34:

reg34:

repro34:

addressee35:

draft35:

reg35:

repro35:

addressee36:

draft36:

reg36:

repro36:

addressee37:

draft37:

reg37:

repro37:

addressee38:

draft38:

reg38x:

repro38:

total_draft: 3 total_reg: 3 total_repro: 0 remarks: Delivery shall be concurrent with ECP submittal.

See Appendix H of this SOW entitled "Data Requirements Form" and Appendix I “Provisioning Data Element Definitions" for preparation of PTD.

1st submittal of the DCN shall be submitted by 150 DAW. The Government will take fifteen (30) days to review/comment (180 DAW)

2nd submittal DCN shall be submitted by 330 DAW. The Government will take thirty (30) days to review/comment (360 DAW)

Subsequent DCNs shall be submitted as required by the Government. The Government will take thirty (30) days to review/comment.

Format requirements for DCNs shall be provided from the Government to the Contractor at the Guidance Conference/Start of Work Meeting.

All DCNs shall be delivered in Microsoft Excel.

See SOW Paragraph 3.7 for Data Submission Requirements.

Distribution Statement E: Distribution authorized to DoD components only; Documents may contain proprietary or procurement sensitive information. Other requests for this information shall be referred to SFAE-CSS-E2-L.

group:

total_price:

prep_name: Albert Lyou (FCDD-ISR-HFE) line_item: 9999/A025 exhibit: A xtdp: Off xtm: Off othercat: SESS system: Prime Power Distribution System ctr_no: SOL W909MY-24-R-0005 contr:

remarksb:

Page2:

Reset:

2024-03-28T13:30:37-0400

LYOU.ALBERT.1538487704

prep_date: 28 MAR 2024 app_by: Rob Maline, Acting TMD, LPS

2024-03-28T13:56:26-0400

MALINE.ROBERT.L.1228557249

app_date: 28 MAR 2024

Page:

of_pages:

app: Adobe Professional 8.0

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the conformance with Government requirements, and the required to perform additional work to conform to Government without conforming to Government requirements, and the contracted effort and does not require any substantial change to conform to Government requirements with regard to depth of otherwise be incurred in performance of the contract if no data were required. The estimated data prices shall not include any data_item: A026 title: Logistics Management Information (LMI) Summaries sub: Engineering Data for Provisioning (EDFP) auth: DI-SESS-81874 ref: SOW Para 3.20.12 req_ofc: AMEL-LCW-EP dd250: DD appcode: A dist: E freq: SEE ITEM 16 asof: SEE ITEM 16 firstsub: SEE ITEM 16 subsub: SEE ITEM 16 addressee1: SFAE-CSS-E2-L draft1: 1 reg1: 1 repro1:

addressee2: AMEL-LCW-EP draft2: 1 reg2: 1 repro2:

addressee3: DLIS-KACA draft3: 0 reg3: 1 repro3:

addressee4: 74 Washington Ave draft4:

reg4:

repro4:

addressee5: North, Suite 7 draft5:

reg5:

repro5:

addressee6: Creek, MI 49017-3084 draft6:

reg6:

repro6:

addressee7: CCAP-CCV draft7: 1 reg7: 1 repro7:

addressee8:

draft8:

reg8:

repro8:

addressee9:

draft9:

reg9:

repro9:

addressee10:

draft10:

reg10:

repro10:

addressee11:

draft11:

reg11:

repro11:

addressee12:

draft12:

reg12:

repro12:

addressee13:

draft13:

reg13:

repro13:

addressee14:

draft14:

reg14:

repro14:

addressee15:

draft15:

reg15:

repro15:

addressee16:

draft16:

reg16:

repro16:

addressee17:

draft17:

reg17:

repro17:

addressee18:

draft18:

reg18:

repro18:

addressee19:

draft19:

reg19:

repro19:

addressee20:

draft20:

reg20:

repro20:

addressee21:

draft21:

reg21:

repro21:

addressee22:

draft22:

reg22:

repro22:

addressee23:

draft23:

reg23:

repro23:

addressee24:

draft24:

reg24:

repro24:

addressee25:

draft25:

reg25:

repro25:

addressee26:

draft26:

reg26:

repro26:

addressee27:

draft27:

reg27:

repro27:

addressee28:

draft28:

reg28:

repro28:

addressee29:

draft29:

reg29:

repro29:

addressee30:

draft30:

reg30:

repro30:

addressee31:

draft31:

reg31:

repro31:

addressee32:

draft32:

reg32:

repro32:

addressee33:

draft33:

reg33:

repro33:

addressee34:

draft34:

reg34:

repro34:

addressee35:

draft35:

reg35:

repro35:

addressee36:

draft36:

reg36:

repro36:

addressee37:

draft37:

reg37:

repro37:

addressee38:

draft38:

reg38x:

repro38:

total_draft: 3 total_reg: 4 total_repro: 0 remarks: 1st submission (30%) shall be at 120 DAW. The Government requires thirty (30) days to review/comment (150 DAW).

Contractor shall deliver the EDFP in hardcopy and electronic format.

Digital Delivery shall be concurrent with the delivery of LSA-036 Report/ PPL.

The Contractor shall make available one complete set of EDFP (hardcopy) at the Provisioning Conference.

2nd submission (70%) shall be made at 210 DAW. The Government requires thirty (30) days to review/comment (240 DAW).

3rd submission (100%) and final submission shall be made at 270 DAW. The Government will require thirty (30) days to review/approval.

See SOW Paragraph 3.7 for Data Submission Requirements.

Distribution Statement E: Distribution authorized to DoD components only; Documents may contain proprietary or procurement sensitive information. Other requests for this information shall be referred to SFAE-CSS-E2-L.

group:

total_price:

prep_name: Albert Lyou (FCDD-ISR-HFE) line_item: 9999/A026 exhibit: A xtdp: Off xtm: Off othercat: SESS system: Prime Power Distribution System ctr_no: SOL W909MY-24-R-0005 contr:

remarksb:

Page2:

Reset:

2024-03-28T13:30:52-0400

LYOU.ALBERT.1538487704

prep_date: 28 MAR 2024 app_by: Rob Maline, Acting TMD, LPS

2024-03-28T13:56:52-0400

MALINE.ROBERT.L.1228557249

app_date: 28 MAR 2024

Page:

of_pages:

app: Adobe Professional 8.0

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the conformance with Government requirements, and the required to perform additional work to conform to Government without conforming to Government requirements, and the contracted effort and does not require any substantial change to conform to Government requirements with regard to depth of otherwise be incurred in performance of the contract if no data were required. The estimated data prices shall not include any data_item: A027 title: Training Materials sub: Training Support Packages (TSP) auth: DI-ILSS-80872 ref: SOW Para 3.20.14.1 req_ofc: AMEL-LCR-L dd250: DD appcode: A dist: E freq: SEE ITEM 16 asof: SEE ITEM 16 firstsub: SEE ITEM 16 subsub: SEE ITEM 16 addressee1: SFAE-CSS-E2-L draft1: 1 reg1: 1 repro1:

addressee2: AMEL-LCW-EP draft2: 1 reg2: 1 repro2:

addressee3: AMEL-LCR-L draft3: 1 reg3: 1 repro3:

addressee4: ATCL-TS draft4: 1 reg4: 1 repro4:

addressee5: ATCL-TDF draft5: 1 reg5: 1 repro5:

addressee6: CCAP-CCV draft6: 1 reg6: 1 repro6:

addressee7:

draft7:

reg7:

repro7:

addressee8:

draft8:

reg8:

repro8:

addressee9:

draft9:

reg9:

repro9:

addressee10:

draft10:

reg10:

repro10:

addressee11:

draft11:

reg11:

repro11:

addressee12:

draft12:

reg12:

repro12:

addressee13:

draft13:

reg13:

repro13:

addressee14:

draft14:

reg14:

repro14:

addressee15:

draft15:

reg15:

repro15:

addressee16:

draft16:

reg16:

repro16:

addressee17:

draft17:

reg17:

repro17:

addressee18:

draft18:

reg18:

repro18:

addressee19:

draft19:

reg19:

repro19:

addressee20:

draft20:

reg20:

repro20:

addressee21:

draft21:

reg21:

repro21:

addressee22:

draft22:

reg22:

repro22:

addressee23:

draft23:

reg23:

repro23:

addressee24:

draft24:

reg24:

repro24:

addressee25:

draft25:

reg25:

repro25:

addressee26:

draft26:

reg26:

repro26:

addressee27:

draft27:

reg27:

repro27:

addressee28:

draft28:

reg28:

repro28:

addressee29:

draft29:

reg29:

repro29:

addressee30:

draft30:

reg30:

repro30:

addressee31:

draft31:

reg31:

repro31:

addressee32:

draft32:

reg32:

repro32:

addressee33:

draft33:

reg33:

repro33:

addressee34:

draft34:

reg34:

repro34:

addressee35:

draft35:

reg35:

repro35:

addressee36:

draft36:

reg36:

repro36:

addressee37:

draft37:

reg37:

repro37:

addressee38:

draft38:

reg38x:

repro38:

total_draft: 6 total_reg: 6 total_repro: 0 remarks: Operator Training Course and Field Maintenance / Sustainment Training Courses:

The contractor shall make drafts available for review at Training Conferences per SOW paragraph 3.20.14.2.

Updated TSP drafts will be used for training.

Dates for review of TSP training materials shall be coordinated with the Government training representative a minimum of 30 days prior to the review.

1st submittal of the TSP (70%) is at 120 DAW. The Government requires thirty (30) days to review/comment (150 DAW).

The 2nd and final TSP submission (100%) is at 330 DAW. The Government requires thirty

(30) days to review/comment.

All drafts and regular final submissions shall be in hard copy format.

All final reproducible copies shall be in electronic media format as per the SOW and provided to the Government.

See SOW Paragraph 3.7 for Data Submission Requirements.

Distribution Statement E: Distribution authorized to DoD components only; Documents may contain proprietary or procurement sensitive information. Other requests for this information shall be referred to SFAE-CSS-E2-L.

group:

total_price:

prep_name: Albert Lyou (FCDD-ISR-HFE) line_item: 9999/A027 exhibit: A xtdp: Off xtm: Off othercat: ILSS system: Prime Power Distribution System ctr_no: SOL W909MY-24-R-0005 contr:

remarksb:

Page2:

Reset:

2024-03-28T13:31:02-0400

LYOU.ALBERT.1538487704

prep_date: 28 MAR 2024 app_by: Rob Maline, Acting TMD, LPS

2024-03-28T13:57:10-0400

MALINE.ROBERT.L.1228557249

app_date: 28 MAR 2024

Page:

of_pages:

app: Adobe Professional 8.0

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the conformance with Government requirements, and the required to perform additional work to conform to Government without conforming to Government requirements, and the contracted effort and does not require any substantial change to conform to Government requirements with regard to depth of otherwise be incurred in performance of the contract if no data were required. The estimated data prices shall not include any data_item: A028 title: Instructional Media Package sub: Computer Based Training (CBT) auth: DI-SESS-81526C ref: SOW Para 3.20.14.20 req_ofc: AMEL-LCR-L dd250: DD appcode: A dist: E freq: SEE ITEM 16 asof: SEE ITEM 16 firstsub: SEE ITEM 16 subsub: SEE ITEM 16 addressee1: SFAE-CSS-E2-L draft1: 1 reg1: 1 repro1:

addressee2: AMEL-LCW-EP draft2: 1 reg2: 1 repro2:

addressee3: ATCL-TS draft3: 1 reg3: 1 repro3:

addressee4: ATCL-TDF draft4: 1 reg4: 1 repro4:

addressee5: CCAP-CCV draft5: 1 reg5: 1 repro5:

addressee6:

draft6:

reg6:

repro6:

addressee7:

draft7:

reg7:

repro7:

addressee8:

draft8:

reg8:

repro8:

addressee9:

draft9:

reg9:

repro9:

addressee10:

draft10:

reg10:

repro10:

addressee11:

draft11:

reg11:

repro11:

addressee12:

draft12:

reg12:

repro12:

addressee13:

draft13:

reg13:

repro13:

addressee14:

draft14:

reg14:

repro14:

addressee15:

draft15:

reg15:

repro15:

addressee16:

draft16:

reg16:

repro16:

addressee17:

draft17:

reg17:

repro17:

addressee18:

draft18:

reg18:

repro18:

addressee19:

draft19:

reg19:

repro19:

addressee20:

draft20:

reg20:

repro20:

addressee21:

draft21:

reg21:

repro21:

addressee22:

draft22:

reg22:

repro22:

addressee23:

draft23:

reg23:

repro23:

addressee24:

draft24:

reg24:

repro24:

addressee25:

draft25:

reg25:

repro25:

addressee26:

draft26:

reg26:

repro26:

addressee27:

draft27:

reg27:

repro27:

addressee28:

draft28:

reg28:

repro28:

addressee29:

draft29:

reg29:

repro29:

addressee30:

draft30:

reg30:

repro30:

addressee31:

draft31:

reg31:

repro31:

addressee32:

draft32:

reg32:

repro32:

addressee33:

draft33:

reg33:

repro33:

addressee34:

draft34:

reg34:

repro34:

addressee35:

draft35:

reg35:

repro35:

addressee36:

draft36:

reg36:

repro36:

addressee37:

draft37:

reg37:

repro37:

addressee38:

draft38:

reg38x:

repro38:

total_draft: 5 total_reg: 5 total_repro: 0 remarks: Operator Training and Field Maintenance / Sustainment CBT/IMI:

The 1st submission of the CBT development plan and draft CBT Operator and Field Maintenance/Sustainment courses on CD ROM shall be delivered to the Government at 300 DAW. The Government requires thirty (30) days to review/comment (330 DAW). This submission will be jointly reviewed at Training Conference #3.

The 2nd and final CBT development plan and draft CBT Operator and Maintainer courses on CD ROM shall be delivered to the Government at 500 DAW. The Government requires thirty (30) days to review/comment (530 DAW). Will be jointly reviewed at Training Conference #4. Complete Script and storyboards shall be included.

All CBT reproducible copies shall be in electronic media format (CD ROM) delivered at 620 DAW.

See SOW Paragraph 3.7 for Data Submission Requirements.

Distribution Statement E: Distribution authorized to DoD components only; Documents may contain proprietary or procurement sensitive information. Other requests for this information shall be referred to SFAE-CSS-E2-L.

group:

total_price:

prep_name: Albert Lyou (FCDD-ISR-HFE) line_item: 9999/A028 exhibit: A xtdp: Off xtm: Off othercat: SESS system: Prime Power Distribution System ctr_no: SOL W909MY-24-R-0005 contr:

remarksb:

Page2:

Reset:

2024-03-28T13:31:16-0400

LYOU.ALBERT.1538487704

prep_date: 28 MAR 2024 app_by: Rob Maline, Acting TMD, LPS

2024-03-28T13:57:33-0400

MALINE.ROBERT.L.1228557249

app_date: 28 MAR 2024

Page:

of_pages:

app: Adobe Professional 8.0

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the conformance with Government requirements, and the required to perform additional work to conform to Government without conforming to Government requirements, and the contracted effort and does not require any substantial change to conform to Government requirements with regard to depth of supply the data, over and abo

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .