Attachment 0003 PPDS Final Price Model 071624.xlsx

XLSX spreadsheet 102 KB Posted

Attached to
Prime Power Distribution Systems (PPDS) Request for Proposal (RFP)
Solicitation number
W909MY24R0005_RFP
Issued by

About this file

This document is an Excel file related to a Firm Fixed-Price (FFP) Indefinite Delivery Indefinite Quantity (IDIQ) contract opportunity for Prime Power Distribution Systems (PPDS). The PPDS RFP is a 100% Small Business Set-Aside with a five-year base period and one five-year optional ordering period.

The Excel file contains pricing models, cost estimates, and detailed Bill of Materials (BOM) for various components of the PPDS system, including Improved Secondary Distribution Centers, Improved Primary Switching Centers, Tactical Prime Power Transformers, cables, and other accessories. The file also includes a comprehensive list of Contract Data Requirements List (CDRL) items that the contractor must deliver. Key details include estimated quantities, unit prices, and extended pricing for the base and option periods. The pricing models are structured to allow vendors to input firm fixed prices in the yellow highlighted cells.

View the file

Other files

Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CLINs Post Report Hamlet, David A. WNY Tecolote: Version=1.3 Type=TimePhasedReport

Hamlet, David A. WNY Tecolote: culture=en-US Timestamp=5/10/2022 1:44:48 PM Heading=Time Phased Report for Point Estimate in 2022-05-05_ICIDS-POE.acex Inflation=ThenYear UseHeuristicRiskInflation=True Cases="2022-05-05_ICIDS-POE.acex,Point Estimate" HintPaths=2022-05-05_ICIDS-POE.acex=C:\Users\dhamlet\Documents\PM FPS\ RowFilter=All SelectedRows="ACE182,Y","ACE346,Y" SecondaryRows= FirstYear=2021 LastYear=2040 TotalLocation=Beginning ShowMonthlyValues=False FiscalStartMonth=10 FirstMonth=10/1/2020 12:00:00 AM LastMonth=9/30/2021 12:00:00 AM

MonthlyTotal=BeginningTime Phased Report for Point Estimate in 2022-05-05_ICIDS-POE.acex
Funding in TY $K, TY
Tuesday, 10 May 2022, 1:44 PM

Time Phased Results from Point Estimate

Hamlet, David A. WNY Tecolote: Version=1.3 Type=Table Style=PhasedCaseTable Name=1C45-5642-1B64-4EF7 Description=Time Phased Table Culture=en-US Timestamp=5/10/2022 1:44:48 PM Footprint=R12C4:R67C10

Locks=WBSTotalFY2023FY2024FY2025FY2026FY2027
ACE182** QUANTITY PROFILE
ACE346CLIN0.000.000.000.000.000.00
ACE276
ACE277
ACE278
ACE279
ACE280
ACE281
ACE282
ACE283
ACE284
ACE285
ACE286
ACE287
ACE288
ACE289
ACE290
ACE291
ACE292
ACE293
ACE294
ACE295
ACE296
ACE297
ACE298
ACE299
ACE300
ACE301
ACE302
ACE303
ACE304
ACE305
ACE306
ACE307
ACE308
ACE309
ACE310
ACE311
ACE312
ACE313
ACE314
ACE315
ACE316
ACE317
ACE318
ACE319
ACE320
ACE948
ACE889
ACE953
ACE954
ACE955
ACE958
ACE959

&F Page &P of &N Printed: &D &T

Rows Filter Case Years Show Prior/Complete

Instruction Sheet

ICIDS VI Price Model Instruction Sheet
1.) Vendors are directed to enter firm fixed price data estimates in YELLOW cells for all CLINS for Base and all Option Years
2.) Total cost estimate will be calculated as the sum of the total cost for each Base Year and Option Year based off estimated quantity values per year.
3.) Pricing Model is locked, except YELLOW cells requiring vendor input.
4.) CLIN descriptions are provided in the CLIN Descriptions Tab
5.) CDRL descriptions are provided in the CDRL Descriptions Tab
6.) CDRL will not be separately priced EXCEPT A042 (Technical Data Package) under the Base Period tab.
7.) Extended warranty unit is per iSDC,iPSC, TPPT. Extended warranty provisions are IAW SOW Section 3.19.
8.) Base Period includes 3 Production Years (5 years total with the 12-Month Prototype Development and the 12-Month Testing)
9.) Optional contract production extension encompasses One 5-Year Ordering Period
10.) Item quantities are estimated and may change at time of award.

Summary Summary of ICIDS VI Quanity Profile and Extended Price for Base Period and Optional Ordering Periods

Base Period (BP)BP Production Year 1BP Production Year 2BP Production Year 3Ordering Period 1Ordering Period 2Ordering Period 3Ordering Period 4Ordering Period 5Total
Total Cost EstimateERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!
Base Period (BP)BP Production Year 1BP Production Year 2BP Production Year 3Ordering Period 1Ordering Period 2Ordering Period 3Ordering Period 4Ordering Period 5Average Cost per Unit
Development and delivery of First Article Units$ - 0
Contractor Production Prove Out Testing (PPT)$ - 0
Contract Data List Requirements (CDRLs)$ - 0
Technical Data Package (TDP)/ Technical Data Package List (TDPL)$ - 0
Improved Secondary Distribution Center version 1 (ISDC-1)ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!
Improved Secondary Distribution Center version 2 (ISDC-2)ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!
Improved Primary Switching Center (IPSC)ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!
Tactical Prime Power Transformer (TPPT)ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!
Initial / Repair PartsERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!
Mission Readiness Spares Package (MRSP) KitsERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!
Training Courses$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Cables Class L 60 Amp 50 FTERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!
Cables Class L 60 Amp 100 FTERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!
Cables Class L 100 Amp 50 FTERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!
Cable 15 KV 1/0 3750 FTERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!
Extended 3 Year WarrantyERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!
Notes below:
Based off total price per CLIN/ CDRL
Based off average unit price derived from range pricing

Base Period Base Period (BP)

Only yellow highlighted boxes can be filled in
CLIN TypeCLINCLIN TYPEDescriptionQuantity DescriptionUnit of Issue (U/I)QTY (Estimated)Unit PriceExtended PriceDescription
FFPDevelopment and delivery of Prototype UnitsDevelopment of two of each end itemUnit of Issue (U/I)1 sensor (CLIN 0006) plus 1 Premise Control Unit (Control Board for alarm zone)
0001Improved Secondary Distribution Center version 1 (ISDC-1) (2 ea.)Each (1)2$ - 0
0002Improved Secondary Distribution Center version 2 (ISDC-2) (2 ea.)Each (1)2$ - 0
0003Improved Primary Switching Center (IPSC) (2ea)Each (1)2$ - 0
0004Tactical Prime Power Transformer (TPPT) (2ea)Each (1)2$ - 0
0005FFPContractor Production Prove Out Testing (PPT)Level of Effort (1 Unit)Each (1)1$ - 0
Base Production Year 1
CLINCLIN TYPEDescriptionQuantity DescriptionUnit of Issue (U/I)QTY (Estimated)Unit PriceExtended Price
0006FFPBase period - Improved Secondary Distribution Center version 1 (ISDC-1)Level of Effort (1 Unit)Unit of Issue (U/I)22ERROR:#DIV/0!ERROR:#DIV/0!
1 – 4Each (1)Submitted Monthly
5 – 19Each (1)Submitted monthly as following ad hoc meetings in between scheduled monthly meetings
20 – 50Each (1)Submitted for each Delivery Order
51-100Each (1)Submitted for each Delivery Order
Submitted for each Delivery Order
0007FFPBase period - Improved Secondary Distribution Center version 2 (ISDC-2)Level of Effort (1 Unit)Unit of Issue (U/I)58ERROR:#DIV/0!ERROR:#DIV/0!Submitted for each Delivery Order
1 – 4Each (1)Submitted for each Delivery Order
5 – 19Each (1)Submitted for each Delivery Order
20 – 50Each (1)Follows any Audit Event
51-100Each (1)Submitted for each Delivery Order
0008FFPBase period - Improved Primary Switching Center (IPSC)Level of Effort (1 Unit)Unit of Issue (U/I)17ERROR:#DIV/0!ERROR:#DIV/0!Submitted for each Delivery Order
1 – 4Each (1)Submitted for each Delivery Order
5 – 19Each (1)
20 – 50Each (1)Submitted for each Delivery Order
51-100Each (1)Submitted for each Delivery Order
Submitted for each Delivery Order
0009FFPBase period - Tactical Prime Power Transformer (TPPT)Level of Effort (1 Unit)Unit of Issue (U/I)10ERROR:#DIV/0!ERROR:#DIV/0!Submitted for each Failure Occurrence
1 – 4Each (1)Submitted for each failed event during the Warranty Phase for each Delivery Order
5 – 19Each (1)Submitted for each Delivery Order
20 – 50Each (1)
51-100Each (1)Once following the Base Contract Award
Once following the Base Contract Award
0010FFPBase period - Initial / Repair PartsLevel of Effort (1 Unit)Unit of Issue (U/I)1ERROR:#DIV/0!ERROR:#DIV/0!Once following the Base Contract Award
1 – 4Each (1)Submitted for each failed event during PVT1 & 2, the SPV for each Delivery Order
5 – 19Each (1)Submitted once for PVT-1 (ESTL) only
20 – 50Each (1)Submitted once for PVT-1 (ESTL) only
51-100Each (1)Submitted once for PVT-1 (ESTL) only
Once following the Base Contract Award
0011FFPBase period - Mission Readiness Spares Package (MRSP) KitsLevel of Effort (1 Unit)Unit of Issue (U/I)2ERROR:#DIV/0!ERROR:#DIV/0!Submitted once for PVT-2 (First Delivery Order) only
1 – 4Each (1)Submitted once for PVT-2 (First Delivery Order) only
5 – 19Each (1)Submitted once for PVT-2 (First Delivery Order) only
20 – 50Each (1)Submitted once for PVT-2 (First Delivery Order) only
51-100Each (1)Submitted once for PVT-2 (First Delivery Order) only
Submitted once for PVT-2 (First Delivery Order) only
0012FFPBase period - Fielding Training CoursesLevel of Effort (1 Unit)Each (1)1$ - 0Submitted for each Delivery Order
Submitted for each Delivery Order
0013FFPBase period - Cables Class L 60 Amp 50 FTLevel of Effort (1 Unit)Unit of Issue (U/I)160ERROR:#DIV/0!ERROR:#DIV/0!Once following the Base Contract Award
1 – 4Each (1)Once following the Base Contract Award
5 – 19Each (1)
20 – 50Each (1)
51-100Each (1)
0014FFPBase period - Cables Class L 60 Amp 100 FTLevel of Effort (1 Unit)Unit of Issue (U/I)80ERROR:#DIV/0!ERROR:#DIV/0!
1 – 4Each (1)
5 – 19Each (1)
20 – 50Each (1)
51-100Each (1)
0015FFPBase period - Cables Class L 100 Amp 50 FTLevel of Effort (1 Unit)Unit of Issue (U/I)80ERROR:#DIV/0!ERROR:#DIV/0!
1 – 4Each (1)
5 – 19Each (1)
20 – 50Each (1)
51-100Each (1)
0016FFPBase period - Cable 15 KV 1/0 3750 FTLevel of Effort (1 Unit)Unit of Issue (U/I)8ERROR:#DIV/0!ERROR:#DIV/0!
1 – 4Each (1)
5 – 19Each (1)
20 – 50Each (1)
51-100Each (1)
0017FFPBase period - Extended 3 Year WarrantyLevel of Effort (1 Unit)Unit of Issue (U/I)107ERROR:#DIV/0!ERROR:#DIV/0!
1 – 4Each (1)
5 – 19Each (1)
20 – 50Each (1)
51-100Each (1)
Base Production Year 2
CLINCLIN TYPEDescriptionQuantity DescriptionUnit of Issue (U/I)QTY (Estimated)Unit PriceExtended Price
0018FFPBase period - Improved Secondary Distribution Center version 1 (ISDC-1)Level of Effort (1 Unit)Unit of Issue (U/I)22ERROR:#DIV/0!ERROR:#DIV/0!
1 – 4Each (1)
5 – 19Each (1)
20 – 50Each (1)
51-100Each (1)
0019FFPBase period - Improved Secondary Distribution Center version 2 (ISDC-2)Level of Effort (1 Unit)Unit of Issue (U/I)58ERROR:#DIV/0!ERROR:#DIV/0!
1 – 4Each (1)
5 – 19Each (1)
20 – 50Each (1)
51-100Each (1)
0020FFPBase period - Improved Primary Switching Center (IPSC)Level of Effort (1 Unit)Unit of Issue (U/I)17ERROR:#DIV/0!ERROR:#DIV/0!
1 – 4Each (1)
5 – 19Each (1)
20 – 50Each (1)
51-100Each (1)
0021FFPBase period - Tactical Prime Power Transformer (TPPT)Level of Effort (1 Unit)Unit of Issue (U/I)10ERROR:#DIV/0!ERROR:#DIV/0!
1 – 4Each (1)
5 – 19Each (1)
20 – 50Each (1)
51-100Each (1)
0022FFPBase period - Initial / Repair PartsLevel of Effort (1 Unit)Unit of Issue (U/I)1ERROR:#DIV/0!ERROR:#DIV/0!
1 – 4Each (1)
5 – 19Each (1)
20 – 50Each (1)
51-100Each (1)
0023FFPBase period - Mission Readiness Spares Package (MRSP) KitsLevel of Effort (1 Unit)Unit of Issue (U/I)2ERROR:#DIV/0!ERROR:#DIV/0!
1 – 4Each (1)
5 – 19Each (1)
20 – 50Each (1)
51-100Each (1)

0024 FFP Base period - Fielding Training Courses Level of Effort (1 Unit) Each (1) 1 $ - 0

0025FFPBase period - Cables Class L 60 Amp 50 FTLevel of Effort (1 Unit)Unit of Issue (U/I)160ERROR:#DIV/0!ERROR:#DIV/0!
1 – 4Each (1)
5 – 19Each (1)
20 – 50Each (1)
51-100Each (1)
0026FFPBase period - Cables Class L 60 Amp 100 FTLevel of Effort (1 Unit)Unit of Issue (U/I)80ERROR:#DIV/0!ERROR:#DIV/0!
1 – 4Each (1)
5 – 19Each (1)
20 – 50Each (1)
51-100Each (1)
0027FFPBase period - Cables Class L 100 Amp 50 FTLevel of Effort (1 Unit)Unit of Issue (U/I)80ERROR:#DIV/0!ERROR:#DIV/0!
1 – 4Each (1)
5 – 19Each (1)
20 – 50Each (1)
51-100Each (1)
0028FFPBase period - Cable 15 KV 1/0 3750 FTLevel of Effort (1 Unit)Unit of Issue (U/I)8ERROR:#DIV/0!ERROR:#DIV/0!
1 – 4Each (1)
5 – 19Each (1)
20 – 50Each (1)
51-100Each (1)
0029FFPBase period - Extended 3 Year WarrantyLevel of Effort (1 Unit)Unit of Issue (U/I)107ERROR:#DIV/0!ERROR:#DIV/0!
1 – 4Each (1)
5 – 19Each (1)
20 – 50Each (1)
51-100Each (1)
Base Production Year 3
CLINCLIN TYPEDescriptionQuantity DescriptionUnit of Issue (U/I)QTY (Estimated)Unit PriceExtended Price
0030FFPBase period - Improved Secondary Distribution Center version 1 (ISDC-1)Level of Effort (1 Unit)Unit of Issue (U/I)22ERROR:#DIV/0!ERROR:#DIV/0!
1 – 4Each (1)
5 – 19Each (1)
20 – 50Each (1)
51-100Each (1)
0031FFPBase period - Improved Secondary Distribution Center version 2 (ISDC-2)Level of Effort (1 Unit)Unit of Issue (U/I)58ERROR:#DIV/0!ERROR:#DIV/0!
1 – 4Each (1)
5 – 19Each (1)
20 – 50Each (1)
51-100Each (1)
0032FFPBase period - Improved Primary Switching Center (IPSC)Level of Effort (1 Unit)Unit of Issue (U/I)17ERROR:#DIV/0!ERROR:#DIV/0!
1 – 4Each (1)
5 – 19Each (1)
20 – 50Each (1)
51-100Each (1)
0033FFPBase period - Tactical Prime Power Transformer (TPPT)Level of Effort (1 Unit)Unit of Issue (U/I)10ERROR:#DIV/0!ERROR:#DIV/0!
1 – 4Each (1)
5 – 19Each (1)
20 – 50Each (1)
51-100Each (1)
0034FFPBase period - Initial / Repair PartsLevel of Effort (1 Unit)Unit of Issue (U/I)1ERROR:#DIV/0!ERROR:#DIV/0!
1 – 4Each (1)
5 – 19Each (1)
20 – 50Each (1)
51-100Each (1)
0035FFPBase period - Mission Readiness Spares Package (MRSP) KitsLevel of Effort (1 Unit)Unit of Issue (U/I)2ERROR:#DIV/0!ERROR:#DIV/0!
1 – 4Each (1)
5 – 19Each (1)
20 – 50Each (1)
51-100Each (1)

0036 FFP Base period - Fielding Training Courses Level of Effort (1 Unit) Each (1) 1 $ - 0

0037FFPBase period - Cables Class L 60 Amp 50 FTLevel of Effort (1 Unit)Unit of Issue (U/I)160ERROR:#DIV/0!ERROR:#DIV/0!
1 – 4Each (1)
5 – 19Each (1)
20 – 50Each (1)
51-100Each (1)
0038FFPBase period - Cables Class L 60 Amp 100 FTLevel of Effort (1 Unit)Unit of Issue (U/I)80ERROR:#DIV/0!ERROR:#DIV/0!
1 – 4Each (1)
5 – 19Each (1)
20 – 50Each (1)
51-100Each (1)
0039FFPBase period - Cables Class L 100 Amp 50 FTLevel of Effort (1 Unit)Unit of Issue (U/I)80ERROR:#DIV/0!ERROR:#DIV/0!
1 – 4Each (1)
5 – 19Each (1)
20 – 50Each (1)
51-100Each (1)
0040FFPBase period - Cable 15 KV 1/0 3750 FTLevel of Effort (1 Unit)Unit of Issue (U/I)8ERROR:#DIV/0!ERROR:#DIV/0!
1 – 4Each (1)
5 – 19Each (1)
20 – 50Each (1)
51-100Each (1)
0041FFPBase period - Extended 3 Year WarrantyLevel of Effort (1 Unit)Unit of Issue (U/I)107ERROR:#DIV/0!ERROR:#DIV/0!
1 – 4Each (1)
5 – 19Each (1)
20 – 50Each (1)
51-100Each (1)

9999 FFP Contract Data List Requirements (CDRLs) Level of Effort (1 Unit) Each (1) 1 $ - 0

CDRL #CDRL TYPECDRL DescriptionQuantity DescriptionUnit Price
A001NSPOPSEC Standard Operating ProceduresOPSEC Standard Operating Procedures
A002NSPIntegrated Master Schedule (IMS)Integrated Master Schedule (IMS)
A003NSPContract Work Breakdown Structure (CWBS)Contract Work Breakdown Structure (CWBS)
A004NSPContract Funds Status Report (CFSR)Contract Funds Status Report (CFSR)
A005NSPScientific and Technical Reports/ Configuration Baseline (CB) ChangesScientific and Technical Reports/ Configuration Baseline (CB) Changes
A006NSPContract Performance Report (CPR)Contract Performance Report (CPR)
A007NSPConfiguration Audit Summary Report/ PREPCA Configuration Audit Summary ReportConfiguration Audit Summary Report/ PREPCA Configuration Audit Summary Report
A008NSPConfiguration Audit Summary Report/ Production PCA ReportConfiguration Audit Summary Report/ Production PCA Report
A009NSPTest Plan/ Test PlanTest Plan/ Test Plan
A010NSPTest/Inspection Report/ Contractor Pre Production Model Exam/Test ReportTest/Inspection Report/ Contractor Pre Production Model Exam/Test Report
A011NSPScientific and Technical Reports/ Pre-Production Test Incident Report(s) (TIR)Scientific and Technical Reports/ Pre-Production Test Incident Report(s) (TIR)
A012NSPScientific and Technical Reports/ PPT – Failed Item Analysis Reports (FIARs)Scientific and Technical Reports/ PPT – Failed Item Analysis Reports (FIARs)
A013NSPSafety Assessment Report (SAR)/ Safety Assessment Report (SAR)Safety Assessment Report (SAR)/ Safety Assessment Report (SAR)
A014NSPProposed Spare Parts List and MRSP List/ Initial Spares/Repair Parts, Mission Readiness Spares Packages (MRSP) Kits ListProposed Spare Parts List and MRSP List/ Initial Spares/Repair Parts, Mission Readiness Spares Packages (MRSP) Kits List
A015NSPScientific and Technical Reports/ Warranty Status ReportScientific and Technical Reports/ Warranty Status Report
A016NSPScientific and Technical Reports/ Supportability AnalysisScientific and Technical Reports/ Supportability Analysis
A017NSPTechnical Report – Study/Services/ Level of Repair Analysis (LORA) Report/Input DataTechnical Report – Study/Services/ Level of Repair Analysis (LORA) Report/Input Data
A018NSPTechnical Report – Study/Services/ Failure Modes Effects and Criticality Analysis (FMECA)Technical Report – Study/Services/ Failure Modes Effects and Criticality Analysis (FMECA)
A019NSPScientific and Technical Reports/ Supply Support Alternatives PlanScientific and Technical Reports/ Supply Support Alternatives Plan
A020NSPTechnical Report-Study/Services/ Maintenance Allocation Chart (MAC)Technical Report-Study/Services/ Maintenance Allocation Chart (MAC)
A021NSPScientific and Technical Reports/ XML Source File / ETMsScientific and Technical Reports/ XML Source File / ETMs
A022NSPScientific and Technical Reports/ Technical Manuals (ETM) Development PlanScientific and Technical Reports/ Technical Manuals (ETM) Development Plan
A023NSPScientific and Technical Reports/ ETM ID1 Technical Data IncorporationScientific and Technical Reports/ ETM ID1 Technical Data Incorporation
A024NSPLogistics Management Information (LMI) Data Product(s)/ Provisioning Parts List LSA 36Logistics Management Information (LMI) Data Product(s)/ Provisioning Parts List LSA 36
A025NSPLogistics Management Information (LMI) Data Product(s)/ Design Change Notice (DCN)Logistics Management Information (LMI) Data Product(s)/ Design Change Notice (DCN)
A026NSPLogistics Management Information (LMI) Summaries/ Engineering Data for Provisioning (EDFP)Logistics Management Information (LMI) Summaries/ Engineering Data for Provisioning (EDFP)
A027NSPTraining Materials/ Training Support Packages (TSP)Training Materials/ Training Support Packages (TSP)
A028NSPInstructional Media Package/ Computer Based Training (CBT)Instructional Media Package/ Computer Based Training (CBT)
A029NSPComputer Software ProductComputer Software Product
A030NSPLogistics Management Information (LMI) Summaries/ Provisioning and Other Pre-Procurement Screening DataLogistics Management Information (LMI) Summaries/ Provisioning and Other Pre-Procurement Screening Data
A031NSPManufacturing Risk and Readiness/ Manufacturing Readiness ReportManufacturing Risk and Readiness/ Manufacturing Readiness Report
A032NSPItem Unique Identification (IUID)/ IUID ReportItem Unique Identification (IUID)/ IUID Report
A033NSPSource Data for Diminishing Manufacturing Sources and Material Shortages (DMSMS Implementation Plan)/ DMSMS Implementation PlanSource Data for Diminishing Manufacturing Sources and Material Shortages (DMSMS Implementation Plan)/ DMSMS Implementation Plan
A034NSPSoftware Version Description (SVD)/ Software NORSoftware Version Description (SVD)/ Software NOR
A035NSPSoftware Requirements Specification (SRS)/ Software NORSoftware Requirements Specification (SRS)/ Software NOR
A036NSPScientific and Technical Reports/ Interface Control Documents (ICD)Scientific and Technical Reports/ Interface Control Documents (ICD)
A037NSPScientific and Technical Reports/ Software Loading ProceduresScientific and Technical Reports/ Software Loading Procedures
A038NSPScientific and Technical Reports/ Family Tree (Bill of Materiel)Scientific and Technical Reports/ Family Tree (Bill of Materiel)
A039NSPProduct Drawings/Models and Associated Lists/ Product Drawings/Models and Associated ListsProduct Drawings/Models and Associated Lists/ Product Drawings/Models and Associated Lists
A040NSPConference AgendaConference Agenda
A041NSPTechnical Report – Study Services/ Make or Buy Analysis ReportTechnical Report – Study Services/ Make or Buy Analysis Report
A042FFPTechnical Data Package (TDP)/ Technical Data Package List (TDPL)Technical Data Package (TDP)/ Technical Data Package List (TDPL)
A043NSPProvisioning Technical Documentation (PTD)Provisioning Technical Documentation (PTD)
A044NSPEngineering Drawing TreeEngineering Drawing Tree
A045NSPCybersecurity Vulnerability ReportCybersecurity Vulnerability Report
A046NSPVulnerability Scan Compliance (VSC) ReportVulnerability Scan Compliance (VSC) Report
A047NSPSoftware Threat Assessment Report (STAR)Software Threat Assessment Report (STAR)
A048NSPSoftware Assurance Evaluation Report (SAER)Software Assurance Evaluation Report (SAER)
ERROR:#DIV/0!

Ordering Period 1 Ordering Period 1

Only yellow highlighted boxes can be filled in
CLIN TypeCLINCLIN TYPEDescriptionQuantity DescriptionUnit of Issue (U/I)QTY (Estimated)Unit PriceExtended Price
1001FFPOrdering period 1 - Improved Secondary Distribution Center version 1 (ISDC-1)Level of Effort (1 Unit)Unit of Issue (U/I)12ERROR:#DIV/0!ERROR:#DIV/0!
1 – 4Each (1)
5 – 19Each (1)
20 – 50Each (1)
51-100Each (1)
1002FFPOrdering period 1 - Improved Secondary Distribution Center version 2 (ISDC-2)Level of Effort (1 Unit)Unit of Issue (U/I)8ERROR:#DIV/0!ERROR:#DIV/0!
1 – 4Each (1)
5 – 19Each (1)
20 – 50Each (1)
51-100Each (1)
1003FFPOrdering period 1 - Improved Primary Switching Center (IPSC)Level of Effort (1 Unit)Unit of Issue (U/I)2ERROR:#DIV/0!ERROR:#DIV/0!
1 – 4Each (1)
5 – 19Each (1)
20 – 50Each (1)
51-100Each (1)
1004FFPOrdering period 1 - Tactical Prime Power Transformer (TPPT)Level of Effort (1 Unit)Unit of Issue (U/I)1ERROR:#DIV/0!ERROR:#DIV/0!
1 – 4Each (1)
5 – 19Each (1)
20 – 50Each (1)
51-100Each (1)
1005FFPOrdering period 1 - Initial / Repair PartsLevel of Effort (1 Unit)Unit of Issue (U/I)1ERROR:#DIV/0!ERROR:#DIV/0!
1 – 4Each (1)
5 – 19Each (1)
20 – 50Each (1)
51-100Each (1)
1006FFPOrdering period 1 - Mission Readiness Spares Package (MRSP) KitsLevel of Effort (1 Unit)Unit of Issue (U/I)2ERROR:#DIV/0!ERROR:#DIV/0!
FFP1 – 4Each (1)
5 – 19Each (1)
20 – 50Each (1)
51-100Each (1)

1007 FFP Ordering period 1 - Fielding Training Courses Level of Effort (1 Unit) Each (1) 1 $ - 0

1008FFPOrdering period 1 - Cables Class L 60 Amp 50 FTLevel of Effort (1 Unit)Unit of Issue (U/I)40ERROR:#DIV/0!ERROR:#DIV/0!
1 – 4Each (1)
5 – 19Each (1)
20 – 50Each (1)
51-100Each (1)
1009FFPOrdering period 1 - Cables Class L 60 Amp 100 FTLevel of Effort (1 Unit)Unit of Issue (U/I)20ERROR:#DIV/0!ERROR:#DIV/0!
1 – 4Each (1)
5 – 19Each (1)
20 – 50Each (1)
51-100Each (1)
1010FFPOrdering period 1 - Cables Class L 100 Amp 50 FTLevel of Effort (1 Unit)Unit of Issue (U/I)20ERROR:#DIV/0!ERROR:#DIV/0!
1 – 4Each (1)
5 – 19Each (1)
20 – 50Each (1)
51-100Each (1)
1011FFPOrdering period 1 - Cable 15 KV 1/0 3750 FTLevel of Effort (1 Unit)Unit of Issue (U/I)3ERROR:#DIV/0!ERROR:#DIV/0!
1 – 4Each (1)
5 – 19Each (1)
20 – 50Each (1)
51-100Each (1)
1012FFPOrdering period 1 - Extended 3 Year WarrantyLevel of Effort (1 Unit)Unit of Issue (U/I)20ERROR:#DIV/0!ERROR:#DIV/0!
1 – 4Each (1)
5 – 19Each (1)
20 – 50Each (1)
51-100Each (1)

ERROR:#DIV/0!

Ordering Period 2 Ordering Period 2

Only yellow highlighted boxes can be filled in
CLIN TypeCLINCLIN TYPEDescriptionQuantity DescriptionUnit of Issue (U/I)QTY (Estimated)Unit PriceExtended Price
1013FFPOrdering period 2 - Improved Secondary Distribution Center version 1 (ISDC-1)Level of Effort (1 Unit)Unit of Issue (U/I)10ERROR:#DIV/0!ERROR:#DIV/0!
1 – 4Each (1)
5 – 19Each (1)
20 – 50Each (1)
51-100Each (1)
1014FFPOrdering period 2 - Improved Secondary Distribution Center version 2 (ISDC-2)Level of Effort (1 Unit)Unit of Issue (U/I)50ERROR:#DIV/0!ERROR:#DIV/0!
1 – 4Each (1)
5 – 19Each (1)
20 – 50Each (1)
51-100Each (1)
1015FFPOrdering period 2 - Improved Primary Switching Center (IPSC)Level of Effort (1 Unit)Unit of Issue (U/I)15ERROR:#DIV/0!ERROR:#DIV/0!
1 – 4Each (1)
5 – 19Each (1)
20 – 50Each (1)
51-100Each (1)
1016FFPOrdering period 2 - Tactical Prime Power Transformer (TPPT)Level of Effort (1 Unit)Unit of Issue (U/I)10ERROR:#DIV/0!ERROR:#DIV/0!
1 – 4Each (1)
5 – 19Each (1)
20 – 50Each (1)
51-100Each (1)
1017FFPOrdering period 2 - Initial / Repair PartsLevel of Effort (1 Unit)Unit of Issue (U/I)1ERROR:#DIV/0!ERROR:#DIV/0!
1 – 4Each (1)
5 – 19Each (1)
20 – 50Each (1)
51-100Each (1)
1018FFPOrdering period 2 - Mission Readiness Spares Package (MRSP) KitsLevel of Effort (1 Unit)Unit of Issue (U/I)5ERROR:#DIV/0!ERROR:#DIV/0!
FFP1 – 4Each (1)
5 – 19Each (1)
20 – 50Each (1)
51-100Each (1)

1019 FFP Ordering period 2 - Fielding Training Courses Level of Effort (1 Unit) Each (1) 1 $ - 0

1020FFPOrdering period 2 - Cables Class L 60 Amp 50 FTLevel of Effort (1 Unit)Unit of Issue (U/I)120ERROR:#DIV/0!ERROR:#DIV/0!
1 – 4Each (1)
5 – 19Each (1)
20 – 50Each (1)
51-100Each (1)
1021FFPOrdering period 2 - Cables Class L 60 Amp 100 FTLevel of Effort (1 Unit)Unit of Issue (U/I)60ERROR:#DIV/0!ERROR:#DIV/0!
1 – 4Each (1)
5 – 19Each (1)
20 – 50Each (1)
51-100Each (1)
1022FFPOrdering period 2 - Cables Class L 100 Amp 50 FTLevel of Effort (1 Unit)Unit of Issue (U/I)60ERROR:#DIV/0!ERROR:#DIV/0!
1 – 4Each (1)
5 – 19Each (1)
20 – 50Each (1)
51-100Each (1)
1023FFPOrdering period 2 - Cable 15 KV 1/0 3750 FTLevel of Effort (1 Unit)Unit of Issue (U/I)3ERROR:#DIV/0!ERROR:#DIV/0!
1 – 4Each (1)
5 – 19Each (1)
20 – 50Each (1)
51-100Each (1)
1024FFPOrdering period 2 - Extended 3 Year WarrantyLevel of Effort (1 Unit)Unit of Issue (U/I)85ERROR:#DIV/0!ERROR:#DIV/0!
1 – 4Each (1)
5 – 19Each (1)
20 – 50Each (1)
51-100Each (1)

ERROR:#DIV/0!

Ordering Period 3 Ordering Period 3

Only yellow highlighted boxes can be filled in
CLIN TypeCLINCLIN TYPEDescriptionQuantity DescriptionUnit of Issue (U/I)QTY (Estimated)Unit PriceExtended Price
1025FFPOrdering period 3 - Improved Secondary Distribution Center version 1 (ISDC-1)Level of Effort (1 Unit)Unit of Issue (U/I)10ERROR:#DIV/0!ERROR:#DIV/0!
1 – 4Each (1)
5 – 19Each (1)
20 – 50Each (1)
51-100Each (1)
1026FFPOrdering period 3 - Improved Secondary Distribution Center version 2 (ISDC-2)Level of Effort (1 Unit)Unit of Issue (U/I)50ERROR:#DIV/0!ERROR:#DIV/0!
1 – 4Each (1)
5 – 19Each (1)
20 – 50Each (1)
51-100Each (1)
1027FFPOrdering period 3 - Improved Primary Switching Center (IPSC)Level of Effort (1 Unit)Unit of Issue (U/I)15ERROR:#DIV/0!ERROR:#DIV/0!
1 – 4Each (1)
5 – 19Each (1)
20 – 50Each (1)
51-100Each (1)
1028FFPOrdering period 3 - Tactical Prime Power Transformer (TPPT)Level of Effort (1 Unit)Unit of Issue (U/I)10ERROR:#DIV/0!ERROR:#DIV/0!
1 – 4Each (1)
5 – 19Each (1)
20 – 50Each (1)
51-100Each (1)
1029FFPOrdering period 3 - Initial / Repair PartsLevel of Effort (1 Unit)Unit of Issue (U/I)1ERROR:#DIV/0!ERROR:#DIV/0!
1 – 4Each (1)
5 – 19Each (1)
20 – 50Each (1)
51-100Each (1)
1030FFPOrdering period 3 - Mission Readiness Spares Package (MRSP) KitsLevel of Effort (1 Unit)Unit of Issue (U/I)6ERROR:#DIV/0!ERROR:#DIV/0!
FFP1 – 4Each (1)
5 – 19Each (1)
20 – 50Each (1)
51-100Each (1)

1031 FFP Ordering period 3 - Fielding Training Courses Level of Effort (1 Unit) Each (1) 1 $ - 0

1032FFPOrdering period 3 - Cables Class L 60 Amp 50 FTLevel of Effort (1 Unit)Unit of Issue (U/I)120ERROR:#DIV/0!ERROR:#DIV/0!
1 – 4Each (1)
5 – 19Each (1)
20 – 50Each (1)
51-100Each (1)
1033FFPOrdering period 3 - Cables Class L 60 Amp 100 FTLevel of Effort (1 Unit)Unit of Issue (U/I)60ERROR:#DIV/0!ERROR:#DIV/0!
1 – 4Each (1)
5 – 19Each (1)
20 – 50Each (1)
51-100Each (1)
1034FFPOrdering period 3 - Cables Class L 100 Amp 50 FTLevel of Effort (1 Unit)Unit of Issue (U/I)60ERROR:#DIV/0!ERROR:#DIV/0!
1 – 4Each (1)
5 – 19Each (1)
20 – 50Each (1)
51-100Each (1)
1035FFPOrdering period 3 - Cable 15 KV 1/0 3750 FTLevel of Effort (1 Unit)Unit of Issue (U/I)3ERROR:#DIV/0!ERROR:#DIV/0!
1 – 4Each (1)
5 – 19Each (1)
20 – 50Each (1)
51-100Each (1)
1036FFPOrdering period 3 - Extended 3 Year WarrantyLevel of Effort (1 Unit)Unit of Issue (U/I)85ERROR:#DIV/0!ERROR:#DIV/0!
1 – 4Each (1)
5 – 19Each (1)
20 – 50Each (1)
51-100Each (1)

ERROR:#DIV/0!

Ordering Period 4 Ordering Period 4

Only yellow highlighted boxes can be filled in
CLIN TypeCLINCLIN TYPEDescriptionQuantity DescriptionUnit of Issue (U/I)QTY (Estimated)Unit PriceExtended Price
1037FFPOrdering period 4 - Improved Secondary Distribution Center version 1 (ISDC-1)Level of Effort (1 Unit)Unit of Issue (U/I)32ERROR:#DIV/0!ERROR:#DIV/0!
1 – 4Each (1)
5 – 19Each (1)
20 – 50Each (1)
51-100Each (1)
1038FFPOrdering period 4 - Improved Secondary Distribution Center version 2 (ISDC-2)Level of Effort (1 Unit)Unit of Issue (U/I)40ERROR:#DIV/0!ERROR:#DIV/0!
1 – 4Each (1)
5 – 19Each (1)
20 – 50Each (1)
51-100Each (1)
1039FFPOrdering period 4 - Improved Primary Switching Center (IPSC)Level of Effort (1 Unit)Unit of Issue (U/I)14ERROR:#DIV/0!ERROR:#DIV/0!
1 – 4Each (1)
5 – 19Each (1)
20 – 50Each (1)
51-100Each (1)
1040FFPOrdering period 4 - Tactical Prime Power Transformer (TPPT)Level of Effort (1 Unit)Unit of Issue (U/I)8ERROR:#DIV/0!ERROR:#DIV/0!
1 – 4Each (1)
5 – 19Each (1)
20 – 50Each (1)
51-100Each (1)
1041FFPOrdering period 4 - Initial / Repair PartsLevel of Effort (1 Unit)Unit of Issue (U/I)1ERROR:#DIV/0!ERROR:#DIV/0!
1 – 4Each (1)
5 – 19Each (1)
20 – 50Each (1)
51-100Each (1)
1042FFPOrdering period 4 - Mission Readiness Spares Package (MRSP) KitsLevel of Effort (1 Unit)Unit of Issue (U/I)6ERROR:#DIV/0!ERROR:#DIV/0!
FFP1 – 4Each (1)
5 – 19Each (1)
20 – 50Each (1)
51-100Each (1)

1043 FFP Ordering period 4 - Fielding Training Courses Level of Effort (1 Unit) Each (1) 1 $ - 0

1044FFPOrdering period 4 - Cables Class L 60 Amp 50 FTLevel of Effort (1 Unit)Unit of Issue (U/I)144ERROR:#DIV/0!ERROR:#DIV/0!
1 – 4Each (1)
5 – 19Each (1)
20 – 50Each (1)
51-100Each (1)
1045FFPOrdering period 4 - Cables Class L 60 Amp 100 FTLevel of Effort (1 Unit)Unit of Issue (U/I)72ERROR:#DIV/0!ERROR:#DIV/0!
1 – 4Each (1)
5 – 19Each (1)
20 – 50Each (1)
51-100Each (1)
1046FFPOrdering period 4 - Cables Class L 100 Amp 50 FTLevel of Effort (1 Unit)Unit of Issue (U/I)72ERROR:#DIV/0!ERROR:#DIV/0!
1 – 4Each (1)
5 – 19Each (1)
20 – 50Each (1)
51-100Each (1)
1047FFPOrdering period 4 - Cable 15 KV 1/0 3750 FTLevel of Effort (1 Unit)Unit of Issue (U/I)3ERROR:#DIV/0!ERROR:#DIV/0!
1 – 4Each (1)
5 – 19Each (1)
20 – 50Each (1)
51-100Each (1)
1048FFPOrdering period 4 - Extended 3 Year WarrantyLevel of Effort (1 Unit)Unit of Issue (U/I)72ERROR:#DIV/0!ERROR:#DIV/0!
1 – 4Each (1)
5 – 19Each (1)
20 – 50Each (1)
51-100Each (1)

ERROR:#DIV/0!

Ordering Period 5 Ordering Period 5

Only yellow highlighted boxes can be filled in
CLIN TypeCLINCLIN TYPEDescriptionQuantity DescriptionUnit of Issue (U/I)QTY (Estimated)Unit PriceExtended Price
1049FFPOrdering period 5 - Improved Secondary Distribution Center version 1 (ISDC-1)Level of Effort (1 Unit)Unit of Issue (U/I)60ERROR:#DIV/0!ERROR:#DIV/0!
1 – 4Each (1)
5 – 19Each (1)
20 – 50Each (1)
51-100Each (1)
1050FFPOrdering period 5 - Improved Secondary Distribution Center version 2 (ISDC-2)Level of Effort (1 Unit)Unit of Issue (U/I)1ERROR:#DIV/0!ERROR:#DIV/0!
1 – 4Each (1)
5 – 19Each (1)
20 – 50Each (1)
51-100Each (1)
1051FFPOrdering period 5 - Improved Primary Switching Center (IPSC)Level of Effort (1 Unit)Unit of Issue (U/I)5ERROR:#DIV/0!ERROR:#DIV/0!
1 – 4Each (1)
5 – 19Each (1)
20 – 50Each (1)
51-100Each (1)
1052FFPOrdering period 5 - Tactical Prime Power Transformer (TPPT)Level of Effort (1 Unit)Unit of Issue (U/I)1ERROR:#DIV/0!ERROR:#DIV/0!
1 – 4Each (1)
5 – 19Each (1)
20 – 50Each (1)
51-100Each (1)
1053FFPOrdering period 5 - Initial / Repair PartsLevel of Effort (1 Unit)Unit of Issue (U/I)1ERROR:#DIV/0!ERROR:#DIV/0!
1 – 4Each (1)
5 – 19Each (1)
20 – 50Each (1)
51-100Each (1)
1054FFPOrdering period 5 - Mission Readiness Spares Package (MRSP) KitsLevel of Effort (1 Unit)Unit of Issue (U/I)5ERROR:#DIV/0!ERROR:#DIV/0!
FFP1 – 4Each (1)
5 – 19Each (1)
20 – 50Each (1)
51-100Each (1)

1055 FFP Ordering period 5 - Fielding Training Courses Level of Effort (1 Unit) Each (1) 1 $ - 0

1056FFPOrdering period 5 - Cables Class L 60 Amp 50 FTLevel of Effort (1 Unit)Unit of Issue (U/I)120ERROR:#DIV/0!ERROR:#DIV/0!
1 – 4Each (1)
5 – 19Each (1)
20 – 50Each (1)
51-100Each (1)
1057FFPOrdering period 5 - Cables Class L 60 Amp 100 FTLevel of Effort (1 Unit)Unit of Issue (U/I)60ERROR:#DIV/0!ERROR:#DIV/0!
1 – 4Each (1)
5 – 19Each (1)
20 – 50Each (1)
51-100Each (1)
1058FFPOrdering period 5 - Cables Class L 100 Amp 50 FTLevel of Effort (1 Unit)Unit of Issue (U/I)60ERROR:#DIV/0!ERROR:#DIV/0!
1 – 4Each (1)
5 – 19Each (1)
20 – 50Each (1)
51-100Each (1)
1059FFPOrdering period 5 - Cable 15 KV 1/0 3750 FTLevel of Effort (1 Unit)Unit of Issue (U/I)3ERROR:#DIV/0!ERROR:#DIV/0!
1 – 4Each (1)
5 – 19Each (1)
20 – 50Each (1)
51-100Each (1)
1060FFPOrdering period 5 - Extended 3 Year WarrantyLevel of Effort (1 Unit)Unit of Issue (U/I)60ERROR:#DIV/0!ERROR:#DIV/0!
1 – 4Each (1)
5 – 19Each (1)
20 – 50Each (1)
51-100Each (1)

ERROR:#DIV/0!

CLIN & CDRL Descriptions

DATA ITEMTITLEAssociated CLIN(s)FrequencyDue (Initial/Final)PM FPS Review Due from Receipt (CD)DESCRIPTION
A001OPSEC Standard Operating Procedures0018Once: 90 days after contract award9010 DaysOPSEC Standard Operating Procedures
A002Integrated Master Schedule (IMS)0018Monthly: first submission due 30 days after award; subsequent submissions due at the end of every month30 DAW/ Monthly30 DaysIntegrated Master Schedule (IMS)
A003Contract Work Breakdown Structure (CWBS)0018Four times: 30/90/180/360 days after award30/60/150/36030 DaysContract Work Breakdown Structure (CWBS)
A004Contract Funds Status Report (CFSR)0018Monthly: first submission due 30 days after award; subsequent submissions due at the end of every month30 DAW/ Monthly30 DaysContract Funds Status Report (CFSR)
A005Scientific and Technical Reports/ Configuration Baseline (CB) Changes0018As needed: As changes occursAs Req30 DaysScientific and Technical Reports/ Configuration Baseline (CB) Changes
A006Contract Performance Report (CPR)0018Monthly: first submission due 30 days after award; subsequent submissions due at the end of every month30 DAW/ Monthly30 DaysContract Performance Report (CPR)
A007Configuration Audit Summary Report/ PREPCA Configuration Audit Summary Report0018Once: NLT 760 days after contract award76030 DaysConfiguration Audit Summary Report/ PREPCA Configuration Audit Summary Report
A008Configuration Audit Summary Report/ Production PCA Report0018Once: NLT 860 days after contract award86030 DaysConfiguration Audit Summary Report/ Production PCA Report
A009Test Plan/ Test Plan0018Twice: 120/180 days after contract award120/18030 DaysTest Plan/ Test Plan
A010Test/Inspection Report/ Contractor Pre Production Model Exam/Test Report0018Exam report: 210 days after contract award, Test report: 360 days after contract award210/36030 DaysTest/Inspection Report/ Contractor Pre Production Model Exam/Test Report
A011Scientific and Technical Reports/ Pre-Production Test Incident Report(s) (TIR)0018As needed: 5 days after occurrenceAs Req, 5 days after failure30 DaysScientific and Technical Reports/ Pre-Production Test Incident Report(s) (TIR)
A012Scientific and Technical Reports/ PPT – Failed Item Analysis Reports (FIARs)0018As needed: 15 days after failure occurrenceA Req, 15 days after failure30 DaysScientific and Technical Reports/ PPT – Failed Item Analysis Reports (FIARs)
A013Safety Assessment Report (SAR)/ Safety Assessment Report (SAR)0018Twice: NLT 320/ NLT 510 days after contract award320/51030 DaysSafety Assessment Report (SAR)/ Safety Assessment Report (SAR)
A014Proposed Spare Parts List and MRSP List/ Initial Spares/Repair Parts, Mission Readiness Spares Packages (MRSP) Kits List0018Twice: 380/810 days after contract award for Priced Spares List, 360/500 days after contract award for MRSP kit360/810 MRSP Kits, 360/500 Priced Spares30 DaysProposed Spare Parts List and MRSP List/ Initial Spares/Repair Parts, Mission Readiness Spares Packages (MRSP) Kits List
A015Scientific and Technical Reports/ Warranty Status Report0018Quarterly: First submittal six (6) months after acceptance of the first production lot1200 Initial/ Quarterly30 DaysScientific and Technical Reports/ Warranty Status Report
A016Scientific and Technical Reports/ Supportability Analysis0018Supportability Analysis: 90/180/360 days after contract award, Assembly and Components Data List: 360/540 days after contract award, Support Equipment Listing: 180/360 days after contract award90/180/360 Supportability Analysis, 360/540 Assembly and Components Listing, 180/360 Support Equipement Listing30 DaysScientific and Technical Reports/ Supportability Analysis
A017Technical Report – Study/Services/ Level of Repair Analysis (LORA) Report/Input Data0018Report: 90/150/210 days after contract award, Input Data: 90/150/210 days after contract award90/150/210 Report, 90/150/210 Input Data30 DaysTechnical Report – Study/Services/ Level of Repair Analysis (LORA) Report/Input Data
A018Technical Report – Study/Services/ Failure Modes Effects and Criticality Analysis (FMECA)0018Three times: 90/150/210 days after contract award90/150/21030 DaysTechnical Report – Study/Services/ Failure Modes Effects and Criticality Analysis (FMECA)
A019Scientific and Technical Reports/ Supply Support Alternatives Plan0018Twice: 360/570 days after contract award360/57030 DaysScientific and Technical Reports/ Supply Support Alternatives Plan
A020Technical Report-Study/Services/ Maintenance Allocation Chart (MAC)0018Three times: 180/240/300 days after contract award180/240/30030 DaysTechnical Report-Study/Services/ Maintenance Allocation Chart (MAC)
A021Scientific and Technical Reports/ XML Source File / ETMs0018Four times: 90/180/360/540 days after contract award for ETMs, Three times: 120/210/270 days after contract award for RPSTL90/180/360/540 ETMs 120/210/270 RPSTL30 DaysScientific and Technical Reports/ XML Source File / ETMs
A022Scientific and Technical Reports/ Technical Manuals (ETM) Development Plan0018Twice: 60/90 days after contract award60/9030 DaysScientific and Technical Reports/ Technical Manuals (ETM) Development Plan
A023Scientific and Technical Reports/ ETM ID1 Technical Data Incorporation0018Once: 210 days after contract award21030 DaysScientific and Technical Reports/ ETM ID1 Technical Data Incorporation
A024Logistics Management Information (LMI) Data Product(s)/ Provisioning Parts List LSA 360018Three times: 120/210/270 days after contract award120/210/27030 DaysLogistics Management Information (LMI) Data Product(s)/ Provisioning Parts List LSA 36
A025Logistics Management Information (LMI) Data Product(s)/ Design Change Notice (DCN)0018Twice: 150/330 days after contract award, subsequent submissions as needed150/33030 DaysLogistics Management Information (LMI) Data Product(s)/ Design Change Notice (DCN)
A026Logistics Management Information (LMI) Summaries/ Engineering Data for Provisioning (EDFP)0018Three times: 120/210/270 days after contract award120/210/27030 DaysLogistics Management Information (LMI) Summaries/ Engineering Data for Provisioning (EDFP)
A027Training Materials/ Training Support Packages (TSP)0018Twice: 120/330 days after contract award120/33030 DaysTraining Materials/ Training Support Packages (TSP)
A028Instructional Media Package/ Computer Based Training (CBT)0018Twice: 300/500 days after contract award, Reproducible copies due 620 DAW300/50030 DaysInstructional Media Package/ Computer Based Training (CBT)
A029Computer Software Product0018As needed: submitted with delivery of hardwareAs Req30 DaysComputer Software Product
A030Logistics Management Information (LMI) Summaries/ Provisioning and Other Pre-Procurement Screening Data0018Once: 270 days after contract award27030 DaysLogistics Management Information (LMI) Summaries/ Provisioning and Other Pre-Procurement Screening Data
A031Manufacturing Risk and Readiness/ Manufacturing Readiness Report0018Three times: 180/360/770 days after contract award180/360/77030 DaysManufacturing Risk and Readiness/ Manufacturing Readiness Report
A032Item Unique Identification (IUID)/ IUID Report0018As required: First report due 10 days after Government acceptance of the first lot.As req, 10 days after first lot acceptance30 DaysItem Unique Identification (IUID)/ IUID Report
A033Source Data for Diminishing Manufacturing Sources and Material Shortages (DMSMS Implementation Plan)/ DMSMS Implementation Plan0018Periodically: Initial Plan due at first design review (approx. 90 DAW), subsequent submission changes reported every 60 daysPeriodically30 DaysSource Data for Diminishing Manufacturing Sources and Material Shortages (DMSMS Implementation Plan)/ DMSMS Implementation Plan
A034Software Version Description (SVD)/ Software NOR0018Twice: 90/150 days after contract award90/15030 DaysSoftware Version Description (SVD)/ Software NOR
A035Software Requirements Specification (SRS)/ Software NOR0018Twice: 90/150 days after contract award90/15030 DaysSoftware Requirements Specification (SRS)/ Software NOR
A036Scientific and Technical Reports/ Interface Control Documents (ICD)0018Once: 540 days after contract award54030 DaysScientific and Technical Reports/ Interface Control Documents (ICD)
A037Scientific and Technical Reports/ Software Loading Procedures0018Twice: 90/150days after contract award90/15030 DaysScientific and Technical Reports/ Software Loading Procedures
A038Scientific and Technical Reports/ Family Tree (Bill of Materiel)0018Three times: 90/120/210 days after contract award90/120/21030 DaysScientific and Technical Reports/ Family Tree (Bill of Materiel)
A039Product Drawings/Models and Associated Lists/ Product Drawings/Models and Associated Lists0018Four times: 90/180/360/510 days after contract award90/180/360/51030 DaysProduct Drawings/Models and Associated Lists/ Product Drawings/Models and Associated Lists
A040Conference Agenda0018As needed: Submit 15 calendar days prior to each conference, meeting, audit, or reviewAs req, 15 days before each conference30 DaysConference Agenda
A041Technical Report – Study Services/ Make or Buy Analysis Report0018Once: 360 days after contract award36030 DaysTechnical Report – Study Services/ Make or Buy Analysis Report
A042Technical Data Package (TDP)/ Technical Data Package List (TDPL)0018Four times: 90/180/360/510 days after contract award for TDP, Four times: 90/180/360/510 days after contract award for TDPL90/180/360/51030 DaysTechnical Data Package (TDP)/Technical Data Package List (TDPL)
A043Provisioning Technical Documentation (PTD)0018Twice: 150/330 days after contract award, subsequent submissions as needed150/33030 DaysProvisioning Technical Documentation (PTD)
A044Engineering Drawing Tree0018Four times: 90/180/360/510 days after contract award90/180/360/51030 DaysEngineering Drawing Tree
A045Cybersecurity Vulnerability Report0018Once: 365 days after contract award, subsequent submissions as needed36530 DaysCybersecurity Vulnerability Report
A046Vulnerability Scan Compliance (VSC) Report0018Twice: 365/810 days after contract award, subsequent submissions as needed365/81030 DaysVulnerability Scan Compliance (VSC) Report
A047Software Threat Assessment Report (STAR)0018Twice: 365/810 days after contract award, subsequent submissions as needed365/81030 DaysSoftware Threat Assessment Report (STAR)
A048Software Assurance Evaluation Report (SAER)0018Once: 810 days after contract award, subsequent submissions as needed81030 DaysSoftware Assurance Evaluation Report (SAER)

CDRLs

CDRLAssociated CLIN(s)
A0010003
A0020003
A0030003
A0040003
A0050003
A0060003
A0070003
A0080003
A0090003
A0100003
A0110003
A0120003
A0130003
A0140003
A0150003
A0160003
A0170003
A0180003
A0190003
A0200003
A0210003
A0220003
A0230003
A0240003
A0250003
A0260003
A0270003
A0280003
A0290003
A0300003
A0310003
A0320003
A0330003
A0340003
A0350003
A0360003
A0370003
A0380003
A0390003
A0400003
A0410003
A0420003
A0430003
A0440003
A0450003

POE

RowWBS/CES DescriptionAppropTotalFY 2021FY 2022FY 2023FY 2024FY 2025FY 2026FY 2027FY 2028
1*ICIDS Estimate
2ICIDS Program Office Estimate (POE)
3Recurring Production
4XS Zone
5S Zone
6M Zone
7L Zone
8XL Zone
9A Sensor
10SCIF
11ECP
12XS PMC
13S PMC
14M PMC
15L PMC
16XL PMC
17OPWS
18RSM
19PMC UPS
20WS UPS
21S WS UPS
22XS SSD
23S SSD
24M SSD
25L SSD
26XL SSD
27FO IF
28XS SPV
29S SPV
30M SPV
31L SPV
32XL SPV
33SCIF SPV
34PMC UPS SPV
35RSM SPV
36ECP SPV
37OP Training
38SA Training
39M Training
40SCIF Training
41ESTL Establish
42ESTL Support
43IA
44TDP
45ILSP
46CLS
47Travel
48Contingency
49Interface Device for Additional Sensors
50Central Monitoring Station & Study
51Base System Performance Verification (SPV) test report
52Training
53Base Site Survey/Design
54SEPM
55SETA
56Matrix Support
57PRD
58OGA
59ACC
60RSA
61PM TS SETA
62
63*INPUT VARIABLES
64** SCALARS & FACTORS
65ICIDS-IV to -V scalar
66CLS Factor
67Installation Price Factor
68Labor Fringe Factor
69Labor Overhead Factor
70G&A Factor
71Labor Fee
72FCCM-Labor
73FCCM-G&A
74
75Install HW & Misc Material Factor
76
77** QUANTITY PROFILE
78CLIN
79XS Zone
80S Zone
81M Zone
82L Zone
83XL Zone
84A Sensor
85SCIF
86ECP
87XS PMC
88S PMC
89M PMC
90L PMC
91XL PMC
92OPWS
93RSM

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .