Attachment 0003 PPDS Final Price Model 071624.xlsx
XLSX spreadsheet 102 KB Posted
- Solicitation number
- W909MY24R0005_RFP
About this file
This document is an Excel file related to a Firm Fixed-Price (FFP) Indefinite Delivery Indefinite Quantity (IDIQ) contract opportunity for Prime Power Distribution Systems (PPDS). The PPDS RFP is a 100% Small Business Set-Aside with a five-year base period and one five-year optional ordering period.
The Excel file contains pricing models, cost estimates, and detailed Bill of Materials (BOM) for various components of the PPDS system, including Improved Secondary Distribution Centers, Improved Primary Switching Centers, Tactical Prime Power Transformers, cables, and other accessories. The file also includes a comprehensive list of Contract Data Requirements List (CDRL) items that the contractor must deliver. Key details include estimated quantities, unit prices, and extended pricing for the base and option periods. The pricing models are structured to allow vendors to input firm fixed prices in the yellow highlighted cells.
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CLINs Post Report Hamlet, David A. WNY Tecolote: Version=1.3 Type=TimePhasedReport
Hamlet, David A. WNY Tecolote: culture=en-US Timestamp=5/10/2022 1:44:48 PM Heading=Time Phased Report for Point Estimate in 2022-05-05_ICIDS-POE.acex Inflation=ThenYear UseHeuristicRiskInflation=True Cases="2022-05-05_ICIDS-POE.acex,Point Estimate" HintPaths=2022-05-05_ICIDS-POE.acex=C:\Users\dhamlet\Documents\PM FPS\ RowFilter=All SelectedRows="ACE182,Y","ACE346,Y" SecondaryRows= FirstYear=2021 LastYear=2040 TotalLocation=Beginning ShowMonthlyValues=False FiscalStartMonth=10 FirstMonth=10/1/2020 12:00:00 AM LastMonth=9/30/2021 12:00:00 AM
| MonthlyTotal=Beginning | Time Phased Report for Point Estimate in 2022-05-05_ICIDS-POE.acex | |
| Funding in TY $K, TY | ||
| Tuesday, 10 May 2022, 1:44 PM |
Time Phased Results from Point Estimate
Hamlet, David A. WNY Tecolote: Version=1.3 Type=Table Style=PhasedCaseTable Name=1C45-5642-1B64-4EF7 Description=Time Phased Table Culture=en-US Timestamp=5/10/2022 1:44:48 PM Footprint=R12C4:R67C10
| Locks= | WBS | Total | FY2023 | FY2024 | FY2025 | FY2026 | FY2027 | ||
| ACE182 | ** QUANTITY PROFILE | ||||||||
| ACE346 | CLIN | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | ||
| ACE276 | |||||||||
| ACE277 | |||||||||
| ACE278 | |||||||||
| ACE279 | |||||||||
| ACE280 | |||||||||
| ACE281 | |||||||||
| ACE282 | |||||||||
| ACE283 | |||||||||
| ACE284 | |||||||||
| ACE285 | |||||||||
| ACE286 | |||||||||
| ACE287 | |||||||||
| ACE288 | |||||||||
| ACE289 | |||||||||
| ACE290 | |||||||||
| ACE291 | |||||||||
| ACE292 | |||||||||
| ACE293 | |||||||||
| ACE294 | |||||||||
| ACE295 | |||||||||
| ACE296 | |||||||||
| ACE297 | |||||||||
| ACE298 | |||||||||
| ACE299 | |||||||||
| ACE300 | |||||||||
| ACE301 | |||||||||
| ACE302 | |||||||||
| ACE303 | |||||||||
| ACE304 | |||||||||
| ACE305 | |||||||||
| ACE306 | |||||||||
| ACE307 | |||||||||
| ACE308 | |||||||||
| ACE309 | |||||||||
| ACE310 | |||||||||
| ACE311 | |||||||||
| ACE312 | |||||||||
| ACE313 | |||||||||
| ACE314 | |||||||||
| ACE315 | |||||||||
| ACE316 | |||||||||
| ACE317 | |||||||||
| ACE318 | |||||||||
| ACE319 | |||||||||
| ACE320 | |||||||||
| ACE948 | |||||||||
| ACE889 | |||||||||
| ACE953 | |||||||||
| ACE954 | |||||||||
| ACE955 | |||||||||
| ACE958 | |||||||||
| ACE959 |
&F Page &P of &N Printed: &D &T
Rows Filter Case Years Show Prior/Complete
Instruction Sheet
| ICIDS VI Price Model Instruction Sheet |
| 1.) Vendors are directed to enter firm fixed price data estimates in YELLOW cells for all CLINS for Base and all Option Years |
| 2.) Total cost estimate will be calculated as the sum of the total cost for each Base Year and Option Year based off estimated quantity values per year. |
| 3.) Pricing Model is locked, except YELLOW cells requiring vendor input. |
| 4.) CLIN descriptions are provided in the CLIN Descriptions Tab |
| 5.) CDRL descriptions are provided in the CDRL Descriptions Tab |
| 6.) CDRL will not be separately priced EXCEPT A042 (Technical Data Package) under the Base Period tab. |
| 7.) Extended warranty unit is per iSDC,iPSC, TPPT. Extended warranty provisions are IAW SOW Section 3.19. |
| 8.) Base Period includes 3 Production Years (5 years total with the 12-Month Prototype Development and the 12-Month Testing) |
| 9.) Optional contract production extension encompasses One 5-Year Ordering Period |
| 10.) Item quantities are estimated and may change at time of award. |
Summary Summary of ICIDS VI Quanity Profile and Extended Price for Base Period and Optional Ordering Periods
| Base Period (BP) | BP Production Year 1 | BP Production Year 2 | BP Production Year 3 | Ordering Period 1 | Ordering Period 2 | Ordering Period 3 | Ordering Period 4 | Ordering Period 5 | Total | |
| Total Cost Estimate | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! |
| Base Period (BP) | BP Production Year 1 | BP Production Year 2 | BP Production Year 3 | Ordering Period 1 | Ordering Period 2 | Ordering Period 3 | Ordering Period 4 | Ordering Period 5 | Average Cost per Unit | |
| Development and delivery of First Article Units | $ - 0 | |||||||||
| Contractor Production Prove Out Testing (PPT) | $ - 0 | |||||||||
| Contract Data List Requirements (CDRLs) | $ - 0 | |||||||||
| Technical Data Package (TDP)/ Technical Data Package List (TDPL) | $ - 0 | |||||||||
| Improved Secondary Distribution Center version 1 (ISDC-1) | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | |
| Improved Secondary Distribution Center version 2 (ISDC-2) | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | |
| Improved Primary Switching Center (IPSC) | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | |
| Tactical Prime Power Transformer (TPPT) | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | |
| Initial / Repair Parts | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | |
| Mission Readiness Spares Package (MRSP) Kits | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | |
| Training Courses | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Cables Class L 60 Amp 50 FT | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | |
| Cables Class L 60 Amp 100 FT | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | |
| Cables Class L 100 Amp 50 FT | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | |
| Cable 15 KV 1/0 3750 FT | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | |
| Extended 3 Year Warranty | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | |
| Notes below: | ||||||||||
| Based off total price per CLIN/ CDRL | ||||||||||
| Based off average unit price derived from range pricing |
Base Period Base Period (BP)
| Only yellow highlighted boxes can be filled in | |||||||||
| CLIN Type | CLIN | CLIN TYPE | Description | Quantity Description | Unit of Issue (U/I) | QTY (Estimated) | Unit Price | Extended Price | Description |
| FFP | Development and delivery of Prototype Units | Development of two of each end item | Unit of Issue (U/I) | 1 sensor (CLIN 0006) plus 1 Premise Control Unit (Control Board for alarm zone) | |||||
| 0001 | Improved Secondary Distribution Center version 1 (ISDC-1) (2 ea.) | Each (1) | 2 | $ - 0 | |||||
| 0002 | Improved Secondary Distribution Center version 2 (ISDC-2) (2 ea.) | Each (1) | 2 | $ - 0 | |||||
| 0003 | Improved Primary Switching Center (IPSC) (2ea) | Each (1) | 2 | $ - 0 | |||||
| 0004 | Tactical Prime Power Transformer (TPPT) (2ea) | Each (1) | 2 | $ - 0 |
| 0005 | FFP | Contractor Production Prove Out Testing (PPT) | Level of Effort (1 Unit) | Each (1) | 1 | $ - 0 | ||
| Base Production Year 1 | ||||||||
| CLIN | CLIN TYPE | Description | Quantity Description | Unit of Issue (U/I) | QTY (Estimated) | Unit Price | Extended Price | |
| 0006 | FFP | Base period - Improved Secondary Distribution Center version 1 (ISDC-1) | Level of Effort (1 Unit) | Unit of Issue (U/I) | 22 | ERROR:#DIV/0! | ERROR:#DIV/0! | |
| 1 – 4 | Each (1) | Submitted Monthly | ||||||
| 5 – 19 | Each (1) | Submitted monthly as following ad hoc meetings in between scheduled monthly meetings | ||||||
| 20 – 50 | Each (1) | Submitted for each Delivery Order | ||||||
| 51-100 | Each (1) | Submitted for each Delivery Order | ||||||
| Submitted for each Delivery Order | ||||||||
| 0007 | FFP | Base period - Improved Secondary Distribution Center version 2 (ISDC-2) | Level of Effort (1 Unit) | Unit of Issue (U/I) | 58 | ERROR:#DIV/0! | ERROR:#DIV/0! | Submitted for each Delivery Order |
| 1 – 4 | Each (1) | Submitted for each Delivery Order | ||||||
| 5 – 19 | Each (1) | Submitted for each Delivery Order | ||||||
| 20 – 50 | Each (1) | Follows any Audit Event | ||||||
| 51-100 | Each (1) | Submitted for each Delivery Order |
| 0008 | FFP | Base period - Improved Primary Switching Center (IPSC) | Level of Effort (1 Unit) | Unit of Issue (U/I) | 17 | ERROR:#DIV/0! | ERROR:#DIV/0! | Submitted for each Delivery Order |
| 1 – 4 | Each (1) | Submitted for each Delivery Order | ||||||
| 5 – 19 | Each (1) | |||||||
| 20 – 50 | Each (1) | Submitted for each Delivery Order | ||||||
| 51-100 | Each (1) | Submitted for each Delivery Order | ||||||
| Submitted for each Delivery Order | ||||||||
| 0009 | FFP | Base period - Tactical Prime Power Transformer (TPPT) | Level of Effort (1 Unit) | Unit of Issue (U/I) | 10 | ERROR:#DIV/0! | ERROR:#DIV/0! | Submitted for each Failure Occurrence |
| 1 – 4 | Each (1) | Submitted for each failed event during the Warranty Phase for each Delivery Order | ||||||
| 5 – 19 | Each (1) | Submitted for each Delivery Order | ||||||
| 20 – 50 | Each (1) | |||||||
| 51-100 | Each (1) | Once following the Base Contract Award | ||||||
| Once following the Base Contract Award | ||||||||
| 0010 | FFP | Base period - Initial / Repair Parts | Level of Effort (1 Unit) | Unit of Issue (U/I) | 1 | ERROR:#DIV/0! | ERROR:#DIV/0! | Once following the Base Contract Award |
| 1 – 4 | Each (1) | Submitted for each failed event during PVT1 & 2, the SPV for each Delivery Order | ||||||
| 5 – 19 | Each (1) | Submitted once for PVT-1 (ESTL) only | ||||||
| 20 – 50 | Each (1) | Submitted once for PVT-1 (ESTL) only | ||||||
| 51-100 | Each (1) | Submitted once for PVT-1 (ESTL) only | ||||||
| Once following the Base Contract Award | ||||||||
| 0011 | FFP | Base period - Mission Readiness Spares Package (MRSP) Kits | Level of Effort (1 Unit) | Unit of Issue (U/I) | 2 | ERROR:#DIV/0! | ERROR:#DIV/0! | Submitted once for PVT-2 (First Delivery Order) only |
| 1 – 4 | Each (1) | Submitted once for PVT-2 (First Delivery Order) only | ||||||
| 5 – 19 | Each (1) | Submitted once for PVT-2 (First Delivery Order) only | ||||||
| 20 – 50 | Each (1) | Submitted once for PVT-2 (First Delivery Order) only | ||||||
| 51-100 | Each (1) | Submitted once for PVT-2 (First Delivery Order) only | ||||||
| Submitted once for PVT-2 (First Delivery Order) only | ||||||||
| 0012 | FFP | Base period - Fielding Training Courses | Level of Effort (1 Unit) | Each (1) | 1 | $ - 0 | Submitted for each Delivery Order | |
| Submitted for each Delivery Order | ||||||||
| 0013 | FFP | Base period - Cables Class L 60 Amp 50 FT | Level of Effort (1 Unit) | Unit of Issue (U/I) | 160 | ERROR:#DIV/0! | ERROR:#DIV/0! | Once following the Base Contract Award |
| 1 – 4 | Each (1) | Once following the Base Contract Award | ||||||
| 5 – 19 | Each (1) | |||||||
| 20 – 50 | Each (1) | |||||||
| 51-100 | Each (1) |
| 0014 | FFP | Base period - Cables Class L 60 Amp 100 FT | Level of Effort (1 Unit) | Unit of Issue (U/I) | 80 | ERROR:#DIV/0! | ERROR:#DIV/0! |
| 1 – 4 | Each (1) | ||||||
| 5 – 19 | Each (1) | ||||||
| 20 – 50 | Each (1) | ||||||
| 51-100 | Each (1) |
| 0015 | FFP | Base period - Cables Class L 100 Amp 50 FT | Level of Effort (1 Unit) | Unit of Issue (U/I) | 80 | ERROR:#DIV/0! | ERROR:#DIV/0! |
| 1 – 4 | Each (1) | ||||||
| 5 – 19 | Each (1) | ||||||
| 20 – 50 | Each (1) | ||||||
| 51-100 | Each (1) |
| 0016 | FFP | Base period - Cable 15 KV 1/0 3750 FT | Level of Effort (1 Unit) | Unit of Issue (U/I) | 8 | ERROR:#DIV/0! | ERROR:#DIV/0! |
| 1 – 4 | Each (1) | ||||||
| 5 – 19 | Each (1) | ||||||
| 20 – 50 | Each (1) | ||||||
| 51-100 | Each (1) |
| 0017 | FFP | Base period - Extended 3 Year Warranty | Level of Effort (1 Unit) | Unit of Issue (U/I) | 107 | ERROR:#DIV/0! | ERROR:#DIV/0! |
| 1 – 4 | Each (1) | ||||||
| 5 – 19 | Each (1) | ||||||
| 20 – 50 | Each (1) | ||||||
| 51-100 | Each (1) | ||||||
| Base Production Year 2 | |||||||
| CLIN | CLIN TYPE | Description | Quantity Description | Unit of Issue (U/I) | QTY (Estimated) | Unit Price | Extended Price |
| 0018 | FFP | Base period - Improved Secondary Distribution Center version 1 (ISDC-1) | Level of Effort (1 Unit) | Unit of Issue (U/I) | 22 | ERROR:#DIV/0! | ERROR:#DIV/0! |
| 1 – 4 | Each (1) | ||||||
| 5 – 19 | Each (1) | ||||||
| 20 – 50 | Each (1) | ||||||
| 51-100 | Each (1) |
| 0019 | FFP | Base period - Improved Secondary Distribution Center version 2 (ISDC-2) | Level of Effort (1 Unit) | Unit of Issue (U/I) | 58 | ERROR:#DIV/0! | ERROR:#DIV/0! |
| 1 – 4 | Each (1) | ||||||
| 5 – 19 | Each (1) | ||||||
| 20 – 50 | Each (1) | ||||||
| 51-100 | Each (1) |
| 0020 | FFP | Base period - Improved Primary Switching Center (IPSC) | Level of Effort (1 Unit) | Unit of Issue (U/I) | 17 | ERROR:#DIV/0! | ERROR:#DIV/0! |
| 1 – 4 | Each (1) | ||||||
| 5 – 19 | Each (1) | ||||||
| 20 – 50 | Each (1) | ||||||
| 51-100 | Each (1) |
| 0021 | FFP | Base period - Tactical Prime Power Transformer (TPPT) | Level of Effort (1 Unit) | Unit of Issue (U/I) | 10 | ERROR:#DIV/0! | ERROR:#DIV/0! |
| 1 – 4 | Each (1) | ||||||
| 5 – 19 | Each (1) | ||||||
| 20 – 50 | Each (1) | ||||||
| 51-100 | Each (1) |
| 0022 | FFP | Base period - Initial / Repair Parts | Level of Effort (1 Unit) | Unit of Issue (U/I) | 1 | ERROR:#DIV/0! | ERROR:#DIV/0! |
| 1 – 4 | Each (1) | ||||||
| 5 – 19 | Each (1) | ||||||
| 20 – 50 | Each (1) | ||||||
| 51-100 | Each (1) |
| 0023 | FFP | Base period - Mission Readiness Spares Package (MRSP) Kits | Level of Effort (1 Unit) | Unit of Issue (U/I) | 2 | ERROR:#DIV/0! | ERROR:#DIV/0! |
| 1 – 4 | Each (1) | ||||||
| 5 – 19 | Each (1) | ||||||
| 20 – 50 | Each (1) | ||||||
| 51-100 | Each (1) |
0024 FFP Base period - Fielding Training Courses Level of Effort (1 Unit) Each (1) 1 $ - 0
| 0025 | FFP | Base period - Cables Class L 60 Amp 50 FT | Level of Effort (1 Unit) | Unit of Issue (U/I) | 160 | ERROR:#DIV/0! | ERROR:#DIV/0! |
| 1 – 4 | Each (1) | ||||||
| 5 – 19 | Each (1) | ||||||
| 20 – 50 | Each (1) | ||||||
| 51-100 | Each (1) |
| 0026 | FFP | Base period - Cables Class L 60 Amp 100 FT | Level of Effort (1 Unit) | Unit of Issue (U/I) | 80 | ERROR:#DIV/0! | ERROR:#DIV/0! |
| 1 – 4 | Each (1) | ||||||
| 5 – 19 | Each (1) | ||||||
| 20 – 50 | Each (1) | ||||||
| 51-100 | Each (1) |
| 0027 | FFP | Base period - Cables Class L 100 Amp 50 FT | Level of Effort (1 Unit) | Unit of Issue (U/I) | 80 | ERROR:#DIV/0! | ERROR:#DIV/0! |
| 1 – 4 | Each (1) | ||||||
| 5 – 19 | Each (1) | ||||||
| 20 – 50 | Each (1) | ||||||
| 51-100 | Each (1) |
| 0028 | FFP | Base period - Cable 15 KV 1/0 3750 FT | Level of Effort (1 Unit) | Unit of Issue (U/I) | 8 | ERROR:#DIV/0! | ERROR:#DIV/0! |
| 1 – 4 | Each (1) | ||||||
| 5 – 19 | Each (1) | ||||||
| 20 – 50 | Each (1) | ||||||
| 51-100 | Each (1) |
| 0029 | FFP | Base period - Extended 3 Year Warranty | Level of Effort (1 Unit) | Unit of Issue (U/I) | 107 | ERROR:#DIV/0! | ERROR:#DIV/0! |
| 1 – 4 | Each (1) | ||||||
| 5 – 19 | Each (1) | ||||||
| 20 – 50 | Each (1) | ||||||
| 51-100 | Each (1) | ||||||
| Base Production Year 3 | |||||||
| CLIN | CLIN TYPE | Description | Quantity Description | Unit of Issue (U/I) | QTY (Estimated) | Unit Price | Extended Price |
| 0030 | FFP | Base period - Improved Secondary Distribution Center version 1 (ISDC-1) | Level of Effort (1 Unit) | Unit of Issue (U/I) | 22 | ERROR:#DIV/0! | ERROR:#DIV/0! |
| 1 – 4 | Each (1) | ||||||
| 5 – 19 | Each (1) | ||||||
| 20 – 50 | Each (1) | ||||||
| 51-100 | Each (1) |
| 0031 | FFP | Base period - Improved Secondary Distribution Center version 2 (ISDC-2) | Level of Effort (1 Unit) | Unit of Issue (U/I) | 58 | ERROR:#DIV/0! | ERROR:#DIV/0! |
| 1 – 4 | Each (1) | ||||||
| 5 – 19 | Each (1) | ||||||
| 20 – 50 | Each (1) | ||||||
| 51-100 | Each (1) |
| 0032 | FFP | Base period - Improved Primary Switching Center (IPSC) | Level of Effort (1 Unit) | Unit of Issue (U/I) | 17 | ERROR:#DIV/0! | ERROR:#DIV/0! |
| 1 – 4 | Each (1) | ||||||
| 5 – 19 | Each (1) | ||||||
| 20 – 50 | Each (1) | ||||||
| 51-100 | Each (1) |
| 0033 | FFP | Base period - Tactical Prime Power Transformer (TPPT) | Level of Effort (1 Unit) | Unit of Issue (U/I) | 10 | ERROR:#DIV/0! | ERROR:#DIV/0! |
| 1 – 4 | Each (1) | ||||||
| 5 – 19 | Each (1) | ||||||
| 20 – 50 | Each (1) | ||||||
| 51-100 | Each (1) |
| 0034 | FFP | Base period - Initial / Repair Parts | Level of Effort (1 Unit) | Unit of Issue (U/I) | 1 | ERROR:#DIV/0! | ERROR:#DIV/0! |
| 1 – 4 | Each (1) | ||||||
| 5 – 19 | Each (1) | ||||||
| 20 – 50 | Each (1) | ||||||
| 51-100 | Each (1) |
| 0035 | FFP | Base period - Mission Readiness Spares Package (MRSP) Kits | Level of Effort (1 Unit) | Unit of Issue (U/I) | 2 | ERROR:#DIV/0! | ERROR:#DIV/0! |
| 1 – 4 | Each (1) | ||||||
| 5 – 19 | Each (1) | ||||||
| 20 – 50 | Each (1) | ||||||
| 51-100 | Each (1) |
0036 FFP Base period - Fielding Training Courses Level of Effort (1 Unit) Each (1) 1 $ - 0
| 0037 | FFP | Base period - Cables Class L 60 Amp 50 FT | Level of Effort (1 Unit) | Unit of Issue (U/I) | 160 | ERROR:#DIV/0! | ERROR:#DIV/0! |
| 1 – 4 | Each (1) | ||||||
| 5 – 19 | Each (1) | ||||||
| 20 – 50 | Each (1) | ||||||
| 51-100 | Each (1) |
| 0038 | FFP | Base period - Cables Class L 60 Amp 100 FT | Level of Effort (1 Unit) | Unit of Issue (U/I) | 80 | ERROR:#DIV/0! | ERROR:#DIV/0! |
| 1 – 4 | Each (1) | ||||||
| 5 – 19 | Each (1) | ||||||
| 20 – 50 | Each (1) | ||||||
| 51-100 | Each (1) |
| 0039 | FFP | Base period - Cables Class L 100 Amp 50 FT | Level of Effort (1 Unit) | Unit of Issue (U/I) | 80 | ERROR:#DIV/0! | ERROR:#DIV/0! |
| 1 – 4 | Each (1) | ||||||
| 5 – 19 | Each (1) | ||||||
| 20 – 50 | Each (1) | ||||||
| 51-100 | Each (1) |
| 0040 | FFP | Base period - Cable 15 KV 1/0 3750 FT | Level of Effort (1 Unit) | Unit of Issue (U/I) | 8 | ERROR:#DIV/0! | ERROR:#DIV/0! |
| 1 – 4 | Each (1) | ||||||
| 5 – 19 | Each (1) | ||||||
| 20 – 50 | Each (1) | ||||||
| 51-100 | Each (1) |
| 0041 | FFP | Base period - Extended 3 Year Warranty | Level of Effort (1 Unit) | Unit of Issue (U/I) | 107 | ERROR:#DIV/0! | ERROR:#DIV/0! |
| 1 – 4 | Each (1) | ||||||
| 5 – 19 | Each (1) | ||||||
| 20 – 50 | Each (1) | ||||||
| 51-100 | Each (1) |
9999 FFP Contract Data List Requirements (CDRLs) Level of Effort (1 Unit) Each (1) 1 $ - 0
| CDRL # | CDRL TYPE | CDRL Description | Quantity Description | Unit Price | |
| A001 | NSP | OPSEC Standard Operating Procedures | OPSEC Standard Operating Procedures | ||
| A002 | NSP | Integrated Master Schedule (IMS) | Integrated Master Schedule (IMS) | ||
| A003 | NSP | Contract Work Breakdown Structure (CWBS) | Contract Work Breakdown Structure (CWBS) | ||
| A004 | NSP | Contract Funds Status Report (CFSR) | Contract Funds Status Report (CFSR) | ||
| A005 | NSP | Scientific and Technical Reports/ Configuration Baseline (CB) Changes | Scientific and Technical Reports/ Configuration Baseline (CB) Changes | ||
| A006 | NSP | Contract Performance Report (CPR) | Contract Performance Report (CPR) | ||
| A007 | NSP | Configuration Audit Summary Report/ PREPCA Configuration Audit Summary Report | Configuration Audit Summary Report/ PREPCA Configuration Audit Summary Report | ||
| A008 | NSP | Configuration Audit Summary Report/ Production PCA Report | Configuration Audit Summary Report/ Production PCA Report | ||
| A009 | NSP | Test Plan/ Test Plan | Test Plan/ Test Plan | ||
| A010 | NSP | Test/Inspection Report/ Contractor Pre Production Model Exam/Test Report | Test/Inspection Report/ Contractor Pre Production Model Exam/Test Report | ||
| A011 | NSP | Scientific and Technical Reports/ Pre-Production Test Incident Report(s) (TIR) | Scientific and Technical Reports/ Pre-Production Test Incident Report(s) (TIR) | ||
| A012 | NSP | Scientific and Technical Reports/ PPT – Failed Item Analysis Reports (FIARs) | Scientific and Technical Reports/ PPT – Failed Item Analysis Reports (FIARs) | ||
| A013 | NSP | Safety Assessment Report (SAR)/ Safety Assessment Report (SAR) | Safety Assessment Report (SAR)/ Safety Assessment Report (SAR) | ||
| A014 | NSP | Proposed Spare Parts List and MRSP List/ Initial Spares/Repair Parts, Mission Readiness Spares Packages (MRSP) Kits List | Proposed Spare Parts List and MRSP List/ Initial Spares/Repair Parts, Mission Readiness Spares Packages (MRSP) Kits List | ||
| A015 | NSP | Scientific and Technical Reports/ Warranty Status Report | Scientific and Technical Reports/ Warranty Status Report | ||
| A016 | NSP | Scientific and Technical Reports/ Supportability Analysis | Scientific and Technical Reports/ Supportability Analysis | ||
| A017 | NSP | Technical Report – Study/Services/ Level of Repair Analysis (LORA) Report/Input Data | Technical Report – Study/Services/ Level of Repair Analysis (LORA) Report/Input Data | ||
| A018 | NSP | Technical Report – Study/Services/ Failure Modes Effects and Criticality Analysis (FMECA) | Technical Report – Study/Services/ Failure Modes Effects and Criticality Analysis (FMECA) | ||
| A019 | NSP | Scientific and Technical Reports/ Supply Support Alternatives Plan | Scientific and Technical Reports/ Supply Support Alternatives Plan | ||
| A020 | NSP | Technical Report-Study/Services/ Maintenance Allocation Chart (MAC) | Technical Report-Study/Services/ Maintenance Allocation Chart (MAC) | ||
| A021 | NSP | Scientific and Technical Reports/ XML Source File / ETMs | Scientific and Technical Reports/ XML Source File / ETMs | ||
| A022 | NSP | Scientific and Technical Reports/ Technical Manuals (ETM) Development Plan | Scientific and Technical Reports/ Technical Manuals (ETM) Development Plan | ||
| A023 | NSP | Scientific and Technical Reports/ ETM ID1 Technical Data Incorporation | Scientific and Technical Reports/ ETM ID1 Technical Data Incorporation | ||
| A024 | NSP | Logistics Management Information (LMI) Data Product(s)/ Provisioning Parts List LSA 36 | Logistics Management Information (LMI) Data Product(s)/ Provisioning Parts List LSA 36 | ||
| A025 | NSP | Logistics Management Information (LMI) Data Product(s)/ Design Change Notice (DCN) | Logistics Management Information (LMI) Data Product(s)/ Design Change Notice (DCN) | ||
| A026 | NSP | Logistics Management Information (LMI) Summaries/ Engineering Data for Provisioning (EDFP) | Logistics Management Information (LMI) Summaries/ Engineering Data for Provisioning (EDFP) | ||
| A027 | NSP | Training Materials/ Training Support Packages (TSP) | Training Materials/ Training Support Packages (TSP) | ||
| A028 | NSP | Instructional Media Package/ Computer Based Training (CBT) | Instructional Media Package/ Computer Based Training (CBT) | ||
| A029 | NSP | Computer Software Product | Computer Software Product | ||
| A030 | NSP | Logistics Management Information (LMI) Summaries/ Provisioning and Other Pre-Procurement Screening Data | Logistics Management Information (LMI) Summaries/ Provisioning and Other Pre-Procurement Screening Data | ||
| A031 | NSP | Manufacturing Risk and Readiness/ Manufacturing Readiness Report | Manufacturing Risk and Readiness/ Manufacturing Readiness Report | ||
| A032 | NSP | Item Unique Identification (IUID)/ IUID Report | Item Unique Identification (IUID)/ IUID Report | ||
| A033 | NSP | Source Data for Diminishing Manufacturing Sources and Material Shortages (DMSMS Implementation Plan)/ DMSMS Implementation Plan | Source Data for Diminishing Manufacturing Sources and Material Shortages (DMSMS Implementation Plan)/ DMSMS Implementation Plan | ||
| A034 | NSP | Software Version Description (SVD)/ Software NOR | Software Version Description (SVD)/ Software NOR | ||
| A035 | NSP | Software Requirements Specification (SRS)/ Software NOR | Software Requirements Specification (SRS)/ Software NOR | ||
| A036 | NSP | Scientific and Technical Reports/ Interface Control Documents (ICD) | Scientific and Technical Reports/ Interface Control Documents (ICD) | ||
| A037 | NSP | Scientific and Technical Reports/ Software Loading Procedures | Scientific and Technical Reports/ Software Loading Procedures | ||
| A038 | NSP | Scientific and Technical Reports/ Family Tree (Bill of Materiel) | Scientific and Technical Reports/ Family Tree (Bill of Materiel) | ||
| A039 | NSP | Product Drawings/Models and Associated Lists/ Product Drawings/Models and Associated Lists | Product Drawings/Models and Associated Lists/ Product Drawings/Models and Associated Lists | ||
| A040 | NSP | Conference Agenda | Conference Agenda | ||
| A041 | NSP | Technical Report – Study Services/ Make or Buy Analysis Report | Technical Report – Study Services/ Make or Buy Analysis Report | ||
| A042 | FFP | Technical Data Package (TDP)/ Technical Data Package List (TDPL) | Technical Data Package (TDP)/ Technical Data Package List (TDPL) | ||
| A043 | NSP | Provisioning Technical Documentation (PTD) | Provisioning Technical Documentation (PTD) | ||
| A044 | NSP | Engineering Drawing Tree | Engineering Drawing Tree | ||
| A045 | NSP | Cybersecurity Vulnerability Report | Cybersecurity Vulnerability Report | ||
| A046 | NSP | Vulnerability Scan Compliance (VSC) Report | Vulnerability Scan Compliance (VSC) Report | ||
| A047 | NSP | Software Threat Assessment Report (STAR) | Software Threat Assessment Report (STAR) | ||
| A048 | NSP | Software Assurance Evaluation Report (SAER) | Software Assurance Evaluation Report (SAER) | ||
| ERROR:#DIV/0! |
Ordering Period 1 Ordering Period 1
| Only yellow highlighted boxes can be filled in | ||||||||
| CLIN Type | CLIN | CLIN TYPE | Description | Quantity Description | Unit of Issue (U/I) | QTY (Estimated) | Unit Price | Extended Price |
| 1001 | FFP | Ordering period 1 - Improved Secondary Distribution Center version 1 (ISDC-1) | Level of Effort (1 Unit) | Unit of Issue (U/I) | 12 | ERROR:#DIV/0! | ERROR:#DIV/0! | |
| 1 – 4 | Each (1) | |||||||
| 5 – 19 | Each (1) | |||||||
| 20 – 50 | Each (1) | |||||||
| 51-100 | Each (1) |
| 1002 | FFP | Ordering period 1 - Improved Secondary Distribution Center version 2 (ISDC-2) | Level of Effort (1 Unit) | Unit of Issue (U/I) | 8 | ERROR:#DIV/0! | ERROR:#DIV/0! |
| 1 – 4 | Each (1) | ||||||
| 5 – 19 | Each (1) | ||||||
| 20 – 50 | Each (1) | ||||||
| 51-100 | Each (1) |
| 1003 | FFP | Ordering period 1 - Improved Primary Switching Center (IPSC) | Level of Effort (1 Unit) | Unit of Issue (U/I) | 2 | ERROR:#DIV/0! | ERROR:#DIV/0! |
| 1 – 4 | Each (1) | ||||||
| 5 – 19 | Each (1) | ||||||
| 20 – 50 | Each (1) | ||||||
| 51-100 | Each (1) |
| 1004 | FFP | Ordering period 1 - Tactical Prime Power Transformer (TPPT) | Level of Effort (1 Unit) | Unit of Issue (U/I) | 1 | ERROR:#DIV/0! | ERROR:#DIV/0! |
| 1 – 4 | Each (1) | ||||||
| 5 – 19 | Each (1) | ||||||
| 20 – 50 | Each (1) | ||||||
| 51-100 | Each (1) |
| 1005 | FFP | Ordering period 1 - Initial / Repair Parts | Level of Effort (1 Unit) | Unit of Issue (U/I) | 1 | ERROR:#DIV/0! | ERROR:#DIV/0! |
| 1 – 4 | Each (1) | ||||||
| 5 – 19 | Each (1) | ||||||
| 20 – 50 | Each (1) | ||||||
| 51-100 | Each (1) |
| 1006 | FFP | Ordering period 1 - Mission Readiness Spares Package (MRSP) Kits | Level of Effort (1 Unit) | Unit of Issue (U/I) | 2 | ERROR:#DIV/0! | ERROR:#DIV/0! |
| FFP | 1 – 4 | Each (1) | |||||
| 5 – 19 | Each (1) | ||||||
| 20 – 50 | Each (1) | ||||||
| 51-100 | Each (1) |
1007 FFP Ordering period 1 - Fielding Training Courses Level of Effort (1 Unit) Each (1) 1 $ - 0
| 1008 | FFP | Ordering period 1 - Cables Class L 60 Amp 50 FT | Level of Effort (1 Unit) | Unit of Issue (U/I) | 40 | ERROR:#DIV/0! | ERROR:#DIV/0! |
| 1 – 4 | Each (1) | ||||||
| 5 – 19 | Each (1) | ||||||
| 20 – 50 | Each (1) | ||||||
| 51-100 | Each (1) |
| 1009 | FFP | Ordering period 1 - Cables Class L 60 Amp 100 FT | Level of Effort (1 Unit) | Unit of Issue (U/I) | 20 | ERROR:#DIV/0! | ERROR:#DIV/0! |
| 1 – 4 | Each (1) | ||||||
| 5 – 19 | Each (1) | ||||||
| 20 – 50 | Each (1) | ||||||
| 51-100 | Each (1) |
| 1010 | FFP | Ordering period 1 - Cables Class L 100 Amp 50 FT | Level of Effort (1 Unit) | Unit of Issue (U/I) | 20 | ERROR:#DIV/0! | ERROR:#DIV/0! |
| 1 – 4 | Each (1) | ||||||
| 5 – 19 | Each (1) | ||||||
| 20 – 50 | Each (1) | ||||||
| 51-100 | Each (1) |
| 1011 | FFP | Ordering period 1 - Cable 15 KV 1/0 3750 FT | Level of Effort (1 Unit) | Unit of Issue (U/I) | 3 | ERROR:#DIV/0! | ERROR:#DIV/0! |
| 1 – 4 | Each (1) | ||||||
| 5 – 19 | Each (1) | ||||||
| 20 – 50 | Each (1) | ||||||
| 51-100 | Each (1) |
| 1012 | FFP | Ordering period 1 - Extended 3 Year Warranty | Level of Effort (1 Unit) | Unit of Issue (U/I) | 20 | ERROR:#DIV/0! | ERROR:#DIV/0! |
| 1 – 4 | Each (1) | ||||||
| 5 – 19 | Each (1) | ||||||
| 20 – 50 | Each (1) | ||||||
| 51-100 | Each (1) |
ERROR:#DIV/0!
Ordering Period 2 Ordering Period 2
| Only yellow highlighted boxes can be filled in | ||||||||
| CLIN Type | CLIN | CLIN TYPE | Description | Quantity Description | Unit of Issue (U/I) | QTY (Estimated) | Unit Price | Extended Price |
| 1013 | FFP | Ordering period 2 - Improved Secondary Distribution Center version 1 (ISDC-1) | Level of Effort (1 Unit) | Unit of Issue (U/I) | 10 | ERROR:#DIV/0! | ERROR:#DIV/0! | |
| 1 – 4 | Each (1) | |||||||
| 5 – 19 | Each (1) | |||||||
| 20 – 50 | Each (1) | |||||||
| 51-100 | Each (1) |
| 1014 | FFP | Ordering period 2 - Improved Secondary Distribution Center version 2 (ISDC-2) | Level of Effort (1 Unit) | Unit of Issue (U/I) | 50 | ERROR:#DIV/0! | ERROR:#DIV/0! |
| 1 – 4 | Each (1) | ||||||
| 5 – 19 | Each (1) | ||||||
| 20 – 50 | Each (1) | ||||||
| 51-100 | Each (1) |
| 1015 | FFP | Ordering period 2 - Improved Primary Switching Center (IPSC) | Level of Effort (1 Unit) | Unit of Issue (U/I) | 15 | ERROR:#DIV/0! | ERROR:#DIV/0! |
| 1 – 4 | Each (1) | ||||||
| 5 – 19 | Each (1) | ||||||
| 20 – 50 | Each (1) | ||||||
| 51-100 | Each (1) |
| 1016 | FFP | Ordering period 2 - Tactical Prime Power Transformer (TPPT) | Level of Effort (1 Unit) | Unit of Issue (U/I) | 10 | ERROR:#DIV/0! | ERROR:#DIV/0! |
| 1 – 4 | Each (1) | ||||||
| 5 – 19 | Each (1) | ||||||
| 20 – 50 | Each (1) | ||||||
| 51-100 | Each (1) |
| 1017 | FFP | Ordering period 2 - Initial / Repair Parts | Level of Effort (1 Unit) | Unit of Issue (U/I) | 1 | ERROR:#DIV/0! | ERROR:#DIV/0! |
| 1 – 4 | Each (1) | ||||||
| 5 – 19 | Each (1) | ||||||
| 20 – 50 | Each (1) | ||||||
| 51-100 | Each (1) |
| 1018 | FFP | Ordering period 2 - Mission Readiness Spares Package (MRSP) Kits | Level of Effort (1 Unit) | Unit of Issue (U/I) | 5 | ERROR:#DIV/0! | ERROR:#DIV/0! |
| FFP | 1 – 4 | Each (1) | |||||
| 5 – 19 | Each (1) | ||||||
| 20 – 50 | Each (1) | ||||||
| 51-100 | Each (1) |
1019 FFP Ordering period 2 - Fielding Training Courses Level of Effort (1 Unit) Each (1) 1 $ - 0
| 1020 | FFP | Ordering period 2 - Cables Class L 60 Amp 50 FT | Level of Effort (1 Unit) | Unit of Issue (U/I) | 120 | ERROR:#DIV/0! | ERROR:#DIV/0! |
| 1 – 4 | Each (1) | ||||||
| 5 – 19 | Each (1) | ||||||
| 20 – 50 | Each (1) | ||||||
| 51-100 | Each (1) |
| 1021 | FFP | Ordering period 2 - Cables Class L 60 Amp 100 FT | Level of Effort (1 Unit) | Unit of Issue (U/I) | 60 | ERROR:#DIV/0! | ERROR:#DIV/0! |
| 1 – 4 | Each (1) | ||||||
| 5 – 19 | Each (1) | ||||||
| 20 – 50 | Each (1) | ||||||
| 51-100 | Each (1) |
| 1022 | FFP | Ordering period 2 - Cables Class L 100 Amp 50 FT | Level of Effort (1 Unit) | Unit of Issue (U/I) | 60 | ERROR:#DIV/0! | ERROR:#DIV/0! |
| 1 – 4 | Each (1) | ||||||
| 5 – 19 | Each (1) | ||||||
| 20 – 50 | Each (1) | ||||||
| 51-100 | Each (1) |
| 1023 | FFP | Ordering period 2 - Cable 15 KV 1/0 3750 FT | Level of Effort (1 Unit) | Unit of Issue (U/I) | 3 | ERROR:#DIV/0! | ERROR:#DIV/0! |
| 1 – 4 | Each (1) | ||||||
| 5 – 19 | Each (1) | ||||||
| 20 – 50 | Each (1) | ||||||
| 51-100 | Each (1) |
| 1024 | FFP | Ordering period 2 - Extended 3 Year Warranty | Level of Effort (1 Unit) | Unit of Issue (U/I) | 85 | ERROR:#DIV/0! | ERROR:#DIV/0! |
| 1 – 4 | Each (1) | ||||||
| 5 – 19 | Each (1) | ||||||
| 20 – 50 | Each (1) | ||||||
| 51-100 | Each (1) |
ERROR:#DIV/0!
Ordering Period 3 Ordering Period 3
| Only yellow highlighted boxes can be filled in | ||||||||
| CLIN Type | CLIN | CLIN TYPE | Description | Quantity Description | Unit of Issue (U/I) | QTY (Estimated) | Unit Price | Extended Price |
| 1025 | FFP | Ordering period 3 - Improved Secondary Distribution Center version 1 (ISDC-1) | Level of Effort (1 Unit) | Unit of Issue (U/I) | 10 | ERROR:#DIV/0! | ERROR:#DIV/0! | |
| 1 – 4 | Each (1) | |||||||
| 5 – 19 | Each (1) | |||||||
| 20 – 50 | Each (1) | |||||||
| 51-100 | Each (1) |
| 1026 | FFP | Ordering period 3 - Improved Secondary Distribution Center version 2 (ISDC-2) | Level of Effort (1 Unit) | Unit of Issue (U/I) | 50 | ERROR:#DIV/0! | ERROR:#DIV/0! |
| 1 – 4 | Each (1) | ||||||
| 5 – 19 | Each (1) | ||||||
| 20 – 50 | Each (1) | ||||||
| 51-100 | Each (1) |
| 1027 | FFP | Ordering period 3 - Improved Primary Switching Center (IPSC) | Level of Effort (1 Unit) | Unit of Issue (U/I) | 15 | ERROR:#DIV/0! | ERROR:#DIV/0! |
| 1 – 4 | Each (1) | ||||||
| 5 – 19 | Each (1) | ||||||
| 20 – 50 | Each (1) | ||||||
| 51-100 | Each (1) |
| 1028 | FFP | Ordering period 3 - Tactical Prime Power Transformer (TPPT) | Level of Effort (1 Unit) | Unit of Issue (U/I) | 10 | ERROR:#DIV/0! | ERROR:#DIV/0! |
| 1 – 4 | Each (1) | ||||||
| 5 – 19 | Each (1) | ||||||
| 20 – 50 | Each (1) | ||||||
| 51-100 | Each (1) |
| 1029 | FFP | Ordering period 3 - Initial / Repair Parts | Level of Effort (1 Unit) | Unit of Issue (U/I) | 1 | ERROR:#DIV/0! | ERROR:#DIV/0! |
| 1 – 4 | Each (1) | ||||||
| 5 – 19 | Each (1) | ||||||
| 20 – 50 | Each (1) | ||||||
| 51-100 | Each (1) |
| 1030 | FFP | Ordering period 3 - Mission Readiness Spares Package (MRSP) Kits | Level of Effort (1 Unit) | Unit of Issue (U/I) | 6 | ERROR:#DIV/0! | ERROR:#DIV/0! |
| FFP | 1 – 4 | Each (1) | |||||
| 5 – 19 | Each (1) | ||||||
| 20 – 50 | Each (1) | ||||||
| 51-100 | Each (1) |
1031 FFP Ordering period 3 - Fielding Training Courses Level of Effort (1 Unit) Each (1) 1 $ - 0
| 1032 | FFP | Ordering period 3 - Cables Class L 60 Amp 50 FT | Level of Effort (1 Unit) | Unit of Issue (U/I) | 120 | ERROR:#DIV/0! | ERROR:#DIV/0! |
| 1 – 4 | Each (1) | ||||||
| 5 – 19 | Each (1) | ||||||
| 20 – 50 | Each (1) | ||||||
| 51-100 | Each (1) |
| 1033 | FFP | Ordering period 3 - Cables Class L 60 Amp 100 FT | Level of Effort (1 Unit) | Unit of Issue (U/I) | 60 | ERROR:#DIV/0! | ERROR:#DIV/0! |
| 1 – 4 | Each (1) | ||||||
| 5 – 19 | Each (1) | ||||||
| 20 – 50 | Each (1) | ||||||
| 51-100 | Each (1) |
| 1034 | FFP | Ordering period 3 - Cables Class L 100 Amp 50 FT | Level of Effort (1 Unit) | Unit of Issue (U/I) | 60 | ERROR:#DIV/0! | ERROR:#DIV/0! |
| 1 – 4 | Each (1) | ||||||
| 5 – 19 | Each (1) | ||||||
| 20 – 50 | Each (1) | ||||||
| 51-100 | Each (1) |
| 1035 | FFP | Ordering period 3 - Cable 15 KV 1/0 3750 FT | Level of Effort (1 Unit) | Unit of Issue (U/I) | 3 | ERROR:#DIV/0! | ERROR:#DIV/0! |
| 1 – 4 | Each (1) | ||||||
| 5 – 19 | Each (1) | ||||||
| 20 – 50 | Each (1) | ||||||
| 51-100 | Each (1) |
| 1036 | FFP | Ordering period 3 - Extended 3 Year Warranty | Level of Effort (1 Unit) | Unit of Issue (U/I) | 85 | ERROR:#DIV/0! | ERROR:#DIV/0! |
| 1 – 4 | Each (1) | ||||||
| 5 – 19 | Each (1) | ||||||
| 20 – 50 | Each (1) | ||||||
| 51-100 | Each (1) |
ERROR:#DIV/0!
Ordering Period 4 Ordering Period 4
| Only yellow highlighted boxes can be filled in | ||||||||
| CLIN Type | CLIN | CLIN TYPE | Description | Quantity Description | Unit of Issue (U/I) | QTY (Estimated) | Unit Price | Extended Price |
| 1037 | FFP | Ordering period 4 - Improved Secondary Distribution Center version 1 (ISDC-1) | Level of Effort (1 Unit) | Unit of Issue (U/I) | 32 | ERROR:#DIV/0! | ERROR:#DIV/0! | |
| 1 – 4 | Each (1) | |||||||
| 5 – 19 | Each (1) | |||||||
| 20 – 50 | Each (1) | |||||||
| 51-100 | Each (1) |
| 1038 | FFP | Ordering period 4 - Improved Secondary Distribution Center version 2 (ISDC-2) | Level of Effort (1 Unit) | Unit of Issue (U/I) | 40 | ERROR:#DIV/0! | ERROR:#DIV/0! |
| 1 – 4 | Each (1) | ||||||
| 5 – 19 | Each (1) | ||||||
| 20 – 50 | Each (1) | ||||||
| 51-100 | Each (1) |
| 1039 | FFP | Ordering period 4 - Improved Primary Switching Center (IPSC) | Level of Effort (1 Unit) | Unit of Issue (U/I) | 14 | ERROR:#DIV/0! | ERROR:#DIV/0! |
| 1 – 4 | Each (1) | ||||||
| 5 – 19 | Each (1) | ||||||
| 20 – 50 | Each (1) | ||||||
| 51-100 | Each (1) |
| 1040 | FFP | Ordering period 4 - Tactical Prime Power Transformer (TPPT) | Level of Effort (1 Unit) | Unit of Issue (U/I) | 8 | ERROR:#DIV/0! | ERROR:#DIV/0! |
| 1 – 4 | Each (1) | ||||||
| 5 – 19 | Each (1) | ||||||
| 20 – 50 | Each (1) | ||||||
| 51-100 | Each (1) |
| 1041 | FFP | Ordering period 4 - Initial / Repair Parts | Level of Effort (1 Unit) | Unit of Issue (U/I) | 1 | ERROR:#DIV/0! | ERROR:#DIV/0! |
| 1 – 4 | Each (1) | ||||||
| 5 – 19 | Each (1) | ||||||
| 20 – 50 | Each (1) | ||||||
| 51-100 | Each (1) |
| 1042 | FFP | Ordering period 4 - Mission Readiness Spares Package (MRSP) Kits | Level of Effort (1 Unit) | Unit of Issue (U/I) | 6 | ERROR:#DIV/0! | ERROR:#DIV/0! |
| FFP | 1 – 4 | Each (1) | |||||
| 5 – 19 | Each (1) | ||||||
| 20 – 50 | Each (1) | ||||||
| 51-100 | Each (1) |
1043 FFP Ordering period 4 - Fielding Training Courses Level of Effort (1 Unit) Each (1) 1 $ - 0
| 1044 | FFP | Ordering period 4 - Cables Class L 60 Amp 50 FT | Level of Effort (1 Unit) | Unit of Issue (U/I) | 144 | ERROR:#DIV/0! | ERROR:#DIV/0! |
| 1 – 4 | Each (1) | ||||||
| 5 – 19 | Each (1) | ||||||
| 20 – 50 | Each (1) | ||||||
| 51-100 | Each (1) |
| 1045 | FFP | Ordering period 4 - Cables Class L 60 Amp 100 FT | Level of Effort (1 Unit) | Unit of Issue (U/I) | 72 | ERROR:#DIV/0! | ERROR:#DIV/0! |
| 1 – 4 | Each (1) | ||||||
| 5 – 19 | Each (1) | ||||||
| 20 – 50 | Each (1) | ||||||
| 51-100 | Each (1) |
| 1046 | FFP | Ordering period 4 - Cables Class L 100 Amp 50 FT | Level of Effort (1 Unit) | Unit of Issue (U/I) | 72 | ERROR:#DIV/0! | ERROR:#DIV/0! |
| 1 – 4 | Each (1) | ||||||
| 5 – 19 | Each (1) | ||||||
| 20 – 50 | Each (1) | ||||||
| 51-100 | Each (1) |
| 1047 | FFP | Ordering period 4 - Cable 15 KV 1/0 3750 FT | Level of Effort (1 Unit) | Unit of Issue (U/I) | 3 | ERROR:#DIV/0! | ERROR:#DIV/0! |
| 1 – 4 | Each (1) | ||||||
| 5 – 19 | Each (1) | ||||||
| 20 – 50 | Each (1) | ||||||
| 51-100 | Each (1) |
| 1048 | FFP | Ordering period 4 - Extended 3 Year Warranty | Level of Effort (1 Unit) | Unit of Issue (U/I) | 72 | ERROR:#DIV/0! | ERROR:#DIV/0! |
| 1 – 4 | Each (1) | ||||||
| 5 – 19 | Each (1) | ||||||
| 20 – 50 | Each (1) | ||||||
| 51-100 | Each (1) |
ERROR:#DIV/0!
Ordering Period 5 Ordering Period 5
| Only yellow highlighted boxes can be filled in | ||||||||
| CLIN Type | CLIN | CLIN TYPE | Description | Quantity Description | Unit of Issue (U/I) | QTY (Estimated) | Unit Price | Extended Price |
| 1049 | FFP | Ordering period 5 - Improved Secondary Distribution Center version 1 (ISDC-1) | Level of Effort (1 Unit) | Unit of Issue (U/I) | 60 | ERROR:#DIV/0! | ERROR:#DIV/0! | |
| 1 – 4 | Each (1) | |||||||
| 5 – 19 | Each (1) | |||||||
| 20 – 50 | Each (1) | |||||||
| 51-100 | Each (1) |
| 1050 | FFP | Ordering period 5 - Improved Secondary Distribution Center version 2 (ISDC-2) | Level of Effort (1 Unit) | Unit of Issue (U/I) | 1 | ERROR:#DIV/0! | ERROR:#DIV/0! |
| 1 – 4 | Each (1) | ||||||
| 5 – 19 | Each (1) | ||||||
| 20 – 50 | Each (1) | ||||||
| 51-100 | Each (1) |
| 1051 | FFP | Ordering period 5 - Improved Primary Switching Center (IPSC) | Level of Effort (1 Unit) | Unit of Issue (U/I) | 5 | ERROR:#DIV/0! | ERROR:#DIV/0! |
| 1 – 4 | Each (1) | ||||||
| 5 – 19 | Each (1) | ||||||
| 20 – 50 | Each (1) | ||||||
| 51-100 | Each (1) |
| 1052 | FFP | Ordering period 5 - Tactical Prime Power Transformer (TPPT) | Level of Effort (1 Unit) | Unit of Issue (U/I) | 1 | ERROR:#DIV/0! | ERROR:#DIV/0! |
| 1 – 4 | Each (1) | ||||||
| 5 – 19 | Each (1) | ||||||
| 20 – 50 | Each (1) | ||||||
| 51-100 | Each (1) |
| 1053 | FFP | Ordering period 5 - Initial / Repair Parts | Level of Effort (1 Unit) | Unit of Issue (U/I) | 1 | ERROR:#DIV/0! | ERROR:#DIV/0! |
| 1 – 4 | Each (1) | ||||||
| 5 – 19 | Each (1) | ||||||
| 20 – 50 | Each (1) | ||||||
| 51-100 | Each (1) |
| 1054 | FFP | Ordering period 5 - Mission Readiness Spares Package (MRSP) Kits | Level of Effort (1 Unit) | Unit of Issue (U/I) | 5 | ERROR:#DIV/0! | ERROR:#DIV/0! |
| FFP | 1 – 4 | Each (1) | |||||
| 5 – 19 | Each (1) | ||||||
| 20 – 50 | Each (1) | ||||||
| 51-100 | Each (1) |
1055 FFP Ordering period 5 - Fielding Training Courses Level of Effort (1 Unit) Each (1) 1 $ - 0
| 1056 | FFP | Ordering period 5 - Cables Class L 60 Amp 50 FT | Level of Effort (1 Unit) | Unit of Issue (U/I) | 120 | ERROR:#DIV/0! | ERROR:#DIV/0! |
| 1 – 4 | Each (1) | ||||||
| 5 – 19 | Each (1) | ||||||
| 20 – 50 | Each (1) | ||||||
| 51-100 | Each (1) |
| 1057 | FFP | Ordering period 5 - Cables Class L 60 Amp 100 FT | Level of Effort (1 Unit) | Unit of Issue (U/I) | 60 | ERROR:#DIV/0! | ERROR:#DIV/0! |
| 1 – 4 | Each (1) | ||||||
| 5 – 19 | Each (1) | ||||||
| 20 – 50 | Each (1) | ||||||
| 51-100 | Each (1) |
| 1058 | FFP | Ordering period 5 - Cables Class L 100 Amp 50 FT | Level of Effort (1 Unit) | Unit of Issue (U/I) | 60 | ERROR:#DIV/0! | ERROR:#DIV/0! |
| 1 – 4 | Each (1) | ||||||
| 5 – 19 | Each (1) | ||||||
| 20 – 50 | Each (1) | ||||||
| 51-100 | Each (1) |
| 1059 | FFP | Ordering period 5 - Cable 15 KV 1/0 3750 FT | Level of Effort (1 Unit) | Unit of Issue (U/I) | 3 | ERROR:#DIV/0! | ERROR:#DIV/0! |
| 1 – 4 | Each (1) | ||||||
| 5 – 19 | Each (1) | ||||||
| 20 – 50 | Each (1) | ||||||
| 51-100 | Each (1) |
| 1060 | FFP | Ordering period 5 - Extended 3 Year Warranty | Level of Effort (1 Unit) | Unit of Issue (U/I) | 60 | ERROR:#DIV/0! | ERROR:#DIV/0! |
| 1 – 4 | Each (1) | ||||||
| 5 – 19 | Each (1) | ||||||
| 20 – 50 | Each (1) | ||||||
| 51-100 | Each (1) |
ERROR:#DIV/0!
CLIN & CDRL Descriptions
| DATA ITEM | TITLE | Associated CLIN(s) | Frequency | Due (Initial/Final) | PM FPS Review Due from Receipt (CD) | DESCRIPTION |
| A001 | OPSEC Standard Operating Procedures | 0018 | Once: 90 days after contract award | 90 | 10 Days | OPSEC Standard Operating Procedures |
| A002 | Integrated Master Schedule (IMS) | 0018 | Monthly: first submission due 30 days after award; subsequent submissions due at the end of every month | 30 DAW/ Monthly | 30 Days | Integrated Master Schedule (IMS) |
| A003 | Contract Work Breakdown Structure (CWBS) | 0018 | Four times: 30/90/180/360 days after award | 30/60/150/360 | 30 Days | Contract Work Breakdown Structure (CWBS) |
| A004 | Contract Funds Status Report (CFSR) | 0018 | Monthly: first submission due 30 days after award; subsequent submissions due at the end of every month | 30 DAW/ Monthly | 30 Days | Contract Funds Status Report (CFSR) |
| A005 | Scientific and Technical Reports/ Configuration Baseline (CB) Changes | 0018 | As needed: As changes occurs | As Req | 30 Days | Scientific and Technical Reports/ Configuration Baseline (CB) Changes |
| A006 | Contract Performance Report (CPR) | 0018 | Monthly: first submission due 30 days after award; subsequent submissions due at the end of every month | 30 DAW/ Monthly | 30 Days | Contract Performance Report (CPR) |
| A007 | Configuration Audit Summary Report/ PREPCA Configuration Audit Summary Report | 0018 | Once: NLT 760 days after contract award | 760 | 30 Days | Configuration Audit Summary Report/ PREPCA Configuration Audit Summary Report |
| A008 | Configuration Audit Summary Report/ Production PCA Report | 0018 | Once: NLT 860 days after contract award | 860 | 30 Days | Configuration Audit Summary Report/ Production PCA Report |
| A009 | Test Plan/ Test Plan | 0018 | Twice: 120/180 days after contract award | 120/180 | 30 Days | Test Plan/ Test Plan |
| A010 | Test/Inspection Report/ Contractor Pre Production Model Exam/Test Report | 0018 | Exam report: 210 days after contract award, Test report: 360 days after contract award | 210/360 | 30 Days | Test/Inspection Report/ Contractor Pre Production Model Exam/Test Report |
| A011 | Scientific and Technical Reports/ Pre-Production Test Incident Report(s) (TIR) | 0018 | As needed: 5 days after occurrence | As Req, 5 days after failure | 30 Days | Scientific and Technical Reports/ Pre-Production Test Incident Report(s) (TIR) |
| A012 | Scientific and Technical Reports/ PPT – Failed Item Analysis Reports (FIARs) | 0018 | As needed: 15 days after failure occurrence | A Req, 15 days after failure | 30 Days | Scientific and Technical Reports/ PPT – Failed Item Analysis Reports (FIARs) |
| A013 | Safety Assessment Report (SAR)/ Safety Assessment Report (SAR) | 0018 | Twice: NLT 320/ NLT 510 days after contract award | 320/510 | 30 Days | Safety Assessment Report (SAR)/ Safety Assessment Report (SAR) |
| A014 | Proposed Spare Parts List and MRSP List/ Initial Spares/Repair Parts, Mission Readiness Spares Packages (MRSP) Kits List | 0018 | Twice: 380/810 days after contract award for Priced Spares List, 360/500 days after contract award for MRSP kit | 360/810 MRSP Kits, 360/500 Priced Spares | 30 Days | Proposed Spare Parts List and MRSP List/ Initial Spares/Repair Parts, Mission Readiness Spares Packages (MRSP) Kits List |
| A015 | Scientific and Technical Reports/ Warranty Status Report | 0018 | Quarterly: First submittal six (6) months after acceptance of the first production lot | 1200 Initial/ Quarterly | 30 Days | Scientific and Technical Reports/ Warranty Status Report |
| A016 | Scientific and Technical Reports/ Supportability Analysis | 0018 | Supportability Analysis: 90/180/360 days after contract award, Assembly and Components Data List: 360/540 days after contract award, Support Equipment Listing: 180/360 days after contract award | 90/180/360 Supportability Analysis, 360/540 Assembly and Components Listing, 180/360 Support Equipement Listing | 30 Days | Scientific and Technical Reports/ Supportability Analysis |
| A017 | Technical Report – Study/Services/ Level of Repair Analysis (LORA) Report/Input Data | 0018 | Report: 90/150/210 days after contract award, Input Data: 90/150/210 days after contract award | 90/150/210 Report, 90/150/210 Input Data | 30 Days | Technical Report – Study/Services/ Level of Repair Analysis (LORA) Report/Input Data |
| A018 | Technical Report – Study/Services/ Failure Modes Effects and Criticality Analysis (FMECA) | 0018 | Three times: 90/150/210 days after contract award | 90/150/210 | 30 Days | Technical Report – Study/Services/ Failure Modes Effects and Criticality Analysis (FMECA) |
| A019 | Scientific and Technical Reports/ Supply Support Alternatives Plan | 0018 | Twice: 360/570 days after contract award | 360/570 | 30 Days | Scientific and Technical Reports/ Supply Support Alternatives Plan |
| A020 | Technical Report-Study/Services/ Maintenance Allocation Chart (MAC) | 0018 | Three times: 180/240/300 days after contract award | 180/240/300 | 30 Days | Technical Report-Study/Services/ Maintenance Allocation Chart (MAC) |
| A021 | Scientific and Technical Reports/ XML Source File / ETMs | 0018 | Four times: 90/180/360/540 days after contract award for ETMs, Three times: 120/210/270 days after contract award for RPSTL | 90/180/360/540 ETMs 120/210/270 RPSTL | 30 Days | Scientific and Technical Reports/ XML Source File / ETMs |
| A022 | Scientific and Technical Reports/ Technical Manuals (ETM) Development Plan | 0018 | Twice: 60/90 days after contract award | 60/90 | 30 Days | Scientific and Technical Reports/ Technical Manuals (ETM) Development Plan |
| A023 | Scientific and Technical Reports/ ETM ID1 Technical Data Incorporation | 0018 | Once: 210 days after contract award | 210 | 30 Days | Scientific and Technical Reports/ ETM ID1 Technical Data Incorporation |
| A024 | Logistics Management Information (LMI) Data Product(s)/ Provisioning Parts List LSA 36 | 0018 | Three times: 120/210/270 days after contract award | 120/210/270 | 30 Days | Logistics Management Information (LMI) Data Product(s)/ Provisioning Parts List LSA 36 |
| A025 | Logistics Management Information (LMI) Data Product(s)/ Design Change Notice (DCN) | 0018 | Twice: 150/330 days after contract award, subsequent submissions as needed | 150/330 | 30 Days | Logistics Management Information (LMI) Data Product(s)/ Design Change Notice (DCN) |
| A026 | Logistics Management Information (LMI) Summaries/ Engineering Data for Provisioning (EDFP) | 0018 | Three times: 120/210/270 days after contract award | 120/210/270 | 30 Days | Logistics Management Information (LMI) Summaries/ Engineering Data for Provisioning (EDFP) |
| A027 | Training Materials/ Training Support Packages (TSP) | 0018 | Twice: 120/330 days after contract award | 120/330 | 30 Days | Training Materials/ Training Support Packages (TSP) |
| A028 | Instructional Media Package/ Computer Based Training (CBT) | 0018 | Twice: 300/500 days after contract award, Reproducible copies due 620 DAW | 300/500 | 30 Days | Instructional Media Package/ Computer Based Training (CBT) |
| A029 | Computer Software Product | 0018 | As needed: submitted with delivery of hardware | As Req | 30 Days | Computer Software Product |
| A030 | Logistics Management Information (LMI) Summaries/ Provisioning and Other Pre-Procurement Screening Data | 0018 | Once: 270 days after contract award | 270 | 30 Days | Logistics Management Information (LMI) Summaries/ Provisioning and Other Pre-Procurement Screening Data |
| A031 | Manufacturing Risk and Readiness/ Manufacturing Readiness Report | 0018 | Three times: 180/360/770 days after contract award | 180/360/770 | 30 Days | Manufacturing Risk and Readiness/ Manufacturing Readiness Report |
| A032 | Item Unique Identification (IUID)/ IUID Report | 0018 | As required: First report due 10 days after Government acceptance of the first lot. | As req, 10 days after first lot acceptance | 30 Days | Item Unique Identification (IUID)/ IUID Report |
| A033 | Source Data for Diminishing Manufacturing Sources and Material Shortages (DMSMS Implementation Plan)/ DMSMS Implementation Plan | 0018 | Periodically: Initial Plan due at first design review (approx. 90 DAW), subsequent submission changes reported every 60 days | Periodically | 30 Days | Source Data for Diminishing Manufacturing Sources and Material Shortages (DMSMS Implementation Plan)/ DMSMS Implementation Plan |
| A034 | Software Version Description (SVD)/ Software NOR | 0018 | Twice: 90/150 days after contract award | 90/150 | 30 Days | Software Version Description (SVD)/ Software NOR |
| A035 | Software Requirements Specification (SRS)/ Software NOR | 0018 | Twice: 90/150 days after contract award | 90/150 | 30 Days | Software Requirements Specification (SRS)/ Software NOR |
| A036 | Scientific and Technical Reports/ Interface Control Documents (ICD) | 0018 | Once: 540 days after contract award | 540 | 30 Days | Scientific and Technical Reports/ Interface Control Documents (ICD) |
| A037 | Scientific and Technical Reports/ Software Loading Procedures | 0018 | Twice: 90/150days after contract award | 90/150 | 30 Days | Scientific and Technical Reports/ Software Loading Procedures |
| A038 | Scientific and Technical Reports/ Family Tree (Bill of Materiel) | 0018 | Three times: 90/120/210 days after contract award | 90/120/210 | 30 Days | Scientific and Technical Reports/ Family Tree (Bill of Materiel) |
| A039 | Product Drawings/Models and Associated Lists/ Product Drawings/Models and Associated Lists | 0018 | Four times: 90/180/360/510 days after contract award | 90/180/360/510 | 30 Days | Product Drawings/Models and Associated Lists/ Product Drawings/Models and Associated Lists |
| A040 | Conference Agenda | 0018 | As needed: Submit 15 calendar days prior to each conference, meeting, audit, or review | As req, 15 days before each conference | 30 Days | Conference Agenda |
| A041 | Technical Report – Study Services/ Make or Buy Analysis Report | 0018 | Once: 360 days after contract award | 360 | 30 Days | Technical Report – Study Services/ Make or Buy Analysis Report |
| A042 | Technical Data Package (TDP)/ Technical Data Package List (TDPL) | 0018 | Four times: 90/180/360/510 days after contract award for TDP, Four times: 90/180/360/510 days after contract award for TDPL | 90/180/360/510 | 30 Days | Technical Data Package (TDP)/Technical Data Package List (TDPL) |
| A043 | Provisioning Technical Documentation (PTD) | 0018 | Twice: 150/330 days after contract award, subsequent submissions as needed | 150/330 | 30 Days | Provisioning Technical Documentation (PTD) |
| A044 | Engineering Drawing Tree | 0018 | Four times: 90/180/360/510 days after contract award | 90/180/360/510 | 30 Days | Engineering Drawing Tree |
| A045 | Cybersecurity Vulnerability Report | 0018 | Once: 365 days after contract award, subsequent submissions as needed | 365 | 30 Days | Cybersecurity Vulnerability Report |
| A046 | Vulnerability Scan Compliance (VSC) Report | 0018 | Twice: 365/810 days after contract award, subsequent submissions as needed | 365/810 | 30 Days | Vulnerability Scan Compliance (VSC) Report |
| A047 | Software Threat Assessment Report (STAR) | 0018 | Twice: 365/810 days after contract award, subsequent submissions as needed | 365/810 | 30 Days | Software Threat Assessment Report (STAR) |
| A048 | Software Assurance Evaluation Report (SAER) | 0018 | Once: 810 days after contract award, subsequent submissions as needed | 810 | 30 Days | Software Assurance Evaluation Report (SAER) |
CDRLs
| CDRL | Associated CLIN(s) |
| A001 | 0003 |
| A002 | 0003 |
| A003 | 0003 |
| A004 | 0003 |
| A005 | 0003 |
| A006 | 0003 |
| A007 | 0003 |
| A008 | 0003 |
| A009 | 0003 |
| A010 | 0003 |
| A011 | 0003 |
| A012 | 0003 |
| A013 | 0003 |
| A014 | 0003 |
| A015 | 0003 |
| A016 | 0003 |
| A017 | 0003 |
| A018 | 0003 |
| A019 | 0003 |
| A020 | 0003 |
| A021 | 0003 |
| A022 | 0003 |
| A023 | 0003 |
| A024 | 0003 |
| A025 | 0003 |
| A026 | 0003 |
| A027 | 0003 |
| A028 | 0003 |
| A029 | 0003 |
| A030 | 0003 |
| A031 | 0003 |
| A032 | 0003 |
| A033 | 0003 |
| A034 | 0003 |
| A035 | 0003 |
| A036 | 0003 |
| A037 | 0003 |
| A038 | 0003 |
| A039 | 0003 |
| A040 | 0003 |
| A041 | 0003 |
| A042 | 0003 |
| A043 | 0003 |
| A044 | 0003 |
| A045 | 0003 |
POE
| Row | WBS/CES Description | Approp | Total | FY 2021 | FY 2022 | FY 2023 | FY 2024 | FY 2025 | FY 2026 | FY 2027 | FY 2028 |
| 1 | *ICIDS Estimate | ||||||||||
| 2 | ICIDS Program Office Estimate (POE) | ||||||||||
| 3 | Recurring Production | ||||||||||
| 4 | XS Zone | ||||||||||
| 5 | S Zone | ||||||||||
| 6 | M Zone | ||||||||||
| 7 | L Zone | ||||||||||
| 8 | XL Zone | ||||||||||
| 9 | A Sensor | ||||||||||
| 10 | SCIF | ||||||||||
| 11 | ECP | ||||||||||
| 12 | XS PMC | ||||||||||
| 13 | S PMC | ||||||||||
| 14 | M PMC | ||||||||||
| 15 | L PMC | ||||||||||
| 16 | XL PMC | ||||||||||
| 17 | OPWS | ||||||||||
| 18 | RSM | ||||||||||
| 19 | PMC UPS | ||||||||||
| 20 | WS UPS | ||||||||||
| 21 | S WS UPS | ||||||||||
| 22 | XS SSD | ||||||||||
| 23 | S SSD | ||||||||||
| 24 | M SSD | ||||||||||
| 25 | L SSD | ||||||||||
| 26 | XL SSD | ||||||||||
| 27 | FO IF | ||||||||||
| 28 | XS SPV | ||||||||||
| 29 | S SPV | ||||||||||
| 30 | M SPV | ||||||||||
| 31 | L SPV | ||||||||||
| 32 | XL SPV | ||||||||||
| 33 | SCIF SPV | ||||||||||
| 34 | PMC UPS SPV | ||||||||||
| 35 | RSM SPV | ||||||||||
| 36 | ECP SPV | ||||||||||
| 37 | OP Training | ||||||||||
| 38 | SA Training | ||||||||||
| 39 | M Training | ||||||||||
| 40 | SCIF Training | ||||||||||
| 41 | ESTL Establish | ||||||||||
| 42 | ESTL Support | ||||||||||
| 43 | IA | ||||||||||
| 44 | TDP | ||||||||||
| 45 | ILSP | ||||||||||
| 46 | CLS | ||||||||||
| 47 | Travel | ||||||||||
| 48 | Contingency | ||||||||||
| 49 | Interface Device for Additional Sensors | ||||||||||
| 50 | Central Monitoring Station & Study | ||||||||||
| 51 | Base System Performance Verification (SPV) test report | ||||||||||
| 52 | Training | ||||||||||
| 53 | Base Site Survey/Design | ||||||||||
| 54 | SEPM | ||||||||||
| 55 | SETA | ||||||||||
| 56 | Matrix Support | ||||||||||
| 57 | PRD | ||||||||||
| 58 | OGA | ||||||||||
| 59 | ACC | ||||||||||
| 60 | RSA | ||||||||||
| 61 | PM TS SETA | ||||||||||
| 62 | |||||||||||
| 63 | *INPUT VARIABLES | ||||||||||
| 64 | ** SCALARS & FACTORS | ||||||||||
| 65 | ICIDS-IV to -V scalar | ||||||||||
| 66 | CLS Factor | ||||||||||
| 67 | Installation Price Factor | ||||||||||
| 68 | Labor Fringe Factor | ||||||||||
| 69 | Labor Overhead Factor | ||||||||||
| 70 | G&A Factor | ||||||||||
| 71 | Labor Fee | ||||||||||
| 72 | FCCM-Labor | ||||||||||
| 73 | FCCM-G&A | ||||||||||
| 74 | |||||||||||
| 75 | Install HW & Misc Material Factor | ||||||||||
| 76 | |||||||||||
| 77 | ** QUANTITY PROFILE | ||||||||||
| 78 | CLIN | ||||||||||
| 79 | XS Zone | ||||||||||
| 80 | S Zone | ||||||||||
| 81 | M Zone | ||||||||||
| 82 | L Zone | ||||||||||
| 83 | XL Zone | ||||||||||
| 84 | A Sensor | ||||||||||
| 85 | SCIF | ||||||||||
| 86 | ECP | ||||||||||
| 87 | XS PMC | ||||||||||
| 88 | S PMC | ||||||||||
| 89 | M PMC | ||||||||||
| 90 | L PMC | ||||||||||
| 91 | XL PMC | ||||||||||
| 92 | OPWS | ||||||||||
| 93 | RSM |
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .