EXHIBIT A PERFORMANCE RELEVANCY SURVEY (1).docx

DOCX document 43 KB Posted

Attached to
Z1DZ--667-21-4-513-0184 - Project 667-21-101 Replace NFS and Pharmacy Refrigerators and Freezers (VA-21-00058352)
Solicitation number
36C25621R0127
Issued by

About this file

This document contains an exhibit and solicitation for a federal contract to replace refrigerators and freezers at a VA medical center. The Overton Brooks VA Medical Center is seeking to award a 100% set-aside contract for service-disabled veteran-owned small businesses to replace its national food service and pharmacy refrigerators and freezers. The project number is 667-21-101, with an anticipated contract award date of approximately 30 days after receipt of proposals due around July 7, 2021. The contract performance period will be 180 calendar days after issuance of the notice to proceed. The location of work will be at the Overton Brooks VA Medical Center in Shreveport, Louisiana. The contractor must provide all labor, materials, tools and equipment to perform the work described in the project scope of work, drawings and specifications. The construction cost range is between $500,000 to $1 million.

View the file

Other files

File Type Posted
36C25621R0127 0004.docx DOCX document
RFI 2.docx DOCX document
36C25621R0127 0003.docx DOCX document
Revised 7-15-21 SOW - REPLACE NFS AND PHARMACY REFRIGERATORS AND FREEZERS.docx DOCX document
36C25621R0127 0002.docx DOCX document
Revised 7-15-21 DRWGS SHEETS - Replace NFS and Pharmacy Refridgerators and Freezers.pdf PDF
Replace NFS and Pharmacy Refrigerators and Freezers - Sign In Sheet.pdf PDF
Project Requirements Questions - NFS Freezers and Refrigerator.docx DOCX document
36C25621R0127 0001.docx DOCX document
09 30 13 - Ceramin and Porcelain Tiling.docx DOCX document
01 35 26 - Safety Requirements.docx DOCX document
09 91 00 - Painting.docx DOCX document
EXHIBIT C SUBCONTRACTOR INFORMATION AND CONSENT.docx DOCX document
27 05 11 - Requirements for Communications Installations.docx DOCX document
EXHIBIT E SURETY FORM.docx DOCX document
23 21 13 - Hydronic Piping.docx DOCX document
23 31 00 - HVAC Ducts and Casings.docx DOCX document
01 42 19 - Reference Standards.docx DOCX document
22 05 11 - Common Work Results for Plumbing.docx DOCX document
02 82 13 13 - Glovebag Asbestos Abatement.docx DOCX document
26 05 11 - Requirements for Electrical Installations.docx DOCX document
08 11 13 - Hollow Metal Doors and Frames.docx DOCX document
23 23 00 - Refigerant Piping.docx DOCX document
23 34 00 - HVAC Fans.docx DOCX document
26 51 00 - Interior Lighting.docx DOCX document
Revised 4-17-21 SPEC 11 41 21 - Walk In Coolers and Freezers.docx DOCX document
21 08 00 - Commissioning of Fire Suppression Systems.docx DOCX document
26 05 26 - Grounding and Bonding for Electrical Systems.docx DOCX document
05 50 00 - Metal Fabrications.docx DOCX document
26 29 11 - Motor Controllers.docx DOCX document
23 08 00 - Comissioning of HVAC System.docx DOCX document
23 82 00 - Convection Heating and Cooling Units.docx DOCX document
09 29 00 - Gypsum Board.docx DOCX document
EXHIBIT D CONTRACTOR EVALUATION FORM CONSTRUCTION SAFETY v2.docx DOCX document
09 65 13 - Resilient Base and Accessories.docx DOCX document
36C25621R0127_1.docx DOCX document
27 15 00 - Communications Structured Cabling.docx DOCX document
02 41 00 - Demolition.docx DOCX document
01 33 23 - Shop Drawings_Product Data and Samples.docx DOCX document
10 14 00 - Signage.docx DOCX document
09 51 00 - Acoustical Ceilings.docx DOCX document
02 82 13 31 - Asbestos Transite Abatement.docx DOCX document
26 05 33 - Raceway and Boxes for Electrical Systems.docx DOCX document
23 07 11 - HVAC and Boiler Plant Insulation.docx DOCX document
01 45 00 - Quality Control.docx DOCX document
23 05 11 - Common Work Results for HVAC.docx DOCX document
08 90 00 - Louvers and Vents.docx DOCX document
21 13 13 - Wet-Pipe Sprinkler Systems.docx DOCX document
01 00 00 - General Requirements.docx DOCX document
Revised 4-17-21 SOW - REPLACE NFS AND PHARMACY REFRIGERATORS AND FREEZERS.docx DOCX document
Show 40 more

Latest 50 of 72 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FOR OFFICIAL USE ONLY

Source Selection Sensitive Information—See FAR 2.101 & 3.104 36C25621R0127 Replace NFS and Pharmacy Refrigerators and Freezers

EXHIBIT A

PERFORMANCE RELEVANCY SURVEY

Offeror Name/Company

PART 1. CONTRACT REFERENCES: Provide the following information requested in this format for each of the projects/contracts you intend to have considered for evaluation. Projects shall have been completed no more than 5 years prior to the solicitation issue date. Provide all information requested regarding YOUR PERFORMANCE on the contracts you elect to reference.

Project Submittal #___________________ (NOTE: Offerors allowed NO MORE than 5 projects- offerors to make appropriate copies) Project/Contract Title: ________________________________ Contract Number/Task Order Number:_______________________ Location of Project:__________________________________ Description of Effort as Prime ( ) or Subcontractor ( ) Original Contract Value: $________________________ Current/completed Contract Value: $_________________________ Was project completed on time: Yes ( ) No ( ) Start date: ___________________ End date:_________________ Reason for delay if applicable:__________________________________________________ Any liquidated damages: Yes ( ) No ( ) CPARS available: Yes ( ) No ( ) (NOTE: Offeror can provide CPARS with proposal; however, the questionnaire has more detailed questions.)

Provide detailed description of the work performed under the contract and describe why you believe the work is VERY REVELANT, RELEVANT, or SEMI-RELEVANT. (Circle one)

Very Relevant Present/past performance effort involved essentially the same scope and magnitude of effort and complexities this solicitation requires.

Relevant Present/past performance effort involved similar scope and magnitude of effort and complexities this solicitation requires.

Somewhat Relevant Present/past performance effort involved some of the scope and magnitude of effort and complexities this solicitation requires.

Relevance detailed description of project to include work by subcontractors:

Point of Contact of Reference on project (who you are sending questionnaire/survey to):

Name: ________________________ Title: ________________________ Agency: ________________________ Email: ________________________ Phone: ________________________ POTENTIAL OFFERORS: IT IS YOUR RESPONSIBILITY TO FOLLOW-UP WITH YOUR REFERENCES IN SUBMITTING QUESTIONNAIRES PRIOR TO THE CLOSE OF THE SOLICITATION.

PART 2. NOT RELATED TO PART 1: Additional offeror information required, but not project specific. THIS INFORMATION NEED ONLY BE PROVIDED ONCE IN YOUR SUBMISSION PACKAGE.

Offeror representative providing the below information:_______________________

1. Provide information regarding the assessment of liquidated damages on any contracts within the last five years. (Frequency, circumstances, severity of problem, etc.)

2. Offerors are strongly encouraged to include with their proposals information on problems encountered on any relevant projects and the specific corrective actions taken to remedy the problems. Furthermore, please provide explanation of any marginal ratings in CPARS if applicable:

3. Other Past Performance Considerations. Information provided shall be limited to the period starting five years prior to the solicitation release date and may include the following:

a. Professional/Industry awards (Identify award type, date of award and copy of certificate if applicable), Letters of appreciation, recognition or commendations

b. Discuss unique skills and accomplishments (Explain unique skills and/or accomplishments and provide supporting information for verification).

4. Address any technical areas about this project you consider uniquely relevant to this solicitation.

· Descriptions must address the following:

· Describe the specific elements of the work performed by your firm.

· Indicate what elements of work were performed by your major subcontractors and indicate if those same subcontractors will be used on this project.