Exhibit A.docx

DOCX document 15 KB Posted

Attached to
CHILLER AND VENTILATION MAINTENANCE
Solicitation number
ARFQ 0512 WSH2700000006 1
Issued by
Kanawha County, West Virginia

About this file

This is a Mandatory Exhibit A document outlining a bi-annual inspection and maintenance schedule for chiller and ventilation equipment maintenance services in West Virginia. The exhibit specifies detailed maintenance requirements for four categories of equipment: cooling towers, air-cooled chillers, water-cooled chillers, and exhaust fans. Cooling tower maintenance includes ten tasks ranging from cleaning the pan strainer and pan to checking water quality for biological contamination and inspecting fan blades. Air-cooled chiller maintenance requires three bi-annual tasks including condenser coil cleaning, fan blade inspection, and unit operation verification. Water-cooled chiller maintenance is the most extensive, encompassing eight tasks including water strainer cleaning, lubrication of control linkages and bearings, condenser tube inspection, oil sampling and analysis, compressor motor winding resistance measurement, and oil changes every 1,000 hours of operation per the Trane Oil Analysis Program. Exhaust fan maintenance requires four tasks including belt replacement, lubrication, fan inspection for cracks and vibrations, and operational verification.

The document does not contain information regarding pricing terms, set-asides, incumbent contractors, funding sources, response deadlines, contract award dates, or contract term and renewal options. This appears to be a performance specification document establishing the minimum maintenance standards and frequencies required of contractors performing chiller and ventilation maintenance services under the state and local contract opportunity.

View the file

Other files

File Type Posted
TCA.pdf PDF
Exhibit B.xlsx XLSX spreadsheet
WV75 - Construction Bid Submission Review.pdf PDF
WV36.pdf PDF
WV43.pdf PDF
RFQ Specifications.docx DOCX document
Exhibit C.xlsx XLSX spreadsheet
Bid Bond Form.pdf PDF
Final_ARFQ_0512_WSH2700000006_1_WV_ARFQ_FORM.PDF PDF
Bid Bond Instructions.pdf PDF
BondPerform.pdf PDF
Purchasing Affidavit.pdf PDF
WV73 Drug Free Affidavit.pdf PDF
BondLaborMat.pdf PDF
WV72 Drug Free Coversheet.pdf PDF
OSAFederalFundsContractClauseAddendum.pdf PDF
Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MANDATORY

Exhibit A Bi-Annual Inspection and Maintenance Schedule Cooling Tower Bi-Annual

1. Clean Pan Strainer

2. Clean and Flush Pan

3. Check and Adjust Float Valve

4. Check Vibration Switch

5. Check Water Distribution System for Proper Spray

6. Check Fan Blades for Cracks and Proper Balance

7. Lubricate all Bearings

8. Replace Belt (Spring) and Ensure Proper Tension / Operation

9. Clean Louvers and Fan Screens

10. Check Water Quality for Biological Contamination Air Cooled Chiller Bi-Annual

1. Clean Condenser Coils with coil cleaner and water

2. Inspect Fan Blades for Cracks, Vibration and Proper Operation

3. Check Unit for Proper Operation Compressor Amp Draw / Refrigerant Charge Water-Cooled Chiller Bi-Annual

1. Clean all water strainers in system

2. Lubricate the vane control linkage, bearings, and ball-joints

3. Lubricate the vane operator tang O-rings

4. Drain contents of rupture disk and purge discharge vent line drip leg

5. Inspect the condenser tubes for fouling and clean

6. Collect oil sample and submit to qualified lab for testing

7. Measure compressor motor windings resistance to ground

8. Change oil every 1000 hours of operation per Trane Oil Analysis Program Exhaust Fan Maintenance

1. Replace belt

2. Lube if possible

3. Inspect fan for cracks, vibrations and clean

4. Inspect proper operation of unit

File details come from the government source that posted it. Updated .