The file's text, extracted by GovTribe without its formatting.
18 April 2023
| DD FORM 1423-1, FEB 2001 | PREVIOUS EDITION MAY BE USED | Page 2 of 13 Pages |
| CONTRACT DATA REQUIREMENTS LIST (CDRL) | |
(1 Data Item) Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
| A. CONTRACT LINE ITEM NO. |
| B. EXHIBIT |
| C. CATEGORY: |
| F |
| TDP ____ |
| TM _____ |
| OTHER TRAINING DATA |
| D. SYSTEM/ITEM |
| E. CONTRACT/PR NO. |
| F. CONTRACTOR |
RRL FY24 CONTENT CONVERSION
| 1. DATA ITEM NO. |
| 2. TITLE OF DATA ITEM |
| 3. SUBTITLE |
17. PRICE GROUP
| F001 |
| INSTRUCTIONAL MEDIA DESIGN PACKAGE |
| LESSON PROTOTYPES |
| 4. AUTHORITY (Data Acquisition Document No.) |
| 5. CONTRACT REFERENCE |
| 6. REQUIRING OFFICE |
18. ESTIMATED
TOTAL PRICE
| DI-SESS-81520B |
| SOW PARA 3.5.2.2 |
| NAWCTSD RRL TSPM |
| 7. DD 250 REQ |
| 9. DIST STATEMENT |
| 10. FREQUENCY |
| 12. DATE OF FIRST SUBMISSION |
| 14. DISTRIBUTION |
| LT |
| REQUIRED |
| ASREQ |
| SEE BLOCK 16 |
| a. ADDRESSEE |
| b. COPIES |
| 8. APP CODE |
| D |
| 11. AS OF DATE |
| 13. DATE IF SUBSEQUENT SUBM. |
A
| 16. REMARKS |
| NAWCTSD TPOC |
| 1 |
1. BLK 4: DELETE ALL PARAGRAPHS EXCEPT 2.3.1, 2.3.6.a thru f, AND 2.4.7.
2. BLK 10/12/13: THESE DELIVERABLES WILL BE ACCEPTED/REJECTED ONLY SINCE THEY ARE NOT PERIODACLLY SUBMITTED. SUBMISSION SHALL BE DELIVERED IN ACCORDANCE WITH (IAW) THE GOVERNMENT-ACCEPTED INTEGRATED MASTER SCHEDULE (IMS). THE FRIST SUBMISSION OF A PROTOTYPE SHALL INCLUDE DELIVERY OF AN UPDATED DRAFT STYLE GUIDE. SUBSEQUENT SUBMISSION SHALL BE IAW THE GOVERNMENT-ACCEPTED IMS AND SHALL INCORPORATE ALL GOVERNMENT PROVIDED COMMENTS ON THE PREVIOUS SUBMISSION. SUBSEQUENT SUBMISSIONS SHALL ENSURE THAT THE PROTOTYPE AND THE STYLE GUIDE ARE ALIGNED.
3. BLK 13: FINAL SUBMISSION SHALL BE DELIVERED NLT TWO (2) MONTHS PRIOR TO END OF CONTRACT.
4. BLK 14: SUBMISSIONS OF THE LESSON PROTOTYPES SHALL BE POSTED TO THE CONTRACTOR DELIVERABLE ONLINE MANAGEMENT SYSTEM, INCLUDING NAWCTSD FORM 4330 WITH THE APPROPRIATE INFORMATION FILLED IN. AN E-MAIL INDICATING THE SUBMISSION IS READY FOR GOVERNMENT REVIEW SHALL BE SENT TO DESIGNATED ADDRESSES, ALSO INDICATING THE DATE GOVERNMENT REVIEW COMMENCES. THE CONTRACTOR SHALL PROVIDE THE GOVERNMENT WITH AT LEAST ONE DAY NOTICE PRIOR TO THE BEGINNING OF THE GOVERNMENT REVIEW PERIOD. EMAIL ADDRESSES ARE IN SECTION F OF THE CONTRACT SCHEDULE.
5. THE GOVERNMENT WILL HAVE 15 WORKING DAYS FOR REVIEW AND ACCEPTANCE/ REJECTION OF EACH SUBMISSION
6. FOR EACH SUBMISSION, CONTRACTOR INCORPORATION OF GOVERNMENT COMMENTS SHALL BE DUE WITHIN 10 WORKING DAYS OF RECEIPT OF COMMENTS IF REJECTED.
7. THE CONTRACTOR SHALL DEVELOP AND TEST ONE SEPARATE LESSON PROTOTYPE FOR EACH CONTENT DELIVERY MODE (INSTRUCTOR-FACILITATED INTERACTIVE TRAINING IMI LEVEL 2, SELF-DIRECTED INTERACTIVE TRAINING IMI LEVEL 3 (IF APPLICABLE FOR THAT COURSE)) DEMONSTRATING THE DESIGN CONVENTIONS, STANDARDS, SCREEN INTERFACES, AND FUNCTIONALITY OF THE TRAINING PRODUCTS. EACH LESSON PROTOTYPE SHALL BE DEVELOPED BASED ON ONE ENABLING LEARNING OBJECTIVE, COVERING CONTENT AGREED UPON BY BOTH THE CONTRACTOR AND THE GOVERNMENT AND ADDRESSING THE MEDIA CHARACTERISTICS IDENTIFIED IN THE CORRESPONDING WORKBOOK. THE LESSON PROTOTYPES SHALL DEMONSTRATE FULL FUNCTIONALITY OF ALL PROPOSED STRATEGIES AND SHALL PASS GOVERNEMNT CONTENT ACCEPTANCE TESTING (GCAT) REQUIREMENTS FOR HOSTING IN NEL ENVIRONMENTS.
8. IF A LESSON PROTOTYPE AFFECTS A DEVIATION FROM THE NETC STYLE GUIDE, THE CONTRACTOR SHALL REQUEST THE DEVIATION IN WRITING FROM NETC. IF APPROVED, THE CONTRAFTOR SHALL UPDATE THE NETC STYLE GUIDE AND SUBMIT TO NAWCTSD WITH THE LESSON PROTOTYPE FINAL SUBMISSION. .
9. ACCEPTANCE OF CHANGES IN CONTRACT REQUIREMENTS/STANDARDS/SPECIFICATIONS DOES NOT CONSTITUTE GOVERNMENT AGREEMENT TO THOSE CHANGES. ONLY BY DIRECTION OF THE CONTRACTING OFFICER CAN SUCH CHANGES BE MADE.
10. THE FOLLOWING DISTRIBUTION STATEMENT SHALL BE INCLUDED ON THE DELIVERABLE:
11.
DISTRIBUTION D. DISTRIBUTION AUTHORIZED TO DOD AND U.S. DOD CONTRACTORS ONLY; ADMINISTRATIVE OR OPERATIONAL USE, 24 JUL 2018. OTHER REQUESTS FOR THIS DOCUMENT SHALL BE REFERRED TO NAVAL AIR WARFARE CENTER TRAINING SYSTEMS DIVISION, 12211 SCIENCE DRIVE, ORLANDO, FL 32826-3275.
DESTRUCTION NOTICE - FOR CLASSIFIED DOCUMENTS; FOLLOW THE GUIDANCE FOR DESTRUCTION OF CLASSIFED MATERIAL IN ACCORDANCE WITH 32 CFR 2001.47 AND THE DESTRUCTION EQUIPMENT STANDARDS IN ACCORDANC WITH 32 CFR 2001.42(b). FOR CUI DOCUMENTS; FOLLOW THE GUIDANCE PRESCRIBED BY THE INFORMATION SECURITY OVERSIGHT OFFICE CUI NOTICE 2019-03: DESTROYING CONTRQLLED UNCLASSIFIED INFORMATION (CUI) IN PAPER FORM AND NIST SPECIAL PUBLICATION 800-88. REVISION 1. GUIDELINES FOR MEDIA SANITATION.
NAWCTSD PCO
NAWCTSD PJM
| G. PREPARED BY |
| H. DATE |
| I. APPROVED BY |
| J. DATE |
BROOKE DAVIS, RRL FY24 CONTENT CONVERSION TPOC
KELSEY DENOVE, RRL FY24 PROGRAM MANAGER
| DD FORM 1423-1, FEB 2001 | PREVIOUS EDITION MAY BE USED | Page 5 of 13 Pages |
| CONTRACT DATA REQUIREMENTS LIST (CDRL) | |
(1 Data Item) Form Approved
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
| A. CONTRACT LINE ITEM NO. |
| B. EXHIBIT |
| C. CATEGORY: |
| F |
| TDP ____ |
| TM _____ |
| OTHER TRAINING DATA |
| D. SYSTEM/ITEM |
| E. CONTRACT/PR NO. |
| F. CONTRACTOR |
RRL FY24 CONTENT CONVERSION
| 1. DATA ITEM NO. |
| 2. TITLE OF DATA ITEM |
| 3. SUBTITLE |
17. PRICE GROUP
| F002 |
| TEST PACKAGE |
| TEST PACKAGE (ASSESSMENTS) |
| 4. AUTHORITY (Data Acquisition Document No.) |
| 5. CONTRACT REFERENCE |
| 6. REQUIRING OFFICE |
18. ESTIMATED
TOTAL PRICE
| DI-PSSS-81525C |
| SOW PARA 3.5.2.4 |
| NAWCTSD RRL TSPM |
| 7. DD 250 REQ |
| 9. DIST STATEMENT |
| 10. FREQUENCY |
| 12. DATE OF FIRST SUBMISSION |
| 14. DISTRIBUTION |
| REQUIRED |
| ASREQ |
| SEE BLOCK 16 |
| a. ADDRESSEE |
| b. COPIES |
| 8. APP CODE |
| SEE BLOCK 16 |
| 11. AS OF DATE |
| 13. DATE IF SUBSEQUENT SUBM. |
| 16. REMARKS |
| NAWCTSD TPOC |
| 1 |
1. BLK 4: DELETE ALL PARAGRAPHS EXCEPT 2.2.a-d.
2. BLK 10/12/13: SUBMISSIONS SHALL BE INCLUDED IN THE CDRL F004 TRAINING CONDUCT SUPPORT DOCUMENT (CURRICULUM PACKAGE) AND CDRL F008 INCREMENTS IN ACCORDANCE WITH (IAW) THE GOVERNMENT-ACCEPTED INTEGRATED MASTER SCHEDULE (IMS). TO AID REVIEW OF COMPLEX MEDIA PRODUCTS, SUBMISSIONS SHALL BE SCHEDULED IN THE IMS TO ALSO ACCOMPANY SOFTWARE PRODUCT PACKAGE (SPP) (A005), AND LOGIC TABLES (A008).
3. SUBMISSIONS SHALL BE VIA THE CONTRACTOR ONLINE MANAGEMENT SYSTEM, INCLUDING NAWCTSD FORM 4330 WITH THE APPROPRIATE INFORMATION FILLED IN. NO PAPER COPIES WILL BE ACCEPTED. AN E-MAIL INDICATING THE SUBMISSION IS READY FOR GOVERNMENT REVIEW SHALL BE SENT TO DESIGNATED ADDRESSES, ALSO INDICATING THE DATE GOVERNMENT REVIEW COMMENCES. THE CONTRACTOR SHALL PROVIDE THE GOVERNMENT WITH AT LEAST ONE DAY NOTICE PRIOR TO THE BEGINNING OF THE GOVERNMENT REVIEW PERIOD. EMAIL ADDRESSES ARE IN SECTION F OF THE CONTRACT SCHEDULE.
4. THE GOVERNMENT WILL HAVE 15 WORKING DAYS FOR REVIEW AND ACCEPTANCE/CONDITIONAL ACCEPTANCE/REJECTION OF EACH INCREMENTALLY DELIVERED SUBMISSION. FOR SUBMISSION DELIVERED WITH F004 CURRICULUM PACKAGE SUBMISSIONS, CONTRACTOR INCORPORATION OF GOVERNMENT COMMENTS SHALL BE DUE IN 10 WORKING DAYS OF RECEIPT OF COMMENTS IF ACCEPTED WITH COMMENTS OR REJECTED.
5. TEST PACKAGE SUBMISSIONS SHALL, IN ADDITION TO REQUIREMENTS OUTLINED IN DI-SESS-81525C, BE FORMATTED AND SUBMITTED USING THE GOVERNMENT PROVIDED NAVEDTRA 136 QUESTIONS BANK LAYOUT TEMPLATE.
6. ACCEPTANCE OF CHANGES IN CONTRACT REQUIREMENTS/STANDARDS/SPECIFICATIONS DOES NOT CONSTITUTE GOVERNMENT AGREEMENT TO THOSE CHANGES. ONLY BY DIRECTION OF THE CONTRACTING OFFICER CAN SUCH CHANGES BE MADE.
7. THE DISTRIBUTION STATEMENT SHALL BE IAW THE HIGHEST CLASSIFICATION MARKING OF THE SOURCE MATERIAL FOR THE DELIVERABLE.
NAWCTSD PCO
NAWCTSD PJM
NAWCTSD RRL LSE
| G. PREPARED BY |
| H. DATE |
| I. APPROVED BY |
| J. DATE |
BROOKE DAVIS, RRL FY24 CONTENT CONVERSION TPOC
KELSEY DENOVE, RRL FY24 PROGRAM MANAGER
| DD FORM 1423-1, FEB 2001 | PREVIOUS EDITION MAY BE USED | Page 6 of 13 Pages |
| CONTRACT DATA REQUIREMENTS LIST (CDRL) | |
(1 Data Item) Form Approved
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
| A. CONTRACT LINE ITEM NO. |
| B. EXHIBIT |
| C. CATEGORY: |
| F |
| TDP ____ |
| TM _____ |
| OTHER TRAINING DATA |
| D. SYSTEM/ITEM |
| E. CONTRACT/PR NO. |
| F. CONTRACTOR |
RRL FY24 CONTENT CONVERSION
| 1. DATA ITEM NO. |
| 2. TITLE OF DATA ITEM |
| 3. SUBTITLE |
17. PRICE GROUP
| F003 |
| TEST PACKAGE |
| COURSE TESTING PLAN (ADMINISTRATION) |
| 4. AUTHORITY (Data Acquisition Document No.) |
| 5. CONTRACT REFERENCE |
| 6. REQUIRING OFFICE |
18. ESTIMATED
TOTAL PRICE
| DI-PSSS-81525C |
| SOW PARA 3.5.2.5 |
NAWCTSD RRL TSPM
| 7. DD 250 REQ |
| 9. DIST STATEMENT |
| 10. FREQUENCY |
| 12. DATE OF FIRST SUBMISSION |
| 14. DISTRIBUTION |
| REQUIRED |
| SEE BLK 16 |
| SEE BLOCK 16 |
| a. ADDRESSEE |
| b. COPIES |
| 8. APP CODE |
| SEE BLOCK 16 |
| 11. AS OF DATE |
| 13. DATE IF SUBSEQUENT SUBM. |
| 16. REMARKS |
| NAWCTSD TPOC |
| 1 |
1. BLK 4: DELETE ALL PARAGRAPHS EXCEPT 2.4.1, 2.4.2, AND 2.4.3.
2. BLK 10/12/13: SUBMISSIONS SHALL BE PER EACH COURSE, DELIVERED IN INCREMENTS IN ACCORDANCE WITH (IAW) THE GOVERNMENT-ACCEPTED INTEGRATED MASTER SCHEDULE (IMS). FIRST SUBMISSION SHALL COINCIDE WITH SUBMISSION OF TEST PACKAGE (ASSESSMENTS) CDRL F002 ONCE ALL INCREMENTS OF A COURSE HAVE BEEN INITIALLY DELIVERED. SECOND SUBMISSION SHALL BE PRIOR TO TRAIN THE TRAINER EVENT. FINAL SUBMISSION SHALL BE POST COURSE PILOT EVENT.
3. BLK 14: SUBMISSIONS SHALL BE VIA THE CONTRACTOR ONLINE MANAGEMENT SYSTEM, INCLUDING NAWCTSD FORM 4330 WITH THE APPROPRIATE INFORMATION FILLED IN. AN E-MAIL INDICATING THE SUBMISSION IS READY FOR GOVERNMENT REVIEW SHALL BE SENT TO DESIGNATED ADDRESSES, ALSO INDICATING THE DATE GOVERNMENT REVIEW COMMENCES, THE CONTRACTOR SHALL PROVIDE THE GOVERNMENT WITH AT LEAST ONE DAY NOTICE PRIOR TO THE BEGINNING OF THE GOVERNMENT REVIEW PERIOD. EMAIL ADDRESSES ARE IN SECTION F OF THE CONTRACT SCHEDULE.
4. THE GOVERNMENT WILL HAVE 15 WORKING DAYS FOR REVIEW AND ACCEPTANCE/CONDITIONAL ACCEPTANCE/REJECTION OF EACH INCREMENTALLY DELIVERED SUBMISSION. CONTRACTOR INCORPORATION OF GOVERNMENT COMMENTS SHALL BE IN 10 WORKING DAYS OF RECEIPT OF COMMENTS.
5. ACCEPTANCE OF CHANGES IN CONTRACT REQUIREMENTS/STANDARDS/SPECIFICATIONS DOES NOT CONSTITUTE GOVERNMENT AGREEMENT TO THOSE CHANGES. ONLY BY DIRECTION OF THE CONTRACTING OFFICER CAN SUCH CHANGES BE MADE.
6. THE DISTRIBUTION STATEMENT SHALL BE IAW THE HIGHEST CLASSIFICATION MARKING OF THE SOURCE MATERIAL FOR THE DELIVERABLE:
NAWCTSD PCO
NAWCTSD PJM
| G. PREPARED BY |
| H. DATE |
| I. APPROVED BY |
| J. DATE |
BROOKE DAVIS, RRL FY24 CONTENT CONVERSION TPOC
KELSEY DENOVE, RRL FY24 PROGRAM MANAGER
| DD FORM 1423-1, FEB 2001 | PREVIOUS EDITION MAY BE USED | Page 7 of 13 Pages |
| CONTRACT DATA REQUIREMENTS LIST (CDRL) | |
(1 Data Item) Form Approved
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
| A. CONTRACT LINE ITEM NO. |
| B. EXHIBIT |
| C. CATEGORY: |
| F |
| TDP ____ |
| TM _____ |
| OTHER TRAINING DATA |
| D. SYSTEM/ITEM |
| E. CONTRACT/PR NO. |
| F. CONTRACTOR |
RRL FY24 CONTENT CONVERSION
| 1. DATA ITEM NO. |
| 2. TITLE OF DATA ITEM |
| 3. SUBTITLE |
17. PRICE GROUP
| F004 |
| TRAINING CONDUCT SUPPORT DOCUMENT |
| CURRICULUM PACKAGE (LP, TG, TRAINING HANDOUTS,AND PRESENTATION MATERIALS) |
| 4. AUTHORITY (Data Acquisition Document No.) |
| 5. CONTRACT REFERENCE |
| 6. REQUIRING OFFICE |
18. ESTIMATED
TOTAL PRICE
| DI-PSSS-81523D |
| SOW PARA 3.5.2.6, 3.5.3.4.2 |
| NAWCTSD RRL TSPM |
| 7. DD 250 REQ |
| 9. DIST STATEMENT |
| 10. FREQUENCY |
| 12. DATE OF FIRST SUBMISSION |
| 14. DISTRIBUTION |
| LT |
| REQUIRED |
| ASREQ |
| SEE BLOCK 16 |
| a. ADDRESSEE |
| b. COPIES |
| 8. APP CODE |
| SEE BLOCK 16 |
| 11. AS OF DATE |
| 13. DATE IF SUBSEQUENT SUBM. |
A
| 16. REMARKS |
| NAWCTSD TPOC |
| 1 |
1. BLK 4: DELETE ALL PARAGRAPHS EXCEPT 3.2 – 3.2.2.4, 3.2.2.7 – 3.2.2.8, 3.2.2.13 – 3.2.2.17, 3.2.2.19 – 3.2.2.25, 3.2.2.27 – 3.2.2.30, 3.2.2.32 – 3.2.2.33, 3.2.2.36 – 3.2.2.37, 3.2.3 – 3.2.4, 3.3 – 3.3.7, AND 3.4 – 3.5.2.5.
2. BLK 10/12/13: SUBMISSIONS SHALL BE IN ACCORDANCE WITH (IAW) THE GOVERNMENT-ACCEPTED INTEGRATED MASTER SCHEDULE (IMS). TCSD SHALL ALSO BE AVAILABLE TO SUPPORT REVIEW OF COMPLEX MEDIA DELIVERABLES (A002). SUBSEQUENT SUBMISSIONS SHALL BE DELIVERED PRIOR TO T3, AND PRIOR TO COURSE PILOT. FINAL SUBMISSION SHALL BE PROVIDED NLT TWO MONTHS PRIOR TO CONTRACT END. TO AID REVIEW OF COMPLEX MEDIA PRODUCTS, SUBMISSIONS SHALL BE SCHEDULED IN THE IMS TO ALSO ACCOMPANY SOFTWARE PRODUCT PACKAGE (SPP) (A005),
3. BLK 14: SUBMISSIONS SHALL BE IN MICROSOFT OFFICE 2010 OR LATER FORMAT, OR PDF 2010 OR LATER FORMAT. SUBMISSIONS SHALL BE POSTED TO THE CONTRACTOR ONLINE MANAGEMENT SYSTEM, INCLUDING NAWCTSD FORM 4330 WITH THE APPROPRIATE INFORMATION FILLED IN. AN E-MAIL INDICATING THE SUBMISSION IS READY FOR GOVERNMENT REVIEW SHALL BE SENT TO DESIGNATED ADDRESSES, ALSO INDICATING THE DATE GOVERNMENT REVIEW COMMENCES. THE CONTRACTOR SHALL PROVIDE THE GOVERNMENT WITH AT LEAST ONE DAY NOTICE PRIOR TO THE BEGINNING OF THE GOVERNMENT REVIEW PERIOD. EMAIL ADDRESSES ARE IN SECTION F OF THE CONTRACT SCHEDULE.
4. FOR EACH INCREMENTAL SUBMISSION OF COURSEWARE LESSONS, THE GOVERNMENT WILL HAVE 15 WORKING DAYS FOR REVIEW AND ACCEPTANCE/CONDITIONAL ACCEPTANCE/REJECTION OF EACH SUBMISSION.
5. FOR EACH SUBMISSION OF COURSEWARE LESSONS, CONTRACTOR INCORPORATION OF GOVERNMENT COMMENTS SHALL BE INCORPORATED WITHIN 10 WORKING DAYS OF RECEIPT OF COMMENTS IF ACCEPTED WITH COMMENTS OR REJECTED.
6. ACCEPTANCE OF CHANGES IN CONTRACT REQUIREMENTS/STANDARDS/SPECIFICATIONS DOES NOT CONSTITUTE GOVERNMENT AGREEMENT TO THOSE CHANGES. ONLY BY DIRECTION OF THE CONTRACTING OFFICER CAN SUCH CHANGES BE MADE.
THE DISTRIBUTION STATEMENT SHALL BE IAW THE HIGHEST CLASSIFICATION MARKING OF THE SOURCE MATERIAL FOR THE DELIVERABLE.
NAWCTSD PCO
NAWCTSD PJM
| G. PREPARED BY |
| H. DATE |
| I. APPROVED BY |
| J. DATE |
BROOKE DAVIS, RRL FY24 CONTENT CONVERSION TPOC
KELSEY DENOVE, RRL FY24 PROGRAM MANAGER
| DD FORM 1423-1, FEB 2001 | PREVIOUS EDITION MAY BE USED | Page 8 of 13 Pages |
| CONTRACT DATA REQUIREMENTS LIST (CDRL) | |
(1 Data Item) Form Approved
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
| A. CONTRACT LINE ITEM NO. |
| B. EXHIBIT |
| C. CATEGORY: |
| F |
| TDP ____ |
| TM _____ |
| OTHER TRAINING DATA |
| D. SYSTEM/ITEM |
| E. CONTRACT/PR NO. |
| F. CONTRACTOR |
RRL FY24 CONTENT CONVERSION
| 1. DATA ITEM NO. |
| 2. TITLE OF DATA ITEM |
| 3. SUBTITLE |
17. PRICE GROUP
| F005 |
| TRAINING PROGRAM STRUCTURE DOCUMENT |
TRAINING COURSE CONTROL DOCUMENT (TCCD), TRAINING PROJECT PLAN (TPP), COUSRSE MASTER SCHEDULE (CMS), AND RESOURCE REQUIREMENTS LIST
| 4. AUTHORITY (Data Acquisition Document No.) |
| 5. CONTRACT REFERENCE |
| 6. REQUIRING OFFICE |
18. ESTIMATED
TOTAL PRICE
| DI-SESS-81521B |
| SOW PARA 3.5.2.7, 3.5.3.4.2 |
| NAWCTSD RRL TSPM |
| 7. DD 250 REQ |
| 9. DIST STATEMENT |
| 10. FREQUENCY |
| 12. DATE OF FIRST SUBMISSION |
| 14. DISTRIBUTION |
| LT |
| REQUIRED |
| ASREQ |
| SEE BLOCK 16 |
| a. ADDRESSEE |
| b. COPIES |
| 8. APP CODE |
| SEE BLOCK 16 |
| 11. AS OF DATE |
| 13. DATE IF SUBSEQUENT SUBM. |
A
| 16. REMARKS |
| NAWCTSD TPOC |
| 1 |
1. BLK 4: DELETE ALL PARAGRAPHS EXCEPT 2.3.1a-j, 2.3.1l-p, 2.3.1s, 2.3.1u-v, 2.3.1x-y, 2.3.2a-g, 2.3.2i-m, 2.3.3-2.3.4a(1), 2.3.4a(3), 2.3.4b(3)-(4), 2.3.4c(1), 2.3.4c(2)(c), 2.3.4c(3)-(4), 2.3.4c(5)(c), 2.3.4d(1)-(3), 2.3.4f(1)(a)-(c), 2.3.4f(2), 2.3.6, 2.3.7, 2.3.8a-k, 2.3.8n, 2.3.8p, 2.3.10, 2.3.13a-f, 2.3.13h-j, 2.3.13o-p, 2.3.13r-s
2. BLK 10/12/13: SUBMISSIONS SHALL BE IN ACCORDANCE WITH (IAW) THE GOVERNMENT-ACCEPTED INTEGRATED MASTER SCHEDULE (IMS). FIRST SUBMISSION SHALL BE THE INITIAL TPP AND TCCD TO SUPPORT COURSE SEQUENCING. TPSD SHALL ALSO BE AVAILABLE TO SUPPORT REVIEW OF COMPLEX MEDIA DELIVERABLES (A002,).
3. BLK 14: SUBMISSIONS SHALL BE IN MICROSOFT OFFICE (WORD) 2010 OR LATER FORMAT. SUBMISSIONS SHALL BE POSTED TO THE CONTRACTOR ONLINE MANAGEMENT SYSTEM, INCLUDING NAWCTSD FORM 4330 WITH THE APPROPRIATE INFORMATION FILLED IN. AN E-MAIL INDICATING THE SUBMISSION IS READY FOR GOVERNMENT REVIEW SHALL BE SENT TO DESIGNATED ADDRESSES, ALSO INDICATING THE DATE GOVERNMENT REVIEW COMMENCESTHE CONTRACTOR SHALL PROVIDE THE GOVERNMENT WITH AT LEAST ONE DAY NOTICE PRIOR TO THE BEGINNING OF THE GOVERNMENT REVIEW PERIOD. EMAIL ADDRESSES ARE IN SECTION F OF THE CONTRACT SCHEDULE.
4. THE GOVERNMENT SHALL HAVE 15 WORKING DAYS FOR REVIEW AND ACCEPTANCE/CONDITIONAL ACCEPTANCE/REJECTION.
5. CONTRACTOR INCORPORATION OF GOVERNMENT COMMENTS SHALL BE WITHIN 10 WORKING DAYS OF RECEIPT OF COMMENTS IF ACCEPTED CONDITIONALLY/REJECTED.
6. ACCEPTANCE OF CHANGES IN CONTRACT REQUIREMENTS/STANDARDS/SPECIFICATIONS DOES NOT CONSTITUTE GOVERNMENT AGREEMENT TO THOSE CHANGES. ONLY BY DIRECTION OF THE CONTRACTING OFFICER CAN SUCH CHANGES BE MADE.
7. THE DISTRIBUTION STATEMENT SHALL BE IAW THE HIGHEST CLASSIFICATION MARKING OF THE SOURCE MATERIAL FOR THE DELIVERABLE:
NAWCTSD PCO
NAWCTSD PJM
| G. PREPARED BY |
| H. DATE |
| I. APPROVED BY |
| J. DATE |
BROOKE DAVIS, RRL FY24 CONTENT CONVERSION TPOC
KELSEY DENOVE, RRL FY24 PROGRAM MANAGER
| DD FORM 1423-1, FEB 2001 | PREVIOUS EDITION MAY BE USED | Page 9 of 13 Pages |
| CONTRACT DATA REQUIREMENTS LIST (CDRL) | |
(1 Data Item) Form Approved
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
| A. CONTRACT LINE ITEM NO. |
| B. EXHIBIT |
| C. CATEGORY: |
| F |
| TDP ____ |
| TM _____ |
| OTHER TRAINING DATA |
| D. SYSTEM/ITEM |
| E. CONTRACT/PR NO. |
| F. CONTRACTOR |
RRL FY24 CONTENT CONVERSION
| 1. DATA ITEM NO. |
| 2. TITLE OF DATA ITEM |
| 3. SUBTITLE |
17. PRICE GROUP
| F006 |
| TRAINING SYSTEM SUPPORT DOCUMENT |
| TRAINING SYSTEMS SUPPORT PROCEDURES |
| 4. AUTHORITY (Data Acquisition Document No.) |
| 5. CONTRACT REFERENCE |
6. REQUIRING OFFICE
18. ESTIMATED
TOTAL PRICE
| DI-PSSS-81527D |
| SOW PARA 3.5.2.8 |
| NAWCTSD RRL TSPM |
| 7. DD 250 REQ |
| 9. DIST STATEMENT |
| 10. FREQUENCY |
| 12. DATE OF FIRST SUBMISSION |
| 14. DISTRIBUTION |
| LT |
| REQUIRED |
| ASREQ |
| SEE BLK 16 |
| a. ADDRESSEE |
| b. COPIES |
| 8. APP CODE |
| SEE BLOCK 16 |
| 11. AS OF DATE |
| 13. DATE IF SUBSEQUENT SUBM. |
A
| 16. REMARKS |
| NAWCTSD TPOC |
| 1 |
1. BLK 4: DELETE ALL PARAGRAPHS EXCEPT 3.2, 3.2.1, 3.2.2.3-3.2.2.5.5, 3.2.3.2-3.2.3.4, 3.2.4, 3.3, 3.3.1, 3.3.1.1-3.3.2.4.10, 3.3.2.4.11-3.3.2.4.12, 3.3.2.6, 3.3.6.1-3.3.6.4, 3.3.6.6, 3.3.7, 3.3.8, 3.3.9.2-3.3.9.4, 2.3.9.7-2.3.9.8, 3.3.10.1, 3.3.102.1-3.3.10.2.8, 3.3.10.210-3.3.10.2.12, 3.3.10.3.
2. BLK 10/12/13: SUBMISSIONS SHALL BE IN ACCORDANCE WITH (IAW) THE GOVERNMENT-ACCEPTED INTEGRATED MASTER SCHEDULE (IMS). SUBMISSIONS SHALL INCLUDE A DRAFT VERSION, AND A FINAL VERSION.
3. BLK 14: SUBMISSIONS SHALL BE IN MICROSOFT OFFICE (WORD) 2010 OR LATER FORMAT. SUBMISSIONS SHALL BE POSTED TO THE CONTRACTOR ONLINE MANAGEMENT SYSTEM, INCLUDING NAWCTSD FORM 4330 WITH THE APPROPRIATE INFORMATION FILLED IN. AN E-MAIL INDICATING THE SUBMISSION IS READY FOR GOVERNMENT REVIEW SHALL BE SENT TO DESIGNATED ADDRESSES, ALSO INDICATING THE DATE GOVERNMENT REVIEW COMMENCES. THE CONTRACTOR SHALL PROVIDE THE GOVERNMENT WITH AT LEAST ONE DAY NOTICE PRIOR TO THE BEGINNING OF THE GOVERNMENT REVIEW PERIOD. EMAIL ADDRESSES ARE IN SECTION F OF THE CONTRACT SCHEDULE.
4. THE GOVERNMENT SHALL HAVE 15 WORKING DAYS FOR REVIEW AND ACCEPTANCE/CONDITIONAL ACCEPTANCE/REJECTION. FOR THE FINAL SUBMISSION, THE GOVERNMENT WILL HAVE 10 WORKING DAYS FOR REVIEW AND APPROVAL/ REJECTION.
5. CONTRACTOR INCORPORATION OF GOVERNMENT COMMENTS SHALL BE WITHIN 10 WORKING DAYS OF RECEIPT OF COMMENTS IF ACCEPTED WITH COMMENTS OR REJECTED.
6. ACCEPTANCE OF CHANGES IN CONTRACT REQUIREMENTS/STANDARDS/SPECIFICATIONS DOES NOT CONSTITUTE GOVERNMENT AGREEMENT TO THOSE CHANGES. ONLY BY DIRECTION OF THE CONTRACTING OFFICER CAN SUCH CHANGES BE MADE.
7. THE DISTRIBUTION STATEMENT SHALL BE IAW THE HIGHEST CLASSIFICATION MARKING OF THE SOURCE MATERIAL FOR THE DELIVERABLE:
NAWCTSD PCO
NAWCTSD PJM
| G. PREPARED BY |
| H. DATE |
| I. APPROVED BY |
| J. DATE |
BROOKE DAVIS, RRL FY24 CONTENT CONVERSION TPOC
KELSEY DENOVE, RRL FY24 PROGRAM MANAGER
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED Page 10 of 13 Pages
CONTRACT DATA REQUIREMENTS LIST (CDRL)
(1 Data Item) Form Approved
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
| A. CONTRACT LINE ITEM NO. |
| B. EXHIBIT |
| C. CATEGORY: |
| F |
| TDP ____ |
| TM _____ |
| OTHER TRAINING DATA |
| D. SYSTEM/ITEM |
| E. CONTRACT/PR NO. |
| F. CONTRACTOR |
RRL FY24 CONTENT CONVERSION
| 1. DATA ITEM NO. |
| 2. TITLE OF DATA ITEM |
| 3. SUBTITLE |
17. PRICE GROUP
| F007 |
| INSTRUCTIONAL MEDIA PACKAGE |
| MEDIA SOURCE FILES |
| 4. AUTHORITY (Data Acquisition Document No.) |
| 5. CONTRACT REFERENCE |
| 6. REQUIRING OFFICE |
18. ESTIMATED
TOTAL PRICE
| DI-PSSS-81526C |
| SOW PARA 3.5.2.10.1, 3.5.3.3.4.1, 3.5.3.4, 3.5.3.4.2.2 |
| NAWCTSD RRL TSPM |
| 7. DD 250 REQ |
| 9. DIST STATEMENT |
| 10. FREQUENCY |
| 12. DATE OF FIRST SUBMISSION |
| 14. DISTRIBUTION |
| LT |
| REQUIRED |
| ASREQ |
| SEE BLOCK 16 |
| a. ADDRESSEE |
| b. COPIES |
| 8. APP CODE |
| SEE BLOCK 16 |
| 11. AS OF DATE |
| 13. DATE IF SUBSEQUENT SUBM. |
A
| 16. REMARKS |
| NAWCTSD TPOC |
| 1 |
1. BLK 4: DELETE ALL PARAGRAPHS EXCEPT 2.6, 2.6.1c-2.6.1h, 2.6.2 -2.6.2b(5), 2.6.3 -2.6.3c(2)(c), 2.6.3c(2)(e) – 2.6.3c(2)(g), 2.6.3c(2)(k)-2.6.3c(2)(m), 2.6.3c(2)(s), 2.6.4-2.7.2f.
2. BLK 10/12/13: SUBMISSIONS SHALL BE IN ACCORDANCE WITH (IAW) THE GOVERNMENT-ACCEPTED INTEGRATED MASTER SCHEDULE (IMS).
3. BLK 14: SUBMISSIONS SHALL BE VIA EXTERNAL HARD DRIVE. NAWCTSD FORM 4330 WITH THE APPROPRIATE INFORMATION FILLED IN SHALL BE POSTED TO THE CONTRACTORONLINE MANAGEMENT SYSTEM AND AN E-MAIL INDICATING THE SUBMISSION IS READY FOR GOVERNMENT REVIEW SHALL BE SENT TO DESIGNATED ADDRESSES, ALSO INDICATING THE DATE GOVERNMENT REVIEW COMMENCES. . THE CONTRACTOR SHALL PROVIDE THE GOVERNMENT WITH AT LEAST ONE DAY NOTICE PRIOR TO THE BEGINNING OF THE GOVERNMENT REVIEW PERIOD. EMAIL ADDRESSES ARE IN SECTION F OF THE CONTRACT SCHEDULE.
4. THE GOVERNMENT WILL HAVE 5 WORKING DAYS FOR REVIEW AND ACCEPTANCE/REJECTION.
5. CONTRACTOR INCORPORATION OF GOVERNMENT COMMENTS SHALL BE WITHIN 5 WORKING DAYS OF RECEIPT OF COMMENTS IF REJECTED.
6. WHEN APPLICABLE, PAPER-BASED AND ELECTRONIC COPIES OF COPYRIGHT PERMISSIONS SHALL BE PROVIDED IN MICROSOFT OFFICE (WORD) 2010 OR LATER.
7. ACCEPTANCE OF CHANGES IN CONTRACT REQUIREMENTS/STANDARDS/SPECIFICATIONS DOES NOT CONSTITUTE GOVERNMENT AGREEMENT TO THOSE CHANGES. ONLY BY DIRECTION OF THE CONTRACTING OFFICER CAN SUCH CHANGES BE MADE.
8. THE DISTRIBUTION STATEMENT SHALL BE IAW THE HIGHEST CLASSIFICATION MARKING OF THE SOURCE MATERIAL FOR THE DELIVERABLE:
NAWCTSD PCO
NAWCTSD PJM
| G. PREPARED BY |
| H. DATE |
| I. APPROVED BY |
| J. DATE |
BROOKE DAVIS, RRL FY24 CONTENT CONVERSION TPOC
KELSEY DENOVE, RRL FY24 PROGRAM MANAGER
| DD FORM 1423-1, FEB 2001 | PREVIOUS EDITION MAY BE USED | Page 11 of 13 Pages |
| ONTRACT DATA REQUIREMENTS LIST (CDRL) | |
(1 Data Item) Form Approved
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
| A. CONTRACT LINE ITEM NO. |
| B. EXHIBIT |
| C. CATEGORY: |
| F |
| TDP ____ |
| TM _____ |
| OTHER TRAINING DATA |
| D. SYSTEM/ITEM |
| E. CONTRACT/PR NO. |
| F. CONTRACTOR |
RRL FY24 CONTENT CONVERSION
| 1. DATA ITEM NO. |
| 2. TITLE OF DATA ITEM |
| 3. SUBTITLE |
17. PRICE GROUP
| F008 |
| INSTRUCTIONAL MEDIA PACKAGE |
| FINAL CURRICULUM DELIVERY |
| 4. AUTHORITY (Data Acquisition Document No.) |
| 5. CONTRACT REFERENCE |
| 6. REQUIRING OFFICE |
18. ESTIMATED
TOTAL PRICE
| DI-PSSS-81526C |
| SOW PARA 3.5.2.10.2, 3.5.3.4.2.3, 3.5.6.3 |
| NAWCTSD RRL TSPM |
| 7. DD 250 REQ |
| 9. DIST STATEMENT |
| 10. FREQUENCY |
| 12. DATE OF FIRST SUBMISSION |
| 14. DISTRIBUTION |
| SEE BLK 16 |
| a. ADDRESSEE |
| b. COPIES |
| 8. APP CODE |
| SEE BLOCK 16 |
| 11. AS OF DATE |
| 13. DATE IF SUBSEQUENT SUBM. |
A
| 16. REMARKS |
| NAWCTSD TPOC |
| 1 |
1. BLK 4: DELETE ALL PARAGRAPHS EXCEPT 2.1, 2.3.10, 2.6.2, 2.6.3-2.6.3B(2), AND 2.6.5B.
2. BLK 10/12/13: SUBMISSIONS SHALL BE IN ACCORDANCE WITH (IAW) THE GOVERNMENT-ACCEPTED INTEGRATED MASTER SCHEDULE (IMS).
3. BLK 14: A TOTAL OF ONE (1) SET OF FINAL UNCLASSIFIED CURRICULUM SHALL BE DELIVERED VIA DOD SAFE (https://safe.apps.mil/) TO THE DESIGNATED E-MAIL ADDRESSES. A TOTAL OF TWO (2) SETS OF FINAL CLASSIFIED CURRICULUM CD-ROM/DVDs SHALL BE DELIVERED TO THE DESIGNATED ADDRESSES. USING MICROSOFT BITLOCKER-ENABLED EXTERNAL HARD DRIVES WITH LETTER OFAUTHORIZATION. NAWCTSD FORM 4330 WITH THE APPROPRIATE INFORMATION FILLED IN SHALL BE POSTED TO THE CONTRACTOR ONLINE MANAGEMENT SYSTEM AND AN E-MAIL INDICATING THE SUBMISSION IS READY FOR GOVERNMENT REVIEW SHALL BE SENT TO DESIGNATED ADDRESSES, ALSO INDICATING THE DATE GOVERNMENT REVIEW COMMENCES. THE CONTRACTOR SHALL PROVIDE THE GOVERNMENT WITH AT LEAST ONE DAY NOTICE PRIOR TO THE BEGINNING OF THE GOVERNMENT REVIEW PERIOD. EMAIL ADDRESSES ARE IN SECTION F OF THE CONTRACT SCHEDULE.
4. FOR THE SUBMISSION, THE GOVERNMENT WILL HAVE 10 WORKING DAYS FOR REVIEW AND APPROVAL/ACCEPTANCE/REJECTION.
5. CONTRACTOR INCORPORATION OF GOVERNMENT COMMENTS SHALL BE WITHIN 5 WORKING DAYS OF RECEIPT OF COMMENTS IF REJECTED.
6. IN ADDITION TO REQUIREMENTS OUTLINED IN DI-SESS-81526C, EACH SET OF THE UNCLASSIFIED FINAL CURRICULUM SENT VIA DOD SAFE AND THE CLASSIFIED FINAL CURRICULUM CDS/DVDS SHALL CONTAIN, AT A MINIMUM, ALL FILES ASSOCIATED WITH THE CREATION OF THE CURRICULUM, ALL DELIVERABLES PROVIDED TO THE GOVERNMENT DURING THE EFFORT, IN GOVERNMENT-ACCEPTED FINAL FORMAT, AND ALL FILES ASSOCIATED WITH THE DEPLOYMENT OF THE CURRICULUM. EACH SET OF THE FINAL UNCLASSIFIED CURRICULUM DELIVERED VIA DOD SAFE SHALL BE TITLED AND LABELED ACCORDINGLY. ALL FILES ASSOCIATED WITH THE DEPLOYMENT OF THE CLASSIFIED CURRICULUM WITHIN EACH SET OF THE FINAL CLASSIFIED CURRICULUM CD-ROM/DVD SHALL BE TITLED AND LABELED ACCORDINGLY.
7. ACCEPTANCE OF CHANGES IN CONTRACT REQUIREMENTS/STANDARDS/SPECIFICATIONS DOES NOT CONSTITUTE GOVERNMENT AGREEMENT TO THOSE CHANGES. ONLY BY DIRECTION OF THE CONTRACTING OFFICER CAN SUCH CHANGES BE MADE.
8. THE DISTRIBUTION STATEMENT SHALL BE IAW THE HIGHEST CLASSIFICATION MARKING OF THE SOURCE MATERIAL FOR THE DELIVERABLE.
NAWCTSD PCO
NAWCTSD PJM
| G. PREPARED BY |
| H. DATE |
| I. APPROVED BY |
| J. DATE |
BROOKE DAVIS, RRL FY24 CONTENT CONVERSION TPOC
KELSEY DENOVE, RRL FY24 PROGRAM MANAGER
| DD FORM 1423-1, FEB 2001 | PREVIOUS EDITION MAY BE USED | Page 12 of 13 Pages |
| CONTRACT DATA REQUIREMENTS LIST (CDRL) | |
(1 Data Item) Form Approved
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
| A. CONTRACT LINE ITEM NO. |
| B. EXHIBIT |
| C. CATEGORY: |
| F |
| TDP ____ |
| TM _____ |
| OTHER TRAINING DATA |
| D. SYSTEM/ITEM |
| E. CONTRACT/PR NO. |
| F. CONTRACTOR |
RRL FY24 CONTENT CONVERSION
| 1. DATA ITEM NO. |
| 2. TITLE OF DATA ITEM |
| 3. SUBTITLE |
17. PRICE GROUP
| F009 |
| COURSE CONDUCT INFORMATION PACKAGE |
| TRAIN THE TRAINER (T3) |
| 4. AUTHORITY (Data Acquisition Document No.) |
| 5. CONTRACT REFERENCE |
| 6. REQUIRING OFFICE |
18. ESTIMATED
TOTAL PRICE
| DI-PSSS-81522D |
| SOW PARA 3.5.5 |
| NAWCTSD RRL TSPM |
| 7. DD 250 REQ |
| 9. DIST STATEMENT |
| 10. FREQUENCY |
| 12. DATE OF FIRST SUBMISSION |
| 14. DISTRIBUTION |
| LT |
| REQUIRED |
| 1TIME |
| SEE BLK 16 |
| a. ADDRESSEE |
| b. COPIES |
| 8. APP CODE |
| SEE BLOCK 16 |
| 11. AS OF DATE |
| 13. DATE IF SUBSEQUENT SUBM. |
A
| 16. REMARKS |
| NAWCTSD TPOC |
| 1 |
1. BLK 4: DELTE ALL PARAGRAPHS EXCEPT 3.2.1.3, 3.2.1.7, 3.2.1.8, AND 3.5.6.
2. BLK 13: SUBMISSION SHALL BE DELIVERED NLT TEN (10) WORKING DAYS AFTER THE CONCLUSION OF T3 EVENT.
3. BLK 14: SUBMISSION SHALL BE IN MICROSOFT OFFICE (WORD) 2010 OR LATER. SUBMISSION SHALL BE POSTED TO THE CONTRACTOR ONLINE MANAGEMENT SYSTEM. AN E-MAIL INDICATING THE SUBMISSION IS READY FOR GOVERNMENT REVIEW SHALL BE SENT TO DESIGNATED ADDRESSES, INDICATE THE DATE THE GOVERNMENT REVIEW COMMENCES, AND INCLUDE NAWCTSD FORM 4330 WITH THE APPROPRIATE INFORMATION FILLED IN. THE CONTRACTOR SHALL PROVIDE THE GOVERNMENT WITH AT LEAST ONE DAYS NOTICE PRIOR TO THE BEGINNING OF THE GOVERNMENT REVIEW PERIOD. EMAIL ADDRESSES ARE IN SECTION F OF THE CONTRACT SCHEDULE.FOR THE SUBMISSION,
4. THE GOVERNMENT WILL HAVE 10 WORKING DAYS FOR REVIEW AND APPROVAL/ACCEPTANCE/REJECTION.
5. CONTRACTOR INCORPORATION OF GOVERNMENT COMMENTS SHALL BE WITHIN 5 WORKING DAYS OF RECEIPT OF COMMENTS IF REJECTED.
6. ACCEPTANCE OF CHANGES IN CONTRACT REQUIREMENTS/STANDARDS/SPECIFICATIONS DOES NOT CONSTITUTE GOVERNMENT AGREEMENT TO THOSE CHANGES. ONLY BY DIRECTION OF THE CONTRACTING OFFICER CAN SUCH CHANGES BE MADE.
7. THE DISTRIBUTION STATEMENT SHALL BE IAW THE HIGHEST CLASSIFICATION MARKING OF THE SOURCE MATERIAL FOR THE DELIVERABLE:
NAWCTSD PCO
NAWCTSD PJM
| G. PREPARED BY |
| H. DATE |
| I. APPROVED BY |
| J. DATE |
BROOKE DAVIS, RRL FY24 CONTENT CONVERSION TPOC
KELSEY DENOVE, RRL FY24 PROGRAM MANAGER
| DD FORM 1423-1, FEB 2001 | PREVIOUS EDITION MAY BE USED | Page 13 of 13 Pages |
| CONTRACT DATA REQUIREMENTS LIST (CDRL) | |
(1 Data Item) Form Approved
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
| A. CONTRACT LINE ITEM NO. |
| B. EXHIBIT |
| C. CATEGORY: |
| F |
| TDP ____ |
| TM _____ |
| OTHER TRAINING DATA |
| D. SYSTEM/ITEM |
| E. CONTRACT/PR NO. |
| F. CONTRACTOR |
RRL FY24 CONTENT CONVERSION
| 1. DATA ITEM NO. |
| 2. TITLE OF DATA ITEM |
| 3. SUBTITLE |
17. PRICE GROUP
| F00A |
| TRAINING EVALUATION DOCUMENT |
| COURSE PILOT |
| 4. AUTHORITY (Data Acquisition Document No.) |
| 5. CONTRACT REFERENCE |
| 6. REQUIRING OFFICE |
18. ESTIMATED
TOTAL PRICE
| DI-PSSS-81524D |
| SOW PARA 3.5.6 |
| NAWCTSD RRL TSPM |
| 7. DD 250 REQ |
| 9. DIST STATEMENT |
| 10. FREQUENCY |
| 12. DATE OF FIRST SUBMISSION |
| 14. DISTRIBUTION |
| LT |
| REQUIRED |
| 1TIME |
| SEE BLK 16 |
| a. ADDRESSEE |
| b. COPIES |
| 8. APP CODE |
| SEE BLOCK 16 |
| 11. AS OF DATE |
| 13. DATE IF SUBSEQUENT SUBM. |
A
| 16. REMARKS |
| NAWCTSD TPOC |
| 1 |
1. BLK 4: DELETE ALL PARAGRAPHS EXCEPT 3.3.1-3.3.5, 3.3.7.4, 3.4.1.7, 3.4.1.9, 3.4.1.12, 3.4.2, AND 3.4.3.1.
2. BLK 13: SUBMISSION SHALL BE DELIVERED NLT TEN (10) WORKING DAYS AFTER THE CONCLUSION OF PILOT EVENT.
3. BLK 14: SUBMISSION SHALL BE IN MICROSOFT OFFICE (WORD) 2010 OR LATER. SUBMISSION SHALL BE POSTED TO THE CONTRACTOR ONLINE MANAGEMENT SYSTEM. AN E-MAIL INDICATING THE SUBMISSION IS READY FOR GOVERNMENT REVIEW SHALL BE SENT TO DESIGNATED ADDRESSES, INDICATE THE DATE THE GOVERNMENT REVIEW COMMENCES, AND INCLUDE NAWCTSD FORM 4330 WITH THE APPROPRIATE INFORMATION FILLED IN. THE CONTRACTOR SHALL PROVIDE THE GOVERNMENT WITH AT LEAST ONE DAYS NOTICE PRIOR TO THE BEGINNING OF THE GOVERNMENT REVIEW PERIOD. EMAIL ADDRESSES ARE IN SECTION F OF THE CONTRACT SCHEDULE.FOR THE SUBMISSION. THE GOVERNMENT WILL HAVE 10 WORKING DAYS FOR REVIEW AND APPROVAL/ACCEPTANCE/REJECTION.
4. CONTRACTOR INCORPORATION OF GOVERNMENT COMMENTS SHALL BE WITHIN 5 WORKING DAYS OF RECEIPT OF COMMENTS IF REJECTED.
5. ACCEPTANCE OF CHANGES IN CONTRACT REQUIREMENTS/STANDARDS/SPECIFICATIONS DOES NOT CONSTITUTE GOVERNMENT AGREEMENT TO THOSE CHANGES. ONLY BY DIRECTION OF THE CONTRACTING OFFICER CAN SUCH CHANGES BE MADE.
6. THE DISTRIBUTION STATEMENT SHALL BE IAW THE HIGHEST CLASSIFICATION MARKING OF THE SOURCE MATERIAL FOR THE DELIVERABLE:
NAWCTSD PCO
NAWCTSD PJM
| G. PREPARED BY |
| H. DATE |
| I. APPROVED BY |
| J. DATE |
BROOKE DAVIS, RRL FY24 CONTENT CONVERSION TPOC
KELSEY DENOVE, RRL FY24 PROGRAM MANAGER
CONTRACT DATA REQUIREMENTS LIST (CDRL)
(1 Data Item) Form Approved
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
| A. CONTRACT LINE ITEM NO. |
| B. EXHIBIT |
| C. CATEGORY: |
| F |
| TDP ____ |
| TM _____ |
| OTHER MISC |
| D. SYSTEM/ITEM |
| E. CONTRACT/PR NO. |
| F. CONTRACTOR |
RRL FY24 CONTENT CONVERSION
| 1. DATA ITEM NO. |
| 2. TITLE OF DATA ITEM |
| 3. SUBTITLE |
17. PRICE GROUP
| F00B |
| SCIENTIFIC AND TECHNICAL REPORTS |
| PHOTO/GRAPHIC TRACEABILITY CROSS REFERENCE MATRIX |
| 4. AUTHORITY (Data Acquisition Document No.) |
| 5. CONTRACT REFERENCE |
| 6. REQUIRING OFFICE |
18. ESTIMATED
TOTAL PRICE
| DI-MISC-80711A |
| SOW PARA 3.5.2.3 |
| NAWCTSD RRL TSPM |
| 7. DD 250 REQ |
| 9. DIST STATEMENT |
| 10. FREQUENCY |
| 12. DATE OF FIRST SUBMISSION |
| 14. DISTRIBUTION |
| LT |
| REQUIRED |
| ASREQ |
| SEE BLK 16 |
| a. ADDRESSEE |
| b. COPIES |
| 8. APP CODE |
| D |
| 11. AS OF DATE |
| 13. DATE IF SUBSEQUENT SUBM. |
A
| 16. REMARKS |
| NAWCTSD TPOC |
| 1 |
1. BLK 10/12/13: SUBMISSIONS SHALL BE INCREMENTALLY DELIVERED NO LATER THAN 15 WORKING DAYS PRIOR TO PHOTO/GRAPHIC CAPTURE DATA GATHERING TRIPS ARE EXECUTED.
2. BLK 14: SUBMISSIONS SHALL BE IN MICROSOFT OFFICE (WORD OR EXCEL) 2010 OR LATER AND BE POSTED TO THE CONTRACTOR ONLINE DELIVERABLE WEBSITE OR TRANSMITTED ELECTRONICALLY BY EMAIL TO DESIGNATED ADDRESSES. AN E-MAIL INDICATING THE SUBMISSION IS READY FOR GOVERNMENT REVIEW SHALL BE SENT TO DESIGNATED ADDRESSES, INDICATE THE DATE THE GOVERNMENT REVIEW COMMENCES, AND INCLUDE NAWCTSD FORM 4330 WITH THE APPROPRIATE INFORMATION FILLED IN. THE CONTRACTOR SHALL PROVIDE THE GOVERNMENT WITH AT LEAST ONE WORKING DAY NOTICE PRIOR TO THE BEGINNING OF THE GOVERNMENT REVIEW PERIOD. EMAIL ADDRESSES ARE IN SECTION F OF THE CONTRACT SCHEDULE.
3. FOR EACH SUBMISSION THE GOVERNMENT SHALL HAVE 10 WORKING DAYS FOR REVIEW AND ACCEPTANCE/CONDITIONAL ACCEPTANCE/REJECTION. FOR THE FINAL VERSION SUBMISSION, THE GOVERNMENT SHALL HAVE 10 WORKING DAYS FOR THE REVIEW AND ACCEPTANCE/CONDITIONAL ACCEPTANCE/REJECTION.
4. CONTRACTOR INCORPORATION OF GOVERNMENT COMMENTS SHALL BE DUE IN 5 WORKING DAYS OF RECEIPT OF COMMENTS IF ACCEPTED CONDITIONALLY/REJECTED, REGARDLESS OF VERSION SUBMITTED.
5. THE PHOTO/GRAPHIC CAPTURE PREPARATORY CHECKLIST SUBMISSIONS SHALL ADHERE TO REQUIREMENTS IDENTIFIED IN SOW.
6. ACCEPTANCE OF CHANGES IN CONTRACT REQUIREMENTS/STANDARDS/SPECIFICATIONS DOES NOT CONSTITUTE GOVERNMENT AGREEMENT TO THOSE CHANGES. ONLY BY DIRECTION OF THE CONTRACTING OFFICER CAN SUCH CHANGES BE MADE.
7. THE FOLLOWING DISTRIBUTION STATEMENT SHALL BE INCLUDED ON THE DELIVERABLE:
DISTRIBUTION D. DISTRIBUTION AUTHORIZED TO DOD AND U.S. DOD CONTRACTORS ONLY; ADMINISTRATIVE OR OPERATIONAL USE, 24 JUL 2018. OTHER REQUESTS FOR THIS DOCUMENT SHALL BE REFERRED TO NAVAL AIR WARFARE CENTER TRAINING SYSTEMS DIVISION, 12211 SCIENCE DRIVE, ORLANDO, FL 32826-3275.
DESTRUCTION NOTICE - FOR CLASSIFIED DOCUMENTS; FOLLOW THE GUIDANCE FOR DESTRUCTION OF CLASSIFED MATERIAL IN ACCORDANCE WITH 32 CFR 2001.47 AND THE DESTRUCTION EQUIPMENT STANDARDS IN ACCORDANC WITH 32 CFR 2001.42(b). FOR CUI DOCUMENTS; FOLLOW THE GUIDANCE PRESCRIBED BY THE INFORMATION SECURITY OVERSIGHT OFFICE CUI NOTICE 2019-03: DESTROYING CONTRQLLED UNCLASSIFIED INFORMATION (CUI) IN PAPER FORM AND NIST SPECIAL PUBLICATION 800-88. REVISION 1. GUIDELINES FOR MEDIA SANITATION.
NAWCTSD PCO
NAWCTSD PJM
| G. PREPARED BY |
| H. DATE |
| I. APPROVED BY |
| J. DATE |
BROOKE DAVIS, RRL FY24 CONTENT CONVERSION TPOC
KELSEY DENOVE, RRL FY24 PROGRAM MANAGER
DISTRIBUTION STATEMENT A. Approved for public release. Distribution is unlimited.