ESBD_File_349413_Site Visit Notes.pdf

PDF 204 KB Posted

Attached to
IFB 2024-B06 Sentinel Peak - Asbestos Abatement & Building Demolition
Solicitation number
IFB2024-B06
Issued by
Hays County, Texas

About this file

This document is the Site Visit Notes for IFB 2024-B06 Sentinel Peak - Asbestos Abatement & Building Demolition, a solicitation issued by the Hays County Purchasing Office in Texas. The contract seeks bids from qualified, licensed, and experienced General Abatement Contractors to provide labor, materials, and equipment necessary for the permitting, abatement, demolition, removal, and disposal of all structures and debris located at Sentinel Peak. The Site Visit Notes detail the walkthrough of the project site, including the identification of additional concrete pads, confirmation of building inclusion, and clarification on the removal of pipes, trees, showers, and concrete stairs.

The IFB is open to contractors within the jurisdictions of Hays County and the City of San Marcos, Texas. Pricing terms, set asides, incumbents, funding requirements and sources, and other salient information were not provided in the Site Visit Notes document.

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

OFFICE OF THE COUNTY PURCHASING OFFICE

Stephanie Hunt, Purchasing Agent

712 S. Stagecoach Trail, Ste. 1012 San Marcos, Texas 78666

512-393-2267 ● purchasing@co.hays.tx.us

IFB 2024-B06 Sentinel Peak – Asbestos Abatement & Building Demolition

Site Visit Notes February 20, 2024 @ 9:00 AM

Notes:

• Walked all buildings and structures that needed asbestos abatement and demolition.

• Concrete Pads – River Front Area #32, adding two additional pads, will be labeled 32a, 32b, and

32c.

• Building 120, East Campus, HALFF will confirm if this building is included in project and if asbestos survey included all building on the East Campus.

Questions:

1. Are the Pipes around the concrete pads being removed? (Main Camp Area)

• Yes, see Update Attachment A

2. Are we able to remove any trees around the concrete pads to get equipment in? (Main Camp

Area)

• Any trees that the contractor would like to be removed would need to be tagged and

MUST be assessed and approved by Hays County prior to being removed.

3. Shower Removal, are we able to remove the trees around the showers to remove the building?

(River Front)

• See Question 2.

4. Do the concrete stairs to the river being removed?

• No.

5. Do we remove the rock around the concrete pads or is Hays keeping them? If Hays County is keeping do, we leave as is or put in a pile?

• Bid item B06.8 & B06.9 state that the stone is to remain in place.