ESBD_File_349413_Attachment C - Demolition Specifications.pdf

PDF 392 KB Posted

Attached to
IFB 2024-B06 Sentinel Peak - Asbestos Abatement & Building Demolition
Solicitation number
IFB2024-B06
Issued by
Hays County, Texas

About this file

This document is a set of demolition specifications for a state and local contract opportunity from Hays County, Texas to provide asbestos abatement and building demolition services at the Sentinel Peak location.

The contract consists of asbestos abatement and demolition of improvements at Sentinel Peak located at 5800 Farm to Market 32, Fischer, Texas 78623. Key tasks include locating and marking utilities, implementing the erosion control plan, removing building contents, performing asbestos abatement activities, removing designated structures and improvements, restoring the site, and properly disposing of all impacted materials. The contractor must furnish all labor, materials, necessary permits, and equipment to complete the work. Payment will be made on a lump sum basis for the various demolition and site restoration activities.

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

01001 GENERAL REQUIREMENTS

AVO 35090 PAGE 01001-1

01001

GENERAL PROJECT REQUIREMENTS

1.0 GENERAL

1.1 Owner: The "Owner" as referred to in these Specifications is Hays County.

1.2 Site: The Contractor shall limit his work to the area indicated by these Specifications and the asbestos abatement plan included as Attachments B & B-1.

1.3 Project Description: This Contract consists of asbestos abatement and demolition of improvements at Sentinel Peak located at 5800 Farm to Market 32, Fischer, Texas 78623.

1.4 Calendar Day Count: Calendar days shall be counted by the Program Manager or Owner on the basis of the definition set out in the General Conditions.

The calendar day count shall be suspended upon receipt by the Program Manager of a written request for final inspection. The calendar day count shall resume upon receipt by the Contractor of a written list of items necessary to satisfactorily complete the project.

This process shall continue until such time as the project is accepted by the Program Manager and the Owner(s). The calendar day count will not be suspended or otherwise affected by the use of completed portions of "substantial completion" of any of the project.

1.5 Safety Precautions: The Contractor shall comply with all applicable laws including the Occupational Safety and Health Act of 1970, ordinances, rules, regulations and orders of any public authority having jurisdiction for the safety of persons or property to protect them from damage, injury, or loss. The Contractor shall adhere to all health and safety requirements as specified in Section 01060 of these specifications. He shall erect and maintain, as required by existing conditions and progress of the work, all reasonable safeguards for safety and protection, including posting danger signs and other warnings against hazards, promulgating safety regulations and notifying owners and users of adjacent

ATTACHMENT C: Demolition Specifications

AVO 35090 PAGE 01001-2

utilities.

1.6 Conformity with Drawings: All work shall conform to the lines, grades, cross-sections, and dimensions shown on the Drawings. Any deviation from the Drawings which may be required by the exigencies of construction will be determined by the Engineer and authorized by him in writing.

1.7 Stop Work Order: If the work should be stopped or suspended under any order of the court, or other public authority, the Engineer or Owner may at any time during suspension upon seven days written notice to the Contractor, terminate the Contract. In such an event, the Engineer or Owner shall be liable only for payment for all work completed plus a reasonable cost for any expenses resulting from the termination of the Contract, but such expenses shall not exceed $2,000.

1.8 Warning Devices: The Contractor shall provide and maintain all warning devices and take all precautionary measures required by Laws and Regulations to protect persons and property, while said persons or property are approaching, leaving, or on the Site or any area adjacent to the Site. No additional compensation will be paid to the Contractor for the installation or maintenance of any warning devices, barricades, lights, signs, or any other precautionary measures required by Laws and Regulations for the protection of persons or property.

Where the Work is carried on, in, or adjacent to, any street, alley, sidewalk, public right-of-way or public place, the Contractor shall at its own cost and expense provide such flagmen, watchmen, warning devices, barricades, lights, signs and other precautionary measures for the protection of persons or property as are required by Laws and Regulations. The Contractor’s responsibility for providing and maintaining flagmen, watchmen, warning devices, barricades, lights, signs, and other precautionary measures shall not cease until the Project shall have been accepted by Engineer or Owner.

If the Engineer discovers that the Contractor has failed to comply with the applicable Laws and Regulations, the Engineer will notify the Contractor and allow two Days to implement corrective measures. If Contractor fails to implement the corrective measures, the Engineer may, but is under no obligation to, take such additional precautionary measures as required by Laws and Regulations to be taken to protect persons and property, and Contractor shall reimburse Owner for any expense incurred as a result of Engineer’s actions.

In addition, the Contractor will be held responsible for all damages to the Work and other

AVO 35090 PAGE 01001-3

public or private property due to the failure to provide flagmen, watchmen, warning devices, barricades, lights, signs, or other precautionary measures in protecting the property, and whenever evidence is found of such damage, the Engineer may order the damaged portion immediately removed and replaced by and at the cost and expense of the Contractor

1.9 Testing Materials: The Engineer or Owner shall bear the costs of all material testing, except those specified for payment by Contractor, required in the Contract Documents. Testing shall be done by an approved certified laboratory under the supervision of a registered professional engineer. The Contractor will be responsible for costs associated with re-testing materials which originally failed. The Engineer or Owner shall pay for all passing quality control tests with any failing tests paid by the Contractor. If failed tests require additional inspection time, then the Contractor will bear the cost of the additional inspection

1.10 Existing Utilities, Structures and Other Property:

a. Prior to any excavation, the Contractor shall determine the locations of all existing water, gas, sewer, electric, telephone, telegraph, television, and other underground utilities and structures.

b. After commencing the work, use every precaution to avoid interferences with existing underground and surface utilities and structures, and protect them from damage.

c. Where the locations of existing underground and surface utilities and surface utilities and structures are indicated, these locations are generally approximate, and all items which may be encountered during the work are not necessarily indicated. The Contractor shall determine the exact locations of all items indicated, and the existence and locations of all items not indicated.

d. The Contractor shall repair or pay for all damage caused by his operations to all existing utilities, public property, and private property, whether it is below ground or above ground, and he shall settle in total cost of all damage suits which may arise as a result of his operations.

e. To avoid unnecessary interferences or delays, the Contractor shall coordinate locating all utilities with the appropriate utility company as well as all utility removals, replacements and construction.

1.11 Drainage: The Contractor shall maintain adequate drainage at all times. Excavation and stockpile areas shall be bermed to prevent runoff from, or flow into, areas of potentially contaminated soil. Stockpiles shall not block existing drainage. The Contractor shall pump any groundwater from the excavation as necessary to perform construction in a dry condition. Contractor shall comply with all storm water permit requirements, as applicable.

1.12 Staging Area

AVO 35090 PAGE 01001-4

The "Staging Area" will be approved by the Engineer. The "Staging Area" is to be for the temporary storage of demolition debris, Contractor's equipment, tools, and materials and must be established to minimize the extent of possible interferences with the daily operations at the site location. Security of the "Staging Area" is to be the sole responsibility of Contractor.

1.13 Insurance: The Contractor shall not commence Work under this Contract until it has obtained all the insurance required hereunder and reasonable proof of such insurance coverage has been filed with the Engineer.

1.14 Permits & Bonds: The Contractor shall, at its expense, secure or file all permits, notices, licenses, or notifications required for the completing of the asbestos abatement and demolition under this Project.

1.15 Ambiguity: In case of ambiguity or lack of clarity in prices in the Bid Proposal Form, the

Engineer reserves the right to make the most advantageous construction thereof to the Engineer that is reasonably inferable from the Bid Proposal Form, or other Contract Documents.

1.16 Nondiscrimination: The Contractor shall not discriminate against any employee or applicant for employment because of race, age, color, religion, gender, ancestry, national origin, or place of birth. The Contractor shall take affirmative action to ensure that applicants are employed, and that employees are treated during employment, without regard to their race, age, color, religion, gender, ancestry, national origin or place of birth.

This action shall include, but is not limited to, the following: employment, upgrading, demotion or termination; rates of pay or other forms of compensation; and selection for training, including apprenticeship. The Contractor agrees to post in conspicuous places, available to employees and applicants, notices to be provided by the Engineer setting forth the conditions of this nondiscrimination clause.

The Contractor shall in all solicitations or advertisements for employees placed by or on behalf of the Contractor, state that all qualified applicants will receive consideration for employment without regard to race, age, color, religion, sex, ancestry, national origin, or place of birth.

The Contractor shall furnish all information and reports required by the Owner or Engineer to investigate Contractor’s payroll and personnel records, which pertain to the Contract with the Engineer for purposes of ascertaining compliance with this nondiscrimination clause.

The Contractor shall file compliance reports with the Engineer, as may be required by the Owner. Compliance reports must be filed within the time, must contain information as to the employment practices, policies, programs, and statistics of the Contractor, and must be in the form that the Engineer prescribes.

AVO 35090 PAGE 01001-5

1.17 Subsidiary Work: Any and all Work required to complete the Project, in which no specific item for Proposal has been provided for in the Proposal, shall be considered as a subsidiary item of Work, the cost of which shall be included in the Proposal, for each Proposal item. By way of example and not by way of limitation, surface restoration and clean up are general items of Work which fall in the category of subsidiary Work.

1.18 Release of Lien: As a condition to payment, the Contractor shall be required to provide releases of all liens (whether due to the actions of Contractor, Subcontractor, Supplier or other persons and organizations performing or furnishing any of the Work under a direct or indirect contract with Contractor) in a form acceptable to Engineer or Owner.

1.19 Payment: Payment for Work completed will be on a monthly basis. The Contractor shall submit monthly payment requests, for each Project Area, in a detailed format satisfactory to the Engineer. Ten percent (10%) may be retained in accordance with the Agreement.

1.20 Utilities for Construction: All utilities required for demolition and remediation will be furnished by the Contractor at its own expense.

1.21 Work on Sundays & Holidays: When Work is to be performed on Sundays and Holidays, the Contractor must request the permission of the Engineer at least 48 hours in advance.

Any additional costs associated with Work on these Days shall be borne by the Contractor.

2.0 PRODUCTS

Not Used.

3.0 EXECUTION

4.0 PAYMENT

There shall be no measurement or payment for any Work required in this Section. The Contractor shall include any costs for actions or Work described in this Section in its Bid for other pay items.

END OF SECTION

01004 DISPOSAL FACILITY LISTING

AVO 35090 PAGE 01004-1

01004

DISPOSAL FACILITY LISTING

1.0 GENERAL

1.1 PROPOSAL

A. Contractor shall provide the information requested below for the off-Site treatment/disposal facilities, which shall be pre-approved by Client for waste removed from the Project Site. Facilities actually used must be approved by the Client.

B. Provide all information requested. Attach additional sheets as required.

1.2 FACILITY

A. Facility name, EPA Identification Number and Texas Commission on

Environmental Quality (“TCEQ”) Identification Number.

B. Facility Address.

C. Name of responsible contact for the facility.

D. Telephone number of contact.

E. Waste material for which the facility will be utilized.

In addition to the above information for each facility, the Contractor shall include the following information for each.

A. A listing of all permits, licenses, letter of approval, and other authorizations to operate held by the facility, concerning the receipt and management of wastes derived from this Contract.

B. Specify and describe the unit(s) at the facility that you propose to use to manage hazardous waste and provide dates of construction and beginning of use.

Drawings may be provided. Identify the capacity available in the units and the capacity reserved for the subject waste.

C. Provide the date of the facility’s last compliance inspection under Resource

Conservation and Recovery Act (“RCRA”), Toxic Substances Control Act (“TSCA”) and other Laws and Regulations.

01004 DISPOSAL FACILITY LISTING

AVO 35090 PAGE 01004-2

D. Identify and provide copies of all orders (or agreements), enforcement notices, or notices of violation issued to the facility. State the source and nature of the cause of contamination.

E. Provide proof that the facility meets licensing and financial responsibility requirements.

F. Update the above information promptly as new information becomes available.

If the Contractor desires to use a different disposal facility than identified above, the Contractor must re-submit all information requested in Section 01004.

3.0 EXECUTION

Not Used.

4.0 PAYMENT

There shall be no measurement or payment for any Work required in this Section. The Contractor shall include any costs for actions or Work described in this Section in its Bid for other pay items.

01005 TRANSPORTER LISTING

AVO 35090 PAGE 01005-1

01005

TRANSPORTER LISTING

1.1 PROPOSAL

A. The Contractor shall provide the information requested below for transporters, reviewed and pre-approved by Client, for transport of the waste removed from the Project Site to the storage, treatment, or disposal facilities.

B. Provide all information requested. Attach additional sheets as required.

1.2 TRANSPORTERS

A. Name, EPA Identification Number, and TCEQ Identification Number.

B. Transporter address.

C. Name of responsible contact for the transporter.

D. Telephone number of contact.

E. List of types and sizes of all vehicles and equipment to be used, noting the type of waste material to be handled by each type of equipment.

F. Provide proof of liability insurance.

G. List all permits and licenses to transport each type of waste proposed to be transported by each transporter.

There shall be no measurement or payment for any Work required in this Section. The Contractor shall include any costs for actions or Work described in this Section in its Bid for other pay items.

01010 SUMMARY OF WORK

AVO 35090 PAGE 01010-1

01010

SUMMARY OF WORK

This section summarizes the scope of work for this project. It presents as an overview of tasks which must be completed. See subsequent specifications for task details.

The work covered under this contract will be performed at Sentinel Peak located at 5800 Farm to Market 32, Fischer, Texas 78623.

2.0 PROJECT DESCRIPTION

The work objectives are to demolish the buildings, structures, and improvements indicated in the Asbestos Survey Report (Attachment B), perform demolition operations according to the Demolition Specifications (Attachment C), and properly dispose of impacted materials. This project is designed to achieve the objective as outlined in the following tasks:

A. Conduct preliminary meetings.

B. Locate and mark all utilities in conjunction with utility companies

C. Mobilize, provide barricades, and materials required for security

D. Implement the erosion control plan.

E. Remove all building contents, and all combustible and biodegradable materials and dispose off-Site.

F. Perform and coordinate asbestos abatement activities with the Engineer.

G. Remove designated structures, buildings, concrete foundations, all surface cover.

Provide sheeting, shoring, and/or bracing as required to protect utilities, adjacent properties, and public roadways.

H. Install temporary fencing as required.

I. Restore Site.

The work requires the contractor to furnish all labor, materials, necessary permits, and equipment for each task.

3.0 WORK OF THIS CONTRACT

01010 SUMMARY OF WORK

AVO 35090 PAGE 01010-2

The work to be performed under this contract is summarized as follows:

A. UTILITY RELOCATIONS/REMOVALS

The Contractor will locate and mark all Underground and Surface Facilities in conjunction with the utility companies. The Underground, Overhead, and Surface Facilities (Facilities) locations identified on the Drawings are for information purposes only and are approximate. The Contractor will assume responsibility for actual field location, protection, shoring, sheeting, bracing, repair, relocation, and costs of all existing Facilities, whether shown or not, associated with the work.

Prior to beginning demolition/remediation in the vicinity of existing Facilities, the Contractor will notify utility companies to request the marking of the location of Facilities owned by such utility companies. The Contractor shall also request the utility owners to perform severance/termination of utility service when required.

Contractor will coordinate utility outages with the Engineer, and Client as applicable.

B. ASBESTOS ABATEMENT

Abatement of asbestos containing materials (“ACM”) will be required as specified in Attachments B & B-1 of the Specifications.

C. DEMOLITION ACTIVITIES

Demolition will be require as specified in Attachment C. Reference Attachment D for the Architectural & Structural Assessment. The following will require demolition per the Drawings:

i. Building #1.4 Bathhouse 1

ii. Building #1.5 Outbuilding 1 – Staff Cabin

iii. Building #1.14 Outbuilding 6 – Adult Showers Building

iv. All slabs, retaining walls, pits/subsurface features, footings, pedestals, and pilings.

v. #1.16 Wood Decks (approx. 36 of various sizes)

vi. #1.27 Various Concrete Pads (23 Total)

vii. #1.29-1.35 Various Concrete Pads & Retaining Walls along river.

viii. Backfill all disturbed areas below ground surface to prevent ponding of water.

Contractor shall include any costs for actions or Work described in this Section in its Bid for other pay items.

01014 WORK SEQUENCE

AVO 35090 PAGE 01014-1

01014

WORK SEQUENCE

The sequence of work presented in this section is provided as general guidance to the Contractor for scheduling the work and preparing the construction schedule (see Section 01310).

2.0 DESCRIPTION

Activities shall be performed by Contractor or subcontractor as specified in the plans and specifications. The following General sequence of work shall be followed unless alternate sequencing is approved by the Engineer in writing.

A. Inspect site to obtain overall understanding of all work required to complete work.

B. Ensure work specified to be completed by others has been performed.

C. Locate and mark all Underground, Overhead, and Surface Facilities in conjunction with utility companies.

D. Obtain or submit all necessary permits, authorizations, notifications, and licenses for the Project. Install barricades and erosion control, establish access routes, and perform required pre-demolition/remediation activities.

E. Install temporary facilities for the Project field offices and utilities, if required.

F. The Contractor shall request the utility owners to perform severance/termination of utility service to the buildings/structures to be demolished. The Contractor shall be responsible for all utility termination fees.

G. Install storm water pollution prevention controls.

H. Perform asbestos abatement operations.

I. Contractor to determine work sequence from this point forward to determine the most efficient and cost effective sequence.

J. Clean up, remove equipment from Site, and final Site grading.

01014 WORK SEQUENCE

AVO 35090 PAGE 01014-2

Contractor shall submit, for approval, a Work plan detailing the procedures, time and manpower required to complete the Work specified in Part 2.0 above. The Work plan will also detail the Contractor’s proposed work sequence for Engineer’s approval. Contractor shall ensure that all activities are completed in coordination with the above Work sequence so as to minimize cost to the Owner.

4.0 MEASUREMENT AND PAYMENT

There shall be no measurement or payment for any Work required in this Section. The Contractor shall include any costs for actions or Work described in this Section in its Bid for other pay items.

01026

UNIT PRICES

A. This Section specifies administrative and procedural requirements for Unit Price Work.

B. The Unit Price proposed by a Bidder and stated on the Bid Form will be added to or deducted from the Contract Sum by Change Order, if estimated quantities of Work are increased or decreased.

C. Refer to individual Sections for activities requiring establishment of Unit Prices.

Methods of measurement and payment for unit prices are specified in those Sections.

D. The Engineer will check average transported quantities, waste manifests, etc., required to determine pay quantities. This activity will take place and be documented daily and on a weekly basis. Contractor shall sign documentation to evidence agreement with the payment quantities.

2.0 PAYMENT

Measurement and Payment: There shall be no measurement or payment for any Work required in this Section. The Contractor shall include any costs for actions or Work described in this Section in its Bid for other pay items.

01026 UNIT PRICES

AVO 31856 PAGE 01026-1

01060 HEALTH AND SAFETY

AVO 35090 PAGE 01060-1

01060

HEALTH AND SAFETY

This section specifies health and safety requirements which must be adhered to throughout the project.

Contractor has full responsibility for site safety and the safety of its employees and uninvolved parties. The Contractor shall prepare a Health and Safety Plan for his project operations to be submitted to Engineer for review. Contractor shall be responsible for providing protection for its field personnel, including necessary safety equipment. This, however, does not release Contractor from responsibility for providing protection for Contractor's field personnel and complying with all associated health and safety requirements.

A. SAFETY AND HEALTH REGULATIONS

Concentrations of total petroleum hydrocarbons, volatile organic compounds, semi volatile organic compounds and metals identified in soil samples were below regulatory cleanup levels for this site. Other constituents, such as emissions associated with construction equipment exhaust, may be encountered by the Contractor while present in the work area. The Contractor shall be solely responsible for determining/removing the concentration of these other constituents and/or organic vapors in the work area prior to or during construction activities. In performing the work, Contractor shall, as a minimum, satisfy all federal, state and local statutes, regulations, and ordinances regarding health and safety including, but not limited to, 29 CFR Part 1926 Subpart T – Demolition Standards and 29 CFR

1910.120 OSHA Hazardous Waste Operations and Emergency Response, Final Rule, U.S. Department of Labor, Occupational Safety and Health Administration.

Excavations over four feet deep shall be tested before entry to assure acceptable atmospheric conditions exist. The Contractor shall satisfy all provisions of 29 CFR 1926, OSHA Occupational Safety and Health Standards - Excavations; Final Rule.

B. RESPONSIBILITIES

The Contractor shall appoint an on-site Health and Safety Coordinator that shall be present during all operations involving impacted media, or other health and safety related matters.

The Contractor and Contractor's project superintendents directly involved in the demolition and abatement activities shall be responsible for monitoring the execution of safe work practices.

01060 HEALTH AND SAFETY

AVO 35090 PAGE 01060-2

C. AIR MONITORING PROGRAM/RESPIRATORY PROTECTION

The Contractor shall be responsible for the reduction of dust, particulate matter, or other airborne contaminants so as to provide suitable and safe working conditions and prevention of off-Site migration of airborne matter and comply with all applicable local, state and federal Laws and Regulations.

The Contractor shall comply with all applicable local, state and federal Laws and Regulations concerning the prevention and control of air pollution. In conducting demolition and abatement activities and the operation of equipment, the Contractor shall utilize such practicable methods and devices as are reasonably available to control, prevent, and otherwise minimize atmospheric emissions or discharges of air contaminants.

The Contractor shall provide all labor, equipment, and materials including water, and shall use efficient methods wherever and whenever required to prevent dust, nuisance, or damage to persons or property.

The Owner has the authority to stop any and all activities contributing to airborne contaminants, which are excessive or in violation of applicable local, state and federal Laws and Regulations. All expenses resulting from such a work stoppage shall be the responsibility of the Contractor.

The Contractor will provide all recorded information pertaining to on-Site air monitoring results in the Site health and safety plan for review by Engineer.

All work shall be performed according to health and safety requirements as described in this section.

Payment for all work covered by this section shall be made under the various proposal items established in the Proposal Form, which items shall include all materials, labor, equipment, and all other costs in connection therewith. The specific method of measurement and payment for shall be as follows:

Proposal Item No. 2: Measurement for payment for Site Safety and Health Plan, Site

Safety will be paid for as the lump sum price identified in the Base Proposal item upon completion and after Engineer approval.

Payment shall be at the lump sum price.

01300 SUBMITTALS

AVO 35090 PAGE 01300-1

01300

SUBMITTALS

This section describes the Contractor requirements for transferring required information to the Owner or Owner's representative.

Where required by the plans and/or specifications, the Contractor shall submit descriptive information which will enable the Engineer to advise the Owner whether the Contractor's proposed materials and equipment are in general conformance to the design concept and in compliance with that specified. The information to be submitted shall consist of drawings, specifications, descriptive data, certificates, samples, test results, and such other information, all as required in the plans and specifications. In some instances, specified submittal information describes some, but not all, features of the material, equipment, or method of work. Features not requiring submittals shall be as specified.

A. CONTRACTOR'S RESPONSIBILITIES

Contractor shall be responsible for the accuracy and completeness of the information contained in each submittal and shall assure that the material and equipment shall be as described in the submittal. The Contractor shall verify that all features of all submitted information conform to the specified requirements. The Contractor shall ensure that there is no conflict with other submittals and notify the Engineer in each case where his submittal may affect the work of another Contractor or the Owner.

A. GENERAL

Submittals shall be clearly labeled with the project name, and specification section name and number. Three copies of each submittal shall be transmitted in one package to the Engineer at the following address:

Halff Associates, Inc.

Attn: Kari Biddix 13620 Briarwick Drive, Ste. 100 Austin, Texas 78729

Facsimiles of submittals are not acceptable.

B. DEVIATION FROM CONTRACT:

AVO 35090 PAGE 01300-2

If the Contractor proposes to provide materials, equipment or method of work which deviates from that specified in the agreement, he shall indicate so under "deviations" on the transmittal form accompanying the submittal copies.

C. SUBMITTAL COMPLETENESS:

Submittals which do not have all the information required to be submitted, including deviations, are not acceptable and will be returned.

D. REQUIRED INFORMATION:

The review procedure is based on the Contractor's guarantee that all features and characteristics not requiring submittals conform as specified. Review shall not extend to means, methods, techniques, sequences or procedures of construction, or to verifying quantities, dimensions, weights or gages, or fabrication processes (except where specifically indicated or required by the agreement), or to safety precautions or programs incident thereto.

In accordance with this specification the Contractor shall submit the following information:

1. Project submittals specified in the Asbestos Survey Report included as

Attachment B;

2. Disposal facility listing;

2. Transporter listing;

3. Work Plan;

4. Health and Safety Plan;

5. Proposed construction schedule;

6. Copies of all permits;

7. Verification of compliance with the trench safety design as specified within the specifications;

8. Trip tickets, charges, and certifications for backfill material;

9. Signed manifests; and

10. Submittals required by specification sections.

Copies of trip tickets and manifests shall be submitted to the Engineer as generated.

For other submittals, if the review indicates that the submittal does not comply with

AVO 35090 PAGE 01300-3

the plans and specifications, copies of the submittal will be marked "REJECTED - SEE REMARKS." Unless otherwise specified, within seven (7) calendar days after receipt of the submittal, Engineer will review the submittal and return one (1) copy of the marked-up reproducible original.

There shall be no measurement or payment for any work required in this section. The Contractor shall include any costs for actions or work described in this section in price bid

01310 CONSTRUCTION SCHEDULE

AVO 35090 PAGE 01310-1

01310

CONSTRUCTION SCHEDULE

This section specifies schedules for planning and monitoring work progress.

The Contractor shall provide a graphic and narrative construction schedule which allows the Engineer to track progression of work throughout the course of the project. Any task requiring three days or more to complete shall be listed.

The schedule shall incorporate but not be limited to the following:

A. Critical path items/tasks for project completion. Identify costs associated with each task.

B. Slack time for items not on the critical path.

C. Constraints on the construction sequence, delivery, material installation, testing, payment dates and other events which may affect construction activities.

D. Personnel and equipment which the Contractor plans to use to complete the work.

The Contractor shall submit a construction schedule as specified in this section. The submittal shall consist of two (2) copies and an electronic copy. Changes to any activity, the completion time, and specified dates and sequencing may be made only if such change is in accordance with the specifications and is approved by the Engineer. Contractor shall receive written approval of construction schedule prior to initiating construction activities.

There shall be no measurement or payment for any actions or work required in this section.

The Contractor shall include any costs for actions or work described in this section in price Bid for other pay items.

01400 CONTRACTOR QUALITY CONTROL

AVO 35090 PAGE 01400-1

01400

CONTRACTOR QUALITY CONTROL

A. REQUIREMENTS OF CONTRACTOR:

1. Description: Maintain quality control over supervision, Site conditions, Suppliers, manufacturers, products, services, workmanship, and Subcontractors, to produce Work in accordance with Contract Documents.

2. Contractor quality control of products and workmanship.

B. RELATED DOCUMENTS AND SECTIONS OF SPECIFICATIONS:

1. Section 01300 – Submittals

2. Other Documents and Sections as applicable

C. QUALITY CONTROL PLAN:

D. SUBMISSION DETAILS

1. Five Days prior to beginning demolition and asbestos abatement activities, the Contractor shall submit to the Engineer for approval, the quality control plan with which the Contractor intends to maintain quality control during progress of the Work. The plan shall identify personnel, and establish procedures, instructions, records, and forms to be used. An approved quality control plan is required for the Contractor to mobilize to the Site. The Engineer may withhold funds from progress payments until such time as an acceptable quality control plan is submitted.

2. The quality control plan shall include as a minimum, the following:

i. A description of Contractor’s control organization, including a chart showing lines of authority, and acknowledgment that the staff shall conduct inspections for all aspects of the Work specified, and shall report to the Project Manager or someone higher in the Contractor’s organization.

ii. The name, qualifications, responsibilities, and authority of each person assigned a quality control function.

iii. A copy of the letter to the quality control manager signed by an authorized official of the Contractor, which describes the

AVO 35090 PAGE 01400-2

responsibility and delegates authority to the quality control manager.

iv. Procedures for scheduling and managing submittals, including those of Subcontractors, fabricators, Suppliers, and purchasing agents.

v. Control procedures to be promulgated.

3. The acceptance of the Contractor’s quality control plan by the Engineer is required prior to the start of demolition and asbestos abatement.

Acceptance is conditional, and its continuation will depend on satisfactory performance by Contractor during demolition and asbestos abatement.

The Engineer reserves the right to require Contractor to make changes in the quality control plan and operations, as necessary to obtain the quality specified, at no additional cost to Engineer.

E. Notification of Changes: After acceptance of the quality control plan, the

Contractor shall notify Engineer in writing of any proposed change, which will be subject to acceptance by Engineer.

F. QUALITY CONTROL ORGANIZATION

G. Quality Control Manager: Contractor shall name an individual, within its organization, who will be responsible for overall management of the quality control at the Project Site, and who will have authority to act in all quality control matters for the Contractor. The quality control manager shall have a minimum of four years of experience in demolition quality control on a job of similar size and budget. The sole responsibility of the quality control manager is to insure compliance with the Contract. This person shall demonstrate the ability to perform the required duties to the satisfaction of the Engineer, and shall be physically at the Site whenever Work is in progress during demolition and asbestos abatement.

H. Personnel: Contractor shall hire, as may be required, and maintain under direction of the quality control manager a staff to perform all quality control activities. The staff shall be qualified by experience and technical training to perform their assigned duties. The number of staff during any specific work period may vary to cover work needs and specific inspection requirements.

2.0 IMPLEMENTATION OF THE QUALITY CONTROL PLAN.

A. General

AVO 35090 PAGE 01400-3

1. Comply with national industry standards except when more restrictive tolerances or specified requirements indicate more rigid standards or more precise workmanship.

2. Provide qualified personnel to produce work of specified quality.

3. Secure, protect, and maintain products and Work completed or in progress from damage during the progress of remaining Work.

B. Preparatory Inspection: The Contractor shall perform a preparatory inspection prior to beginning Work on any definable segment of Work. It shall include a review of Contract requirements; a check to assure that all materials and/or equipment are on hand, and have been tested, submitted and approved; a check to assure that provisions have been made to do required control testing; examination of the Work area to ascertain that all preliminary Work has been completed; and a physical examination of materials, equipment and sample Work to assure that they conform to approved Shop Drawings or submittal data. Contractor shall instruct each contributing worker as to the acceptable level of workmanship required in order to meet the requirements of the Contract.

C. Initial Inspection: The Contractor shall perform an initial inspection as soon as a representative portion of the particular segment of Work has been accomplished, and shall include examination of the quality of workmanship and materials, a review of control testing for compliance with Contract requirements, and inspection for omissions and dimensional requirements. The inspection shall be made a matter of record in the quality control documentation.

D. Follow-up Inspections: The Contractor shall perform a follow-up inspection regularly to assure continuing compliance with Contract requirements, including control testing, until Final Completion of the particular segment of Work. Such inspection shall be made a matter of record in the quality control documentation.

Deficiencies shall be corrected prior to acceptance of segments of the Work.

E. Complete Inspection: Upon Final Completion of all Work or any segment thereof, the Contractor shall conduct a completion inspection of the Work and develop a “punch list” of items, which do not conform to the approved Contract Documents. Such a list shall be included in the quality control documentation and shall include the estimated date by which the deficiencies will be corrected. The Contractor shall make a second completion inspection to ascertain that all deficiencies have been corrected, and so notify the Engineer. The completion inspection and any deficiency corrections required by this paragraph shall be accomplished within the time stated for completion of the Work, or any particular segment thereof, if the Work is divided into any segments with separate completion dates.

AVO 35090 PAGE 01400-4

F. Documentation: Contractor shall maintain current records of quality control operations, activities and tests performed including the Work of Suppliers and Subcontractors. These records shall be on an acceptable form and shall indicate a description of the trades working on the Project, the number of personnel working, weather conditions encountered, any delays encountered, and acknowledgment of deficiencies noted along with corrective actions taken on current or previous deficiencies.

G. Notification of Non-Compliance: Engineer will promptly notify the Contractor in writing of any observed noncompliance with requirements of this Section by the Contractor. If the Contractor fails or refuses to comply promptly, Engineer, at its discretion, may issue an order stopping all or part of the Work until satisfactory corrective action is taken. No part of the time lost due to any such stop Work orders shall be made the subject of claim for extension of time, or for extra compensation costs or damages by the Contractor.

3.0 PRODUCTS

4.0 EXECUTION

5.0 MEASUREMENT AND PAYMENT

01540 Security

AVO 35090 PAGE 01540-1

SECURITY

A. Requirements Included: Contractor shall provide on-Site security required to maintain a safe Work Site. Specific requirements include:

1. Entry control

2. Site security perimeter fence

3. Personnel identification

4. Security personnel

5. Security emergencies

B. Related Documents and Sections of Specifications:

1. Section 01010 – Summary of Work

2. Section 01590 – Mobilization

3. Section 01720 – Record Documents 4, Other Documents and Sections as applicable

C. Submittals:

1. Site Security Plan: Contractor shall submit a Site security plan, covering all phases of the Contract, for review and approval by Engineer.

2. The Site security plan shall include procedures by which to restrict and/or control financial losses to the Owner, Engineer, and/or Contractor due to theft, embezzlement, vandalism, sabotage, and/or arson.

3. The Site security plan shall include an on-Site organization chart and procedures to implement security directives of the health and safety plan.

A. Entrance Control: Control of all persons and vehicles entering and leaving the Site shall be provided by the Contractor during the Site demolition activities. The Contractor shall exclude from the Site, personnel not properly identified. The Contractor shall:

01540 Security

AVO 35090 PAGE 01540-2

1. Maintain a current list of accredited personnel and submit a copy of the list to the Engineer.

2. Require a display of proper identification by each person.

3. Require personnel to sign in upon entering the Site and to sign out when leaving.

4. Maintain a log of all vehicles entering and leaving the Site.

B Entrance Gates: The Contractor is responsible for the repair and maintenance of the entrance gates at the Site.

1. Site Security: The Contractor is responsible for the security of all equipment, vehicles, field offices, sheds, and facilities.

2. Security Personnel

- The Contractor shall provide sufficient security personnel to accomplish the Specifications.

- The Contractor shall ensure that all security personnel have been made aware of the Site hazards and provided with the training and medical examination requirements as required to perform the Work.

- The Engineer shall have the right of approval and rejection of the security personnel assigned to the Site at any time during Contractor’s activities.

3. Security Emergencies: The Contractor shall coordinate with local law enforcement officials (e.g., police/sheriff, highway patrol, emergency medical corps units, fire department, and utility emergency teams) to map out contingency plans for any emergency situation.

4.0 - MEASUREMENT AND PAYMENT

01560 ENVIRONMENTAL CONTROLS

AVO 35090 PAGE 01560-1

01560

ENVIRONMENTAL CONTROLS

This section specifies environmental considerations for the Contractor, including site maintenance, air/odor emissions, noise, and traffic control.

A. SITE MAINTENANCE

The Contractor shall keep the site clean and free from rubbish and debris resulting from his operation. Materials and equipment shall be removed from the site when they are no longer necessary. Upon completion of the work and before final acceptance, the work site shall be cleared of equipment, unused materials, and rubbish to present a clean and neat appearance.

B. AIR POLLUTION CONTROL

The Contractor shall not discharge smoke, dust, and other pollutants into the atmosphere that violate the regulations or any legally constituted authority.

Contractor shall not discharge construction equipment engine exhaust emission constituents (i.e., organic compounds, carbon monoxide, oxides of nitrogen, etc.)

that may require the use of respiratory protection or that may result in the degradation of air quality in the work area. Contractor shall also abate dust by cleaning, sweeping, and sprinkling with water, or other means as necessary.

Site operations may create odors or emissions that in turn, may create a nuisance.

The Contractor shall take whatever steps are necessary to abate any nuisance including, but not limited to:

1. Maintaining adequate ventilation within demolition area or implementation of other control measures necessary to prevent accumulation of construction equipment engine exhaust emissions within work area.

2. Prevention of surface water run-on and run-off from debris stockpiles.

3. Temporary cessation of operations pending more favorable environmental conditions.

C. NOISE CONTROL

Noise from Contractor's operations shall not exceed limits established by applicable laws or regulations and in no event shall exceed 85 dBA at a distance of 50 feet from

01560 ENVIRONMENTAL CONTROLS

AVO 35090 PAGE 01560-2

the noise source.

D. TRAFFIC CONTROL

Contractor shall control traffic which would otherwise pass through the project site including the demolition area and material staging area. Control shall include barricades, lighting, and traffic detour signs which comply with all state and local regulations and which are acceptable to the Engineer.

Where the Work is carried on or adjacent to any street, alley or public place (including the demolittion area, construction ingress/egress point at the Site, and ingress/egress routes to demolition staging area), the Contractor shall, at his own cost and expense, furnish, erect and maintain such barricades, fences, lights and danger signals, shall provide such watchmen and security, and shall take such other precautionary measures for the protection of persons or property and of the Work as are necessary. All barricades shall be painted in a color that will be visible at night, shall indicate in bold letters thereon the Contractor's name and shall be illuminated by lights from sunset to sunrise. The term lights, as used herein, shall mean flares, flashers, or both. A sufficient number of barricades shall be erected to keep vehicles from being driven on or into any Work under construction or to prevent passers-by or trespassers from entering the project. The Contractor shall furnish watchmen in sufficient number to protect the Work. The Contractor will be held responsible for all damage to the Work or injuries resulting due to failure of barricades, signs, lights and watchmen to protect it, and whenever evidence is found of such damage, the Engineer may order the damaged portion immediately removed and replaced by the Contractor at Contractor's sole cost and expense. The Contractor's responsibility for maintenance of barricades, signs, and lights, and for providing watchmen, shall not cease until the Project has been accepted by the Engineer and Owner.

The Contractor shall conduct work to ensure environmental controls are satisfied as specified in this section.

Contractor shall include any costs for actions or work described in this section in price Bid

01563 – Standard General TPDES Requirement AVO 35090 Page - 1

01590

STANDARD GENERAL REQUIREMENT TPDES REQUIREMENTS

This section includes:

A. Documentation to be prepared and signed by Contractor/Operator before conducting construction operations, in accordance with the Texas Pollutant Discharge Elimination System (TPDES) Construction General Permit Number TXR150000 issued on February 8, 2018 (the Construction General Permit).

B. Implementation, maintenance inspection, and termination of storm water pollution prevention control measures including, but not limited to, erosion and sediment controls, storm water management plans, waste collection and disposal, off-site vehicle tracking, and other appropriate practices specified in the Contract.

C. Review of the Storm Water Pollution Prevention Plan (SWP3) implementation in a meeting with Engineer prior to start of construction.

1.02 DEFINITIONS

A. Commencement of Construction Activities: The exposure of soil resulting from activities such as clearing, grading, and excavation activities, as well as other construction related activities (e.g., stock piling of fill material, demolition).

B. Large Construction Activity: Project that:

1. disturbs five acres or more, or

2. disturbs less than five acres but is part of a larger common plan of development that will disturb five acres or more of land.

C. Small Construction Activity: Project that:

1. disturbs one or more acres but less than five acres, or

2. are part of a larger common plan of development that will disturb at least one acre but less than five acres of land.

D. TPDES Operator:

Operator - The person or persons associated with a large or small construction activity that is either a primary or secondary as defined below:

AVO 35090 Page - 2

Primary Operator – the person or persons associated with a large or small construction activity that meets either of the following two criteria:

(a) the persons have operational control over construction plans and specifications, including the ability to make modifications to those plans and specifications; or the person or persons have day-to-day operational control of those activities at a construction site that are necessary to ensure compliance with a storm water pollution prevention plan (SWP3) for the site or other permit conditions (e.g., they are authorized to direct workers at a site to carry out activities required by the SWP3 or comply with other permit conditions).

Secondary Operator –The person or entity, often the property owner, whose operational control is limited to:

(a) the employment of other operators, such as a general contractor, to perform or supervise construction activities, or

(b) the ability to approve or disapprove changes to construction plans and specifications, but who does not have day-to-day on-site operational control over construction activities at the site.

2.0 PRODUCTS - Not Used

3.1 SITE SPECIFIC STORM WATER POLLUTION PREVENTION PLAN (SWP3)

A. Prepare a SWP3 following Part III of the Construction General Permit and the

Storm Water Management Handbook for Construction Activities issued under City Ordinance Section 47-695(b). If conflicts exist between the Construction General Permit and the handbook, the more stringent requirements will apply.

B. Update or revise the SWP3 as needed during the construction following Part III, Section E of the Construction General Permit.

C. Submit the SWP3 and any updates or revisions to Engineer for review and address comments prior to commencing, or continuing, construction activities.

3.2 CONSTRUCTION SITE NOTICE FOR SMALL CONSTRUCTION ACTIVITY

A. Fill out, sign, and date the Construction Site Notice, Attachment 2 to TPDES

General Permit TXR150000, “Small Construction Site Notice.”

B. Transmit the signed Construction Site Notice to Engineer at least seven days…