Enclosure No. 3_Price Proposal Form.xlsx

XLSX spreadsheet 38 KB Posted

Attached to
Site-Wide Laundry Service
Solicitation number
6-JV79-P-00119-00
Issued by

About this file

This is a Pricing Proposal Form for a Site-Wide Laundry Service contract at Argonne National Laboratory operated by UChicago Argonne, LLC, under RFP No. 6-JV79-P-00119-00. The form contains six pricing schedules with estimated quantities for evaluation purposes only, covering a five-year period from October 1, 2026 through September 30, 2031, consisting of a three-year base period and two option periods.

Schedule One addresses rental services for contractor-owned items including various shirts and pants (cotton/polyester blends, 100% cotton, and flame-resistant materials), lab coats in multiple material compositions, shop towels, face masks, and employee transfer services. Schedule Two covers laundry services for Argonne-owned items with multiple finish types (pressed, rough, and tumble), including lab coats, coveralls, shirts, pants, sweat shirts, towels, scrubs, sheets, jackets, and RFID chip insertion charges. Schedule Three itemizes minor repairs to Argonne-owned items such as button replacement, zipper installation, pocket repairs, hemming, and tailoring with estimated quantities per year. Schedule Four covers lab coat purchases across five material types. Schedule Five establishes replacement costs for contractor-owned items lost or damaged, and Schedule Six defines buy-out costs to provide employees with their uniforms and garments at contract conclusion. The form requires contractors to submit unit prices for all line items across each schedule, with subtotals calculated for the three-year base period and each option period, culminating in a five-year estimated total cost for evaluation.

View the file

Other files

Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Schedule 1-Rental Argonne RFP No. 6-JV79-P-00119-00

ENCLOSURE NO. 3
PRICING PROPOSAL FORM
Schedule One
RENTAL Service (Contractor-Owned Items)
Base Period: October 1, 2026 through September 30, 2029
Garment/ItemChanges Per Week (A)# Weeks Per Year (B)Estimated # of Employees (C)Estimated # Total Changes per year (A x B x C)Unit Price Per ChangeTotal Proposed Cost
65%/35% Cotton/Polyester Shirts & Pants550205,000$ - 0
100% Cotton Shirts & Pants55035087,500$ - 0
FR Shirts & Pants55010025,000$ - 0
18 X 18 Red Print Shop Towels29250n/a14,600$ - 0
Women's Pants/Elastic Waist55010025,000$ - 0
Lab Coat (65/35 Poly/Cotton)25024024,000$ - 0
Lab Coat (100% Cotton)25024024,000$ - 0
Lab Coat (Flame Resistant)25024024,000$ - 0
Lab Coat (Chemical)25012012,000$ - 0
Lab Coat (Flame and Chemeical Resistant)25012012,000$ - 0
Cloth Face Mask550750187,500$ - 0
Employee Transfer20$ - 0
Subtotal:$ - 0
Option One: October 1, 2029 through June 30, 2030
Garment/ItemChanges Per Week (A)# Weeks Per Year (B)Estimated # of Employees (C)Estimated # Total Changes per year (A x B x C)Unit Price Per ChangeTotal Proposed Cost
65%/35% Cotton/Polyester Shirts & Pants550205,000$ - 0
100% Cotton Shirts & Pants55035087,500$ - 0
FR Shirts & Pants55010025,000$ - 0
18 X 18 Red Print Shop Towels29250n/a14,600$ - 0
Women's Pants/Elastic Waist55010025,000$ - 0
Lab Coat (65/35 Poly/Cotton)25024024,000$ - 0
Lab Coat (100% Cotton)25024024,000$ - 0
Lab Coat (Flame Resistant)25024024,000$ - 0
Lab Coat (Chemical)25012012,000$ - 0
Lab Coat (Flame and Chemeical Resistant)25012012,000$ - 0
Cloth Face Mask550750187,500$ - 0
Employee Transfer20$ - 0
Subtotal:$ - 0
Option Two: October 1, 2030 through September 30, 2031
Garment/ItemChanges Per Week (A)# Weeks Per Year (B)Estimated # of Employees (C)Estimated # Total Changes per year (A x B x C)Unit Price Per ChangeTotal Proposed Cost
65%/35% Cotton/Polyester Shirts & Pants550205,000$ - 0
100% Cotton Shirts & Pants55035087,500$ - 0
FR Shirts & Pants55010025,000$ - 0
18 X 18 Red Print Shop Towels29250n/a14,600$ - 0
Women's Pants/Elastic Waist55010025,000$ - 0
Lab Coat (65/35 Poly/Cotton)25024024,000$ - 0
Lab Coat (100% Cotton)25024024,000$ - 0
Lab Coat (Flame Resistant)25024024,000$ - 0
Lab Coat (Chemical)25012012,000$ - 0
Lab Coat (Flame and Chemeical Resistant)25012012,000$ - 0
Cloth Face Mask550750187,500$ - 0
Employee Transfer20$ - 0
Subtotal:$ - 0

Five-Year Total: $ - 0

*Estimated quantities are for proposal evalutation purposes only and do not guarantee that any minimum or maximum dollar amount will be awarded to the Contractor.

RFQ No. 7-KD02-P-00015-00 Pricing Proposal Form

Page &P

Schedule 2-Laundry Svc

Argonne RFP No. 6-JV79-P-00119-00
ENCLOSURE NO. 3
PRICING PROPOSAL FORM
Schedule Two
LAUNDRY Service (Argonne-Owned Items)
Base: October 1, 2026 through September 30, 2029
Garment/ItemType of FinishEstimated Annual UsageUnitUnit PriceTotal Proposed Cost
Lab Coat (100% Cotton)Pressed600Each$ - 0
Lab Coat (65/35 Poly/Cotton)Pressed300Each$ - 0
Lab Coat (flame resistant)Pressed25Each$ - 0
Lab Coat (chemical resistant)Pressed100Each$ - 0
Lab Coat (flame+chemical resistant)Pressed100Each$ - 0
CoverallsRough25Each$ - 0
Shirts, 100% CottonPressed100Each$ - 0
Pants 100% CottonPressed100Each$ - 0
Pants, Dacron/CottonPressed500Each$ - 0
Sweat ShirtsTumble50Each$ - 0
Towels, BathTumble500Each$ - 0
Towels, Hand 12 x 12Tumble600soiled lb$ - 0
Towels, Med 12 x 16Tumble800soiled lb$ - 0
ScrubsPressed150Each$ - 0
Twin SheetsRough1500soiled lb$ - 0
JacketsPressed10Each$ - 0
Insert RFID Chips - 1X Charge50Each$ - 0
Subtotal:$ - 0
Option One: October 1, 2029 through September 30, 2030
Garment/ItemType of FinishEstimated Annual UsageUnitUnit PriceTotal Proposed Cost
Lab Coat (100% Cotton)Pressed600Each$ - 0
Lab Coat (65/35 Poly/Cotton)Pressed300Each$ - 0
Lab Coat (flame resistant)Pressed25Each$ - 0
Lab Coat (chemical resistant)Pressed100Each$ - 0
Lab Coat (flame+chemical resistant)Pressed100Each$ - 0
CoverallsRough25Each$ - 0
Shirts, 100% CottonPressed100Each$ - 0
Pants 100% CottonPressed100Each$ - 0
Pants, Dacron/CottonPressed500Each$ - 0
Sweat ShirtsTumble50Each$ - 0
Towels, BathTumble500Each$ - 0
Towels, Hand 12 x 12Tumble600soiled lb$ - 0
Towels, Med 12 x 16Tumble800soiled lb$ - 0
ScrubsPressed150Each$ - 0
Twin SheetsRough1500soiled lb$ - 0
JacketsPressed10Each$ - 0
Insert RFID Chips - 1X Charge50Each$ - 0
Subtotal:$ - 0
Option Two: October 1, 2030 through June 30, 2031
Garment/ItemType of FinishEstimated Annual UsageUnitUnit PriceTotal Proposed Cost
Lab Coat (100% Cotton)Pressed600Each$ - 0
Lab Coat (65/35 Poly/Cotton)Pressed300Each$ - 0
Lab Coat (flame resistant)Pressed25Each$ - 0
Lab Coat (chemical resistant)Pressed100Each$ - 0
Lab Coat (flame+chemical resistant)Pressed100Each$ - 0
CoverallsRough25Each$ - 0
Shirts, 100% CottonPressed100Each$ - 0
Pants 100% CottonPressed100Each$ - 0
Pants, Dacron/CottonPressed500Each$ - 0
Sweat ShirtsTumble50Each$ - 0
Towels, BathTumble500Each$ - 0
Towels, Hand 12 x 12Tumble600soiled lb$ - 0
Towels, Med 12 x 16Tumble800soiled lb$ - 0
ScrubsPressed150Each$ - 0
Twin SheetsRough1500soiled lb$ - 0
JacketsPressed10Each$ - 0
Insert RFID Chips - 1X Charge50Each$ - 0
Subtotal:$ - 0
Five-Year Total:$ - 0
*Estimated quantities are for proposal evaluation purposes only and do not guarantee that any minimum or maximum dollar amount will be awarded to the Contractor.

Page &P

Schedule 3-Repairs

Argonne RFP No. 6-JV79-P-00119-00
ENCLOSURE NO. 3
PRICING PROPOSAL FORM
Schedule Three
Minor Repairs to Argonne-Owned Items
Base: October 1, 2026 through September 30, 2029
Type of RepairEstimated Quantity per YearUnit PriceTotal Proposed Cost
Replace Buttons300$ - 0
New Zipper on Trousers50$ - 0
New Zipper on Jackets, Windbrakers and Coats5$ - 0
Half Pockets on Trousers25$ - 0
Side Pockets on Trousers25$ - 0
Hip Pockets on Trousers25$ - 0
Lengthen or Shorten Trousers15$ - 0
Repair of Minor Rips or Tears on Trousers, Coats and Windbreakers75$ - 0
Tailoring of waist on trousers150$ - 0
Repair croutch of trousers20$ - 0
Repair or hem cuffs on trousers20$ - 0
Lengthen or shorten sleeves10$ - 0
New waist bands10$ - 0
Repair Jackets cuffs- binding5$ - 0
Button holes - new or rewoven45$ - 0
Subtotal:$ - 0
Option One: October 1, 2029 through September 30, 2030
Type of RepairEstimated Quantity per YearUnit PriceTotal Proposed Cost
Replace Buttons300$ - 0
New Zipper on Trousers50$ - 0
New Zipper on Jackets, Windbrakers and Coats5$ - 0
Half Pockets on Trousers25$ - 0
Side Pockets on Trousers25$ - 0
Hip Pockets on Trousers25$ - 0
Lengthen or Shorten Trousers15$ - 0
Repair of Minor Rips or Tears on Trousers, Coats and Windbreakers75$ - 0
Tailoring of waist on trousers150$ - 0
Repair croutch of trousers20$ - 0
Repair or hem cuffs on trousers20$ - 0
Lengthen or shorten sleeves10$ - 0
New waist bands10$ - 0
Repair Jackets cuffs- binding5$ - 0
Button holes - new or rewoven45$ - 0
Subtotal:$ - 0
Option Two: October 1, 2030 through September 30, 2031
Type of RepairEstimated Quantity per YearUnit PriceTotal Proposed Cost
Replace Buttons300$ - 0
New Zipper on Trousers50$ - 0
New Zipper on Jackets, Windbrakers and Coats5$ - 0
Half Pockets on Trousers25$ - 0
Side Pockets on Trousers25$ - 0
Hip Pockets on Trousers25$ - 0
Lengthen or Shorten Trousers15$ - 0
Repair of Minor Rips or Tears on Trousers, Coats and Windbreakers75$ - 0
Tailoring of waist on trousers150$ - 0
Repair croutch of trousers20$ - 0
Repair or hem cuffs on trousers20$ - 0
Lengthen or shorten sleeves10$ - 0
New waist bands10$ - 0
Repair Jackets cuffs- binding5$ - 0
Button holes - new or rewoven45$ - 0
Subtotal:$ - 0
Five-Year Total$ - 0
*Estimated quantities are for proposal evaluation purposes only and do not guarantee that any minimum or maximum dollar amount will be awarded to the Contractor.

Page &P

Schedule 4-Lab Coat Purchase Argonne RFP No. 6-JV79-P-00119-00

ENCLOSURE NO. 3
PRICING PROPOSAL FORM
Schedule Four
Lab Coats for Purchase
Base: October 1, 2026 through September 30, 2029
Garment/ItemEstimated Quantity per YearUnit PriceTotal Proposed Cost
Lab Coat (Flame Resistant)300$ - 0
Lab Coat (Chemical)300$ - 0
Lab Coat (Flame and Chemical Resistant)300$ - 0
Lab Coat (65/35 Poly/Cotton)300$ - 0
Lab Coat (100% Cotton)300$ - 0
Subtotal:$ - 0
Option One: October 1, 2029 through September 30, 2030
Garment/ItemEstimated Quantity per YearUnit PriceTotal Proposed Cost
Lab Coat (Flame Resistant)300$ - 0
Lab Coat (Chemical)300$ - 0
Lab Coat (Flame and Chemical Resistant)300$ - 0
Lab Coat (65/35 Poly/Cotton)300$ - 0
Lab Coat (100% Cotton)300$ - 0
Subtotal:$ - 0
Option Two: October 1, 2030 through September 30, 2031
Garment/ItemEstimated Quantity per YearUnit PriceTotal Proposed Cost
Lab Coat (Flame Resistant)300$ - 0
Lab Coat (Chemical)300$ - 0
Lab Coat (Flame and Chemical Resistant)300$ - 0
Lab Coat (65/35 Poly/Cotton)300$ - 0
Lab Coat (100% Cotton)300$ - 0
Subtotal:$ - 0
Five-Year Total:$ - 0
*Estimated quantities are for proposal evaluation purposes only and do not guarantee that any minimum or maximum dollar amount will be awarded to the Contractor.

Page &P

Schedule 5-Loss&Dmg Argonne RFP No. 6-JV79-P-00119-00

ENCLOSURE NO. 3
PRICING PROPOSAL FORM
Schedule Five
Replacement Cost to Contractor-Owned Items
Base: October 1, 2026 through September 30, 2029
Garment/ItemEstimated QuantityUnit PriceTotal Proposed Cost
65%/35% Cotton/Polyester Shirts & Pants10$ - 0
100% Cotton Shirts & Pants10$ - 0
FR Shirts & Pants10$ - 0
18 X 18 Red Print Shop Towels10$ - 0
Women's Pants/Elastic Waist10$ - 0
Lab Coat (65/35 Poly/Cotton)10$ - 0
Lab Coat (100% Cotton)10$ - 0
Lab Coat (Flame Resistant)10$ - 0
Lab Coat (Chemical)10$ - 0
Lab Coat (Flame and Chemeical Resistant)10$ - 0
Cloth Face Mask10$ - 0
Subtotal:$ - 0
Option One: October 1, 2029 through September 30, 2030
Garment/ItemEstimated QuantityUnit PriceTotal Proposed Cost
65%/35% Cotton/Polyester Shirts & Pants$ - 0
100% Cotton Shirts & Pants$ - 0
FR Shirts & Pants$ - 0
18 X 18 Red Print Shop Towels$ - 0
Lab Coat (65/35 Poly/Cotton)$ - 0
Lab Coat (100% Cotton)$ - 0
Lab Coat (Flame Resistant)$ - 0
Lab Coat (Chemical)$ - 0
Lab Coat (Flame and Chemeical Resistant)$ - 0
Cloth Face Mask$ - 0
Subtotal:$ - 0
Option Two: October 1, 2030 through September 30, 2031
Garment/ItemEstimated QuantityUnit PriceTotal Proposed Cost
65%/35% Cotton/Polyester Shirts & Pants$ - 0
100% Cotton Shirts & Pants$ - 0
FR Shirts & Pants$ - 0
18 X 18 Red Print Shop Towels$ - 0
Lab Coat (65/35 Poly/Cotton)$ - 0
Lab Coat (100% Cotton)$ - 0
Lab Coat (Flame Resistant)$ - 0
Lab Coat (Chemical)$ - 0
Lab Coat (Flame and Chemeical Resistant)$ - 0
Cloth Face Mask$ - 0
Subtotal:$ - 0
Five-Year Total:$ - 0
*Estimated quantities are for proposal evaluation purposes only and do not guarantee that any minimum or maximum dollar amount will be awarded to the Contractor.

Page &P

Schedule 6-Buy Out

Argonne RFP No. 6-JV79-P-00119-00
ENCLOSURE NO. 3
PRICING PROPOSAL FORM
Schedule Six
Buy-Out Costs
Base: October 1, 2026 through September 30, 2029
Garment/ItemEstimated number of employeesUnit PriceTotal Proposed Cost
Shirts 65/35% Cotton/Polyester20$ - 0
Shirts 100% Cotton350$ - 0
Pants 65/35% Cotton/Polyester20$ - 0
Pants 100% Cotton350$ - 0
Women's Pants/Elastic Waist25$ - 0
FR Shirts100$ - 0
FR Pants100$ - 0
18 X 18 Red Print Shop Towels100$ - 0
Lab Coat (65/35 Poly/Cotton)100$ - 0
Lab Coat (100% Cotton)100$ - 0
Lab Coat (Flame Resistant)100$ - 0
Lab Coat (Chemical)100$ - 0
Lab Coat (Flame and Chemeical Resistant)100$ - 0
Cloth Face Mask300$ - 0
Subtotal:$ - 0
Option One: October 1, 2029 through September 30, 2030
Garment/ItemEstimated number of employeesUnit PriceTotal Proposed Cost
Shirts 65/35% Cotton/Polyester20$ - 0
Shirts 100% Cotton350$ - 0
Pants 65/35% Cotton/Polyester20$ - 0
Pants 100% Cotton350$ - 0
Women's Pants/Elastic Waist25$ - 0
FR Shirts100$ - 0
FR Pants100$ - 0
18 X 18 Red Print Shop Towels100$ - 0
Lab Coat (65/35 Poly/Cotton)100$ - 0
Lab Coat (100% Cotton)100$ - 0
Lab Coat (Flame Resistant)100$ - 0
Lab Coat (Chemical)100$ - 0
Lab Coat (Flame and Chemeical Resistant)100$ - 0
Cloth Face Mask300$ - 0
Subtotal:$ - 0
Option Two: October 1, 2030 through September 30, 2031
Garment/ItemEstimated number of employeesUnit PriceTotal Proposed Cost
Shirts 65/35% Cotton/Polyester20$ - 0
Shirts 100% Cotton350$ - 0
Pants 65/35% Cotton/Polyester20$ - 0
Pants 100% Cotton350$ - 0
Women's Pants/Elastic Waist25$ - 0
FR Shirts100$ - 0
FR Pants100$ - 0
18 X 18 Red Print Shop Towels100$ - 0
Lab Coat (65/35 Poly/Cotton)100$ - 0
Lab Coat (100% Cotton)100$ - 0
Lab Coat (Flame Resistant)100$ - 0
Lab Coat (Chemical)100$ - 0
Lab Coat (Flame and Chemeical Resistant)100$ - 0
Cloth Face Mask300$ - 0
Subtotal:$ - 0
Five-Year Total:$ - 0
*Estimated quantities are for proposal evaluation purposes only and do not guarantee that any minimum or maximum dollar amount will be awarded to the Contractor.

Page &P

Summary ENCLOSURE NO. 3 PRICING PROPOSAL FORM Argonne RFP No. 6-JV79-P-00119-00

TOTALS
Estimate for Schedule OneEstimate for Schedule TwoEstimate for Schedule ThreeEstimate for Schedule FourEstimate for Schedule FiveEstimate for Schedule Six5-YEAR SUBTOTALS
3-YEAR BASE PERIOD$0.00$0.00$0.00$0.00$0.00$0.00$0.00
OPTION PERIOD ONE$0.00$0.00$0.00$0.00$0.00$0.00$0.00
OPTION PERIOD TWO$0.00$0.00$0.00$0.00$0.00$0.00$0.00
ESTIMATED TOTAL
$0.00

Page &P

File details come from the government source that posted it. Updated .