Addendum 1 to RFP No 6-JV79-P-00119-00.doc
DOC document 154 KB Posted
- Attached to
- Site-Wide Laundry Service
- Solicitation number
- 6-JV79-P-00119-00
- Issued by
-
Department of Energy Office of Science
About this file
This is an addendum to a Request for Proposal (RFP No. 6-JV79-P-00119-00) issued by Argonne National Laboratory for site-wide laundry services. The addendum, dated March 20, 2026, confirms that a pre-proposal conference is scheduled for Friday, March 31, 2026, from 9:00 AM to 10:30 AM CT via Microsoft Teams. The conference agenda includes an introduction of ANL personnel, a review of the Statement of Work and RFP requirements, an ANL site map overview, and a question-and-answer session. Interested attendees must notify Jackie Arriaga (arriaga@anl.gov) by 3:00 PM CT on Monday, March 23, 2026, with their full legal name and company name. All questions answered during the pre-proposal meeting will be documented in a subsequent addendum to the solicitation.
The addendum also addresses subcontracting plan requirements. If subcontracting opportunities exist for the Statement of Work, they must be identified in the Small Business and Small Disadvantaged Business Model Subcontracting Plan (Enclosure 2.H.). While this plan is not required to be submitted with the proposal, it will be mandatory from the successful offeror if they are classified as a large business. A sample Small Business Subcontracting Plan (ANL-372, dated January 24, 2025) is included as an enclosure. The subcontracting plan submission requirement does not apply if the successful offeror is a small business concern. All other terms and conditions of the original RFP remain unchanged.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Addendum 5.doc | DOC document | |
| Addendum 4.doc | DOC document | |
| Addendum 3.doc | DOC document | |
| Addendum 2.doc | DOC document | |
| Enclosure No. 2.B._Argonne Statement of Work.doc | DOC document | |
| Enclosure No. 2.C._Appendix C -Fixed Unit Price Schedule.xlsx | XLSX spreadsheet | |
| Enclosure No. 3_Price Proposal Form.xlsx | XLSX spreadsheet | |
| Enclosure No. 2.F._Register of Wage Determination No 2015-5017 Rev 31 12-3-2025.pdf.pdf | ||
| Enclosure No. 4_Evaluation Criteria.docx | DOCX document | |
| Enclosure No. 2.G._Service Contract Act Poster.pdf | ||
| Enclosure No. 1 -RFP Letter and Instructions.docx | DOCX document | |
| Enclosure No. 2._Draft IDTC FP Contract.doc | DOC document | |
| Enclosure No. 2.E._ Low Risk Work by Contractors On The Argonne Site Supplemental Conditions-01-OCT-2024.pdf | ||
| Enclosure No. 2.A._Appendix A-71COM-22-OCT-2025.pdf | ||
| Enclosure No. 2.D._Appendix D8 IP Provisions.pdf | ||
| Enclosure No. 5_ANL-70B Reps and Certs -13-JAN-2025.pdf |
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Jackie Arriaga Subcontracts Procurement Manager
Office of the Chief Financial Officer
Procurement Department
Argonne National Laboratory
9700 South Cass Avenue, Bldg. 201
Lemont, IL 60439
Phone: (630)252-0978 Email: arriaga@anl.gov
March 20, 2026
TO ALL OFFERORS:
Subject:
Pre-Proposal Conference Information and New Enclosure Request for FORMDROPDOWN No. 6-JV79-P-00119-00 Addendum No. 1 Attached herewith for your information and use in preparing your proposal for subject project is Addendum No. 1.
Kindly acknowledge receipt of this Addendum by signing and returning a copy of this letter via email.
Sincerely, Procurement Department
Receipt Acknowledged:
Company:
By:
cc:
File
CF
Addendum No. 1
TO
REQUEST FOR FORMDROPDOWN
6-JV79-P-00119-00
REF Text6 \h
\* MERGEFORMAT
FOR
Argonne National Laboratory
BLDG. 201 OCF
9700 S. Cass Ave.
Lemont, IL 60439
March 20, 2026 This addendum is being issued to modify the subject FORMDROPDOWN as follows:
1. Confirming the Pre-Proposal Conference is scheduled for Friday, March 31, 2023. Please see agenda listed below:
· 9:00am – MS Teams Meeting begins
· 9:00 – 9:15am Introduction of ANL personnel and attendance
· 9:15 – 10:00am Review SOW/Requirements, ANL site map overview, and key RFP information/instructions
· 10:00 – 10:30am Question and Answer Session
· 10:30am Conclude
2. Requesting responses (from any attendees who have not yet notified arriaga@anl.gov) by 3:00 PM CT Monday, March 23, 2026 with the full legal name of attendees, and company name, interested in attending the Pre-Proposal Conference. Procurement will review and confirm availability.
3. Please see optional virtual meeting information/link below for the 9:00 AM to 10:30 AM CT timeslot of the agenda to go over introductions and brief overview of the SOW and RFP requirements.
All questions that Argonne answers during the pre-proposal meeting will be confirmed in writing via an addendum to the solicitation.
Microsoft Teams meeting
Join: https://teams.microsoft.com/meet/23909037429724?p=N9tV9HoD4HBuBa4Eav
Meeting ID: 239 090 374 297 24
Passcode: rD2rk9Vd
Need help? | System reference
Dial in by phone
+1 630-556-7958,,933674544# United States, Big Rock
Find a local number
Phone conference ID: 933 674 544#
For organizers: Meeting options | Reset dial-in PIN
The Laboratory reserves the right to amend the above-mentioned instructions at any time.
4. Small Business and Small Disadvantaged Business Model Subcontracting Plan. If there will be any subcontracting opportunities in performing the Appendix “B” Statement of Work, they shall be identified (Enclosure No. 2.H.) This plan is not required to be submitted with the proposal but will be required from the successful offeror if they are a Large Business. The Laboratory will examine the plan to determine its acceptability. The accepted plan will be included in any resultant contract. The requirement for submittal of a subcontracting plan does not apply if the successful offeror is a small business concern.
A copy of the Sample Small Business Plan is included as Enclosure 2.H., Small Business Subcontracting Plan, ANL-372 (January 24, 2025) to the RFP.
ALL OTHER TERMS AND CONDITIONS OF THE ABOVE REFERENCED RFP REMAIN THE SAME.
Attachments: 1 U. S. Department of Energy laboratory managed by UChicago Argonne, LLC
File details come from the government source that posted it. Updated .