ELINs 2025 for Proposal.xlsx
XLSX spreadsheet 55 KB Posted
- Attached to
- Landfill Maintenance and Repair Services
- Solicitation number
- N4008525R2529
About this file
This is a pricing template spreadsheet for a landfill maintenance and repair services contract with recurring and non-recurring line items spanning a base year and four option years. The template includes detailed Exhibit Line Item Numbers (ELINs) for waste container repairs (including various sizes of dumpsters and compactors), leachate system services, weight scale support, and grounds maintenance services like mowing, vegetation control, and pond maintenance.
The recurring services include maintenance of 200 8CY trash dumpsters, 150 cardboard dumpsters, various roll-off containers, leachate system servicing for 11 units, weight scale technical support, and grounds maintenance for 240 acres. Non-recurring services include wood grinding operations (5,000 tons), yard waste grinding (3,000 tons), concrete crushing (5,000 tons), and various repair services with specified response times. The template also includes provisions for extension of services under FAR 52.217-8 for periods of 1 month, 3 months, or 6 months. All line items require offerors to input unit prices to calculate total costs for each contract period.
View the file
Other files
Show all 31
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BaseYR FFP & IDIQ Line Item 0001 Recurring - Base Option PRICES FOR WASTE CONTAINERS (ANNEX 1502000) - RECURRING PRICE - IN ACCORDANCE WITH SECTION C, SPEC ITEM 3, ELIN A001AA THROUGH A001AJ
| ELIN/Sub ELIN | Description | Qty | U/I | Freq. | Unit Price | Total |
| A001AA | 8 CY Trash Dumpster Recurring Repairs | 200 | EA | $0.00 | ||
| A001AB | 8 CY Cardboard Dumpster Recurring Repairs | 150 | EA | $0.00 | ||
| A001AC | 40 CY Compactor Recurring Repairs | 1 | EA | $0.00 | ||
| A001AD | 40 CY Roll-Off Dumpster Recurring Repairs | 12 | EA | $0.00 | ||
| A001AE | 30 CY Roll-Off Dumpster Recurring Repairs | 12 | EA | $0.00 | ||
| A001AF | 20 CY Roll-Off Dumpster Recurring Repairs | 12 | EA | $0.00 | ||
| A001AG | 8 CY Drop Bottom Dumpster Recurring Repairs | 10 | EA | $0.00 | ||
| A001AH | 6 CY Drop Bottom Dumpster Recurring Repairs | 10 | EA | $0.00 | ||
| A001AJ | 4 CY Drop Bottom Dumpster Recurring Repairs | 3 | EA | $0.00 | ||
| TOTAL RECURRING BASE OPTION YEAR ELINS A001AA thru A001AJ | $0.00 | |||||
| Line Item 0001 Recurring - Base Option |
PRICES FOR RECURRING SERVICES PROGRAM LEACHATE SYSTEMS, & WEIGHT SCALE ANNUAL TECHNICAL SUPPORT (ANNEX 1502000) - RECURRING PRICE - IN ACCORDANCE WITH SECTION C, SPEC ITEM 3, ELIN A001AK THROUGH A001AM
| ELIN/Sub ELIN | Description | Qty | U/I | Freq. | Unit Price | Total |
| A001AK | Recurring Service Program Leachate Systems | 11 | EA | 1 | $0.00 | |
| A001AL | Weight Scale Annual Technical Support | 1 | EA | 1 | $0.00 | |
| A001AM | Start-Up Software & Hardware Support | 1 | LS | 1 | $0.00 | |
| TOTAL RECURRING BASE OPTION YEAR ELIN A001AK THROUGH A001AM | $0.00 | |||||
| Line Item 0001 Recurring - Base Option |
PRICES FOR GROUNDS MAINTENANCE (ANNEX 1503050) - RECURRING PRICE - IN ACCORDANCE WITH SECTION C, SPEC ITEM 3, ELINS A001AN THROUGH A001AW
| ELIN/Sub ELIN | Description | Qty | U/I | Freq. | Unit Price | Total |
| A001AN | Grounds Care | 240 | Acres | 6 | $0.00 | |
| A001AP | Vegetation Control; Fence Line Spraying | 16162 | LF | 2 | $0.00 | |
| A001AQ | Vegetation Control; T&P Site Spraying | 174240 | SF | 2 | $0.00 | |
| A001AR | Clearing Ditches and Brush | 71400 | SF | 1 | $0.00 | |
| A001AS | Storm Water Pond Maintenance | 12 | EA | 1 | $0.00 | |
| A001AT | Leachate Pond Cleaning | 2 | EA | 1 | $0.00 | |
| A001AU | The contractor shall perform annual top down cleaning of the 6802 sq ft brass collection area at landfill (entire facility floor to ceiling and machines) to include sampling field testing and laboratory services at building 978 | 1 | EA | 1 | $0.00 | |
| A001AV | The contractor shall perform annual 8ft down cleaning of the 6802 sq ft brass collection area at landfill (0-8ft. only) to include sampling field testing and laboratory services at building 978 | 1 | EA | 1 | $0.00 | |
| A001AW | Spot Sampling | 6 | LS | $0.00 | ||
| TOTAL RECURRING BASE OPTION YEAR ELINS A002AN THRU A002AW | $0.00 | |||||
| Line Item 0002 Non-Recurring - Base Option |
PRICES FOR NON- RECURRING SERVICES PROGRAM LEACHATE SYSTEMS, WEIGHT SCALE (ANNEX 1502000) & GROUNDS MAINTENANCE (ANNEX 1503050) - NON-RECURRING - IN ACCORDANCE WITH SECTION C, SPEC ITEM 4, ELINS A002AA THROUGH A002AL
| ELIN/Sub ELIN | Description | Est. Qty | U/I | Unit Price | Total | ||
| A002AA | Labor Hours | 500 | HR | $0.00 | |||
| A002AB | Materials and Supplies | 1 | LS | ||||
| A002AC | Grass shall be cut to a height of 3 inches. Mowing and trimming is required including areas maintained outside the fence. Trimming shall be accomplished to ensure vegetation adjacent to fencing, poles, walls, valves, valve boxes and other similar objects is trimmed to a height not to exceed the height of surrounding vegetation. | ||||||
| Prior to mowing or trimming, the Contractor shall remove and appropriately dispose of debris that interferes with the mowing or trimming operation. Vegetation adjacent to fencing, poles, walls, valves, valve boxes and other similar objects shall be trimmed to a height not to exceed the height of surrounding vegetation. Contractor shall have one working day to mobilize and one working day for each 10 acres ordered to complete the work. | 100 | AC | $0.00 | ||||
| A002AD | The contractor shall clear brush. All brush shall be cut to the ground and either mulched or hauled to the New Base Landfill on Piney Green Road. Contractor shall have one working day to mobilize and one working day for each 500 SF ordered. | 50000 | SF | $0.00 | |||
| A002AE | Repair leachate breaks/blowouts and methane gas leaching on all side slopes by adding 6 inches of topsoil to the leaching area and a 10 foot diameter around the leaching area, grass area with sod and keep sod watered for 30 days. Contractor shall have one working day to mobilize and one working day for each repair ordered. | 1000 | SF | $0.00 | |||
| A002AF | Repair settled outer perimeter berms by adding a mounded amount of topsoil (2 foot high x 6 foot wide) to all marked areas and grass repaired berm areas with sod and keep sod watered for 30 days. Contractor shall have one working day to mobilize and one working day for each 1,000 LF ordered. | 1000 | LF | $0.00 | |||
| A002AG | Apply herbicide to areas designated in the task order. Herbicide application shall be in accordance with the Contractor's approved Herbicide Usage Plan. Contractor shall have one working day to mobilize and one working day for each 1,000 LF ordered. | 5000 | LF | $0.00 | |||
| A002AH | Apply herbicide to areas designated in the task order. Herbicide application shall be in accordance with the Contractor's approved Herbicide Usage Plan. Contractor shall have one working day to mobilize. | 1306800 | SF | $0.00 | |||
| A002AJ | The Contractor shall service the Leachate Lines as follows: |
High pressure water cleaning and vacuuming of all debris in 1 cell consisting of 3 Leachate lines; after cleaning perform video inspection of 1 cell consisting of the 3 Leachate lines
| High pressure water cleaning and vacuuming of all debris in 1 Sump Pump riser lines; after clean perform video inspection of 1 Sump Pump riser lines. | 2 | EA | $0.00 | |||
| A002AK | Scales System Maintenance | 1 | LS | $0.00 | ||
| A002AL | Landfill Scale Calibration | 1 | EA | $0.00 | ||
| TOTAL NON-RECURRING BASE OPTION YEAR ELINS A002AA thru A002AL | ||||||
| Line Item 0002 Non-Recurring - Base Option |
PRICES FOR WASTE CONTAINERS, DROP BOTTOMS 4CY, 6CY, 8CY, ROLL-OFFS 20CY, 30CY, 40CY, COMPACTORS 40CY, TRASH & CARDBOARD 8CY (ANNEX 1502000) - NON-RECURRING - IN ACCORDANCE WITH SECTION C, SPEC ITEM 4, ELINS A002AM THROUGH A002AN
| ELIN/Sub ELIN | Description | Est. Qty | U/I | Unit Price | Total |
| A002AM | Labor Hours | 1000 | HR | $0.00 | |
| A002AN | Materials and Supplies | 1 | LS | $0.00 | |
| TOTAL NON-RECURRING BASE YEAR ELINS A002AM thru A002AN | $0.00 | ||||
| Prices for services in accordance with the scope of work as stated in Section C, Spec Iten 4, Non-Recurring preperation of proposals: In response to the Government's Request for Proposal (RFP), the contractor shall submit a Non-Recurring proposal to the KO within ten (10) working days following recipt for each potential task order which includes: 1) a complete list of all tasks necessary to perform the required scope of work, 2) the number of direct labor hours to perform each task and 3) the project quantity and cost of materials and equipment to perform the required scope of work. 4) a minimum of two (2) commercial supplier's quotes to determine fair and responsable pricing. | |||||
| Grand Totals | $0.00 |
Base YR IDIQ Line Item 00010 Non-Recurring - BASE Option: Prices for Non-Recurring Services for Landfill Wood Grinding, Yard Waste Grinding, and Concrete Crushing Operations
| ELINS | PRODUCT NAME | DESCRIPTION EXTENDED | QUANITITY | UNIT OF ISSUE | UNIT OF PRICE | EXTENDED PRICE |
| A002AP | WOOD GRINDING OPERATIONS | The Contractor shall provide all labor management, supervision, tools material and equipment required per Attachment J-1502000-10 and as follows: The contractor shall grind piles of wood debris identified during a site inspection with the Landfill Manager, to include but not limited to plant growth such as tree limbs, stumps, logs, pallets, plywood, dimensional lumber, and wood debris. Activities will include but are not limited to grinder operation, land clearing of waste and hauling chips off site. | 5000 | TON | $0.00 | |
| A002AQ | YARD WASTE GRINDING OPERATIONS | The Contractor shall provide all labor management, supervision, tools material and equipment required per Attachment J-1502000-10 and as follows: The contractor shall grind piles of yard waste identified during a site inspection with the Landfill Manager, to include but not limited to leaves, pine straw, yard clippings, small limbs, and yard debris. Activities will include grinder operation, yard waste shall be grinded on site and remain at that location for government use. | 3000 | TON | $0.00 | |
| A002AR | CONCRETE CRUSHING OPERATIONS | The Contractor shall provide all labor management, supervision, tools material and equipment required per Attachment J-1502000-10 and as follows: The Contractor shall crush piles of concrete debris identified during a site inspection, to include but not limited to: brick, block, concrete slabs, concrete pilings, concrete culvert and various other types of concrete debris. Crushed debris will remain on site for government use. | 5000 | TON | $0.00 | |
| TOTAL | $0.00 |
1st Yr Option FFP & IDIQ Line Item 0003 Recurring - FIRST OPTION PRICES FOR WASTE CONTAINERS (ANNEX 1502000) - RECURRING PRICE - IN ACCORDANCE WITH SECTION C, SPEC ITEM 3, ELIN B003AA THROUGH B003AJ
| Description | Qty | U/I | Freq. | Unit Price | Total | |
| B003AA | 8 CY Trash Dumpster Recurring Repairs | 200 | EA | $0.00 | ||
| B003AB | 8 CY Cardboard Dumpster Recurring Repairs | 150 | EA | $0.00 | ||
| B003AC | 40 CY Compactor Recurring Repairs | 1 | EA | $0.00 | ||
| B003AD | 40 CY Roll-Off Dumpster Recurring Repairs | 12 | EA | $0.00 | ||
| B003AE | 30 CY Roll-Off Dumpster Recurring Repairs | 12 | EA | $0.00 | ||
| B003AF | 20 CY Roll-Off Dumpster Recurring Repairs | 12 | EA | $0.00 | ||
| B003AG | 8 CY Drop Bottom Dumpster Recurring Repairs | 10 | EA | $0.00 | ||
| B003AH | 6 CY Drop Bottom Dumpster Recurring Repairs | 10 | EA | $0.00 | ||
| B003AJ | 4 CY Drop Bottom Dumpster Recurring Repairs | 3 | EA | $0.00 | ||
| TOTAL RECURRING FIRST OPTION YEAR ELINS B003AA thru B003AJ | $0.00 | |||||
| Line Item 0003 Recurring - FIRST OPTION |
PRICES FOR RECURRING SERVICES PROGRAM LEACHATE SYSTEMS, & WEIGHT SCALE ANNUAL TECHNICAL SUPPORT (ANNEX 1502000) - RECURRING PRICE - IN ACCORDANCE WITH SECTION C, SPEC ITEM 3, ELIN B003AK THROUGH B003AM
| ELIN/Sub ELIN | Description | Qty | U/I | Freq. | Unit Price | Total |
| B003AK | Recurring Service Program Leachate Systems | 11 | EA | 1 | $0.00 | |
| B003AL | Weight Scale Annual Technical Support | 1 | EA | 1 | $0.00 | |
| B003AM | Start-Up Software & Hardware Support | 1 | LS | $0.00 | ||
| TOTAL RECURRING FIRST OPTION YEAR ELIN B003AK THROUGH B003AM | $0.00 | |||||
| Line Item 0003 Recurring - First Option |
PRICES FOR GROUNDS MAINTENANCE (ANNEX 1503050) - RECURRING PRICE - IN ACCORDANCE WITH SECTION C, SPEC ITEM 3, ELINS B003AN THROUGH B003AW
| ELIN/Sub ELIN | Description | Qty | U/I | Freq. | Unit Price | Total |
| B003AN | Grounds Care | 240 | Acres | 6 | $0.00 | |
| B003AP | Vegetation Control; Fence Line Spraying | 16162 | LF | 2 | $0.00 | |
| B003AQ | Vegetation Control; T&P Site Spraying | 174240 | SF | 2 | $0.00 | |
| B003AR | Clearing Ditches and Brush | 71400 | SF | 1 | $0.00 | |
| B003AS | Storm Water Pond Maintenance | 12 | EA | 1 | $0.00 | |
| B003AT | Leachate Pond Cleaning | 2 | EA | 1 | $0.00 | |
| B003AU | The contractor shall perform annual top down cleaning of the 6802 sq ft brass collection area at landfill (entire facility floor to ceiling and machines) to include sampling field testing and laboratory services at building 978 | 1 | EA | 1 | $0.00 | |
| B003AV | The contractor shall perform annual 8ft down cleaning of the 6802 sq ft brass collection area at landfill (0-8ft. only) to include sampling field testing and laboratory services at building 978 | 1 | EA | 1 | $0.00 | |
| B003AW | Spot Sampling | 6 | LS | $0.00 | ||
| TOTAL RECURRING FIRST OPTION YEAR ELINS B004AN THRU B004AW | $0.00 | |||||
| Line Item 0004 Non-Recurring - FIRST OPTION |
PRICES FOR NON- RECURRING SERVICES PROGRAM LEACHATE SYSTEMS, WEIGHT SCALE (ANNEX 1502000) & GROUNDS MAINTENANCE (ANNEX 1503050) - NON-RECURRING - IN ACCORDANCE WITH SECTION C, SPEC ITEM 4, ELINS B003AA THROUGH B003AL
| ELIN/Sub ELIN | Description | Est. Qty | U/I | Unit Price | Total |
| B004AA | Labor Hours | 500 | HR | $0.00 |
| B004AB | Materials and Supplies | 1 | LS | |||
| B004AC | Grass shall be cut to a height of 3 inches. Mowing and trimming is required including areas maintained outside the fence. Trimming shall be accomplished to ensure vegetation adjacent to fencing, poles, walls, valves, valve boxes and other similar objects is trimmed to a height not to exceed the height of surrounding vegetation. | |||||
| Prior to mowing or trimming, the Contractor shall remove and appropriately dispose of debris that interferes with the mowing or trimming operation. Vegetation adjacent to fencing, poles, walls, valves, valve boxes and other similar objects shall be trimmed to a height not to exceed the height of surrounding vegetation. Contractor shall have one working day to mobilize and one working day for each 10 acres ordered to complete the work. | 100 | AC | $0.00 | |||
| B004AD | The contractor shall clear brush. All brush shall be cut to the ground and either mulched or hauled to the New Base Landfill on Piney Green Road. Contractor shall have one working day to mobilize and one working day for each 500 SF ordered. | 50000 | SF | $0.00 | ||
| B004AE | Repair leachate breaks/blowouts and methane gas leaching on all side slopes by adding 6 inches of topsoil to the leaching area and a 10 foot diameter around the leaching area, grass area with sod and keep sod watered for 30 days. Contractor shall have one working day to mobilize and one working day for each repair ordered. | 1000 | SF | $0.00 | ||
| B004AF | Repair settled outer perimeter berms by adding a mounded amount of topsoil (2 foot high x 6 foot wide) to all marked areas and grass repaired berm areas with sod and keep sod watered for 30 days. Contractor shall have one working day to mobilize and one working day for each 1,000 LF ordered. | 1000 | LF | $0.00 | ||
| B004AG | Apply herbicide to areas designated in the task order. Herbicide application shall be in accordance with the Contractor's approved Herbicide Usage Plan. Contractor shall have one working day to mobilize and one working day for each 1,000 LF ordered. | 5000 | LF | $0.00 | ||
| B004AH | Apply herbicide to areas designated in the task order. Herbicide application shall be in accordance with the Contractor's approved Herbicide Usage Plan. Contractor shall have one working day to mobilize. | 1306800 | SF | $0.00 | ||
| B004AJ | The Contractor shall service the Leachate Lines as follows: |
High pressure water cleaning and vacuuming of all debris in 1 cell consisting of 3 Leachate lines; after cleaning perform video inspection of 1 cell consisting of the 3 Leachate lines
| High pressure water cleaning and vacuuming of all debris in 1 Sump Pump riser lines; after clean perform video inspection of 1 Sump Pump riser lines. | 2 | EA | $0.00 | |||
| B004AK | Scales System Maintenance | 1 | LS | $0.00 | ||
| B004AL | Landfill Scale Calibration | 1 | EA | $0.00 | ||
| TOTAL NON-RECURRING FIRST OPTION YEAR ELINS B004AA thru B004AL | $0.00 | |||||
| Line Item 004 Non-Recurring - FIRST OPTION |
PRICES FOR WASTE CONTAINERS, DROP BOTTOMS 4CY, 6CY, 8CY, ROLL-OFFS 20CY, 30CY, 40CY, COMPACTORS 40CY, TRASH & CARDBOARD 8CY (ANNEX 1502000) - NON-RECURRING - IN ACCORDANCE WITH SECTION C, SPEC ITEM 4, ELINS B004AM THROUGH B004AN
| ELIN/Sub ELIN | Description | Est. Qty | U/I | Unit Price | Total |
| B004AM | Labor Hours | 1000 | HR | $0.00 | |
| B004AN | Materials and Supplies | 1 | LS | $0.00 | |
| TOTAL NON-RECURRING FIRST YEAR ELINS B004AM thru B004AN | $0.00 | ||||
| Prices for services in accordance with the scope of work as stated in Section C, Spec Iten 4, Non-Recurring preperation of proposals: In response to the Government's Request for Proposal (RFP), the contractor shall submit a Non-Recurring proposal to the KO within ten (10) working days following recipt for each potential task order which includes: 1) a complete list of all tasks necessary to perform the required scope of work, 2) the number of direct labor hours to perform each task and 3) the project quantity and cost of materials and equipment to perform the required scope of work. 4) a minimum of two (2) commercial supplier's quotes to determine fair and responsable pricing. |
Grand Totals $0.00
1st Op YR IDIQ Line Item 0004 Non-Recurring - FIRST Option: Prices for Non-Recurring Services for Landfill Wood Grinding, Yard Waste Grinding, and Concrete Crushing Operations
| ELINS | PRODUCT NAME | DESCRIPTION EXTENDED | QUANITITY | UNIT OF ISSUE | UNIT OF PRICE | EXTENDED PRICE |
| B004AP | WOOD GRINDING OPERATIONS | The Contractor shall provide all labor management, supervision, tools material and equipment required per Attachment J-1502000-10 and as follows: The contractor shall grind piles of wood debris identified during a site inspection with the Landfill Manager, to include but not limited to plant growth such as tree limbs, stumps, logs, pallets, plywood, dimensional lumber, and wood debris. Activities will include but are not limited to grinder operation, land clearing of waste and hauling chips off site. | 5000 | TON | $0.00 | |
| B004AQ | YARD WASTE GRINDING OPERATIONS | The Contractor shall provide all labor management, supervision, tools material and equipment required per Attachment J-1502000-10 and as follows: The contractor shall grind piles of yard waste identified during a site inspection with the Landfill Manager, to include but not limited to leaves, pine straw, yard clippings, small limbs, and yard debris. Activities will include grinder operation, yard waste shall be grinded on site and remain at that location for government use. | 3000 | TON | $0.00 | |
| B004AR | CONCRETE CRUSHING OPERATIONS | The Contractor shall provide all labor management, supervision, tools material and equipment required per Attachment J-1502000-10 and as follows: The Contractor shall crush piles of concrete debris identified during a site inspection, to include but not limited to: brick, block, concrete slabs, concrete pilings, concrete culvert and various other types of concrete debris. Crushed debris will remain on site for government use. | 5000 | TON | $0.00 | |
| TOTAL | $0.00 |
2nd Yr Option FFP & IDIQ Line Item 0005 Recurring - SECOND OPTION PRICES FOR WASTE CONTAINERS (ANNEX 1502000) - RECURRING PRICE - IN ACCORDANCE WITH SECTION C, SPEC ITEM 3, ELIN C005AA THROUGH C005AJ
| ELIN/Sub ELIN | Description | Qty | U/I | Freq. | Unit Price | Total |
| C005AA | 8 CY Trash Dumpster Recurring Repairs | 200 | EA | $0.00 | ||
| C005AB | 8 CY Cardboard Dumpster Recurring Repairs | 150 | EA | $0.00 | ||
| C005AC | 40 CY Compactor Recurring Repairs | 1 | EA | $0.00 | ||
| C005AD | 40 CY Roll-Off Dumpster Recurring Repairs | 12 | EA | $0.00 | ||
| C005AE | 30 CY Roll-Off Dumpster Recurring Repairs | 12 | EA | $0.00 | ||
| C005AF | 20 CY Roll-Off Dumpster Recurring Repairs | 12 | EA | $0.00 | ||
| C005AG | 8 CY Drop Bottom Dumpster Recurring Repairs | 10 | EA | $0.00 | ||
| C005AH | 6 CY Drop Bottom Dumpster Recurring Repairs | 10 | EA | $0.00 | ||
| C005AJ | 4 CY Drop Bottom Dumpster Recurring Repairs | 3 | EA | $0.00 | ||
| TOTAL RECURRING SECOND OPTION YEAR ELINS C005AA thru C005AJ | $0.00 | |||||
| Line Item 0005 Recurring - SECOND OPTION |
PRICES FOR RECURRING SERVICES PROGRAM LEACHATE SYSTEMS, & WEIGHT SCALE ANNUAL TECHNICAL SUPPORT (ANNEX 1502000) - RECURRING PRICE - IN ACCORDANCE WITH SECTION C, SPEC ITEM 3, ELIN C005AK THROUGH C005AM
| ELIN/Sub ELIN | Description | Qty | U/I | Freq. | Unit Price | Total |
| C005AK | Recurring Service Program Leachate Systems | 11 | EA | 1 | $0.00 | |
| C005AL | Weight Scale Annual Technical Support | 1 | EA | 1 | $0.00 | |
| C005AM | Start-Up Software & Hardware Support | 1 | LS | $0.00 | ||
| TOTAL RECURRING SECOND OPTION YEAR ELIN C005AK THROUGH C005AM | $0.00 | |||||
| Line Item 0005 Recurring - SECOND Option |
PRICES FOR GROUNDS MAINTENANCE (ANNEX 1503050) - RECURRING PRICE - IN ACCORDANCE WITH SECTION C, SPEC ITEM 3, ELINS C005AN THROUGH C005AW
| ELIN/Sub ELIN | Description | Qty | U/I | Freq. | Unit Price | Total |
| C005AN | Grounds Care | 240 | Acres | 6 | $0.00 | |
| C005AP | Vegetation Control; Fence Line Spraying | 16162 | LF | 2 | $0.00 | |
| C005AQ | Vegetation Control; T&P Site Spraying | 174240 | SF | 2 | $0.00 | |
| C005AR | Clearing Ditches and Brush | 71400 | SF | 1 | $0.00 | |
| C005AS | Storm Water Pond Maintenance | 12 | EA | 1 | $0.00 | |
| C005AT | Leachate Pond Cleaning | 2 | EA | 1 | $0.00 | |
| C005AU | The contractor shall perform annual top down cleaning of the 6802 sq ft brass collection area at landfill (entire facility floor to ceiling and machines) to include sampling field testing and laboratory services at building 978 | 1 | EA | 1 | $0.00 | |
| C005AV | The contractor shall perform annual 8ft down cleaning of the 6802 sq ft brass collection area at landfill (0-8ft. only) to include sampling field testing and laboratory services at building 978 | 1 | EA | 1 | $0.00 | |
| C005AW | Spot Sampling | 6 | LS | $0.00 | ||
| TOTAL RECURRING SECOND OPTION YEAR ELINS C005AN THRU C005AW | $0.00 | |||||
| Line Item 0006 Non-Recurring - SECOND OPTION |
PRICES FOR NON- RECURRING SERVICES PROGRAM LEACHATE SYSTEMS, WEIGHT SCALE (ANNEX 1502000) & GROUNDS MAINTENANCE (ANNEX 1503050) - NON-RECURRING - IN ACCORDANCE WITH SECTION C, SPEC ITEM 4, ELINS C006AA THROUGH C006AK
| ELIN/Sub ELIN | Description | Est. Qty | U/I | Unit Price | Total |
| C006AA | Labor Hours | 500 | HR | $0.00 |
| C006AB | Materials and Supplies | 1 | LS | |||
| C006AC | Grass shall be cut to a height of 3 inches. Mowing and trimming is required including areas maintained outside the fence. Trimming shall be accomplished to ensure vegetation adjacent to fencing, poles, walls, valves, valve boxes and other similar objects is trimmed to a height not to exceed the height of surrounding vegetation. | |||||
| Prior to mowing or trimming, the Contractor shall remove and appropriately dispose of debris that interferes with the mowing or trimming operation. Vegetation adjacent to fencing, poles, walls, valves, valve boxes and other similar objects shall be trimmed to a height not to exceed the height of surrounding vegetation. Contractor shall have one working day to mobilize and one working day for each 10 acres ordered to complete the work. | 100 | AC | $0.00 | |||
| C006AD | The contractor shall clear brush. All brush shall be cut to the ground and either mulched or hauled to the New Base Landfill on Piney Green Road. Contractor shall have one working day to mobilize and one working day for each 500 SF ordered. | 50000 | SF | $0.00 | ||
| C006AE | Repair leachate breaks/blowouts and methane gas leaching on all side slopes by adding 6 inches of topsoil to the leaching area and a 10 foot diameter around the leaching area, grass area with sod and keep sod watered for 30 days. Contractor shall have one working day to mobilize and one working day for each repair ordered. | 1000 | SF | $0.00 | ||
| C006AF | Repair settled outer perimeter berms by adding a mounded amount of topsoil (2 foot high x 6 foot wide) to all marked areas and grass repaired berm areas with sod and keep sod watered for 30 days. Contractor shall have one working day to mobilize and one working day for each 1,000 LF ordered. | 1000 | LF | $0.00 | ||
| C006AG | Apply herbicide to areas designated in the task order. Herbicide application shall be in accordance with the Contractor's approved Herbicide Usage Plan. Contractor shall have one working day to mobilize and one working day for each 1,000 LF ordered. | 5000 | LF | $0.00 | ||
| C006AH | Apply herbicide to areas designated in the task order. Herbicide application shall be in accordance with the Contractor's approved Herbicide Usage Plan. Contractor shall have one working day to mobilize. | 1306800 | SF | $0.00 | ||
| C006AJ | The Contractor shall service the Leachate Lines as follows: |
High pressure water cleaning and vacuuming of all debris in 1 cell consisting of 3 Leachate lines; after cleaning perform video inspection of 1 cell consisting of the 3 Leachate lines
| High pressure water cleaning and vacuuming of all debris in 1 Sump Pump riser lines; after clean perform video inspection of 1 Sump Pump riser lines. | 2 | EA | $0.00 | |||
| C006AK | Scales System Maintenance | 1 | LS | $0.00 | ||
| C006AL | Landfill Scale Calibration | 1 | EA | $0.00 | ||
| TOTAL NON-RECURRING SECOND OPTION YEAR ELINS C006AA thru C006AL | $0.00 | |||||
| Line Item 006 Non-Recurring - SECOND OPTION |
PRICES FOR WASTE CONTAINERS, DROP BOTTOMS 4CY, 6CY, 8CY, ROLL-OFFS 20CY, 30CY, 40CY, COMPACTORS 40CY, TRASH & CARDBOARD 8CY (ANNEX 1502000) - NON-RECURRING - IN ACCORDANCE WITH SECTION C, SPEC ITEM 4, ELINS C006AM THROUGH C006AN
| ELIN/Sub ELIN | Description | Est. Qty | U/I | Unit Price | Total |
| C006AM | Labor Hours | 1000 | HR | $0.00 | |
| C006AN | Materials and Supplies | 1 | LS | $0.00 | |
| TOTAL NON-RECURRING SECOND YEAR ELINS C006AM thru C006AN | $0.00 | ||||
| Prices for services in accordance with the scope of work as stated in Section C, Spec Iten 4, Non-Recurring preperation of proposals: In response to the Government's Request for Proposal (RFP), the contractor shall submit a Non-Recurring proposal to the KO within ten (10) working days following recipt for each potential task order which includes: 1) a complete list of all tasks necessary to perform the required scope of work, 2) the number of direct labor hours to perform each task and 3) the project quantity and cost of materials and equipment to perform the required scope of work. 4) a minimum of two (2) commercial supplier's quotes to determine fair and responsable pricing. | |||||
| Grand Totals | $0.00 |
2nd Op YR IDIQ Line Item 0006 Non-Recurring - SECOND Option: Prices for Non-Recurring Services for Landfill Wood Grinding, Yard Waste Grinding, and Concrete Crushing Operations
| ELINS | PRODUCT NAME | DESCRIPTION EXTENDED | QUANITITY | UNIT OF ISSUE | UNIT OF PRICE | EXTENDED PRICE |
| C006AQ | WOOD GRINDING OPERATIONS | The Contractor shall provide all labor management, supervision, tools material and equipment required per Attachment J-1502000-10 and as follows: The contractor shall grind piles of wood debris identified during a site inspection with the Landfill Manager, to include but not limited to plant growth such as tree limbs, stumps, logs, pallets, plywood, dimensional lumber, and wood debris. Activities will include but are not limited to grinder operation, land clearing of waste and hauling chips off site. | 5000 | TON | $0.00 | |
| C006AR | YARD WASTE GRINDING OPERATIONS | The Contractor shall provide all labor management, supervision, tools material and equipment required per Attachment J-1502000-10 and as follows: The contractor shall grind piles of yard waste identified during a site inspection with the Landfill Manager, to include but not limited to leaves, pine straw, yard clippings, small limbs, and yard debris. Activities will include grinder operation, yard waste shall be grinded on site and remain at that location for government use. | 3000 | TON | $0.00 | |
| C006AQ | CONCRETE CRUSHING OPERATIONS | The Contractor shall provide all labor management, supervision, tools material and equipment required per Attachment J-1502000-10 and as follows: The Contractor shall crush piles of concrete debris identified during a site inspection, to include but not limited to: brick, block, concrete slabs, concrete pilings, concrete culvert and various other types of concrete debris. Crushed debris will remain on site for government use. | 5000 | TON | $0.00 | |
| TOTAL | $0.00 |
3rd Yr Option FFP & IDIQ Line Item 0007 Recurring - THIRD OPTION PRICES FOR WASTE CONTAINERS (ANNEX 1502000) - RECURRING PRICE - IN ACCORDANCE WITH SECTION C, SPEC ITEM 3, ELIN D007AA THROUGH C007AJ
| ELIN/Sub ELIN | Description | Qty | U/I | Freq. | Unit Price | Total |
| D007AA | 8 CY Trash Dumpster Recurring Repairs | 200 | EA | $0.00 | ||
| D007AB | 8 CY Cardboard Dumpster Recurring Repairs | 150 | EA | $0.00 | ||
| D007AC | 40 CY Compactor Recurring Repairs | 1 | EA | $0.00 | ||
| D007AD | 40 CY Roll-Off Dumpster Recurring Repairs | 12 | EA | $0.00 | ||
| D007AE | 30 CY Roll-Off Dumpster Recurring Repairs | 12 | EA | $0.00 | ||
| D007AF | 20 CY Roll-Off Dumpster Recurring Repairs | 12 | EA | $0.00 | ||
| D007AG | 8 CY Drop Bottom Dumpster Recurring Repairs | 10 | EA | $0.00 | ||
| D007AH | 6 CY Drop Bottom Dumpster Recurring Repairs | 10 | EA | $0.00 | ||
| D007AJ | 4 CY Drop Bottom Dumpster Recurring Repairs | 3 | EA | $0.00 | ||
| TOTAL RECURRING THIRD OPTION YEAR ELINS D007AA thru D075AJ | $0.00 | |||||
| Line Item 0007 Recurring - THIRD OPTION |
PRICES FOR RECURRING SERVICES PROGRAM LEACHATE SYSTEMS, & WEIGHT SCALE ANNUAL TECHNICAL SUPPORT (ANNEX 1502000) - RECURRING PRICE - IN ACCORDANCE WITH SECTION C, SPEC ITEM 3, ELIN D007AK THROUGH D007AM
| ELIN/Sub ELIN | Description | Qty | U/I | Freq. | Unit Price | Total |
| D007AK | Recurring Service Program Leachate Systems | 11 | EA | 1 | $0.00 | |
| D007AL | Weight Scale Annual Technical Support | 1 | EA | 1 | $0.00 | |
| D007AM | Start-Up Software & Hardware Support | 1 | LS | $0.00 | ||
| TOTAL RECURRING THIRD OPTION YEAR ELIN D007AK THROUGH D007AM | $0.00 | |||||
| Line Item 0007 Recurring - THIRD Option |
PRICES FOR GROUNDS MAINTENANCE (ANNEX 1503050) - RECURRING PRICE - IN ACCORDANCE WITH SECTION C, SPEC ITEM 3, ELINS D007AN THROUGH D007AW
| ELIN/Sub ELIN | Description | Qty | U/I | Freq. | Unit Price | Total |
| D007AN | Grounds Care | 240 | Acres | 6 | $0.00 | |
| D007AP | Vegetation Control; Fence Line Spraying | 16162 | LF | 2 | $0.00 | |
| D007AQ | Vegetation Control; T&P Site Spraying | 174240 | SF | 2 | $0.00 | |
| D007AR | Clearing Ditches and Brush | 71400 | SF | 1 | $0.00 | |
| D007AS | Storm Water Pond Maintenance | 12 | EA | 1 | $0.00 | |
| D007AT | Leachate Pond Cleaning | 2 | EA | 1 | $0.00 | |
| D007AU | The contractor shall perform annual top down cleaning of the 6802 sq ft brass collection area at landfill (entire facility floor to ceiling and machines) to include sampling field testing and laboratory services at building 978 | 1 | EA | 1 | $0.00 | |
| D0071AV | The contractor shall perform annual 8ft down cleaning of the 6802 sq ft brass collection area at landfill (0-8ft. only) to include sampling field testing and laboratory services at building 978 | 1 | EA | 1 | $0.00 | |
| D007AW | Spot Sampling | 6 | LS | $0.00 | ||
| TOTAL RECURRING THIRD OPTION YEAR ELINS D007AN THRU D007AW | $0.00 | |||||
| Line Item 0009 Non-Recurring - THIRD OPTION |
PRICES FOR NON- RECURRING SERVICES PROGRAM LEACHATE SYSTEMS, WEIGHT SCALE (ANNEX 1502000) & GROUNDS MAINTENANCE (ANNEX 1503050) - NON-RECURRING - IN ACCORDANCE WITH SECTION C, SPEC ITEM 4, ELINS D008AA THROUGH D008AL
| ELIN/Sub ELIN | Description | Est. Qty | U/I | Unit Price | Total |
| D008AA | Labor Hours | 500 | HR | $0.00 |
| D008AB | Materials and Supplies | 1 | LS | $0.00 | ||
| D008AC | Grass shall be cut to a height of 3 inches. Mowing and trimming is required including areas maintained outside the fence. Trimming shall be accomplished to ensure vegetation adjacent to fencing, poles, walls, valves, valve boxes and other similar objects is trimmed to a height not to exceed the height of surrounding vegetation. | |||||
| Prior to mowing or trimming, the Contractor shall remove and appropriately dispose of debris that interferes with the mowing or trimming operation. Vegetation adjacent to fencing, poles, walls, valves, valve boxes and other similar objects shall be trimmed to a height not to exceed the height of surrounding vegetation. Contractor shall have one working day to mobilize and one working day for each 10 acres ordered to complete the work. | 100 | AC | $0.00 | |||
| D008AD | The contractor shall clear brush. All brush shall be cut to the ground and either mulched or hauled to the New Base Landfill on Piney Green Road. Contractor shall have one working day to mobilize and one working day for each 500 SF ordered. | 50000 | SF | $0.00 | ||
| D008AE | Repair leachate breaks/blowouts and methane gas leaching on all side slopes by adding 6 inches of topsoil to the leaching area and a 10 foot diameter around the leaching area, grass area with sod and keep sod watered for 30 days. Contractor shall have one working day to mobilize and one working day for each repair ordered. | 1000 | SF | $0.00 | ||
| D008AF | Repair settled outer perimeter berms by adding a mounded amount of topsoil (2 foot high x 6 foot wide) to all marked areas and grass repaired berm areas with sod and keep sod watered for 30 days. Contractor shall have one working day to mobilize and one working day for each 1,000 LF ordered. | 1000 | LF | $0.00 | ||
| D008AG | Apply herbicide to areas designated in the task order. Herbicide application shall be in accordance with the Contractor's approved Herbicide Usage Plan. Contractor shall have one working day to mobilize and one working day for each 1,000 LF ordered. | 5000 | LF | $0.00 | ||
| D008AH | Apply herbicide to areas designated in the task order. Herbicide application shall be in accordance with the Contractor's approved Herbicide Usage Plan. Contractor shall have one working day to mobilize. | 1306800 | SF | $0.00 | ||
| D008AJ | The Contractor shall service the Leachate Lines as follows: |
High pressure water cleaning and vacuuming of all debris in 1 cell consisting of 3 Leachate lines; after cleaning perform video inspection of 1 cell consisting of the 3 Leachate lines
| High pressure water cleaning and vacuuming of all debris in 1 Sump Pump riser lines; after clean perform video inspection of 1 Sump Pump riser lines. | 2 | EA | $0.00 | |||
| D008AK | Scales System Maintenance | 1 | LS | $0.00 | ||
| D008AL | Landfill Scale Calibration | 1 | EA | $0.00 | ||
| TOTAL NON-RECURRING THIRD OPTION YEAR ELINS D008AA thru D008AL | $0.00 | |||||
| Line Item 008 Non-Recurring - THIRD OPTION |
PRICES FOR WASTE CONTAINERS, DROP BOTTOMS 4CY, 6CY, 8CY, ROLL-OFFS 20CY, 30CY, 40CY, COMPACTORS 40CY, TRASH & CARDBOARD 8CY (ANNEX 1502000) - NON-RECURRING - IN ACCORDANCE WITH SECTION C, SPEC ITEM 4, ELINS D008AM THROUGH D008AN
| ELIN/Sub ELIN | Description | Est. Qty | U/I | Unit Price | Total |
| D008AM | Labor Hours | 1000 | HR | $0.00 | |
| D008AN | Materials and Supplies | 1 | LS | $0.00 | |
| TOTAL NON-RECURRING THIRD YEAR ELINS D008AM thru D008AN | $0.00 | ||||
| Prices for services in accordance with the scope of work as stated in Section C, Spec Iten 4, Non-Recurring preperation of proposals: In response to the Government's Request for Proposal (RFP), the contractor shall submit a Non-Recurring proposal to the KO within ten (10) working days following recipt for each potential task order which includes: 1) a complete list of all tasks necessary to perform the required scope of work, 2) the number of direct labor hours to perform each task and 3) the project quantity and cost of materials and equipment to perform the required scope of work. 4) a minimum of two (2) commercial supplier's quotes to determine fair and responsable pricing. | |||||
| Grand Totals | $0.00 |
3rd Op YR IDIQ Line Item 0008 Non-Recurring - THIRD OPTION: Prices for Non-Recurring Services for Landfill Wood Grinding, Yard Waste Grinding, and Concrete Crushing Operations
| ELINS | PRODUCT NAME | DESCRIPTION EXTENDED | QUANITITY | UNIT OF ISSUE | UNIT OF PRICE | EXTENDED PRICE |
| D008AP | WOOD GRINDING OPERATIONS | The Contractor shall provide all labor management, supervision, tools material and equipment required per Attachment J-1502000-10 and as follows: The contractor shall grind piles of wood debris identified during a site inspection with the Landfill Manager, to include but not limited to plant growth such as tree limbs, stumps, logs, pallets, plywood, dimensional lumber, and wood debris. Activities will include but are not limited to grinder operation, land clearing of waste and hauling chips off site. | 5000 | TON | $0.00 | |
| D008AQ | YARD WASTE GRINDING OPERATIONS | The Contractor shall provide all labor management, supervision, tools material and equipment required per Attachment J-1502000-10 and as follows: The contractor shall grind piles of yard waste identified during a site inspection with the Landfill Manager, to include but not limited to leaves, pine straw, yard clippings, small limbs, and yard debris. Activities will include grinder operation, yard waste shall be grinded on site and remain at that location for government use. | 3000 | TON | $0.00 | |
| D008AR | CONCRETE CRUSHING OPERATIONS | The Contractor shall provide all labor management, supervision, tools material and equipment required per Attachment J-1502000-10 and as follows: The Contractor shall crush piles of concrete debris identified during a site inspection, to include but not limited to: brick, block, concrete slabs, concrete pilings, concrete culvert and various other types of concrete debris. Crushed debris will remain on site for government use. | 5000 | TON | $0.00 | |
| TOTAL | $0.00 |
4th Yr Option FFP & IDIQ Line Item 0009 Recurring - FOURTH OPTION PRICES FOR WASTE CONTAINERS (ANNEX 1502000) - RECURRING PRICE - IN ACCORDANCE WITH SECTION C, SPEC ITEM 3, ELIN E009AA THROUGH E097AJ
| ELIN/Sub ELIN | Description | Qty | U/I | Freq. | Unit Price | Total |
| E009AA | 8 CY Trash Dumpster Recurring Repairs | 200 | EA | $0.00 | ||
| E009AB | 8 CY Cardboard Dumpster Recurring Repairs | 150 | EA | $0.00 | ||
| E009AC | 40 CY Compactor Recurring Repairs | 1 | EA | $0.00 | ||
| E097AD | 40 CY Roll-Off Dumpster Recurring Repairs | 12 | EA | $0.00 | ||
| E009AE | 30 CY Roll-Off Dumpster Recurring Repairs | 12 | EA | $0.00 | ||
| E009AF | 20 CY Roll-Off Dumpster Recurring Repairs | 12 | EA | $0.00 | ||
| E009AG | 8 CY Drop Bottom Dumpster Recurring Repairs | 10 | EA | $0.00 | ||
| E009AH | 6 CY Drop Bottom Dumpster Recurring Repairs | 10 | EA | $0.00 | ||
| E009AJ | 4 CY Drop Bottom Dumpster Recurring Repairs | 3 | EA | $0.00 | ||
| TOTAL RECURRING FOURTH OPTION YEAR ELINS E009AA thru E095AJ | $0.00 | |||||
| Line Item 0009 Recurring - FOURTH OPTION |
PRICES FOR RECURRING SERVICES PROGRAM LEACHATE SYSTEMS, & WEIGHT SCALE ANNUAL TECHNICAL SUPPORT (ANNEX 1502000) - RECURRING PRICE - IN ACCORDANCE WITH SECTION C, SPEC ITEM 3, ELIN E009AK THROUGH E009AM
| ELIN/Sub ELIN | Description | Qty | U/I | Freq. | Unit Price | Total |
| E009AK | Recurring Service Program Leachate Systems | 11 | EA | 1 | $0.00 | |
| E009AL | Weight Scale Annual Technical Support | 1 | EA | 1 | $0.00 | |
| E009AM | Start-Up Software & Hardware Support | 1 | LS | $0.00 | ||
| TOTAL RECURRING FOURTH OPTION YEAR ELIN E009AK THROUGH E009AM | $0.00 | |||||
| Line Item 0009 Recurring - FOURTH OPTION |
PRICES FOR GROUNDS MAINTENANCE (ANNEX 1503050) - RECURRING PRICE - IN ACCORDANCE WITH SECTION C, SPEC ITEM 3, ELINS E009AN THROUGH E009AW
| ELIN/Sub ELIN | Description | Qty | U/I | Freq. | Unit Price | Total |
| E009AN | Grounds Care | 240 | Acres | 6 | $0.00 | |
| E009AP | Vegetation Control; Fence Line Spraying | 16162 | LF | 2 | $0.00 | |
| E009AQ | Vegetation Control; T&P Site Spraying | 174240 | SF | 2 | $0.00 | |
| E009AR | Clearing Ditches and Brush | 71400 | SF | 1 | $0.00 | |
| E097AS | Storm Water Pond Maintenance | 12 | EA | 1 | $0.00 | |
| E0091AT | Leachate Pond Cleaning | 2 | EA | 1 | $0.00 | |
| E009AU | The contractor shall perform annual top down cleaning of the 6802 sq ft brass collection area at landfill (entire facility floor to ceiling and machines) to include sampling field testing and laboratory services at building 978 | 1 | EA | 1 | $0.00 | |
| E0091AV | The contractor shall perform annual 8ft down cleaning of the 6802 sq ft brass collection area at landfill (0-8ft. only) to include sampling field testing and laboratory services at building 978 | 1 | EA | 1 | $0.00 | |
| E009AW | Spot Sampling | 6 | LS | $0.00 | ||
| TOTAL RECURRING FOURTH OPTION YEAR ELINS E009AN THRU E009AW | $0.00 |
| Total of all Recuring Fourth Option Year | $0.00 | |
| Line Item 0010 Non-Recurring - FOURTH OPTION |
PRICES FOR NON- RECURRING SERVICES PROGRAM LEACHATE SYSTEMS, WEIGHT SCALE (ANNEX 1502000) & GROUNDS MAINTENANCE (ANNEX 1503050) - NON-RECURRING - IN ACCORDANCE WITH SECTION C, SPEC ITEM 4, ELINS E0010AA THROUGH E0010AL
| ELIN/Sub ELIN | Description | Est. Qty | U/I | Unit Price | Total |
| E0010AA | Labor Hours | 500 | HR | $0.00 |
| E0010AB | Materials and Supplies | 1 | LS | $0.00 | ||
| E0010AC | Grass shall be cut to a height of 3 inches. Mowing and trimming is required including areas maintained outside the fence. Trimming shall be accomplished to ensure vegetation adjacent to fencing, poles, walls, valves, valve boxes and other similar objects is trimmed to a height not to exceed the height of surrounding vegetation. | |||||
| Prior to mowing or trimming, the Contractor shall remove and appropriately dispose of debris that interferes with the mowing or trimming operation. Vegetation adjacent to fencing, poles, walls, valves, valve boxes and other similar objects shall be trimmed to a height not to exceed the height of surrounding vegetation. Contractor shall have one working day to mobilize and one working day for each 10 acres ordered to complete the work. | 100 | AC | $0.00 | |||
| E0010AD | The contractor shall clear brush. All brush shall be cut to the ground and either mulched or hauled to the New Base Landfill on Piney Green Road. Contractor shall have one working day to mobilize and one working day for each 500 SF ordered. | 50000 | SF | $0.00 | ||
| E0010AE | Repair leachate breaks/blowouts and methane gas leaching on all side slopes by adding 6 inches of topsoil to the leaching area and a 10 foot diameter around the leaching area, grass area with sod and keep sod watered for 30 days. Contractor shall have one working day to mobilize and one working day for each repair ordered. | 1000 | SF | $0.00 | ||
| E00810AF | Repair settled outer perimeter berms by adding a mounded amount of topsoil (2 foot high x 6 foot wide) to all marked areas and grass repaired berm areas with sod and keep sod watered for 30 days. Contractor shall have one working day to mobilize and one working day for each 1,000 LF ordered. | 1000 | LF | $0.00 | ||
| E0010AG | Apply herbicide to areas designated in the task order. Herbicide application shall be in accordance with the Contractor's approved Herbicide Usage Plan. Contractor shall have one working day to mobilize and one working day for each 1,000 LF ordered. | 5000 | LF | $0.00 | ||
| E0010AH | Apply herbicide to areas designated in the task order. Herbicide application shall be in accordance with the Contractor's approved Herbicide Usage Plan. Contractor shall have one working day to mobilize. | 1306800 | SF | $0.00 | ||
| E0010AJ | The Contractor shall service the Leachate Lines as follows: |
High pressure water cleaning and vacuuming of all debris in 1 cell consisting of 3 Leachate lines; after cleaning perform video inspection of 1 cell consisting of the 3 Leachate lines
| High pressure water cleaning and vacuuming of all debris in 1 Sump Pump riser lines; after clean perform video inspection of 1 Sump Pump riser lines. | 2 | EA | $0.00 | |||
| E0010AK | Scales System Maintenance | 1 | LS | $0.00 | ||
| E0010AL | Landfill Scale Calibration | 1 | EA | $0.00 | ||
| TOTAL NON-RECURRING FOURTH OPTION YEAR ELINS E0010AA thru E0010AL | $0.00 | |||||
| Line Item 0010 Non-Recurring - FOURTH OPTION |
PRICES FOR WASTE CONTAINERS, DROP BOTTOMS 4CY, 6CY, 8CY, ROLL-OFFS 20CY, 30CY, 40CY, COMPACTORS 40CY, TRASH & CARDBOARD 8CY (ANNEX 1502000) - NON-RECURRING - IN ACCORDANCE WITH SECTION C, SPEC ITEM 4, ELINS E0010AM THROUGH E0010AN
| ELIN/Sub ELIN | Description | Est. Qty | U/I | Unit Price | Total |
| E0010AM | Labor Hours | 1000 | HR | $0.00 | |
| E0010AN | Materials and Supplies | 1 | LS | $0.00 | |
| TOTAL NON-RECURRING FOURTH YEAR ELINS E0010AM thru E0010AN | $0.00 |
| TOTAL OF ALL NON-RECURRING FOURTH OPTION | $0.00 | ||
| Prices for services in accordance with the scope of work as stated in Section C, Spec Iten 4, Non-Recurring preperation of proposals: In response to the Government's Request for Proposal (RFP), the contractor shall submit a Non-Recurring proposal to the KO within ten (10) working days following recipt for each potential task order which includes: 1) a complete list of all tasks necessary to perform the required scope of work, 2) the number of direct labor hours to perform each task and 3) the project quantity and cost of materials and equipment to perform the required scope of work. 4) a minimum of two (2) commercial supplier's quotes to determine fair and responsable pricing. | |||
| Grand Totals | $0.00 |
4TH Op YR IDIQ Line Item 00010 Non-Recurring - FOURTH OPTION: Prices for Non-Recurring Services for Landfill Wood Grinding, Yard Waste Grinding, and Concrete Crushing Operations
| ELINS | PRODUCT NAME | DESCRIPTION EXTENDED | QUANITITY | UNIT OF ISSUE | UNIT OF PRICE | EXTENDED PRICE |
| E0010AP | WOOD GRINDING OPERATIONS | The Contractor shall provide all labor management, supervision, tools material and equipment required per Attachment J-1502000-10 and as follows: The contractor shall grind piles of wood debris identified during a site inspection with the Landfill Manager, to include but not limited to plant growth such as tree limbs, stumps, logs, pallets, plywood, dimensional lumber, and wood debris. Activities will include but are not limited to grinder operation, land clearing of waste and hauling chips off site. | 5000 | TON | $0.00 | |
| E0010AQ | YARD WASTE GRINDING OPERATIONS | The Contractor shall provide all labor management, supervision, tools material and equipment required per Attachment J-1502000-10 and as follows: The contractor shall grind piles of yard waste identified during a site inspection with the Landfill Manager, to include but not limited to leaves, pine straw, yard clippings, small limbs, and yard debris. Activities will include grinder operation, yard waste shall be grinded on site and remain at that location for government use. | 3000 | TON | $0.00 | |
| E0010AR | CONCRETE CRUSHING OPERATIONS | The Contractor shall provide all labor management, supervision, tools material and equipment required per Attachment J-1502000-10 and as follows: The Contractor shall crush piles of concrete debris identified during a site inspection, to include but not limited to: brick, block, concrete slabs, concrete pilings, concrete culvert and various other types of concrete debris. Crushed debris will remain on site for government use. | 5000 | TON | $0.00 | |
| TOTAL | $0.00 |
OPTION YEAR TO EXTEND SERVICES
| FAR Clause 52.217-8 Option to Extend Services. | ||||||
| PRICES FOR LANDFILL MAINENANCE AND REPAIR SERVICE (SUB-ANNEXS 1502000) - RECURRING - IN ACCORDANCE WITH SECTION C, SPEC ITEM 3 OPTIONAL EXTENSION OF SERVICES, CLIN F011 AND ELINs F011AA - F011AW (NTE Extended Service Period) are the same line items in the 4th Option CLIN E009 ELINS. | ||||||
| ELIN | Description | Quantity | Unit of Issue | Freq | Unit Price | Total Price |
| F011 | ||||||
| F011AA - F011AW 1-month | Same Line Items as Fourth Option ELINS E009AA - E009AU. Contractor shall provide one month (30 days) the cost of the 4th Option services for their pricing. | 1 | LS | 1 | $0.00 | |
| Estimated Cost Includes: Labor, Materials, and Equipment | ||||||
| F011AA - F011AW 3-month | Same Line Items as Fourth Option ELINS E009AA - E009AU, Contractor shall provide a third (1/3) Cost of the 4th Option services for their pricing. | 1 | LS | 3 | $0.00 | |
| Estimated Cost Includes: Labor, Materials, and Equipment | ||||||
| F011AA - F011AW 6-month | Same Line Items as Fourth Option ELINS E009AA - E009AU. Contractor shall provide a half (1/2) Cost of the 4th Option services for their pricing. | 1 | LS | 6 | $0.00 | |
| Estimated Cost Includes: Labor, Materials, and Equipment |
Fourth Option ELINS Extension F011AA -F011AW $0.00
| FAR Clause 52.217-8 Option to Extend Services. | ||||||
| PRICES TO PERFORM Landfill Maintenance and Service Repair (SUB-ANNEX 1502000) - NON- RECURRING (IDIQ ) - IN ACCORDANCE WITH SECTION C, SPEC ITEM 4, OPTIONAL EXTENSION OF SERVICES, CLIN F012 ELIN F012AA - F012AQ (NTE Extended Service Period) are the same line items in the 4th Option CLIN E012 ELINS. | ||||||
| ELIN | Description | Quantity | Unit of Issue | Freq | Unit Price | Total Price |
| F012 | ||||||
| F012AA 1-month | Same Line Items as Fourth Option ELINS E011AA. Contractor shall provide one month (30 days) the cost of the 4th Option services for their pricing | 1 | LS | 1 | $0.00 | |
| Estimated Cost Includes: Labor, Materials, and Equipment | ||||||
| F012AB 3-month | Same Line Items as Fourth Option ELINS E011AA. Contractor shall provide a third (1/3) Cost of the 4th Option services for their pricing. | 1 | LS | 3 | $0.00 | |
| Estimated Cost Includes: Labor, Materials, and Equipment | ||||||
| F012AC 6-month | Same Line Items as Fourth Option ELINS E011AA. Contractor shall provide a half (1/2) Cost of the 4th Option services for their pricing. | 1 | LS | 6 | $0.00 | |
| Estimated Cost Includes: Labor, Materials, and Equipment | ||||||
| Fourth Option ELINS Extension F012AA -F012AQ | $0.00 |
File details come from the government source that posted it. Updated .