ELINs 2025 for Proposal.xlsx

XLSX spreadsheet 55 KB Posted

Attached to
Landfill Maintenance and Repair Services
Solicitation number
N4008525R2529
Issued by

About this file

This is a pricing template spreadsheet for a landfill maintenance and repair services contract with recurring and non-recurring line items spanning a base year and four option years. The template includes detailed Exhibit Line Item Numbers (ELINs) for waste container repairs (including various sizes of dumpsters and compactors), leachate system services, weight scale support, and grounds maintenance services like mowing, vegetation control, and pond maintenance.

The recurring services include maintenance of 200 8CY trash dumpsters, 150 cardboard dumpsters, various roll-off containers, leachate system servicing for 11 units, weight scale technical support, and grounds maintenance for 240 acres. Non-recurring services include wood grinding operations (5,000 tons), yard waste grinding (3,000 tons), concrete crushing (5,000 tons), and various repair services with specified response times. The template also includes provisions for extension of services under FAR 52.217-8 for periods of 1 month, 3 months, or 6 months. All line items require offerors to input unit prices to calculate total costs for each contract period.

View the file

Other files

File Type Posted
Amendment 0005 N4008525R2529.pdf PDF
Amendment 0004 N4008525R2529.pdf PDF
ELINs 2025 Amend 0004 Revised.xlsx XLSX spreadsheet
Amendment 0003 N4008525R2529.pdf PDF
Amendment 0002 N4008525F2529.pdf PDF
Amendment 0001 N4008525R2529.pdf PDF
J-0200000-06 Camp Lejeune Sanitary Landfill Information Sheet.docx DOCX document
J-0200000-02 Wage Determinations.docx DOCX document
J-0200000-05-3 Spill Response Form.pdf PDF
J-1503050 Table of Contents.docx DOCX document
J-0200000-04 Invoice Form.pdf PDF
J-1502000-07 ROLL-OFF REPAIR ITEMS.docx DOCX document
J-1502000-08 SITE MAPS.pdf PDF
J-0200000-05-4 Contractor Hazardous Material Inventory Log.docx DOCX document
J-1502000-02 REFERENCES AND TECHNICAL SPECIFICATIONS (NEW).docx DOCX document
J-0200000-03 Directives Instructions and References.docx DOCX document
J-1502000 Table of Contents (NEW).docx DOCX document
J-0200000-05-2 Motor Vehicle Accident Report.docx DOCX document
J-1502000-03 INVENTORY OF CONTAINERS AND HISTORICAL DATA (NEW).docx DOCX document
J-1502000-04 TRASH DUMPSTER REPAIR ITEMS (NEW).docx DOCX document
J-1503050-01 Definitions and Acronyms.docx DOCX document
Solicitation 25R2529 Landfill Servcies.pdf PDF
J-1502000-06 DROP BOTTOM REPAIR ITEMS.docx DOCX document
J-0200000-01 Definitions and Acronyms.docx DOCX document
J-0200000 Table of Contents.docx DOCX document
J-1503050-02 References and Technical Documents.docx DOCX document
J-0200000-05-1 Contractor Significant Incident Report (CSIR).docx DOCX document
J-1502000-01 PAP.pdf PDF
J-1502000-05 COMPACTOR AND OPEN TOP REPAIR ITEMS.docx DOCX document
J-1502000-04-1 CARDBOARD DUMPSTER REPAIR ITEMS (NEW).docx DOCX document
J-0200000-05 Camp Lejeune Sanitary Landfill Information Sheet.docx DOCX document
Show all 31

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BaseYR FFP & IDIQ Line Item 0001 Recurring - Base Option PRICES FOR WASTE CONTAINERS (ANNEX 1502000) - RECURRING PRICE - IN ACCORDANCE WITH SECTION C, SPEC ITEM 3, ELIN A001AA THROUGH A001AJ

ELIN/Sub ELINDescriptionQtyU/IFreq.Unit PriceTotal
A001AA8 CY Trash Dumpster Recurring Repairs200EA$0.00
A001AB8 CY Cardboard Dumpster Recurring Repairs150EA$0.00
A001AC40 CY Compactor Recurring Repairs1EA$0.00
A001AD40 CY Roll-Off Dumpster Recurring Repairs12EA$0.00
A001AE30 CY Roll-Off Dumpster Recurring Repairs12EA$0.00
A001AF20 CY Roll-Off Dumpster Recurring Repairs12EA$0.00
A001AG8 CY Drop Bottom Dumpster Recurring Repairs10EA$0.00
A001AH6 CY Drop Bottom Dumpster Recurring Repairs10EA$0.00
A001AJ4 CY Drop Bottom Dumpster Recurring Repairs3EA$0.00
TOTAL RECURRING BASE OPTION YEAR ELINS A001AA thru A001AJ$0.00
Line Item 0001 Recurring - Base Option

PRICES FOR RECURRING SERVICES PROGRAM LEACHATE SYSTEMS, & WEIGHT SCALE ANNUAL TECHNICAL SUPPORT (ANNEX 1502000) - RECURRING PRICE - IN ACCORDANCE WITH SECTION C, SPEC ITEM 3, ELIN A001AK THROUGH A001AM

ELIN/Sub ELINDescriptionQtyU/IFreq.Unit PriceTotal
A001AKRecurring Service Program Leachate Systems11EA1$0.00
A001ALWeight Scale Annual Technical Support1EA1$0.00
A001AMStart-Up Software & Hardware Support1LS1$0.00
TOTAL RECURRING BASE OPTION YEAR ELIN A001AK THROUGH A001AM$0.00
Line Item 0001 Recurring - Base Option

PRICES FOR GROUNDS MAINTENANCE (ANNEX 1503050) - RECURRING PRICE - IN ACCORDANCE WITH SECTION C, SPEC ITEM 3, ELINS A001AN THROUGH A001AW

ELIN/Sub ELINDescriptionQtyU/IFreq.Unit PriceTotal
A001ANGrounds Care240Acres6$0.00
A001APVegetation Control; Fence Line Spraying16162LF2$0.00
A001AQVegetation Control; T&P Site Spraying174240SF2$0.00
A001ARClearing Ditches and Brush71400SF1$0.00
A001ASStorm Water Pond Maintenance12EA1$0.00
A001ATLeachate Pond Cleaning2EA1$0.00
A001AUThe contractor shall perform annual top down cleaning of the 6802 sq ft brass collection area at landfill (entire facility floor to ceiling and machines) to include sampling field testing and laboratory services at building 9781EA1$0.00
A001AVThe contractor shall perform annual 8ft down cleaning of the 6802 sq ft brass collection area at landfill (0-8ft. only) to include sampling field testing and laboratory services at building 9781EA1$0.00
A001AWSpot Sampling6LS$0.00
TOTAL RECURRING BASE OPTION YEAR ELINS A002AN THRU A002AW$0.00
Line Item 0002 Non-Recurring - Base Option

PRICES FOR NON- RECURRING SERVICES PROGRAM LEACHATE SYSTEMS, WEIGHT SCALE (ANNEX 1502000) & GROUNDS MAINTENANCE (ANNEX 1503050) - NON-RECURRING - IN ACCORDANCE WITH SECTION C, SPEC ITEM 4, ELINS A002AA THROUGH A002AL

ELIN/Sub ELINDescriptionEst. QtyU/IUnit PriceTotal
A002AALabor Hours500HR$0.00
A002ABMaterials and Supplies1LS
A002ACGrass shall be cut to a height of 3 inches. Mowing and trimming is required including areas maintained outside the fence. Trimming shall be accomplished to ensure vegetation adjacent to fencing, poles, walls, valves, valve boxes and other similar objects is trimmed to a height not to exceed the height of surrounding vegetation.
Prior to mowing or trimming, the Contractor shall remove and appropriately dispose of debris that interferes with the mowing or trimming operation. Vegetation adjacent to fencing, poles, walls, valves, valve boxes and other similar objects shall be trimmed to a height not to exceed the height of surrounding vegetation. Contractor shall have one working day to mobilize and one working day for each 10 acres ordered to complete the work.100AC$0.00
A002ADThe contractor shall clear brush. All brush shall be cut to the ground and either mulched or hauled to the New Base Landfill on Piney Green Road. Contractor shall have one working day to mobilize and one working day for each 500 SF ordered.50000SF$0.00
A002AERepair leachate breaks/blowouts and methane gas leaching on all side slopes by adding 6 inches of topsoil to the leaching area and a 10 foot diameter around the leaching area, grass area with sod and keep sod watered for 30 days. Contractor shall have one working day to mobilize and one working day for each repair ordered.1000SF$0.00
A002AFRepair settled outer perimeter berms by adding a mounded amount of topsoil (2 foot high x 6 foot wide) to all marked areas and grass repaired berm areas with sod and keep sod watered for 30 days. Contractor shall have one working day to mobilize and one working day for each 1,000 LF ordered.1000LF$0.00
A002AGApply herbicide to areas designated in the task order. Herbicide application shall be in accordance with the Contractor's approved Herbicide Usage Plan. Contractor shall have one working day to mobilize and one working day for each 1,000 LF ordered.5000LF$0.00
A002AHApply herbicide to areas designated in the task order. Herbicide application shall be in accordance with the Contractor's approved Herbicide Usage Plan. Contractor shall have one working day to mobilize.1306800SF$0.00
A002AJThe Contractor shall service the Leachate Lines as follows:

High pressure water cleaning and vacuuming of all debris in 1 cell consisting of 3 Leachate lines; after cleaning perform video inspection of 1 cell consisting of the 3 Leachate lines

High pressure water cleaning and vacuuming of all debris in 1 Sump Pump riser lines; after clean perform video inspection of 1 Sump Pump riser lines.2EA$0.00
A002AKScales System Maintenance1LS$0.00
A002ALLandfill Scale Calibration1EA$0.00
TOTAL NON-RECURRING BASE OPTION YEAR ELINS A002AA thru A002AL
Line Item 0002 Non-Recurring - Base Option

PRICES FOR WASTE CONTAINERS, DROP BOTTOMS 4CY, 6CY, 8CY, ROLL-OFFS 20CY, 30CY, 40CY, COMPACTORS 40CY, TRASH & CARDBOARD 8CY (ANNEX 1502000) - NON-RECURRING - IN ACCORDANCE WITH SECTION C, SPEC ITEM 4, ELINS A002AM THROUGH A002AN

ELIN/Sub ELINDescriptionEst. QtyU/IUnit PriceTotal
A002AMLabor Hours1000HR$0.00
A002ANMaterials and Supplies1LS$0.00
TOTAL NON-RECURRING BASE YEAR ELINS A002AM thru A002AN$0.00
Prices for services in accordance with the scope of work as stated in Section C, Spec Iten 4, Non-Recurring preperation of proposals: In response to the Government's Request for Proposal (RFP), the contractor shall submit a Non-Recurring proposal to the KO within ten (10) working days following recipt for each potential task order which includes: 1) a complete list of all tasks necessary to perform the required scope of work, 2) the number of direct labor hours to perform each task and 3) the project quantity and cost of materials and equipment to perform the required scope of work. 4) a minimum of two (2) commercial supplier's quotes to determine fair and responsable pricing.
Grand Totals$0.00

Base YR IDIQ Line Item 00010 Non-Recurring - BASE Option: Prices for Non-Recurring Services for Landfill Wood Grinding, Yard Waste Grinding, and Concrete Crushing Operations

ELINSPRODUCT NAMEDESCRIPTION EXTENDEDQUANITITYUNIT OF ISSUEUNIT OF PRICEEXTENDED PRICE
A002APWOOD GRINDING OPERATIONSThe Contractor shall provide all labor management, supervision, tools material and equipment required per Attachment J-1502000-10 and as follows: The contractor shall grind piles of wood debris identified during a site inspection with the Landfill Manager, to include but not limited to plant growth such as tree limbs, stumps, logs, pallets, plywood, dimensional lumber, and wood debris. Activities will include but are not limited to grinder operation, land clearing of waste and hauling chips off site.5000TON$0.00
A002AQYARD WASTE GRINDING OPERATIONSThe Contractor shall provide all labor management, supervision, tools material and equipment required per Attachment J-1502000-10 and as follows: The contractor shall grind piles of yard waste identified during a site inspection with the Landfill Manager, to include but not limited to leaves, pine straw, yard clippings, small limbs, and yard debris. Activities will include grinder operation, yard waste shall be grinded on site and remain at that location for government use.3000TON$0.00
A002ARCONCRETE CRUSHING OPERATIONSThe Contractor shall provide all labor management, supervision, tools material and equipment required per Attachment J-1502000-10 and as follows: The Contractor shall crush piles of concrete debris identified during a site inspection, to include but not limited to: brick, block, concrete slabs, concrete pilings, concrete culvert and various other types of concrete debris. Crushed debris will remain on site for government use.5000TON$0.00
TOTAL$0.00

1st Yr Option FFP & IDIQ Line Item 0003 Recurring - FIRST OPTION PRICES FOR WASTE CONTAINERS (ANNEX 1502000) - RECURRING PRICE - IN ACCORDANCE WITH SECTION C, SPEC ITEM 3, ELIN B003AA THROUGH B003AJ

DescriptionQtyU/IFreq.Unit PriceTotal
B003AA8 CY Trash Dumpster Recurring Repairs200EA$0.00
B003AB8 CY Cardboard Dumpster Recurring Repairs150EA$0.00
B003AC40 CY Compactor Recurring Repairs1EA$0.00
B003AD40 CY Roll-Off Dumpster Recurring Repairs12EA$0.00
B003AE30 CY Roll-Off Dumpster Recurring Repairs12EA$0.00
B003AF20 CY Roll-Off Dumpster Recurring Repairs12EA$0.00
B003AG8 CY Drop Bottom Dumpster Recurring Repairs10EA$0.00
B003AH6 CY Drop Bottom Dumpster Recurring Repairs10EA$0.00
B003AJ4 CY Drop Bottom Dumpster Recurring Repairs3EA$0.00
TOTAL RECURRING FIRST OPTION YEAR ELINS B003AA thru B003AJ$0.00
Line Item 0003 Recurring - FIRST OPTION

PRICES FOR RECURRING SERVICES PROGRAM LEACHATE SYSTEMS, & WEIGHT SCALE ANNUAL TECHNICAL SUPPORT (ANNEX 1502000) - RECURRING PRICE - IN ACCORDANCE WITH SECTION C, SPEC ITEM 3, ELIN B003AK THROUGH B003AM

ELIN/Sub ELINDescriptionQtyU/IFreq.Unit PriceTotal
B003AKRecurring Service Program Leachate Systems11EA1$0.00
B003ALWeight Scale Annual Technical Support1EA1$0.00
B003AMStart-Up Software & Hardware Support1LS$0.00
TOTAL RECURRING FIRST OPTION YEAR ELIN B003AK THROUGH B003AM$0.00
Line Item 0003 Recurring - First Option

PRICES FOR GROUNDS MAINTENANCE (ANNEX 1503050) - RECURRING PRICE - IN ACCORDANCE WITH SECTION C, SPEC ITEM 3, ELINS B003AN THROUGH B003AW

ELIN/Sub ELINDescriptionQtyU/IFreq.Unit PriceTotal
B003ANGrounds Care240Acres6$0.00
B003APVegetation Control; Fence Line Spraying16162LF2$0.00
B003AQVegetation Control; T&P Site Spraying174240SF2$0.00
B003ARClearing Ditches and Brush71400SF1$0.00
B003ASStorm Water Pond Maintenance12EA1$0.00
B003ATLeachate Pond Cleaning2EA1$0.00
B003AUThe contractor shall perform annual top down cleaning of the 6802 sq ft brass collection area at landfill (entire facility floor to ceiling and machines) to include sampling field testing and laboratory services at building 9781EA1$0.00
B003AVThe contractor shall perform annual 8ft down cleaning of the 6802 sq ft brass collection area at landfill (0-8ft. only) to include sampling field testing and laboratory services at building 9781EA1$0.00
B003AWSpot Sampling6LS$0.00
TOTAL RECURRING FIRST OPTION YEAR ELINS B004AN THRU B004AW$0.00
Line Item 0004 Non-Recurring - FIRST OPTION

PRICES FOR NON- RECURRING SERVICES PROGRAM LEACHATE SYSTEMS, WEIGHT SCALE (ANNEX 1502000) & GROUNDS MAINTENANCE (ANNEX 1503050) - NON-RECURRING - IN ACCORDANCE WITH SECTION C, SPEC ITEM 4, ELINS B003AA THROUGH B003AL

ELIN/Sub ELINDescriptionEst. QtyU/IUnit PriceTotal
B004AALabor Hours500HR$0.00
B004ABMaterials and Supplies1LS
B004ACGrass shall be cut to a height of 3 inches. Mowing and trimming is required including areas maintained outside the fence. Trimming shall be accomplished to ensure vegetation adjacent to fencing, poles, walls, valves, valve boxes and other similar objects is trimmed to a height not to exceed the height of surrounding vegetation.
Prior to mowing or trimming, the Contractor shall remove and appropriately dispose of debris that interferes with the mowing or trimming operation. Vegetation adjacent to fencing, poles, walls, valves, valve boxes and other similar objects shall be trimmed to a height not to exceed the height of surrounding vegetation. Contractor shall have one working day to mobilize and one working day for each 10 acres ordered to complete the work.100AC$0.00
B004ADThe contractor shall clear brush. All brush shall be cut to the ground and either mulched or hauled to the New Base Landfill on Piney Green Road. Contractor shall have one working day to mobilize and one working day for each 500 SF ordered.50000SF$0.00
B004AERepair leachate breaks/blowouts and methane gas leaching on all side slopes by adding 6 inches of topsoil to the leaching area and a 10 foot diameter around the leaching area, grass area with sod and keep sod watered for 30 days. Contractor shall have one working day to mobilize and one working day for each repair ordered.1000SF$0.00
B004AFRepair settled outer perimeter berms by adding a mounded amount of topsoil (2 foot high x 6 foot wide) to all marked areas and grass repaired berm areas with sod and keep sod watered for 30 days. Contractor shall have one working day to mobilize and one working day for each 1,000 LF ordered.1000LF$0.00
B004AGApply herbicide to areas designated in the task order. Herbicide application shall be in accordance with the Contractor's approved Herbicide Usage Plan. Contractor shall have one working day to mobilize and one working day for each 1,000 LF ordered.5000LF$0.00
B004AHApply herbicide to areas designated in the task order. Herbicide application shall be in accordance with the Contractor's approved Herbicide Usage Plan. Contractor shall have one working day to mobilize.1306800SF$0.00
B004AJThe Contractor shall service the Leachate Lines as follows:

High pressure water cleaning and vacuuming of all debris in 1 cell consisting of 3 Leachate lines; after cleaning perform video inspection of 1 cell consisting of the 3 Leachate lines

High pressure water cleaning and vacuuming of all debris in 1 Sump Pump riser lines; after clean perform video inspection of 1 Sump Pump riser lines.2EA$0.00
B004AKScales System Maintenance1LS$0.00
B004ALLandfill Scale Calibration1EA$0.00
TOTAL NON-RECURRING FIRST OPTION YEAR ELINS B004AA thru B004AL$0.00
Line Item 004 Non-Recurring - FIRST OPTION

PRICES FOR WASTE CONTAINERS, DROP BOTTOMS 4CY, 6CY, 8CY, ROLL-OFFS 20CY, 30CY, 40CY, COMPACTORS 40CY, TRASH & CARDBOARD 8CY (ANNEX 1502000) - NON-RECURRING - IN ACCORDANCE WITH SECTION C, SPEC ITEM 4, ELINS B004AM THROUGH B004AN

ELIN/Sub ELINDescriptionEst. QtyU/IUnit PriceTotal
B004AMLabor Hours1000HR$0.00
B004ANMaterials and Supplies1LS$0.00
TOTAL NON-RECURRING FIRST YEAR ELINS B004AM thru B004AN$0.00
Prices for services in accordance with the scope of work as stated in Section C, Spec Iten 4, Non-Recurring preperation of proposals: In response to the Government's Request for Proposal (RFP), the contractor shall submit a Non-Recurring proposal to the KO within ten (10) working days following recipt for each potential task order which includes: 1) a complete list of all tasks necessary to perform the required scope of work, 2) the number of direct labor hours to perform each task and 3) the project quantity and cost of materials and equipment to perform the required scope of work. 4) a minimum of two (2) commercial supplier's quotes to determine fair and responsable pricing.

Grand Totals $0.00

1st Op YR IDIQ Line Item 0004 Non-Recurring - FIRST Option: Prices for Non-Recurring Services for Landfill Wood Grinding, Yard Waste Grinding, and Concrete Crushing Operations

ELINSPRODUCT NAMEDESCRIPTION EXTENDEDQUANITITYUNIT OF ISSUEUNIT OF PRICEEXTENDED PRICE
B004APWOOD GRINDING OPERATIONSThe Contractor shall provide all labor management, supervision, tools material and equipment required per Attachment J-1502000-10 and as follows: The contractor shall grind piles of wood debris identified during a site inspection with the Landfill Manager, to include but not limited to plant growth such as tree limbs, stumps, logs, pallets, plywood, dimensional lumber, and wood debris. Activities will include but are not limited to grinder operation, land clearing of waste and hauling chips off site.5000TON$0.00
B004AQYARD WASTE GRINDING OPERATIONSThe Contractor shall provide all labor management, supervision, tools material and equipment required per Attachment J-1502000-10 and as follows: The contractor shall grind piles of yard waste identified during a site inspection with the Landfill Manager, to include but not limited to leaves, pine straw, yard clippings, small limbs, and yard debris. Activities will include grinder operation, yard waste shall be grinded on site and remain at that location for government use.3000TON$0.00
B004ARCONCRETE CRUSHING OPERATIONSThe Contractor shall provide all labor management, supervision, tools material and equipment required per Attachment J-1502000-10 and as follows: The Contractor shall crush piles of concrete debris identified during a site inspection, to include but not limited to: brick, block, concrete slabs, concrete pilings, concrete culvert and various other types of concrete debris. Crushed debris will remain on site for government use.5000TON$0.00
TOTAL$0.00

2nd Yr Option FFP & IDIQ Line Item 0005 Recurring - SECOND OPTION PRICES FOR WASTE CONTAINERS (ANNEX 1502000) - RECURRING PRICE - IN ACCORDANCE WITH SECTION C, SPEC ITEM 3, ELIN C005AA THROUGH C005AJ

ELIN/Sub ELINDescriptionQtyU/IFreq.Unit PriceTotal
C005AA8 CY Trash Dumpster Recurring Repairs200EA$0.00
C005AB8 CY Cardboard Dumpster Recurring Repairs150EA$0.00
C005AC40 CY Compactor Recurring Repairs1EA$0.00
C005AD40 CY Roll-Off Dumpster Recurring Repairs12EA$0.00
C005AE30 CY Roll-Off Dumpster Recurring Repairs12EA$0.00
C005AF20 CY Roll-Off Dumpster Recurring Repairs12EA$0.00
C005AG8 CY Drop Bottom Dumpster Recurring Repairs10EA$0.00
C005AH6 CY Drop Bottom Dumpster Recurring Repairs10EA$0.00
C005AJ4 CY Drop Bottom Dumpster Recurring Repairs3EA$0.00
TOTAL RECURRING SECOND OPTION YEAR ELINS C005AA thru C005AJ$0.00
Line Item 0005 Recurring - SECOND OPTION

PRICES FOR RECURRING SERVICES PROGRAM LEACHATE SYSTEMS, & WEIGHT SCALE ANNUAL TECHNICAL SUPPORT (ANNEX 1502000) - RECURRING PRICE - IN ACCORDANCE WITH SECTION C, SPEC ITEM 3, ELIN C005AK THROUGH C005AM

ELIN/Sub ELINDescriptionQtyU/IFreq.Unit PriceTotal
C005AKRecurring Service Program Leachate Systems11EA1$0.00
C005ALWeight Scale Annual Technical Support1EA1$0.00
C005AMStart-Up Software & Hardware Support1LS$0.00
TOTAL RECURRING SECOND OPTION YEAR ELIN C005AK THROUGH C005AM$0.00
Line Item 0005 Recurring - SECOND Option

PRICES FOR GROUNDS MAINTENANCE (ANNEX 1503050) - RECURRING PRICE - IN ACCORDANCE WITH SECTION C, SPEC ITEM 3, ELINS C005AN THROUGH C005AW

ELIN/Sub ELINDescriptionQtyU/IFreq.Unit PriceTotal
C005ANGrounds Care240Acres6$0.00
C005APVegetation Control; Fence Line Spraying16162LF2$0.00
C005AQVegetation Control; T&P Site Spraying174240SF2$0.00
C005ARClearing Ditches and Brush71400SF1$0.00
C005ASStorm Water Pond Maintenance12EA1$0.00
C005ATLeachate Pond Cleaning2EA1$0.00
C005AUThe contractor shall perform annual top down cleaning of the 6802 sq ft brass collection area at landfill (entire facility floor to ceiling and machines) to include sampling field testing and laboratory services at building 9781EA1$0.00
C005AVThe contractor shall perform annual 8ft down cleaning of the 6802 sq ft brass collection area at landfill (0-8ft. only) to include sampling field testing and laboratory services at building 9781EA1$0.00
C005AWSpot Sampling6LS$0.00
TOTAL RECURRING SECOND OPTION YEAR ELINS C005AN THRU C005AW$0.00
Line Item 0006 Non-Recurring - SECOND OPTION

PRICES FOR NON- RECURRING SERVICES PROGRAM LEACHATE SYSTEMS, WEIGHT SCALE (ANNEX 1502000) & GROUNDS MAINTENANCE (ANNEX 1503050) - NON-RECURRING - IN ACCORDANCE WITH SECTION C, SPEC ITEM 4, ELINS C006AA THROUGH C006AK

ELIN/Sub ELINDescriptionEst. QtyU/IUnit PriceTotal
C006AALabor Hours500HR$0.00
C006ABMaterials and Supplies1LS
C006ACGrass shall be cut to a height of 3 inches. Mowing and trimming is required including areas maintained outside the fence. Trimming shall be accomplished to ensure vegetation adjacent to fencing, poles, walls, valves, valve boxes and other similar objects is trimmed to a height not to exceed the height of surrounding vegetation.
Prior to mowing or trimming, the Contractor shall remove and appropriately dispose of debris that interferes with the mowing or trimming operation. Vegetation adjacent to fencing, poles, walls, valves, valve boxes and other similar objects shall be trimmed to a height not to exceed the height of surrounding vegetation. Contractor shall have one working day to mobilize and one working day for each 10 acres ordered to complete the work.100AC$0.00
C006ADThe contractor shall clear brush. All brush shall be cut to the ground and either mulched or hauled to the New Base Landfill on Piney Green Road. Contractor shall have one working day to mobilize and one working day for each 500 SF ordered.50000SF$0.00
C006AERepair leachate breaks/blowouts and methane gas leaching on all side slopes by adding 6 inches of topsoil to the leaching area and a 10 foot diameter around the leaching area, grass area with sod and keep sod watered for 30 days. Contractor shall have one working day to mobilize and one working day for each repair ordered.1000SF$0.00
C006AFRepair settled outer perimeter berms by adding a mounded amount of topsoil (2 foot high x 6 foot wide) to all marked areas and grass repaired berm areas with sod and keep sod watered for 30 days. Contractor shall have one working day to mobilize and one working day for each 1,000 LF ordered.1000LF$0.00
C006AGApply herbicide to areas designated in the task order. Herbicide application shall be in accordance with the Contractor's approved Herbicide Usage Plan. Contractor shall have one working day to mobilize and one working day for each 1,000 LF ordered.5000LF$0.00
C006AHApply herbicide to areas designated in the task order. Herbicide application shall be in accordance with the Contractor's approved Herbicide Usage Plan. Contractor shall have one working day to mobilize.1306800SF$0.00
C006AJThe Contractor shall service the Leachate Lines as follows:

High pressure water cleaning and vacuuming of all debris in 1 cell consisting of 3 Leachate lines; after cleaning perform video inspection of 1 cell consisting of the 3 Leachate lines

High pressure water cleaning and vacuuming of all debris in 1 Sump Pump riser lines; after clean perform video inspection of 1 Sump Pump riser lines.2EA$0.00
C006AKScales System Maintenance1LS$0.00
C006ALLandfill Scale Calibration1EA$0.00
TOTAL NON-RECURRING SECOND OPTION YEAR ELINS C006AA thru C006AL$0.00
Line Item 006 Non-Recurring - SECOND OPTION

PRICES FOR WASTE CONTAINERS, DROP BOTTOMS 4CY, 6CY, 8CY, ROLL-OFFS 20CY, 30CY, 40CY, COMPACTORS 40CY, TRASH & CARDBOARD 8CY (ANNEX 1502000) - NON-RECURRING - IN ACCORDANCE WITH SECTION C, SPEC ITEM 4, ELINS C006AM THROUGH C006AN

ELIN/Sub ELINDescriptionEst. QtyU/IUnit PriceTotal
C006AMLabor Hours1000HR$0.00
C006ANMaterials and Supplies1LS$0.00
TOTAL NON-RECURRING SECOND YEAR ELINS C006AM thru C006AN$0.00
Prices for services in accordance with the scope of work as stated in Section C, Spec Iten 4, Non-Recurring preperation of proposals: In response to the Government's Request for Proposal (RFP), the contractor shall submit a Non-Recurring proposal to the KO within ten (10) working days following recipt for each potential task order which includes: 1) a complete list of all tasks necessary to perform the required scope of work, 2) the number of direct labor hours to perform each task and 3) the project quantity and cost of materials and equipment to perform the required scope of work. 4) a minimum of two (2) commercial supplier's quotes to determine fair and responsable pricing.
Grand Totals$0.00

2nd Op YR IDIQ Line Item 0006 Non-Recurring - SECOND Option: Prices for Non-Recurring Services for Landfill Wood Grinding, Yard Waste Grinding, and Concrete Crushing Operations

ELINSPRODUCT NAMEDESCRIPTION EXTENDEDQUANITITYUNIT OF ISSUEUNIT OF PRICEEXTENDED PRICE
C006AQWOOD GRINDING OPERATIONSThe Contractor shall provide all labor management, supervision, tools material and equipment required per Attachment J-1502000-10 and as follows: The contractor shall grind piles of wood debris identified during a site inspection with the Landfill Manager, to include but not limited to plant growth such as tree limbs, stumps, logs, pallets, plywood, dimensional lumber, and wood debris. Activities will include but are not limited to grinder operation, land clearing of waste and hauling chips off site.5000TON$0.00
C006ARYARD WASTE GRINDING OPERATIONSThe Contractor shall provide all labor management, supervision, tools material and equipment required per Attachment J-1502000-10 and as follows: The contractor shall grind piles of yard waste identified during a site inspection with the Landfill Manager, to include but not limited to leaves, pine straw, yard clippings, small limbs, and yard debris. Activities will include grinder operation, yard waste shall be grinded on site and remain at that location for government use.3000TON$0.00
C006AQCONCRETE CRUSHING OPERATIONSThe Contractor shall provide all labor management, supervision, tools material and equipment required per Attachment J-1502000-10 and as follows: The Contractor shall crush piles of concrete debris identified during a site inspection, to include but not limited to: brick, block, concrete slabs, concrete pilings, concrete culvert and various other types of concrete debris. Crushed debris will remain on site for government use.5000TON$0.00
TOTAL$0.00

3rd Yr Option FFP & IDIQ Line Item 0007 Recurring - THIRD OPTION PRICES FOR WASTE CONTAINERS (ANNEX 1502000) - RECURRING PRICE - IN ACCORDANCE WITH SECTION C, SPEC ITEM 3, ELIN D007AA THROUGH C007AJ

ELIN/Sub ELINDescriptionQtyU/IFreq.Unit PriceTotal
D007AA8 CY Trash Dumpster Recurring Repairs200EA$0.00
D007AB8 CY Cardboard Dumpster Recurring Repairs150EA$0.00
D007AC40 CY Compactor Recurring Repairs1EA$0.00
D007AD40 CY Roll-Off Dumpster Recurring Repairs12EA$0.00
D007AE30 CY Roll-Off Dumpster Recurring Repairs12EA$0.00
D007AF20 CY Roll-Off Dumpster Recurring Repairs12EA$0.00
D007AG8 CY Drop Bottom Dumpster Recurring Repairs10EA$0.00
D007AH6 CY Drop Bottom Dumpster Recurring Repairs10EA$0.00
D007AJ4 CY Drop Bottom Dumpster Recurring Repairs3EA$0.00
TOTAL RECURRING THIRD OPTION YEAR ELINS D007AA thru D075AJ$0.00
Line Item 0007 Recurring - THIRD OPTION

PRICES FOR RECURRING SERVICES PROGRAM LEACHATE SYSTEMS, & WEIGHT SCALE ANNUAL TECHNICAL SUPPORT (ANNEX 1502000) - RECURRING PRICE - IN ACCORDANCE WITH SECTION C, SPEC ITEM 3, ELIN D007AK THROUGH D007AM

ELIN/Sub ELINDescriptionQtyU/IFreq.Unit PriceTotal
D007AKRecurring Service Program Leachate Systems11EA1$0.00
D007ALWeight Scale Annual Technical Support1EA1$0.00
D007AMStart-Up Software & Hardware Support1LS$0.00
TOTAL RECURRING THIRD OPTION YEAR ELIN D007AK THROUGH D007AM$0.00
Line Item 0007 Recurring - THIRD Option

PRICES FOR GROUNDS MAINTENANCE (ANNEX 1503050) - RECURRING PRICE - IN ACCORDANCE WITH SECTION C, SPEC ITEM 3, ELINS D007AN THROUGH D007AW

ELIN/Sub ELINDescriptionQtyU/IFreq.Unit PriceTotal
D007ANGrounds Care240Acres6$0.00
D007APVegetation Control; Fence Line Spraying16162LF2$0.00
D007AQVegetation Control; T&P Site Spraying174240SF2$0.00
D007ARClearing Ditches and Brush71400SF1$0.00
D007ASStorm Water Pond Maintenance12EA1$0.00
D007ATLeachate Pond Cleaning2EA1$0.00
D007AUThe contractor shall perform annual top down cleaning of the 6802 sq ft brass collection area at landfill (entire facility floor to ceiling and machines) to include sampling field testing and laboratory services at building 9781EA1$0.00
D0071AVThe contractor shall perform annual 8ft down cleaning of the 6802 sq ft brass collection area at landfill (0-8ft. only) to include sampling field testing and laboratory services at building 9781EA1$0.00
D007AWSpot Sampling6LS$0.00
TOTAL RECURRING THIRD OPTION YEAR ELINS D007AN THRU D007AW$0.00
Line Item 0009 Non-Recurring - THIRD OPTION

PRICES FOR NON- RECURRING SERVICES PROGRAM LEACHATE SYSTEMS, WEIGHT SCALE (ANNEX 1502000) & GROUNDS MAINTENANCE (ANNEX 1503050) - NON-RECURRING - IN ACCORDANCE WITH SECTION C, SPEC ITEM 4, ELINS D008AA THROUGH D008AL

ELIN/Sub ELINDescriptionEst. QtyU/IUnit PriceTotal
D008AALabor Hours500HR$0.00
D008ABMaterials and Supplies1LS$0.00
D008ACGrass shall be cut to a height of 3 inches. Mowing and trimming is required including areas maintained outside the fence. Trimming shall be accomplished to ensure vegetation adjacent to fencing, poles, walls, valves, valve boxes and other similar objects is trimmed to a height not to exceed the height of surrounding vegetation.
Prior to mowing or trimming, the Contractor shall remove and appropriately dispose of debris that interferes with the mowing or trimming operation. Vegetation adjacent to fencing, poles, walls, valves, valve boxes and other similar objects shall be trimmed to a height not to exceed the height of surrounding vegetation. Contractor shall have one working day to mobilize and one working day for each 10 acres ordered to complete the work.100AC$0.00
D008ADThe contractor shall clear brush. All brush shall be cut to the ground and either mulched or hauled to the New Base Landfill on Piney Green Road. Contractor shall have one working day to mobilize and one working day for each 500 SF ordered.50000SF$0.00
D008AERepair leachate breaks/blowouts and methane gas leaching on all side slopes by adding 6 inches of topsoil to the leaching area and a 10 foot diameter around the leaching area, grass area with sod and keep sod watered for 30 days. Contractor shall have one working day to mobilize and one working day for each repair ordered.1000SF$0.00
D008AFRepair settled outer perimeter berms by adding a mounded amount of topsoil (2 foot high x 6 foot wide) to all marked areas and grass repaired berm areas with sod and keep sod watered for 30 days. Contractor shall have one working day to mobilize and one working day for each 1,000 LF ordered.1000LF$0.00
D008AGApply herbicide to areas designated in the task order. Herbicide application shall be in accordance with the Contractor's approved Herbicide Usage Plan. Contractor shall have one working day to mobilize and one working day for each 1,000 LF ordered.5000LF$0.00
D008AHApply herbicide to areas designated in the task order. Herbicide application shall be in accordance with the Contractor's approved Herbicide Usage Plan. Contractor shall have one working day to mobilize.1306800SF$0.00
D008AJThe Contractor shall service the Leachate Lines as follows:

High pressure water cleaning and vacuuming of all debris in 1 cell consisting of 3 Leachate lines; after cleaning perform video inspection of 1 cell consisting of the 3 Leachate lines

High pressure water cleaning and vacuuming of all debris in 1 Sump Pump riser lines; after clean perform video inspection of 1 Sump Pump riser lines.2EA$0.00
D008AKScales System Maintenance1LS$0.00
D008ALLandfill Scale Calibration1EA$0.00
TOTAL NON-RECURRING THIRD OPTION YEAR ELINS D008AA thru D008AL$0.00
Line Item 008 Non-Recurring - THIRD OPTION

PRICES FOR WASTE CONTAINERS, DROP BOTTOMS 4CY, 6CY, 8CY, ROLL-OFFS 20CY, 30CY, 40CY, COMPACTORS 40CY, TRASH & CARDBOARD 8CY (ANNEX 1502000) - NON-RECURRING - IN ACCORDANCE WITH SECTION C, SPEC ITEM 4, ELINS D008AM THROUGH D008AN

ELIN/Sub ELINDescriptionEst. QtyU/IUnit PriceTotal
D008AMLabor Hours1000HR$0.00
D008ANMaterials and Supplies1LS$0.00
TOTAL NON-RECURRING THIRD YEAR ELINS D008AM thru D008AN$0.00
Prices for services in accordance with the scope of work as stated in Section C, Spec Iten 4, Non-Recurring preperation of proposals: In response to the Government's Request for Proposal (RFP), the contractor shall submit a Non-Recurring proposal to the KO within ten (10) working days following recipt for each potential task order which includes: 1) a complete list of all tasks necessary to perform the required scope of work, 2) the number of direct labor hours to perform each task and 3) the project quantity and cost of materials and equipment to perform the required scope of work. 4) a minimum of two (2) commercial supplier's quotes to determine fair and responsable pricing.
Grand Totals$0.00

3rd Op YR IDIQ Line Item 0008 Non-Recurring - THIRD OPTION: Prices for Non-Recurring Services for Landfill Wood Grinding, Yard Waste Grinding, and Concrete Crushing Operations

ELINSPRODUCT NAMEDESCRIPTION EXTENDEDQUANITITYUNIT OF ISSUEUNIT OF PRICEEXTENDED PRICE
D008APWOOD GRINDING OPERATIONSThe Contractor shall provide all labor management, supervision, tools material and equipment required per Attachment J-1502000-10 and as follows: The contractor shall grind piles of wood debris identified during a site inspection with the Landfill Manager, to include but not limited to plant growth such as tree limbs, stumps, logs, pallets, plywood, dimensional lumber, and wood debris. Activities will include but are not limited to grinder operation, land clearing of waste and hauling chips off site.5000TON$0.00
D008AQYARD WASTE GRINDING OPERATIONSThe Contractor shall provide all labor management, supervision, tools material and equipment required per Attachment J-1502000-10 and as follows: The contractor shall grind piles of yard waste identified during a site inspection with the Landfill Manager, to include but not limited to leaves, pine straw, yard clippings, small limbs, and yard debris. Activities will include grinder operation, yard waste shall be grinded on site and remain at that location for government use.3000TON$0.00
D008ARCONCRETE CRUSHING OPERATIONSThe Contractor shall provide all labor management, supervision, tools material and equipment required per Attachment J-1502000-10 and as follows: The Contractor shall crush piles of concrete debris identified during a site inspection, to include but not limited to: brick, block, concrete slabs, concrete pilings, concrete culvert and various other types of concrete debris. Crushed debris will remain on site for government use.5000TON$0.00
TOTAL$0.00

4th Yr Option FFP & IDIQ Line Item 0009 Recurring - FOURTH OPTION PRICES FOR WASTE CONTAINERS (ANNEX 1502000) - RECURRING PRICE - IN ACCORDANCE WITH SECTION C, SPEC ITEM 3, ELIN E009AA THROUGH E097AJ

ELIN/Sub ELINDescriptionQtyU/IFreq.Unit PriceTotal
E009AA8 CY Trash Dumpster Recurring Repairs200EA$0.00
E009AB8 CY Cardboard Dumpster Recurring Repairs150EA$0.00
E009AC40 CY Compactor Recurring Repairs1EA$0.00
E097AD40 CY Roll-Off Dumpster Recurring Repairs12EA$0.00
E009AE30 CY Roll-Off Dumpster Recurring Repairs12EA$0.00
E009AF20 CY Roll-Off Dumpster Recurring Repairs12EA$0.00
E009AG8 CY Drop Bottom Dumpster Recurring Repairs10EA$0.00
E009AH6 CY Drop Bottom Dumpster Recurring Repairs10EA$0.00
E009AJ4 CY Drop Bottom Dumpster Recurring Repairs3EA$0.00
TOTAL RECURRING FOURTH OPTION YEAR ELINS E009AA thru E095AJ$0.00
Line Item 0009 Recurring - FOURTH OPTION

PRICES FOR RECURRING SERVICES PROGRAM LEACHATE SYSTEMS, & WEIGHT SCALE ANNUAL TECHNICAL SUPPORT (ANNEX 1502000) - RECURRING PRICE - IN ACCORDANCE WITH SECTION C, SPEC ITEM 3, ELIN E009AK THROUGH E009AM

ELIN/Sub ELINDescriptionQtyU/IFreq.Unit PriceTotal
E009AKRecurring Service Program Leachate Systems11EA1$0.00
E009ALWeight Scale Annual Technical Support1EA1$0.00
E009AMStart-Up Software & Hardware Support1LS$0.00
TOTAL RECURRING FOURTH OPTION YEAR ELIN E009AK THROUGH E009AM$0.00
Line Item 0009 Recurring - FOURTH OPTION

PRICES FOR GROUNDS MAINTENANCE (ANNEX 1503050) - RECURRING PRICE - IN ACCORDANCE WITH SECTION C, SPEC ITEM 3, ELINS E009AN THROUGH E009AW

ELIN/Sub ELINDescriptionQtyU/IFreq.Unit PriceTotal
E009ANGrounds Care240Acres6$0.00
E009APVegetation Control; Fence Line Spraying16162LF2$0.00
E009AQVegetation Control; T&P Site Spraying174240SF2$0.00
E009ARClearing Ditches and Brush71400SF1$0.00
E097ASStorm Water Pond Maintenance12EA1$0.00
E0091ATLeachate Pond Cleaning2EA1$0.00
E009AUThe contractor shall perform annual top down cleaning of the 6802 sq ft brass collection area at landfill (entire facility floor to ceiling and machines) to include sampling field testing and laboratory services at building 9781EA1$0.00
E0091AVThe contractor shall perform annual 8ft down cleaning of the 6802 sq ft brass collection area at landfill (0-8ft. only) to include sampling field testing and laboratory services at building 9781EA1$0.00
E009AWSpot Sampling6LS$0.00
TOTAL RECURRING FOURTH OPTION YEAR ELINS E009AN THRU E009AW$0.00
Total of all Recuring Fourth Option Year$0.00
Line Item 0010 Non-Recurring - FOURTH OPTION

PRICES FOR NON- RECURRING SERVICES PROGRAM LEACHATE SYSTEMS, WEIGHT SCALE (ANNEX 1502000) & GROUNDS MAINTENANCE (ANNEX 1503050) - NON-RECURRING - IN ACCORDANCE WITH SECTION C, SPEC ITEM 4, ELINS E0010AA THROUGH E0010AL

ELIN/Sub ELINDescriptionEst. QtyU/IUnit PriceTotal
E0010AALabor Hours500HR$0.00
E0010ABMaterials and Supplies1LS$0.00
E0010ACGrass shall be cut to a height of 3 inches. Mowing and trimming is required including areas maintained outside the fence. Trimming shall be accomplished to ensure vegetation adjacent to fencing, poles, walls, valves, valve boxes and other similar objects is trimmed to a height not to exceed the height of surrounding vegetation.
Prior to mowing or trimming, the Contractor shall remove and appropriately dispose of debris that interferes with the mowing or trimming operation. Vegetation adjacent to fencing, poles, walls, valves, valve boxes and other similar objects shall be trimmed to a height not to exceed the height of surrounding vegetation. Contractor shall have one working day to mobilize and one working day for each 10 acres ordered to complete the work.100AC$0.00
E0010ADThe contractor shall clear brush. All brush shall be cut to the ground and either mulched or hauled to the New Base Landfill on Piney Green Road. Contractor shall have one working day to mobilize and one working day for each 500 SF ordered.50000SF$0.00
E0010AERepair leachate breaks/blowouts and methane gas leaching on all side slopes by adding 6 inches of topsoil to the leaching area and a 10 foot diameter around the leaching area, grass area with sod and keep sod watered for 30 days. Contractor shall have one working day to mobilize and one working day for each repair ordered.1000SF$0.00
E00810AFRepair settled outer perimeter berms by adding a mounded amount of topsoil (2 foot high x 6 foot wide) to all marked areas and grass repaired berm areas with sod and keep sod watered for 30 days. Contractor shall have one working day to mobilize and one working day for each 1,000 LF ordered.1000LF$0.00
E0010AGApply herbicide to areas designated in the task order. Herbicide application shall be in accordance with the Contractor's approved Herbicide Usage Plan. Contractor shall have one working day to mobilize and one working day for each 1,000 LF ordered.5000LF$0.00
E0010AHApply herbicide to areas designated in the task order. Herbicide application shall be in accordance with the Contractor's approved Herbicide Usage Plan. Contractor shall have one working day to mobilize.1306800SF$0.00
E0010AJThe Contractor shall service the Leachate Lines as follows:

High pressure water cleaning and vacuuming of all debris in 1 cell consisting of 3 Leachate lines; after cleaning perform video inspection of 1 cell consisting of the 3 Leachate lines

High pressure water cleaning and vacuuming of all debris in 1 Sump Pump riser lines; after clean perform video inspection of 1 Sump Pump riser lines.2EA$0.00
E0010AKScales System Maintenance1LS$0.00
E0010ALLandfill Scale Calibration1EA$0.00
TOTAL NON-RECURRING FOURTH OPTION YEAR ELINS E0010AA thru E0010AL$0.00
Line Item 0010 Non-Recurring - FOURTH OPTION

PRICES FOR WASTE CONTAINERS, DROP BOTTOMS 4CY, 6CY, 8CY, ROLL-OFFS 20CY, 30CY, 40CY, COMPACTORS 40CY, TRASH & CARDBOARD 8CY (ANNEX 1502000) - NON-RECURRING - IN ACCORDANCE WITH SECTION C, SPEC ITEM 4, ELINS E0010AM THROUGH E0010AN

ELIN/Sub ELINDescriptionEst. QtyU/IUnit PriceTotal
E0010AMLabor Hours1000HR$0.00
E0010ANMaterials and Supplies1LS$0.00
TOTAL NON-RECURRING FOURTH YEAR ELINS E0010AM thru E0010AN$0.00
TOTAL OF ALL NON-RECURRING FOURTH OPTION$0.00
Prices for services in accordance with the scope of work as stated in Section C, Spec Iten 4, Non-Recurring preperation of proposals: In response to the Government's Request for Proposal (RFP), the contractor shall submit a Non-Recurring proposal to the KO within ten (10) working days following recipt for each potential task order which includes: 1) a complete list of all tasks necessary to perform the required scope of work, 2) the number of direct labor hours to perform each task and 3) the project quantity and cost of materials and equipment to perform the required scope of work. 4) a minimum of two (2) commercial supplier's quotes to determine fair and responsable pricing.
Grand Totals$0.00

4TH Op YR IDIQ Line Item 00010 Non-Recurring - FOURTH OPTION: Prices for Non-Recurring Services for Landfill Wood Grinding, Yard Waste Grinding, and Concrete Crushing Operations

ELINSPRODUCT NAMEDESCRIPTION EXTENDEDQUANITITYUNIT OF ISSUEUNIT OF PRICEEXTENDED PRICE
E0010APWOOD GRINDING OPERATIONSThe Contractor shall provide all labor management, supervision, tools material and equipment required per Attachment J-1502000-10 and as follows: The contractor shall grind piles of wood debris identified during a site inspection with the Landfill Manager, to include but not limited to plant growth such as tree limbs, stumps, logs, pallets, plywood, dimensional lumber, and wood debris. Activities will include but are not limited to grinder operation, land clearing of waste and hauling chips off site.5000TON$0.00
E0010AQYARD WASTE GRINDING OPERATIONSThe Contractor shall provide all labor management, supervision, tools material and equipment required per Attachment J-1502000-10 and as follows: The contractor shall grind piles of yard waste identified during a site inspection with the Landfill Manager, to include but not limited to leaves, pine straw, yard clippings, small limbs, and yard debris. Activities will include grinder operation, yard waste shall be grinded on site and remain at that location for government use.3000TON$0.00
E0010ARCONCRETE CRUSHING OPERATIONSThe Contractor shall provide all labor management, supervision, tools material and equipment required per Attachment J-1502000-10 and as follows: The Contractor shall crush piles of concrete debris identified during a site inspection, to include but not limited to: brick, block, concrete slabs, concrete pilings, concrete culvert and various other types of concrete debris. Crushed debris will remain on site for government use.5000TON$0.00
TOTAL$0.00

OPTION YEAR TO EXTEND SERVICES

FAR Clause 52.217-8 Option to Extend Services.
PRICES FOR LANDFILL MAINENANCE AND REPAIR SERVICE (SUB-ANNEXS 1502000) - RECURRING - IN ACCORDANCE WITH SECTION C, SPEC ITEM 3 OPTIONAL EXTENSION OF SERVICES, CLIN F011 AND ELINs F011AA - F011AW (NTE Extended Service Period) are the same line items in the 4th Option CLIN E009 ELINS.
ELINDescriptionQuantityUnit of IssueFreqUnit PriceTotal Price
F011
F011AA - F011AW 1-monthSame Line Items as Fourth Option ELINS E009AA - E009AU. Contractor shall provide one month (30 days) the cost of the 4th Option services for their pricing.1LS1$0.00
Estimated Cost Includes: Labor, Materials, and Equipment
F011AA - F011AW 3-monthSame Line Items as Fourth Option ELINS E009AA - E009AU, Contractor shall provide a third (1/3) Cost of the 4th Option services for their pricing.1LS3$0.00
Estimated Cost Includes: Labor, Materials, and Equipment
F011AA - F011AW 6-monthSame Line Items as Fourth Option ELINS E009AA - E009AU. Contractor shall provide a half (1/2) Cost of the 4th Option services for their pricing.1LS6$0.00
Estimated Cost Includes: Labor, Materials, and Equipment

Fourth Option ELINS Extension F011AA -F011AW $0.00

FAR Clause 52.217-8 Option to Extend Services.
PRICES TO PERFORM Landfill Maintenance and Service Repair (SUB-ANNEX 1502000) - NON- RECURRING (IDIQ ) - IN ACCORDANCE WITH SECTION C, SPEC ITEM 4, OPTIONAL EXTENSION OF SERVICES, CLIN F012 ELIN F012AA - F012AQ (NTE Extended Service Period) are the same line items in the 4th Option CLIN E012 ELINS.
ELINDescriptionQuantityUnit of IssueFreqUnit PriceTotal Price
F012
F012AA 1-monthSame Line Items as Fourth Option ELINS E011AA. Contractor shall provide one month (30 days) the cost of the 4th Option services for their pricing1LS1$0.00
Estimated Cost Includes: Labor, Materials, and Equipment
F012AB 3-monthSame Line Items as Fourth Option ELINS E011AA. Contractor shall provide a third (1/3) Cost of the 4th Option services for their pricing.1LS3$0.00
Estimated Cost Includes: Labor, Materials, and Equipment
F012AC 6-monthSame Line Items as Fourth Option ELINS E011AA. Contractor shall provide a half (1/2) Cost of the 4th Option services for their pricing.1LS6$0.00
Estimated Cost Includes: Labor, Materials, and Equipment
Fourth Option ELINS Extension F012AA -F012AQ$0.00

File details come from the government source that posted it. Updated .