This is a Project Manual specification document for Escambia County Project No. 2613, the Area Transit Facility Bid Package #2 located at 100 Clarinda Lane in Pensacola, Florida, prepared by Architectural Design Group, Inc. The document serves as the technical specifications and procurement requirements for construction of five structures: an Administration Building, Maintenance Building, Passenger Terminal Transfer Center, Bus Wash, and Fuel Station. The manual is organized into two volumes, with Volume One covering procurement and contracting requirements, general requirements, and architectural work. The specifications detail work across multiple divisions including concrete, masonry, metals, thermal and moisture protection, openings, finishes, specialties, equipment, furnishings, and conveying equipment. The document establishes procedures for alternates, quality requirements, owner direct purchasing (ODP), execution requirements, and precast structural concrete and unit masonry installations. Bidders may submit proposals for individual lots or the complete package, with substantial completion timelines ranging from 180 to 335 consecutive calendar days from Notice to Proceed, plus 30 days for final completion. The County requires current Florida General Contractor (CGC) or Underground Utility and Excavation Contractor (CUC) licensing, bonds, a Quality Control Plan, and insurance coverage of $2,000,000 combined general liability for general contractors.
The project is funded through HUD Community Development Block Grant-Disaster Recovery (CDBG-DR) funding and incorporates Section 3 contracting preferences, targeting 25 percent of total project hours by Section 3 workers and 5 percent by Targeted Section 3 workers. The procurement follows a lump-sum bidding format with deductive alternates for phased elements of the Maintenance and Administration Buildings, unit prices for pavement and concrete repairs tied to compaction testing, and a $150,000 allowance for exterior digital signage. Owner Direct Purchasing will be used for items exceeding $15,000, including clean fill, stormwater structures, concrete pipe, and PVC pipe. The solicitation includes a non-mandatory pre-bid meeting on October 29, 2026, with questions due November 6, 2026 at 12:00 p.m. and bids due November 23, 2026 at 10:00 a.m. Davis-Bacon wage requirements apply to all work and subcontractor work. Liquidated damages follow the Florida Department of Transportation schedule at $1,318 per calendar day for contracts valued at $299,999 and under. Federal compliance requirements include suspension and debarment verification, domestic preference, recovered materials procurement, MBE/WBE affirmative steps, E-Verify, Title VI, and provisions for protected species including Eastern Indigo Snakes and Tricolored Bats.
View the file
Other files
Show all 26
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Escambia County Project No. 2613
Area Transit Facility Bid Package #2
100 Clarinda Lane
Pensacola, Florida 32505
Architectural Design Group, Inc.
TABLE OF CONTENTS 000000 - 1
VOLUME ONE: Procurement & Contracting Requirements, General Requirements, and Architectural
Work
Issue Date: October 22, 2026
TABLE OF CONTENTS
Number Section Title
Division 00 - Procurement and Contracting Requirements
Refer to Escambia County Project Contract
Division 01 – General Requirements
011000 Summary
012100 Allowances
012200 Unit Prices
012300 Alternates
012500 Substitution Procedures
013100 Project Management and Coordination
013200 Construction Progress Documentation
013300 Submittal Procedures
014000 Quality Requirements
014200 References
015000 Temporary Facilities and Controls
016000 Product Requirements
016100 Owner Direct Purchasing
017000 Execution Requirements
017310 Cutting and Patching
017700 Closeout Procedures
017823 Operation and Maintenance Data
017839 Project Record Documents
Division 02 - Existing Conditions
024119 Selective Demolition
TABLE OF CONTENTS 000000 - 2
Division 03 - Concrete
031000 Concrete Forming and Accessories
032000 Concrete Reinforcing
033000 Cast-in-Place Concrete
034100 Precast Structural Concrete
Division 04 - Masonry
041000 Mortar and Grout
042000 Unit Masonry
042200 Concrete Unit Masonry
Division 05 - Metals
051000 Structural Steel Framing
052100 Steel Joist and Joist Girder Framing
053000 Metal Decking
054000 Cold-Formed Metal Framing
055000 Metal Fabrications
055100 Metal Stairs
055133 Metal Ladders
055213 Pipe and Tube Railings
Division 06 - Wood, Plastics, and Composites
061053 Miscellaneous Rough Carpentry
061600 Sheathing
062023 Interior Finish Carpentry
064116 Plastic-Laminate-Clad Architectural Cabinets
Division 07 - Thermal and Moisture Protection
071326 Self-Adhering Sheet Waterproofing
071800 Traffic Coatings
071900 Water Repellents
072100 Thermal Insulation
072119 Foamed-In-Place Insulation
072600 Vapor Retarders
TABLE OF CONTENTS 000000 - 3
072726 Fluid-Applied Membrane Air Barriers
074113.16 Standing-Seam Metal Roof Panels
074213 Metal Wall Panels
075000 Membrane Roofing
076200 Sheet Metal Flashing and Trim
077100 Roof Specialties
077200 Roof Accessories
077233 Roof Hatches
078100 Applied Fire Protection
078413 Penetration Firestopping
078443 Joint Firestopping
079200 Joint Sealants
Division 08 – Openings
081113 Hollow Metal Doors and Frames
081416 Flush Wood Doors
083100 Access Doors and Panels
083323 Overhead Coiling Doors
084113 Aluminum-Framed Entrances and Storefronts
084413 Glazed Aluminum Curtain Walls
085653 Security Windows
087100 Door Hardware
088000 Glazing
088300 Mirrors
Division 09 – Finishes
090561 Common Work Results for Flooring Preparation
090561.13 Moisture Vapor Emission Control
092116 Gypsum Board Assemblies
093013 Ceramic Tiling
095113 Acoustical Panel Ceilings
095429 Suspended Plastic Ceilings
096500 Resilient Flooring
TABLE OF CONTENTS 000000 - 4
096723 Resinous Flooring
096813 Tile Carpeting
097700 Special Wall Surfacing
099100 Painting
099323 Interior Staining and Finishing
099600 High-Performance Coatings
099733 Concrete Floor Sealer
Division 10 - Specialties
101300 Directories
101400 Signage
102113.17 Phenolic-Core Toilet Compartments
102116 Shower and Dressing Compartments
102600 Wall and Door Protection
102800 Toilet, Bath, and Laundry Accessories
104400 Fire Protection Specialties
105100 Lockers
107320 Pre-Manufactured Canopies
107516 Ground-Set Flagpoles
Division 11 - Equipment
111126 Bus-Washing Equipment
111426 Transit Fare Collection Vault
113013 Residential Appliances
115213 Projection Screens
118119 Vacuum Cleaning Systems
118129 Facility Fall Protection
118226 Facility Waste Compactors
Division 12 - Furnishings
122413 Roller Window Shades
123216 Manufactured Plastic-Laminate-Clad Casework
123600 Countertops
TABLE OF CONTENTS 000000 - 5
Division 13 - Special Construction
133419 Metal Building Systems
Division 14 - Conveying Equipment
142400 Hydraulic Elevators
END OF SECTION
ALTERNATES 012300 - 1
SECTION 012300
ALTERNATES
PART 1 GENERAL
1.1 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including General and Supplementary
Conditions and other Division 01 Specification Sections, apply to this Section.
B. Escambia County Technical Specifications, latest edition.
C. Florida Department of Transportation Standard Specifications for Road and Bridge
Construction, latest edition.
1.2 SUMMARY
A. Section includes administrative and procedural requirements for alternates.
1.3 DEFINITIONS
A. Alternate: An amount proposed by bidders and stated on the Bid Form for certain work defined in the bidding requirements that may be added to or deducted from the base bid amount if Owner decides to accept a corresponding change either in the amount of construction to be completed or in the products, materials, equipment, systems, or installation methods described in the Contract Documents.
1. Alternates described in this Section are part of the Work only if enumerated in the
Agreement.
2. The cost or credit for each alternate is the net addition to or deduction from the Contract
Sum to incorporate alternate into the Work. No other adjustments are made to the
Contract Sum.
1.4 PROCEDURES
A. Coordination: Revise or adjust affected adjacent work as necessary to completely integrate work of the alternate into Project.
1. Include as part of each alternate, miscellaneous devices, accessory objects, and similar items incidental to or required for a complete installation whether or not indicated as part of alternate.
ALTERNATES 012300 - 2
B. Notification: Immediately following award of the Contract, notify each party involved, in writing, of the status of each alternate. Indicate if alternates have been accepted, rejected, or deferred for later consideration. Include a complete description of negotiated revisions to alternates.
C. Execute accepted alternates under the same conditions as other work of the Contract.
D. Schedule: A schedule of alternates is included at the end of this Section. Specification Sections referenced in schedule contain requirements for materials necessary to achieve the work described under each alternate.
E. Order of Alternates listed in the Schedule of Alternates does not indicate which order
Alternates will be accepted.
PART 2 PRODUCTS - NOT USED
PART 3 EXECUTION
3.1 SCHEDULE OF ALTERNATES
A. Alternate Bid No. 1: (DEDUCTIVE) MAINTENANCE BUILDING
Reduce two (2) structural bays (two stalls) from the bus garage and reduce one (1) structural bay (two stalls) from the small vehicle garage. At the bus garage, PEMB manufacturer to engineer the west end wall and exterior canopy to allow for a future expansion of two (2) structural bays at the west end. See drawing set.
B. Alternate Bid No. 2: (DEDUCTIVE) ADMINISTRATION BUILDING
Partially build out/partially unfinish second floor per sheet A111 and associated engineering/building systems sheets. See drawing set.
C. Refer to the Pricing Table in open.gov for numbering of Alternate Bids.
QUALITY REQUIREMENTS 014000 - 1
SECTION 014000
QUALITY REQUIREMENTS
PART 1 GENERAL
1.1 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including General and Supplementary
Conditions and other Division 01 Specification Sections, apply to this Section.
B. Escambia County Technical Specifications, latest edition.
C. Florida Department of Transportation Standard Specifications for Road and Bridge
Construction, latest edition.
1.2 SUMMARY
A. Section includes administrative and procedural requirements for quality assurance and quality control.
B. Testing and inspecting services are required to verify compliance with requirements specified or indicated. These services do not relieve Contractor of responsibility for compliance with the
Contract Document requirements.
1. Specific quality-assurance and -control requirements for individual construction activities are specified in the Sections that specify those activities. Requirements in those Sections may also cover production of standard products.
2. Specified tests, inspections, and related actions do not limit Contractor's other quality-assurance and -control procedures that facilitate compliance with the Contract Document requirements.
3. Requirements for Contractor to provide quality-assurance and -control services required by Architect, Owner, or authorities having jurisdiction are not limited by provisions of this Section.
1.3 DEFINITIONS
A. Quality-Assurance Services: Activities, actions, and procedures performed before and during execution of the Work to guard against defects and deficiencies and substantiate that proposed construction will comply with requirements.
B. Quality-Control Services: Tests, inspections, procedures, and related actions during and after execution of the Work to evaluate that actual products incorporated into the Work and
QUALITY REQUIREMENTS 014000 - 2
completed construction comply with requirements. Services do not include contract enforcement activities performed by Architect.
C. Product Testing: Tests and inspections that are performed by an NRTL (Nationally Recognized
Testing Laboratory), an NVLAP (National Voluntary Laboratory Accreditation Program), or a testing agency qualified to conduct product testing and acceptable to authorities having jurisdiction, to establish product performance and compliance with specified requirements.
D. Source Quality-Control Testing: Tests and inspections that are performed at the source, e.g., plant, mill, factory, or shop.
E. Field Quality-Control Testing: Tests and inspections that are performed on-site for installation of the Work and for completed Work.
F. Testing Agency: An entity engaged to perform specific tests, inspections, or both. Testing laboratory shall mean the same as testing agency.
G. Installer/Applicator/Erector: Contractor or another entity engaged by Contractor as an employee, Subcontractor, or Sub-subcontractor, to perform a particular construction operation, including installation, erection, application, and similar operations.
1. Use of trade-specific terminology in referring to a trade or entity does not require that certain construction activities be performed by accredited or unionized individuals, or that requirements specified apply exclusively to specific trade(s).
H. Experienced: When used with an entity or individual, "experienced" means having successfully completed a minimum of five previous projects similar in nature, size, and extent to this Project; being familiar with special requirements indicated; and having complied with requirements of authorities having jurisdiction.
1.4 CONFLICTING REQUIREMENTS
A. Referenced Standards: If compliance with two or more standards is specified and the standards establish different or conflicting requirements for minimum quantities or quality levels, comply with the most stringent requirement. Refer conflicting requirements that are different, but apparently equal, to Architect for a decision before proceeding.
B. Minimum Quantity or Quality Levels: The quantity or quality level shown or specified shall be the minimum provided or performed. The actual installation may comply exactly with the minimum quantity or quality specified, or it may exceed the minimum within reasonable limits. To comply with these requirements, indicated numeric values are minimum or maximum, as appropriate, for the context of requirements. Refer uncertainties to Architect for a decision before proceeding.
QUALITY REQUIREMENTS 014000 - 3
1.5 INFORMATIONAL SUBMITTALS
A. Contractor's Quality-Control Plan: For quality-assurance and quality-control activities and responsibilities.
B. Schedule of Tests and Inspections: Prepare in tabular form and include the following:
1. Specification Section number and title.
2. Entity responsible for performing tests and inspections.
3. Description of test and inspection.
4. Identification of applicable standards.
5. Identification of test and inspection methods.
6. Number of tests and inspections required.
7. Time schedule or time span for tests and inspections.
8. Requirements for obtaining samples.
9. Unique characteristics of each quality-control service.
1.6 CONTRACTOR'S QUALITY-CONTROL PLAN
A. Refer to County Specifications.
1.7 REPORTS AND DOCUMENTS
A. Test and Inspection Reports: Prepare and submit certified written reports specified in other
Sections. Include the following:
1. Date of issue.
2. Project title and number.
3. Name, address and telephone number of testing agency.
4. Dates and locations of samples and tests or inspections.
5. Names of individuals making tests and inspections.
6. Description of the Work and test and inspection method.
7. Identification of product and Specification Section.
8. Complete test or inspection data.
9. Test and inspection results and an interpretation of test results.
10. Record of temperature and weather conditions at time of sample taking and testing and inspecting.
11. Comments or professional opinion on whether tested or inspected Work complies with the Contract Document requirements.
12. Name and signature of laboratory inspector.
13. Recommendations on retesting and reinspecting.
B. Manufacturer's Technical Representative's Field Reports: Prepare written information documenting manufacturer's technical representative's tests and inspections specified in other
Sections. Include the following:
1. Name, address, and telephone number of technical representative making report.
2. Statement on condition of substrates and their acceptability for installation of product.
3. Statement that products at Project site comply with requirements.
QUALITY REQUIREMENTS 014000 - 4
4. Summary of installation procedures being followed, whether they comply with requirements and, if not, what corrective action was taken.
5. Results of operational and other tests and a statement of whether observed performance complies with requirements.
6. Statement whether conditions, products, and installation will affect warranty.
7. Other required items indicated in individual Specification Sections.
C. Factory-Authorized Service Representative's Reports: Prepare written information documenting manufacturer's factory-authorized service representative's tests and inspections specified in other Sections. Include the following:
1. Name, address, and telephone number of factory-authorized service representative making report.
2. Statement that equipment complies with requirements.
3. Results of operational and other tests and a statement of whether observed performance complies with requirements.
4. Statement whether conditions, products, and installation will affect warranty.
5. Other required items indicated in individual Specification Sections.
D. Permits, Licenses, and Certificates: For Owner's records, submit copies of permits, licenses, certifications, inspection reports, releases, jurisdictional settlements, notices, receipts for fee payments, judgments, correspondence, records, and similar documents, established for compliance with standards and regulations bearing on performance of the Work.
1.8 QUALITY ASSURANCE
A. General: Qualifications paragraphs in this article establish the minimum qualification levels required; individual Specification Sections specify additional requirements.
B. Fabricator Qualifications: A firm experienced in producing products similar to those indicated for this Project and with a record of successful in-service performance, as well as sufficient production capacity to produce required units.
C. Installer Qualifications: A firm or individual experienced in installing, erecting, or assembling work similar in material, design, and extent to that indicated for this Project, whose work has resulted in construction with a record of successful in-service performance.
D. Professional Engineer Qualifications: A professional engineer who is legally qualified to practice in jurisdiction where Project is located and who is experienced in providing engineering services of the kind indicated. Engineering services are defined as those performed for installations of the system, assembly, or product that are similar in material, design, and extent to those indicated for this Project.
E. Specialists: Certain Specification Sections require that specific construction activities shall be performed by entities who are recognized experts in those operations. Specialists shall satisfy qualification requirements indicated and shall be engaged for the activities indicated.
1. Requirements of authorities having jurisdiction shall supersede requirements for specialists.
QUALITY REQUIREMENTS 014000 - 5
F. Manufacturer's Technical Representative Qualifications: An authorized representative of manufacturer who is trained and approved by manufacturer to observe and inspect installation of manufacturer's products that are similar in material, design, and extent to those indicated for this Project.
G. Factory-Authorized Service Representative Qualifications: An authorized representative of manufacturer who is trained and approved by manufacturer to inspect installation of manufacturer's products that are similar in material, design, and extent to those indicated for this Project.
1.9 QUALITY CONTROL
A. Owner Responsibilities: Where quality-control services are indicated as Owner's responsibility, Owner will engage a qualified testing agency to perform these services.
1. Owner will furnish Contractor with names, addresses, and telephone numbers of testing agencies engaged and a description of types of testing and inspecting they are engaged to perform.
2. Costs for retesting and reinspecting construction that replaces or is necessitated by work that failed to comply with the Contract Documents will be charged to Contractor, and the
Contract Sum will be adjusted by Change Order.
B. Contractor Responsibilities: Tests and inspections not explicitly assigned to Owner are
Contractor's responsibility. Perform additional quality-control activities required to verify that the Work complies with requirements, whether specified or not.
1. Unless otherwise indicated, provide quality-control services specified and those required by authorities having jurisdiction. Perform quality-control services required of Contractor by authorities having jurisdiction, whether specified or not.
2. Notify testing agencies at least 24 hours in advance of time when Work that requires testing or inspecting will be performed.
3. Where quality-control services are indicated as Contractor's responsibility, submit a certified written report, in duplicate, of each quality-control service.
4. Testing and inspecting requested by Contractor and not required by the Contract
Documents are Contractor's responsibility.
5. Submit additional copies of each written report directly to authorities having jurisdiction, when they so direct.
C. Manufacturer's Field Services: Where indicated, engage a factory-authorized service representative to inspect field-assembled components and equipment installation, including service connections. Report results in writing as specified in Section 013300 "Submittal
Procedures."
D. Manufacturer's Technical Services: Where indicated, engage a manufacturer's technical representative to observe and inspect the Work. Manufacturer's technical representative's services include participation in preinstallation conferences, examination of substrates and conditions, verification of materials, observation of Installer activities, inspection of completed portions of the Work, and submittal of written reports.
QUALITY REQUIREMENTS 014000 - 6
E. Retesting/Reinspecting: Regardless of whether original tests or inspections were Contractor's responsibility, provide quality-control services, including retesting and reinspecting, for construction that replaced Work that failed to comply with the Contract Documents.
F. Testing Agency Responsibilities: Cooperate with Architect and Contractor in performance of duties. Provide qualified personnel to perform required tests and inspections.
1. Notify Architect and Contractor promptly of irregularities or deficiencies observed in the
Work during performance of its services.
2. Determine the location from which test samples will be taken and in which in-situ tests are conducted.
3. Conduct and interpret tests and inspections and state in each report whether tested and inspected work complies with or deviates from requirements.
4. Submit a certified written report, in duplicate, of each test, inspection, and similar quality-control service through Contractor.
5. Do not release, revoke, alter, or increase the Contract Document requirements or approve or accept any portion of the Work.
6. Do not perform any duties of Contractor.
G. Associated Services: Cooperate with agencies performing required tests, inspections, and similar quality-control services, and provide reasonable auxiliary services as requested. Notify agency sufficiently in advance of operations to permit assignment of personnel. Provide the following:
1. Access to the Work.
2. Incidental labor and facilities necessary to facilitate tests and inspections.
3. Adequate quantities of representative samples of materials that require testing and inspecting. Assist agency in obtaining samples.
4. Preliminary design mix proposed for use for Facilities for storage and field curing of test samples material mixes that require control by testing agency.
5. Security and protection for samples and for testing and inspecting equipment at Project site.
H. Coordination: Coordinate sequence of activities to accommodate required quality-assurance and -control services with a minimum of delay and to avoid necessity of removing and replacing construction to accommodate testing and inspecting.
1. Schedule times for tests, inspections, obtaining samples, and similar activities.
I. Schedule of Tests and Inspections: Prepare a schedule of tests, inspections, and similar quality-control services required by the Contract Documents. Coordinate and submit concurrently with Contractor's construction schedule. Update as the Work progresses.
1. Distribution: Distribute schedule to Owner, Architect, testing agencies, and each party involved in performance of portions of the Work where tests and inspections are required.
QUALITY REQUIREMENTS 014000 - 7
1.10 SPECIAL TESTS AND INSPECTIONS
A. Contractor shall conduct tests indicated throughout the Contract Documents, except as noted below:
1. Owner will engage a qualified testing agency to conduct special tests and inspections identified by authorities having jurisdiction during construction that are not indicated in the Contract Documents.
B. Special Tests and Inspections: Owner will engage a qualified testing agency to conduct special tests and inspections required by authorities having jurisdiction as the responsibility of Owner.
PART 2 PRODUCTS - NOT USED
PART 3 EXECUTION
3.1 TESTING AND INSPECTION LOG
A. Test and Inspection Log: Prepare a record of tests and inspections. Include the following:
1. Date test or inspection was conducted.
2. Description of the Work tested or inspected.
3. Date test or inspection results were transmitted to Architect.
4. Identification of testing agency or special inspector conducting test or inspection.
B. Maintain log at Project site. Post changes and revisions as they occur. Provide access to test and inspection log for Architect's reference during normal working hours.
3.2 REPAIR AND PROTECTION
A. General: On completion of testing, inspecting, sample taking, and similar services, repair damaged construction and restore substrates and finishes.
1. Provide materials and comply with installation requirements specified in other
Specification Sections or matching existing substrates and finishes. Restore patched areas and extend restoration into adjoining areas with durable seams that are as invisible as possible. Comply with the Contract Document requirements for cutting and patching in
Section 017300 "Execution."
B. Protect construction exposed by or for quality-control service activities.
C. Repair and protection are Contractor's responsibility, regardless of the assignment of responsibility for quality-control services.
OWNER DIRECT PURCHASING 016100 - 1
SECTION 016100
OWNER DIRECT PURCHASING
PART 1 GENERAL
1.1 SUMMARY
A. This Section establishes procedures for materials and equipment that Escambia County Board of County Commissioners (County) elects to purchase directly for incorporation into or consumption in the Work. Direct purchase by the County is referred to as Owner Direct
Purchasing (ODP).
B. The County may consider any construction material or equipment for ODP and does not expect to issue purchase orders for less than $15,000. Selection of items for ODP is at the
County's discretion. The Contractor remains responsible for completion of the Work in accordance with the Contract Documents.
C. Apply this Section together with Section 2.2, Owner Direct Purchasing (ODP) Notification, in the Bid Package 2 Scope of Work. If a requirement of this Section conflicts with Section 2.2, Section 2.2 governs; notify the County of the discrepancy before the affected purchase proceeds.
D. Escambia County Technical Specifications, latest edition.
E. Florida Department of Transportation Standard Specifications for Road and Bridge
Construction, latest edition.
1.2 CONTRACTOR SUBMITTALS AND RECORDS
A. At the same time as the preliminary Schedule of Values and project Critical Path Method
(CPM) schedule, submit a list of intended suppliers for the County's consideration for ODP.
For each proposed supplier, include its price quotation and negotiated terms and conditions, together with a description, quantities, and prices of the proposed materials or equipment. The separate award condition governing the bidder's Schedule of Values remains as stated in
Section 2.5 of the Scope of Work.
B. Maintain records identifying ODP items received and incorporated into or consumed in the
Work. Provide the County with a monthly accounting of ODP items, including purchases, receipts, installation or consumption, and items remaining, as applicable.
OWNER DIRECT PURCHASING 016100 - 2
1.3 SUPPLIER SELECTION AND BID BASIS
A. Select material suppliers using competitive bids or proposals. Award supply contracts to the suppliers whose bids or proposals are most advantageous to the County, considering price and other relevant aspects.
B. Include the price of all construction materials and equipment in the lump sum bid, together with Florida sales taxes and other taxes normally applicable to those materials and equipment.
Do not omit an item or its normally applicable taxes from the bid on the assumption that the
County will purchase it directly.
C. Administer each material or equipment purchase selected for ODP through a deductive
Change Order in accordance with the Contract Documents. Identify the selected item and the corresponding amount included in the Contract Sum, including normally applicable taxes, so the direct purchase is not paid for twice. Address any adjustment to other Contract Sum components only as provided by the Contract Documents and the Change Order.
1.4 COUNTY PURCHASE ORDER & PAYMENT
A. The County shall issue its own purchase order for each ODP. The purchase order package shall include the County's Certificate of Entitlement (OF0195) as an attachment in accordance with Rule 12A-1.094, Florida Administrative Code.
B. ODP suppliers shall invoice the County directly. The County shall remit payment directly to the ODP suppliers. Contractor payment applications shall reflect the applicable deductive
Change Orders and shall not request payment for County purchased materials or equipment.
PART 2 PRODUCTS
2.1 MATERIALS & EQUIPMENT
A. The following materials may be considered for ODP:
1. HVAC Units.
2. HVAC Controls.
3. CMU Brick.
4. CMU Mortar.
5. CMU Grout.
6. Electrical Switch Gear.
7. Fencing.
8. Access Control Gates.
9. PEMB.
10. Fuel Station Canopies.
11. Transfer Center Canopy.
12. Concrete.
13. High Volume Low Velocity Fans.
14. Asphalt.
OWNER DIRECT PURCHASING 016100 - 3
15. Dense Graded Aggregate.
16. Bus Wash Equipment.
a. Refer to Project Manual – Volume One – Appendix A for InterClean
Equipment Drawings.
17. Fill Dirt.
18. Vacuum System.
a. Refer to Project Manual – Volume One – Appendix B for N/S Corporation Cut
Sheets.
19. Fuel Pumps.
20. Fuel Tanks.
21. Radio System.
B. Select materials and equipment that comply with the Contract Documents. The Contractor is responsible for supplier selection, specifications, receipt of materials, shipment inspection, and determining that the material or service paid for by the County is appropriate for the construction.
PART 3 EXECUTION
3.1 SCHEDULING & DELIVERY
A. Maintain the project schedule and coordinate performance of the terms and conditions of each
ODP purchase order, including expediting supplier deliveries. Incorporate ODP procurement, delivery, inspection, and installation into the CPM schedule and updates as applicable.
3.2 RECEIPT & INSPECTION
A. Receive and inspect ODP goods and accompanying shipping documents. Verify that quantities and goods received conform to the purchase order and the Contract Documents. Document receipt and inspection.
B. Notify the County of goods received that are damaged or do not comply with the specifications and facilitate timely replacement. Coordinate with the supplier and the County to resolve discrepancies without losing responsibility for the project schedule or acceptable finished Work.
3.3 RECEIVING REPORTS & ACCOUNTING
A. Approve receiving reports for goods received in accordance with the specifications and forward approved reports to the Clerk of the Court/Accounts Payable for processing of supplier invoices. Reconcile the receiving records with the monthly accounting.
OWNER DIRECT PURCHASING 016100 - 4
3.4 INSTALLATION & WARRANTIES
A. Coordinate installation and incorporation of ODP materials and equipment into the Work.
ODP does not reduce the Contractor's responsibility for an acceptable finished Project.
B. Obtain and manage warranties and guarantees for all materials and products specified in the
Contract Documents, including those purchased directly by the County.
EXECUTION REQUIREMENTS 017000 - 1
SECTION 017000
EXECUTION REQUIREMENTS
PART 1 GENERAL
1.1 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including General and Supplementary
Conditions and other Division 1 Specification Sections, apply to this Section.
B. Escambia County Technical Specifications, latest edition.
C. Florida Department of Transportation Standard Specifications for Road and Bridge
Construction, latest edition.
1.2 SUMMARY
A. This Section includes general procedural requirements governing execution of the Work including, but not limited to, the following:
1. Construction layout.
2. Field engineering and surveying.
3. General installation of products.
4. Coordination of Owner-installed products.
5. Progress cleaning.
6. Starting and adjusting.
7. Protection of installed construction.
8. Correction of the Work.
B. Related Sections include the following:
1. Division 1 Section "Project Management and Coordination" for procedures for coordinating field engineering with other construction activities.
2. Division 1 Section "Submittal Procedures" for submitting surveys.
3. Division 1 Section "Closeout Procedures" for submitting final property survey with
Project Record Documents, recording of Owner-accepted deviations from indicated lines and levels, and final cleaning.
PART 2 PRODUCTS - NOT USED
EXECUTION REQUIREMENTS 017000 - 2
PART 3 EXECUTION
3.1 EXAMINATION
A. Existing Conditions: The existence and location of improvements, utilities, and other construction indicated as existing are not guaranteed. The locations shown on the drawings are diagrammatic and are based upon the information available. The contractor shall adjust his work as necessary to avoid existing ducts, pipes, conduit, structural members and similar items not shown on the drawings. The contractor shall adjust and adapt his work to meet all existing conditions in the existing building without any additional cost to the Owner. Before beginning work, investigate and verify the existence and location of mechanical and electrical systems and other construction affecting the Work. Notify the Architect of any significant deviation of existing items from indicated locations prior to performing the work.
B. Existing Utilities: The existence and location of underground and other utilities and construction indicated as existing are not guaranteed. Before beginning work, investigate and verify the existence and location of utilities and other construction affecting the Work.
C. Acceptance of Conditions: Examine substrates, areas, and conditions, with Installer or
Applicator present where indicated, for compliance with requirements for installation tolerances and other conditions affecting performance. Record observations.
1. Written Report: Where a written report listing conditions detrimental to performance of the Work is required by other Sections, include the following:
a. Description of the Work.
b. List of detrimental conditions, including substrates.
c. List of unacceptable installation tolerances.
d. Recommended corrections.
2. Verify compatibility with and suitability of substrates, including compatibility with existing finishes or primers.
3. Examine roughing-in for mechanical and electrical systems to verify actual locations of connections before equipment and fixture installation.
4. Examine walls, floors, and roofs for suitable conditions where products and systems are to be installed.
5. Proceed with installation only after unsatisfactory conditions have been corrected.
Proceeding with the Work indicates acceptance of surfaces and conditions.
3.2 PREPARATION
A. Field Measurements: Take field measurements as required to fit the Work properly. Recheck measurements before installing each product. Where portions of the Work are indicated to fit to other construction, verify dimensions of other construction by field measurements before fabrication. Coordinate fabrication schedule with construction progress to avoid delaying the
Work.
B. Space Requirements: Verify space requirements and dimensions of items shown diagrammatically on Drawings.
EXECUTION REQUIREMENTS 017000 - 3
C. Review of Contract Documents and Field Conditions: Immediately on discovery of the need for clarification of the Contract Documents, submit a request for information to Architect.
Include a detailed description of problem encountered, together with recommendations for changing the Contract Documents.
3.3 CONSTRUCTION LAYOUT
A. Verification: Before proceeding to lay out the Work, verify layout information shown on
Drawings. If discrepancies are discovered, notify Architect promptly.
B. General: Lay out the Work using accepted surveying practices.
1. Establish benchmarks and control points to set lines and levels as needed to locate each element of Project.
2. Establish dimensions within tolerances indicated. Do not scale Drawings to obtain required dimensions.
3. Inform installers of lines and levels to which they must comply.
4. Check the location, level and plumb, of every major element as the Work progresses.
5. Notify Architect when deviations from required lines and levels exceed allowable tolerances.
C. Building Lines and Levels: Locate and lay out control lines and levels for construction activities, including those required for mechanical and electrical work.
3.4 INSTALLATION
A. General: Locate the Work and components of the Work accurately, in correct alignment and elevation, as indicated.
1. Make vertical work plumb and make horizontal work level.
2. Where space is limited, install components to maximize space available for maintenance and ease of removal for replacement.
3. Conceal pipes, ducts, and wiring in finished areas, unless otherwise indicated.
4. Maintain minimum headroom clearance of 8 feet in spaces without a suspended ceiling.
B. Comply with manufacturer's written instructions and recommendations for installing products in applications indicated.
C. Install products at the time and under conditions that will ensure the best possible results.
Maintain conditions required for product performance until Substantial Completion.
D. Conduct construction operations so no part of the Work is subjected to damaging operations or loading in excess of that expected during normal conditions of occupancy.
E. Tools and Equipment: Do not use tools or equipment that produce harmful noise levels.
F. Templates: Obtain and distribute to the parties involved templates for work specified to be factory prepared and field installed. Check Shop Drawings of other work to confirm that
EXECUTION REQUIREMENTS 017000 - 4
adequate provisions are made for locating and installing products to comply with indicated requirements.
G. Anchors and Fasteners: Provide anchors and fasteners as required to anchor each component securely in place, accurately located and aligned with other portions of the Work.
1. Mounting Heights: Where mounting heights are not indicated, mount components at heights directed by Architect.
2. Coordinate installation of anchorages. Furnish setting drawings, templates, and directions for installing anchorages.
H. Joints: Make joints of uniform width. Where joint locations in exposed work are not indicated, arrange joints for the best visual effect. Fit exposed connections together to form hairline joints.
I. Hazardous Materials: Use products, cleaners, and installation materials that are not considered hazardous.
3.5 PROGRESS CLEANING
A. General: Clean Project site and work areas daily, including common areas. Coordinate progress cleaning for joint-use areas where more than one installer has worked. Enforce requirements strictly. Dispose of materials lawfully.
1. Comply with requirements in NFPA 241 for removal of combustible waste materials and debris.
2. Do not hold materials more than 7 days during normal weather or 3 days if the temperature is expected to rise above 80 deg F (27 deg C).
3. Containerize hazardous and unsanitary waste materials separately from other waste. Mark containers appropriately and dispose of legally, according to regulations.
4. The Owner will provide dumpsters for the Contractor's use.
B. Site: Maintain Project site free of waste materials and debris.
C. Work Areas: Clean areas where work is in progress to the level of cleanliness necessary for proper execution of the Work.
1. Remove liquid spills promptly.
2. Where dust would impair proper execution of the Work, broom-clean or vacuum the entire work area, as appropriate.
D. Installed Work: Keep installed work clean. Clean installed surfaces according to written instructions of manufacturer or fabricator of product installed, using only cleaning materials specifically recommended. If specific cleaning materials are not recommended, use cleaning materials that are not hazardous to health or property and that will not damage exposed surfaces.
E. Concealed Spaces: Remove debris from concealed spaces before enclosing the space.
F. Exposed Surfaces in Finished Areas: Clean exposed surfaces and protect as necessary to ensure freedom from damage and deterioration at time of Substantial Completion.
EXECUTION REQUIREMENTS 017000 - 5
G. Waste Disposal: Burying or burning waste materials on-site will not be permitted. Washing waste materials down sewers or into waterways will not be permitted.
H. During handling and installation, clean and protect construction in progress and adjoining materials already in place. Apply protective covering where required to ensure protection from damage or deterioration at Substantial Completion.
I. Clean and provide maintenance on completed construction as frequently as necessary through the remainder of the construction period. Adjust and lubricate operable components to ensure operability without damaging effects.
J. Limiting Exposures: Supervise construction operations to assure that no part of the construction, completed or in progress, is subject to harmful, dangerous, damaging, or otherwise deleterious exposure during the construction period.
3.6 STARTING AND ADJUSTING
A. Start equipment and operating components to confirm proper operation. Remove malfunctioning units, replace with new units, and retest.
B. Adjust operating components for proper operation without binding. Adjust equipment for proper operation.
C. Test each piece of equipment to verify proper operation. Test and adjust controls and safeties.
Replace damaged and malfunctioning controls and equipment.
D. Manufacturer's Field Service: If a factory-authorized service representative is required to inspect field-assembled components and equipment installation, comply with qualification requirements in Division 1 Section "Quality Requirements."
3.7 PROTECTION OF INSTALLED CONSTRUCTION
A. Provide final protection and maintain conditions that ensure installed Work is without damage or deterioration at time of Substantial Completion.
B. Comply with manufacturer's written instructions for temperature and relative humidity.
3.8 CORRECTION OF THE WORK
A. Repair or remove and replace defective construction. Restore damaged substrates and finishes.
Comply with requirements in Division 1 Section "Cutting and Patching."
1. Repairing includes replacing defective parts, refinishing damaged surfaces, touching up with matching materials, and properly adjusting operating equipment.
B. Restore permanent facilities used during construction to their specified condition.
EXECUTION REQUIREMENTS 017000 - 6
C. Remove and replace damaged surfaces that are exposed to view if surfaces cannot be repaired without visible evidence of repair.
D. Repair components that do not operate properly. Remove and replace operating components that cannot be repaired.
E. Remove and replace chipped, scratched, and broken glass or reflective surfaces.
Escambia County Project No. 2613
100 Clarinda Lane
Pensacola, Florida 32505
RLG Consulting Engineers
PRECAST STRUCTURAL CONCRETE 034100 - 1
SECTION 034100
PRECAST STRUCTURAL CONCRETE
PART 1 - GENERAL
1.1 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including General and Supplementary
Conditions and Division 01 Specification Sections, apply to this Section.
1.2 SUMMARY
A. Section Includes:
1. Precast structural concrete.
B. Related Sections:
1. Division 03 Section "Cast-in-Place Concrete" for placing connection anchors in concrete.
2. Division 04 Section "Unit Masonry" for inserts or anchorages required for precast concrete slab connections.
3. Division 04 Section "Exterior Stone Cladding" for preconstruction testing of stone anchors and determination of anchor spacing.
4. Division 05 Section "Structural Steel Framing" for furnishing and installing connections attached to structural-steel framing.
5. Division 05 Section "Metal Fabrications" for kickers and other miscellaneous steel shapes.
6. Division 07 Section "Sheet Metal Flashing and Trim" for flashing receivers and reglets.
7. Division 07 Section "Penetration Firestopping" for joint-filler materials for fire-resistance-rated construction.
8. Division 07 Section "Joint Sealants" for elastomeric joint sealants and sealant backings.
1.3 DEFINITION
A. Design Reference Sample: Sample of approved precast structural concrete color, finish, and texture, preapproved by Architect.
1.4 PERFORMANCE REQUIREMENTS
A. Delegated Design: Design precast structural concrete, including comprehensive engineering analysis by a qualified professional engineer, using performance requirements and design criteria indicated.
B. Structural Performance: Provide precast structural concrete units and connections capable of withstanding the following design loads within limits and under conditions indicated:
1. Dead Loads: See General Notes.
2. Roof Loads: See General Notes .
3. Seismic Loads: See General Notes.
4. Wind Loads: See General Notes.
Escambia County Project No. 2613
100 Clarinda Lane
Pensacola, Florida 32505
RLG Consulting Engineers
PRECAST STRUCTURAL CONCRETE 034100 - 2
5. Design precast structural concrete framing system and connections to maintain clearances at openings, to allow for fabrication and construction tolerances, to accommodate live-load deflection, shrinkage and creep of primary building structure, and other building movements. Maintain precast structural concrete deflections within limits of ACI 318.
a. Thermal Movements: Allow for in-plane thermal movements resulting from annual ambient temperature changes of 0 to plus 120 deg F (minus 10 to plus 67 deg C).
6. Fire-Resistance Rating: Select material and minimum thicknesses to provide indicated fire rating.
1.5 SUBMITTALS
A. Product Data: For each type of product indicated.
B. Design Mixtures: For each precast concrete mixture. Include compressive strength and water-absorption tests.
C. Shop Drawings: Include member locations, plans, elevations, dimensions, shapes and sections, openings, support conditions, and types of reinforcement, including special reinforcement.
Detail fabrication and installation of precast structural concrete units.
1. Indicate joints, reveals, and extent and location of each surface finish.
2. Indicate separate face and backup mixture locations and thicknesses.
3. Indicate welded connections by AWS standard symbols. Show size, length, and type of each weld.
4. Detail loose and cast-in hardware, lifting and erection inserts, connections, and joints.
5. Indicate locations, tolerances, and details of anchorage devices to be embedded in or attached to structure or other construction.
6. Include and locate openings larger than by 10 inches (250 mm).
7. Indicate location of each precast structural concrete unit by same identification mark placed on panel.
8. Indicate relationship of precast structural concrete units to adjacent materials.
9. Indicate locations and details of brick units, including corner units and special shapes, and joint treatment.
10. Indicate locations and details of stone facings, anchors, and joint widths.
11. Indicate estimated camber for precast floor slabs with concrete toppings.
12. Indicate shim sizes and grouting sequence.
13. Design Modifications: If design modifications are proposed to meet performance requirements and field conditions, submit design calculations and Shop Drawings. Do not adversely affect the appearance, durability, or strength of units when modifying details or materials and maintain the general design concept.
D. Samples:
1. For each type of finish indicated on exposed surfaces of precast structural concrete units with architectural finish, in sets of 3, illustrating full range of finish, color, and texture variations expected; approximately 12 by 12 by 2 inches (300 by 300 by 50 mm).
a. Where other faces of precast concrete unit are exposed, include Samples illustrating workmanship, color, and texture of backup concrete as well as facing concrete.
2. Samples for each thin- or half-brick unit required, showing full range of color and texture expected. Include Samples showing color and texture of joint treatment.
a. Grout Samples for Initial Selection: Color charts consisting of actual sections of grout showing manufacturer's full range of colors.
Escambia County Project No. 2613
100 Clarinda Lane
Pensacola, Florida 32505
RLG Consulting Engineers
PRECAST STRUCTURAL CONCRETE 034100 - 3
b. Grout Samples for Verification: Showing color and texture of joint treatment.
E. Delegated-Design Submittal: For precast structural concrete indicated to comply with performance requirements and design criteria, including analysis data signed and sealed by the qualified professional engineer responsible for their preparation.
F. Qualification Data: For Installer, fabricator]& testing agency.
G. Welding certificates.
H. Material Certificates: For the following, from manufacturer:
1. Cementitious materials.
2. Reinforcing materials and prestressing tendons.
3. Admixtures.
4. Bearing pads.
5. Structural-steel shapes and hollow structural sections.
6. Retain first paragraph below for material test reports that are Contractor's responsibility.
I. Material Test Reports: For aggregates.
J. Source quality-control reports.
K. Field quality-control and special inspection reports.
1.6 QUALITY ASSURANCE
A. Fabricator Qualifications: A firm that assumes responsibility for engineering precast structural concrete units to comply with performance requirements. Responsibility includes preparation of Shop Drawings and comprehensive engineering analysis by a qualified professional engineer.
1. Participates in PCI's Plant Certification program at time of bidding and is designated a PCI-certified plant as follows:
a. Group C, Category C2 - Prestressed Hollowcore and Repetitively Produced Products.
B. Installer Qualifications: A precast concrete erector qualified at time of bidding, as evidenced by PCI's Certificate of Compliance, to erect Category S1 - Simple Structural Systems.
C. Installer Qualifications: An experienced precast concrete erector who, before erection of precast concrete, has retained a "PCI-Certified Field Auditor" to conduct a field audit of a project installed by erector in Category S1 - Simple Structural Systems and who produces an
Erectors' Post Audit Declaration, according to PCI MNL 127, "PCI Erector's Manual -
Standards and Guidelines for the Erection of Precast Concrete Products."
D. Testing Agency Qualifications: Qualified according to ASTM C 1077 and ASTM E 329 for testing indicated.
E. Design Standards: Comply with ACI 318 (ACI 318M) and design recommendations in
PCI MNL 120, "PCI Design Handbook - Precast and Prestressed Concrete," applicable to types of precast structural concrete units indicated.
Escambia County Project No. 2613
100 Clarinda Lane
Pensacola, Florida 32505
RLG Consulting Engineers
PRECAST STRUCTURAL CONCRETE 034100 - 4
F. Quality-Control Standard: For manufacturing procedures and testing requirements, quality-control recommendations, and dimensional tolerances for types of units required, comply with
PCI MNL 116, "Manual for Quality Control for Plants and Production of Structural Precast
Concrete Products."
G. Welding Qualifications: Qualify procedures and personnel according to the following:
1. AWS D1.1/D.1.1M, "Structural Welding Code - Steel."
2. AWS D1.4, "Structural Welding Code - Reinforcing Steel."
H. Fire-Resistance Calculations: Where indicated, provide precast…