ECAT_BP2_CONSTRUCTION_ADD-REV_1_WRITE-UP_Rev_1__26-11-13.pdf

PDF 407 KB Posted

Attached to
CDBG-DR HS004 New Escambia County Area Transit (ECAT) Facility
Solicitation number
PD 26-27.004
Issued by
Escambia County, Florida

About this file

This document is an Addendum to the Project Manual for Bid Package 2 of the New ECAT Facility construction project for Escambia County Area Transit (ECAT) in Pensacola, Florida. The addendum details revisions to architectural, structural, mechanical, electrical, plumbing, fire protection, and technology specifications and drawing sheets across five building structures: an Administration Building, Maintenance Building, Transfer Center, Bus Wash, and Fuel Station. The revisions span 19 pages and include updates to general conditions, quality requirements, and execution requirements, along with modifications to numerous specification sections covering precast concrete, masonry, metal fabrications, doors, hardware, glazing, flooring, HVAC systems, plumbing, fire suppression, communication systems, and exterior improvements. Drawing set updates address civil, landscape, electrical, plumbing, and technology systems across all five facilities, with specific changes noted to paving plans, gate configurations, electrical layouts, plumbing fixture locations, mechanical diffusers, fire alarm systems, and access control devices. The revisions ensure compliance with standards including NFPA 285 for fire protection and Federal standards for accessibility and environmental considerations.

The addendum modifications indicate a mature design phase with contractor input reflected through detailed technical corrections and clarifications. Notable revisions include changes to concrete paving specifications (from previous standards to 7-inch concrete sections), gate automation modifications (removing automatic operation from certain gates while maintaining manual operation capability), electrical panel configurations (consolidating to a single automatic transfer switch for the entire campus rather than individual building systems), and enhanced fire detection systems with the addition of carbon monoxide and nitrogen dioxide sensors in bus and service vehicle bays. Project manual volumes include extensive specification sections addressing construction quality, alternate bid opportunities, owner direct purchasing procedures, and technology integration requirements. The document reflects federal funding through HUD Community Development Block Grant-Disaster Recovery program requirements and indicates Davis-Bacon wage compliance throughout all work scopes.

View the file

Other files

File Type Posted
CDBG-DR_HS004_New_Escambia_County_Area_Transit_(ECAT)_Facility_(Addendum_#16_Revision).pdf PDF
ECAT_BP2_PROJECT_MANUAL_Rev_1__26-11-13.pdf PDF
ECAT_BP2_DRAWING_SET_-_05_FUEL_STATION_Rev_1__26-11-13.pdf PDF
ECAT_BP2_DRAWING_SET_-_04_BUS_WASH_Rev_1__26-11-13.pdf PDF
ECAT_BP2_DRAWING_SET_-_03_TRANSFER_CENTER_Rev_1__26-11-13.pdf PDF
ECAT_BP2_DRAWING_SET_-_02_MAINTENANCE_BUILDING_Rev_1_26-11-13.pdf PDF
ECAT_BP2_DRAWING_SET_-_01_ADMINISTRATION_BUILDING_Rev_1_26-11-13.pdf PDF
ECAT_BP2_DRAWING_SET_-_00_SITE_SITE_Rev_1_26-11-13.pdf PDF
CDBG-DR_HS004_New_Escambia_County_Area_Transit_(ECAT)_Facility_(Addendum_#10_Revision).pdf PDF
CDBG-DR_HS004_New_Escambia_County_Area_Transit_(ECAT)_Facility_(Addendum_#9_Revision).pdf PDF
CDBG-DR_HS004_New_Escambia_County_Area_Transit_(ECAT)_Facility_(Addendum_#8_Revision).pdf PDF
CDBG-DR_HS004_New_Escambia_County_Area_Transit_(ECAT)_Facility.pdf PDF
ECAT_BP2_PROJECT_MANUAL_-_VOLUME_TWO.pdf PDF
ECAT_BP2_PROJECT_MANUAL_-_VOLUME_ONE.pdf PDF
ECAT_BP2_DRAWING_SET_-_05_FUEL_STATION.pdf PDF
ECAT_BP2_DRAWING_SET_-_04_BUS_WASH.pdf PDF
ECAT_BP2_DRAWING_SET_-_03_TRANSFER_CENTER.pdf PDF
ECAT_BP2_DRAWING_SET_-_02_MAINTENANCE_BUILDING.pdf PDF
ECAT_BP2_DRAWING_SET_-_01_ADMINISTRATION_BUILDING.pdf PDF
ECAT_BP2_DRAWING_SET_-_00_SITE.pdf PDF
FDOT_Liquidated-Damages-2026-2027.pdf PDF
Building_Construction_Wage_Determination_5.18.26.pdf PDF
Exhibit.FederalContractProvisions.HUD_10.22.26.pdf PDF
Escambia_County_Section_3_Business_Application_CDBG-DR.pdf PDF
Section-3-project-implementation-plan-template---forms-0-8.pdf PDF
Escambia_County_Section_3_Contract_Clause_CDBG-DR.pdf PDF
Show all 26

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Date: 2026.11.12 Project: New ECAT Facility

BIDDING AND CONTRACT Escambia County Area Transit

REQUIREMENTS 50 Clarinda Ln, Pensacola, FL 32505

Document: 00201 – Bid Package 2 Project #: 2613

PROSPECTIVE BIDDERS

PROJECT MANUAL – VOLUME ONE

GENERAL CONDITIONS

1. TABLE OF CONTENTS

a. Revised section.

2. 012300 - ALTERNATES

3. 014000 - QUALITY REQUIREMENTS

4. 016100 - OWNER DIRECT PURCHASING

5. 017000 - EXECUTION REQUIREMENTS

ARCHITECTURAL

1. 034100 - PRECAST STRUCTURAL CONCRETE

a. Added section.

2. 042000 - UNIT MASONRY

3. 055000 - METAL FABRICATIONS

4. 055133 - METAL LADDERS

5. 072726 - FLUID-APPLIED MEMBRANE AIR BARRIERS

6. 074213 - METAL WALL PANELS

7. 078100 - APPLIED FIRE PROTECTION

8. 081416 - FLUSH WOOD DOORS

9. 084113 - ALUMINUM-FRAMED ENTRANCES AND STOREFRONTS

10. 085653 - SECURITY WINDOWS

11. 087100 - DOOR HARDWARE

12. 088000 - GLAZING

13. 093013 - CERAMIC TILING

14. 096723 - RESINOUS FLOORING

15. 096813 - TILE CARPETING

16. 099323 - INTERIOR STAINING AND FINISHING

17. 101300 - DIRECTORIES

a. Removed section.

18. 101400 - SIGNAGE

a. Removed section.

19. 102113.17 - PHENOLIC-CORE TOILET COMPARTMENTS

20. 102600 - WALL AND DOOR PROTECTION

21. 111126 - BUS-WASHING EQUIPMENT

22. 118119 - VACUUM CLEANING SYSTEMS

23. 133419 - METAL BUILDING SYSTEMS

24. 142400 - HYDRAULIC ELEVATORS

APPENDIX

1. APPENDIX A

2. APPENDIX B

PROJECT MANUAL – VOLUME TWO

GENERAL CONDITIONS

1. TABLE OF CONTENTS

FIRE SUPPRESSION

1. 211300 - Sprinkler Systems

PLUMBING

1. 221100 - Plumbing Piping

2. 223300 - Domestic Water Heaters

3. 226713 - High Purity Water Systems (RO)

HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)

1. 231000 - FACILITY FUEL SYSTEMS

a. Revised section.

COMMUNICATIONS

1. 270000 - COMMUNICATION SYSTEMS TABLE OF CONTENTS

2. 270513 - COMMUNICATIONS COMMON WORK RESULTS

3. 274100 - AUDIO VIDEO SYSTEMS

4. 274133 - MASTER ANTENNA TELEVISION SYSTEM

EXTERIOR IMPROVEMENTS

1. 323119 - DECORATIVE METAL FENCES AND GATES

DRAWING SETS

00_SITE

1. 000 – COVER SHEET

a. Added new sheets CS01.01-CS01.09 to CIVIL set

b. Added new sheet PS100 to PLUMBING set

CIVIL

1. ADDED SHEETS CS01.01-CS01.09 – SURVEY SHEETS

2. C00.01 – GENERAL NOTES:

a. Updated “General Notes” note 4.

b. Added additional surveyor information

c. Updated “Grading General Notes” note 2.

3. CR01.01-CR01.03 – PAVING PLAN AND PROFILES

a. 2” of asphalt to be included in BP2

4. C2.00 – OVERALL PAVING PLAN

a. Gates 1P-4P are no longer automatic.

b. Gate 4P is 10’ wide.

c. Gate revisions for 2S, 3S, 1DP, 2DP

d. Operator Type column added to GATE SCHEDULE

e. Operator Schedule added.

f. Added additional description on fuel tanks at Fuel Station.

g. Reference Technology sheets for access control integration at gates.

5. C02.01 – C02.05 PAVING PLANS

a. Reference Landscape Plans for sidewalk on West side of Admin building and the main entrance to the Admin building.

b. Reference Landscape Plans for paving inside of raised curb island at the Transfer Center.

c. Curbed islands are FDOT Curb, Type D.

d. Chain link fence according to Escambia County Technical Specifications.

e. Fence West and South of Admin building shall be Ameristar Echelon fence – Genesis Style w/ no adornments or an approved equal. Reference the Project Manual for additional specifications.

f. A portion of the drive lane West of the Transfer Center was removed from the scope of work.

g. Fuel Station pavement to be priced separately. Limits shown.

h. Bollard quantities and locations changed at the Fuel Station.

i. Gate No.2DP noted as Swing gate.

6. C08.00 – CIVIL DETAILS:

a. Typical paving section changed to 7” concrete to match paving sheet legend.

b. Removed retaining wall section.

c. Added bollard and FDOT Standard Type D Curb details.

LANDSCAPE

1. L4.00

a. Removed ‘compacted aggregate’ from details, replaced with ‘compacted subgrade’

1. L4.01

a. Removed ‘compacted aggregate’ from details, replaced with ‘compacted subgrade’

3. L5.00

a. Updated remarks for plants in planting schedule

4. L5.01

a. Added missing planting label

ELECTRICAL

1. EA000 – ELECTRICAL COVER PAGE

a. UPDATE cover page information

2. ES101 – ELECTRICAL BID #2 SITE PLAN

a. UPDATE electrical layout on site, update notes and schedule info.

b. UPDATE connection point for gates and disconnect locations

2. ES102 – ELECTRICAL BID #2 SITE PLAN

a. UPDATE general notes

1. ES103 – ELECTRICAL BID #2 SITE PLAN

b. ADD note to luminaire schedule

1. PS100 – PLUMBING SITE PLAN

a. REMOVE sanitary piping, floor sink, and two-way yard cleanout. Refer to sheet for additional information.

b. REMOVE keyed note 1. Refer to sheet for additional information

TECHNOLOGY

2. T101 - TECHNOLOGY BID #2 SITE PLAN

a. REVISE card reader location

b. ADD general note

3. T500 - TECHNOLOGY DETAILS

a. REVISE responsibility matrix

4. T600 - TECHNOLOGY SCHEDULES

a. REVISE detail 3 exterior camera pole mounting and riser diagram

01_ADMINISTRATION BUILDING

STRUCTURAL

1. S001 – General Notes

a. Deferred submittals notes: Item 9 removed from notes.

b. Design Data: Seismic design data updated.

2. S110 – Foundation Framing Plan

a. Detail 01: Updated spread footing size

b. Detail 02: Added dimension to located edge of roof framing.

c. Detail 02: Updated Beam reactions.

d. Detail 02: Added hanging bathroom partition to plan.

e. Detail 02: Added plan notes #11.

3. S200 – Roof Framing Plan

a. Plan Note: Added note 12

b. Detail 01: Added plan note and hanging bathroom partition an

4. S300 - Typical Foundation Details – Foundation Details

a. Detail: Added P9 and P11 to the typical spread footing schedule.

5. S400 – Foundation Details

a. Detail 01-05 & 07/S400: Updated footing width

6. S501 – Framing Details

a. Detail 17 & 18: New details to support hanging bathroom partitions.

1. X001 – 3D VIEWS AND WALL/ROOF ASSEMBLIES

a. Ground face brick veneer and MP changes

b. FRT OSB and medium-build applied notes to wall type details, updated to comply with NFPA 285

c. Revised the ground-face brick veneer and metal panel information to the Exterior Finish Schedule.

d. Updated the FRT OSB to WT3 and WT4

e. Updated medium-build fluid-applied notes for compliance with NFPA 285 to WT4.

2. X002 – EXTERIOR LAYOUT PLAN

a. Site key map added

3. X300 – EXTERIOR ELEVATIONS

a. Window schedule updated

b. Note referring to X800 sheet removed

c. Added missing rough opening to North Elevation

4. X301 – EXTERIOR ELEVATIONS

a. Revised the window schedule to remove window types AL9 through AL11 and add missing window types CW4 through CW6.

4. A110 – FLOOR PLAN

a. UPDATED bullet-proof glass window and deal tray note

5. A111 – DEDUCTIVE ALTERNATE BID FLOOR PLAN

a. Updated the HVAC notes to reflect the two second-floor zones identified for a deductive alternate.

6. A113 – REFLECETED CEILING PLAN

a. Corrected the finish schedule reference from A116 to A115.

7. A115 – FINISH PLAN

a. Clarification for integral cove base height

b. Updates to finishes for rooms 102, 103, 130, 131, 148, 149, 157A, 158A, 204 and 205

c. Added missing dimension for floor finish to Admin Reception 114

d. Added new General Note 5

e. Updated General Note 3

f. Updated Floor hatches to Color Schedule

g. Updated WCPT to WCPT1

h. Added specifications for SN1 and SN2

i. Added note to coordinate artwork with owner to WP1

j. Updated WS1 reference detail

k. Updated the specifications for roller shades RS1 and RS2

8. A501 – STAIRS A/B AND LARGE-SCALE PLANS

a. Grab-bars added to Administration restrooms 130 and 131

b. Hung toilet partitions note added to restroom enlarged plan

c. Updated view name and added missing note to Floor plan view 5

9. A700 – INTERIOR ELEVATIONS

a. Administration reception desk 112 elevation added

b. Reception counter 104 elevation added

c. Revised finishes to views 5, 8, 9, 10, 11, 13 and 15

10. A900 – EXTERIOR AND INTERIOR DOOR SCHEDULE AND ELEVATIONS

a. Hardware set column integrated to door schedule

b. Technology access control updated in door schedule

c. Narrow lite width decreased to 3"

PLUMBING

1. PA101 – PLUMBING 1ST & 2ND FLOOR PLAN

a. REVISE plumbing fixture tags as seen on plans. Refer to sheet for additional information.

2. PA401 – PLUMBING 1ST & 2ND ENLARGED VIEWS

a. REVISE plumbing fixture tags as seen on plans. Refer to sheet for additional information.

3. PA600 – PLUMBING SCHEDULES

a. ADD L-2 to LAVATORIES and SINK SCHEDULE. Refer to sheet for additional information.

MECHANICAL

1. MA100 – MECHANICAL 1ST & 2ND FLOOR PLAN

a. ADD diffuser tags on 2nd floor

b. ADD keyed note 5

c. ADD text note clarifying EF-1 ductwork

d. REVISE verbiage for deductive alternate scope

2. MA500 – MECHANICAL DETAILS

a. REVISE natural gas piping riser detail.

3. MA600 – MECHANICAL SCHEDULES

a. REVISE AHU Schedule.

1. EA000 – ELECTRICAL COVER PAGE

a. UPDATE GENERAL NOTES

2. ELA100 – ELECTRICAL LIGHTING PLAN

a. ADD daylight zone to vestibule 100

b. ADD dimmer switch for OCL Glowball fixture to reception area.

c. REVISE control scheme for OCL Glowball fixture.

3. EPA100 – ELECTRICAL POWER PLAN

a. UPDATE notes and update power layout

b. UPDATE TV power layout and locations

4. EPA300 – ELECTRICAL POWER PLAN

a. UPDATE notes and roof lightning protection

5. EYA100 – ELECTRICAL SYSTEMS PLAN

a. ADD CO detector to mechanical room for gas water heater

b. ADD smoke detectors to first floor ADA storage, janitor closet and second floor storage room

c. ADD strobe to call center for coverage

d. ADD duct smoke and CO detector to AHU-1

e. ADD duct smoke detector to VAV-201 and update fire alarm layout

6. EA500 – ELECTRICAL DETAILS

a. UPDATE matrix and fire alarm riser notes

7. EA501 – ELECTRICAL DETAILS

a. UPDATE electrical riser diagram

8. EA503 – ELECTRICAL DETAILS

a. REVISE technology responsibility matrix

9. EA600 – ELECTRICAL SCHEDULES

a. ADD F13 (elevator light) into lighting schedule and update schedules

10. EA601 – ELECTRICAL SCHEDULES

a. UPDATE panel schedules

1. TA101 – TECHNOLOGY 1ST & 2ND FLOOR PLAN

a. REVISE access control devices.

b. REMOVE hatching in room 102

2. TA502 – TECHNOLOGY SCHEDULES

3. TA600 – TECHNOLOGY SCHEDULES

a. REVISE door schedule

02 MAINTENANCE BUILDING

1. S001 – General Notes

a. Deferred submittals notes: Item 9 removed from notes.

b. Design Data: Seismic design data updated.

2. S110 – Foundation Framing Plan

a. Plan note: Added Note #12 updated.

b. Detail 01: Updated slab thicknesses and locations on plan.

c. Detail 01: Updated typical saw joint locations on plan.

d. Detail 01: Added missing PEMB column, pilaster and footings.

3. S114 – Mezzanine Floor Framing Plan

a. Plan Note: Added note #5 for hanging bathroom partition reference.

b. Detail 01: Revised number of stud required.

c. Detail 02: Updated Plan notes

4. S200 – Roof Framing Plan

a. Detail 01: Added MEP loading to roof plan.

5. S300 – Typical Details – Foundation Details

a. Detail 13: Add P5 to typical footing schedule.

6 S400 – Foundation Details

a. Detail 01: Updated detail.

7. S500 – Framing Details

a. Detail 14 & 15: New details to support hanging bathroom partitions.

1. X001 - 3D VIEWS AND WALL / ROOF ASSEMBLIES

a. Remove EB1 and revised MP1 to the Exterior finish schedule

b. Added note to field paint PEMB PURLINS to WT1/WT2

c. Revised notes to RT2

d. Added new Note 10: ROOF FASCIA, CANOPY, SOFFIT

a. Site key map added

a. Corrected door schedule references from X900 and X950 to A900 to General elevation notes.

of missing X900 and X950 for A900 when referring to door schedules

4. X301 – EXTERIOR ELEVATIONS

a. Corrected door schedule references from X900 and X950 to A900 to General elevation notes.

5. A110 – FLOOR PLAN

a. Added a note addressing column and end-wall spacing for future expansion.

6. A113 – REFLECTED CEILING PLAN

a. Corrected the finish schedule reference from A116 to A115 to Ceiling types.

b. Added notes for paint exposed structure.

7. A115 – FINISH PLAN

a. Updates to finishes

b. Added a note requiring field application of PT6 to the PEMB structure before framing to achieve the intended finish quality.

8. A700 – LARGE-SCALE PLANS

a. Added a note for hung toilet partitions to the enlarged restroom plan.

b. Revised finishes to elevation 4 & 5

9. A900 – EXTERIOR AND INTERIOR DOOR SCHEDULE AND ELEVATIONS

a. Added a hardware set column to the door schedule and updated the technology access control information

b. Reduced the narrow lite width to 3 inches to N type door frame

c. Revised Glazing schedule to remove GL2 & GL3

d. Updates to General Door schedule notes

e. Added CR to Abbreviations

FIRE PROTECTION

1. FPM500 – FIRE PROTECTION DETAILS AND SCHEDULES

a. REVISE FIRE SPRINKLER USAGE MATRIX schedule. Refer to sheet for additional information

1. PM100 – PLUMBING UNDERFLOOR PLAN

a. ADD waste oil and waste antifreeze piping. Refer to sheet for additional information

b. REVISE keyed note 7. Refer to sheet for additional information

c. ADD keyed note 8 and 9. Refer to sheet for additional information

2. PM101 – PLUMBING FLOOR PLAN

a. ADD waste oil and waste antifreeze piping. Refer to sheet for additional information

b. ADD keyed notes 19, 20, and 21. Refer to sheet for additional information

3. PM500 – PLUMBING DETAILS

a. REVISE WATER HEATER – TANKLESS – PIPING DIAGRAM detail. Refer to sheet for additional information

4. PM600 – PLUMBING SCHEDULES

a. REVISE PIPING APPLICATION SCHEDULE (PLUMBING). Refer to sheet for additional

Information

1. MM100 – MECHANICAL PLAN

a. REVISE keyed note 2.

b. ADD keyed note 11.

c. ADD keyed note 12.

d. ADD keyed note 13.

e. ADD keyed note 14.

f. ADD CO and NO2 sensors to Bus Bays and SV Bays.

g. ADD EFC-1 and EFC-2 to bus bay and SV bay.

h. ADD thermostats for RTH 1-8.

2. MM500 – MECHANICAL DETAILS

a. REVISE natural gas piping riser detail

b. ADD exhaust fan – on/off detail

3. MM600 – MECHANICAL SCHEDULES

a. REVISE duct application schedule

b. REVISE split system air conditioner schedule electrical information

c. ADD miscellaneous mechanical equipment schedule

1. EM000 – ELECTRICAL COVER PAGE

2. ELM100 – ELECTRICAL LIGHTING PLAN

a. ADD exterior building mounted lighting and circuit lighting relay panel

3. ECM100 – ELECTRICAL LIGHTING PLAN

a. ADD connections for plumbing fixtures

4. EPM100 – ELECTRICAL POWER PLAN

a. REVISE distribution system to utilize a singular ATS for the entire campus rather than one per building on the generator

b. ADD (2) connections for tox alert panels EFC-1 and EFC-2

c. REVISE simplex receptacles to be weatherproof

d. ADD connections for electric water coolers

e. ADD connections for plumbing fixtures.

f. REVISE panel ‘LEM5’ location

5. EPM300 – ELECTRICAL ROOF PLAN

a. ADD notes

b. REVISE notes

6. EYM100 – ELECTRICAL SYSTEMS PLAN

a. ADD mezzanine systems plan

b. ADD manual pull stations, remove smoke detectors in corridor, add heat/smokes in storage rooms

7. EM500 – ELECTRICAL DETAILS

a. UPDATE fire alarm matrix

8. EM501 – ELECTRICAL SYSTEMS PLAN

a. REVISE riser diagram to show one ATS instead of three

b. UPDATE riser diagram information

9. EM503 – ELECTRICAL DETAILS

a. REVISE TECHNOLOGY RESPONSIBILITY MATRIX

10. EM600 – ELECTRICAL SYSTEMS PLAN

a. UPDATE POWER SWITCH SCHEDULE

b. ADD Heat Detector to FIRE ALARM DEVICE SCHEDULE

c. REVISE Simplex receptacle description to include weatherproof cover

d. UPDATE material list schedule info

e. UPDATE CCT and MOUNTING columns and NOTE at LUMINAIRE SCHEDULE

f. UPDATE DIST. PANELs AND PANELs IN GENERAL ELECTRICAL SCHEDULE

11. EM601 – ELECTRICAL SCHEDULES

a. REVISE BRANCH PANELBOARD schedules: LM1-LM4

12. EM602 – ELECTRICAL SCHEDULES

a. UPDATE PANELBOARD schedules: HEM1 and LEM1-LEM3

b. REVISE SWG1-1 to have a 150 A breaker

TECHNOLOGY

1. TM100 – TECHNOLOGY PLAN

a. ADD access control devices to TECHNOLOGY PLAN

b. REVISE access control system general note 5

2. TM502 – TECHNOLOGY DETAILS

a. ADD detail 2 intercom riser diagram.

b. REVISE responsibility matrix

4. TM600 – TECHNOLOGY SCHEDULES

a. Revise schedules.

03 TRANSFER CENTER

1. S001 – General Notes

b. Design Data: Seismic design data Added.

2. S200 – Roof Framing Plan

a. Plan Note: Number 8 is new plan notes for the hanging bathroom partitions.

b. Detail 01: Added plan note #8 and line work on plan for the hanging bathroom partitions.

3. S500 – Framing Details

a. Detail 06 & 07: New details to support hanging bathroom partitions.

1. X001 – 3D VIEWS AND WALL/ROOF ASSEMBLIES

a. Added a 5/8-inch cover board to RT2 and a note specifying membrane requirements.

b. Revised the 5/8-inch substrate board at RT1.

c. Added an MP2 note to the metal panel in the WT2 detail.

d. Revised color for MP2 to Polar White

a. Added a site key map.

a. Corrected elevation titles and added the bullet-proof ticket window specification to the legend.

b. Updated Glazing schedule

4. A600 – LARGE-SCALE PLANS

a. Added a note for hung toilet partitions to the enlarged restroom plan.

b. Revised finishes to elevation 5, 6, 7, 18 and 19

5. A900 – EXTERIOR AND INTERIOR DOOR SCHEDULE AND ELEVATIONS

information.

b. Added Glazing schedule

PLUMBING

1. PT100 – PLUMBING UNDERFLOOR PLAN

a. ADD note on plan of invert elevation of sanitary main. Refer to sheet for additional information

MECHANICAL

1. MT100 – MECHANICAL PLAN

a. ADD keyed note 6

2. MT500 – MECHANICAL DETAILS

ELECTRICAL

1. ET000 – ELECTRICAL COVER PAGE

2. ELT100 – ELECTRICAL SYSTEMS PLAN

a. REVISE EM lighting in canopy of transfer station

3. EMT100 – ELECTRICAL POWER PLAN

a. ADD equipment connection for centrifugal pump “CP-1”

4. EPT100 – ELECTRICAL POWER PLAN

a. REVISE break room receptacle circuiting and usage.

5. EPT300 – ELECTRICAL ROOF PLAN

a. ADD (2) roof receptacles to service mechanical equipment

b. Drawing EPT300: ADD connection for EF-1

c. UPDATE NOTE 1

6. EYT600 – ELECTRICAL SYSTEMS PLAN

a. ADD CO detector nearby gas fired equipment in janitor closet, update notes and remove corridor smokes

7. ET500 – ELECTRICAL DETAILS

a. ADD knox box to fire alarm matrix detail

b. UPDATE fire alarm riser and keynotes

8. ET501 – ELECTRICAL SCHEDULES

a. UPDATE electrical riser diagram

b. UPDATE TECHNOLOGY RESPONSIBILITY MATRIX

9. ET600 – ELECTRICAL SCHEDULES

a. REVISE mounting for F3C to properly be recessed

b. ADD definition for manual horsepower rated switch disconnects to general electric schedule and update schedules

c. UPDATE H DESCRIPTION in POWER SWITCH SCHEDULE

d. UPDATE MOUNTING for F3C in LUMINAIRE SCHEDULE

e. FOR BRANCH PANELBOARD LET1:

f. ADD LET-31 for F-1

g. ADD circuit LET1-55 for the coffee maker

h. ADD circuit LET1-57 for EF-1

i. REVISE loads for circuit LET1-31

j. ADD GFCI protection to LEFT1-14

k. UPDATE CKT 47, 49, 51 CIRCUIT DESCRIPTION, NOTES, CKT BKR P / A, CKT #

l. UPDATE CKT 13 NOTES

10. TT501 – TECHNOLOGY DETAILS

11. TT600 – TECHNOLOGY DETAILS

a. REVISE detail 3 24” tv elevation ceiling mount

b. REVISE DOOR SCHEDULE

04 BUS WASH

1. S001 – General Notes

2. S400 – Foundation Details

a. Detail 04 & 05: Updated top of footing elevation to match manufacturer cut sheet pit depth.

3. S500 – Framing Details

a. Detail 01, 02, 04, 06 & 07: Updated seat angle size.

1. X001 – LAYOUT PLAN, 3D VIEWS AND WALL/ROOF ASSEMBLIES

2. X300 – EXTERIOR ELEVATIONS

a. Added a specification note for the pay terminal opening.

b. Revised the dimensions for coiling door 106 and updated the vacuum and dumpster view titles.

3. A110 – FLOOR PLAN, RCP, DIMENSIONS AND PARTITION TYPES AND 3D VIEWS

a. Added a note below the equipment schedule referencing Section 016100, Paragraph 2.1.A.16.

b. Revised finish schedule

4. A900 – EXTERIOR AND INTERIOR DOOR SCHEDULE AND ELEVATIONS

information. Updated coiling door 106.

1. PW100 – PLUMBING FLOOR PLANS

a. REVISE general note 1. Refer to sheet for additional information.

b. ADD general note 2. Refer to sheet for additional information.

1. MW100 – MECHANICAL PLAN

a. REVISE keyed note 3

b. ADD thermostats for RTH 1, 2

2. MW500 – MECHANICAL DETAILS

3. MW600 – MECHANICAL SCHEDULES

a. REVISE DUCTWORK APPLICATION SCHEDULE

1. EW000 – ELECTRICAL COVER PAGE

2. ELW100 – ELECTRICAL LIGHTING PLAN

a. ADD general note discussing quality of electrical equipment to be installed in wash bay areas of building

b. ADD connection for fare lighting to HEF1-8

c. REVISE all F4A fixtures to be F13 and corrosion resistant

3. EMW100 - ELECTRICAL EQUIPMENT POWER PLAN

a. ADD general note discussing quality of electrical equipment to be installed in wash bay areas

b. REVISE tick markers on home runs, adjusted numbers of neutrals and hots.

c. ADD text to define disconnect switch “DS-AC-1”

4. EPW100 - ELECTRICAL POWER PLAN

a. ADD general note discussing quality of electrical equipment to be installed in wash bay areas

b. ADD electrical connection and 40 A circuit (LW1-17) for EWH-1.

c. ADD (2) dedicated 20 A receptacles for (2) UPS.

d. REVISE tick markers on home runs, adjusted numbers of neutrals and hots.

e. ADD connection for back flow preventer BFP-1.

5. EPW300 – ELECTRICAL POWER PLAN

a. ADD note 28.

6. EYW100 – ELECTRICAL SYSTEMS PLAN

a. REVISE location of fire alarm control panel, associated manual fire alarm pull station and smoke detector to entryway of building

b. ADD general note discussing quality of electrical equipment to be installed in wash bay areas.

1. EW501 – ELECTRICAL DETAILS

a. REVISE technology responsibility matrix

2. EW600 – ELECTRICAL SYSTEMS PLAN

a. REVISE panel enclosure types to NEMA 4X for the corrosive environment of the wash bay

b. EW600: ADD 40 A circuit to panel LW1 for EWH-1.

c. Item 88: Drawing EW600: REVISE light fixture F1 and F9 to be dimmable.

d. Item 89: Drawing EW600: ADD BFP-1 to equipment connection schedule and panel LW1.

e. Item 90: Drawing EW600: ADD F17 into luminaire schedule.

f. UPDATE Panels in GENERAL ELECTRICAL SCHEDULE

g. UPDATE FIRE ALARM DEVICE SCHEDULE

h. ADD POWER SWITCH SCHEDULE

1. TW100 – TECHNOLOGY PLAN

a. ADD note for Access Control to door 101C

2. TW501 – TECHNOLOGY DETAILS

a. ADD note to detail 1 enlarged fare processing 104 equipment plan.

b. ADD detail 2 access control door detail.

c. REVISE responsibility matrix.

3. TW600 – TECHNOLOGY SCHEDULES

a. ADD note to door schedule

05 FUEL STATION

1. S001 – General Notes

1. X001 - LAYOUT PLAN, 3D VIEWS AND WALL / ROOF ASSEMBLIES

b. Updated Equipment schedule

1. PF100 – PLUMBING FLOOR PLANS

a. REVISE PIPING APPLICATION SCHEDULE (PLUMBING). Refer to sheet for additional information

1. EF-000 – ELECTRICAL COVER PAGE

2. ELF100 – ELECTRICAL SCHEDULES

a. REVISE description of feeders from panel HEF1 to wash building for lighting

b. REVISE description of feeders to canopy for lighting

3. EPF100 – ELECTRICAL SCHEDULES

a. ADD MGB-1 near temporary generator

b. REVISE descriptions for conduits running from panels to loads

c. ADD mounting information for EPO near fuel tanks

d. ADD/ UPDATE GENERAL and KEYED NOTES

4. EPF300 – ELECTRICAL SCHEDULES

a. UPDATE NOTE 1

5. EF500 – ELECTRICAL DETAILS

a. REMOVE 100, 4, G from the riser diagram feeder schedule

b. REVISE technology responsibility matrix

6. EF600 – ELECTRICAL DETAILS

a. REVISE enclosure type for panel HEF1 and LEF1

b. ADD fault current, voltage drop and arc-flash schedules

c. ADD additional spares to panel LEF1

d. ADD (1) connection to HEF1-8 for wash building fare office lighting

e. REVISE AIC rating for panel HEF1 to 14000

f. REVISE model information for GDS-1

g. ADD (2) 20A circuits for wash bay office UPS receptacles

7. TF000 – TECHNOLOGY COVER PAGE

a. REVISE technology sheet list.

8. TF100 – TECHNOLOGY PLAN

a. REVISE general notes

9. TF500 – TECHNOLOGY DETAILS

a. REMOVE CCTV riser diagram.

b. REVISE detail location.

10. TF501 – TECHNOLOGY DETAILS

a. Remove sheet.

11. TF600 – TECHNOLOGY SCHEDULES

a. ADD responsibility matrix

This Addendum consists of 19 pages with the following Attachments:

Specification Sections: TOC (VOL 1), 012300, 014000, 016100, 017000, 034100, 042000, 055000, 055133, 072726, 074213, 078100, 081416, 084113, 085653, 087100, 088000, 093013, 096723, 096813, 099323, 102113.17, 102600, 111126, 118119, 133419, 142400, APPENDIX A, APPENDIX B, TOC (VOL 2), 211300, 221100, 223300, 226713, 231000, 270000, 270513, 274100, 274133, and 323119

Drawing Sheets:

00_SITE

000, CS01.01-CS01.09, CR1.01-CR1.03, C2.0, C02.01-C02.05, C08.00, L4.00, L4.01, L5.00, L5.01, ES101, EXS102, ES103, PS100, T101, T500, T600, 01_ADMIN

S001, S110, S200, S300, S400, S501, X001, X002, X300, X301, A110, A111, A113, A115, A501, A700, A900, PA101, PA401, PA600, MA100, MA500, MA600, MM100, EA000, ELA100, EPA100, EPA300, EYA100, EA500, EA501, EA503, EA600, EA601, TA101, TA502, TA600

02_MAINT

S001, S110, S114, S200, S300, S400, S500, X001, X002, X300, X301, A110, A113, A115, A700, A900, FPM500, PM100, PM101, PM500, PM600, MM500, MM600, EM000, ELM100, EPM100, EPM300, EYM100, EM500, EM501, EM600, EM601, EM602, T100, TM500, TM600

03_TRANSFER CENTER

S001, S200, S500, X001, X002, X300, A600, A900, PT100, MT100, MT500, ET000, ELT100, EMT100, EPT100, EPT300, ET500, ET501, ET600, EYT600, TT501, TT600

04_BUS WASH

S001, X001, X300, A110, A900, PW100, MW100, MW500, MW600, EW000, ELW100, EMW100, EPW100, EPW300, EYW100, EW501, TW100, TW501, TW600

05_FUEL STATION

S001, X001, PF100, EF000, ELF100, EPF100, EPF300, EF500, EF600, TF000, TF100, TF500, TF501, TF600

End

Sincerely, ARCHITECTURAL DESIGN GROUP, INC.

Thomas F. Keyser, AIA, NCARB President

File details come from the government source that posted it. Updated .