This is a structural drawing set for Bid Package #2 of the CDBG-DR HS004 New Escambia County Area Transit (ECAT) Facility project located at 2 Clarinda Lane, Pensacola, Florida. The project encompasses construction of five structures including an Administration Building, Maintenance Building, Passenger Terminal Transfer Center, Bus Wash, and Fuel Station. The drawing set specifically addresses the Fuel Station building, which includes two canopy structures (North and South Canopies) with fuel dispensers, stem walls, and foundation systems. The canopies measure approximately 24 feet wide by 125 feet long for the North Canopy and 41 feet long for the South Canopy, with clear heights of approximately 14 feet-6 inches. The project is being managed by Escambia County, Florida's Design and Construction Administration Division, with ADG (Architecture) of Peoria, Illinois serving as Architect of Record, RLG Consulting Engineers as Structural Engineer, and KEDbluestone as MEP Company. The drawings are marked "NOT FOR CONSTRUCTION" with a status date of October 22, 2026.
The structural design is based on the 8th Edition Florida Building Code as adopted by Escambia County and includes design specifications for wind (121 mph ASD, 156 mph basic wind speed), roof live loads (20 psf), and allowable bearing capacity (1.5 ksf). Foundation systems consist of shallow spread footings and concrete stem walls supporting the prefabricated metal canopies, with the canopy structure and foundations delegated to the manufacturer as a design-build element. The project incorporates comprehensive special inspection and testing requirements for concrete, reinforcing steel, soils, and metal canopy systems. Geotechnical support is based on the May 1, 2026 report by Larry M Jacobs & Associates, Inc., with a September 1, 2026 email supplement. Additional bid packages include plumbing, electrical, and technology systems for the fuel station, with electrical service provided by a 30 kVA transformer and provisions for fuel pump electrical connections complying with NEC Article 514 Class 1 Division 2 specifications.
View the file
Other files
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STRUCTURAL
CONTACT -
P - E -
CIVIL
CONTACT -
P - E -
ARCHITECTURE
ADG
800 SW ADAMS STREET
SUITE 101
PEORIA, IL 61602
CONTACT -
P - E -
MECHANICAL, ELECTRICAL & PLUMBING
CONTACT -
P - E -
309.672.6948
LANDSCAPE
CONTACT -
P - E -
ADDRESS
CITY, STATE ZIP
PROJECT NO.
STATUS
DATE
OWNER ID
SHEET INDEX
PROJECT INFORMATION
CIVIL LANDSCAPE STRUCTURAL ARCHITECTURAL FIRE PROTECTION & PLUMBING MECHANICAL ELECTRICAL TECHNOLOGYGENERAL
OWNER CONSULTANT
CONTACT -
P - E -
05 - FUEL STATION CANOPIES05 - FUEL STATION CANOPIES
ESCAMBIA COUNTY AREA TRANSIT - FACILITY
MEP COMPANY NAME
KEDbluestone
707 NE JEFFERSON AVE
PEORIA, IL 61602
515.259.5957 matthew.jahnke@kedbluestone.com
Peter Galick pete.galick@thinkadg.com
RLG CONSULTING ENGINEERS
12001 N CENTRAL
EXPY #300
DALLAS, TX 75243
Phillip Brugger 214.739.8100 pbrugger@rlginc.com
RLG CONSULTING ENGINEERS
12001 N CENTRAL
EXPY #300
DALLAS, TX 75243
214.739.8100 mwendlandt@rlginc.com
Michael Wendlandt
BID PACKAGE #2 - NOT FOR CONSTRUCTION
10/22/2026
2 CLARINDA LN
PENSACOLA, FLORIDA, 32505
HODGSON DOUGLAS LANDSCAPE
ARCHITECTS
12001 N. CENTRAL EXPRESSWAY
STE 1170
DALLAS, TX 75243
214.749.0333 hdalton@hodgsondouglas.com
Hank Dalton Matthew Jhanke
QSC SERVICES, LLC
PMB #69, 545 BRENT LN.
PENSACOLA, FL
309.231.8272 lzaerrjr@qscservices.us
LANCE ZAERR, JR. DESIGN & CONSTRUCTION ADMINISTRATION DIVISION
ESCAMBIA COUNTY, FLORIDA 100. E BLOUNT STREET
PENSACOLA, FL
TF000
TF100
TF500
TF501
TF600
TECHNOLOGY COVER PAGE
TECHNOLOGY PLAN
TECHNOLOGY DETAILS
TECHNOLOGY DETAILS
TECHNOLOGY SCHEDULES
EF000
ELF100
EPF100
EPF300
EF500
EF501
EF600
ELECTRICAL COVER PAGE
ELECTRICAL LIGHTING PLAN
ELECTRICAL POWER PLAN
ELECTRICAL ROOF PLAN
ELECTRICAL DETAILS
ELECTRICAL DETAILS
ELECTRICAL SCHEDULES
00-Cover 000 COVER 01-General
G000 SITE LOCATION PLAN, ABBREVIATIONS, AND SYMBOLS
LEGEND
02-Exterior/Shell
X001 LAYOUT PLAN, 3D VIEWS AND WALL / ROOF
ASSEMBLIES
X300 EXTERIOR ELEVATIONS
PF000
PS100
PF100
PLUMBING COVER PAGE
PLUMBING SITE PLAN
PLUMBING FLOOR PLANS
S000 STRUCTURAL ABBREVIATIONS AND LEGENDS
S001 GENERAL NOTES
S002 SPECIAL INSPECTIONS
S110 FOUNDATION FRAMING PLAN
CONCEPTUAL RENDERING: RENDERING MAY NOT ACCURATELY REFLECT CONSTRUCTION DOCUMENTS - NOT FOR CONSTRUCTION
STRUCTURAL PLANSSTRUCTURAL CALLOUTS
NORTH ARROW (PLAN NORTH)
SECTION CALLOUT
PLAN DETAIL CALLOUT
REVISION CLOUD & DELTA
SPOT ELEVATION
COLUMN / PIER CALLOUT
CMU WALLS
STRUCTURAL STEEL FRAMING
REINFORCED CONCRETE
1 STRUCTURAL GRID
FACE OF ARCH FINISH
(MATL VARIES)
MECHANICAL EQUIPMENT
STRUCTURAL CONCRETE
WALL OR COLUMN IN SECTION
PIERS AND GRADE
BEAM FOUNDATION
(STRAIGHT OR BELL)
FOOTING AND GRADE
BEAM FOUNDATION
(SPREAD OR CONT)
STRUCTURAL COLUMNS
TUBE, PIPE OR WIDE FLANGE
SPLICE FOR STEEL BEAM
DROP-IN-SYSTEM
STEEL FRAMING - PURLIN
BEAM OR GIRDER
STEEL BEAM OR GIRDER w/
NO OF HS AND CAMBER
MOMENT CONNECTION
STEEL BAR JOIST
BRACE FRAME DESIGNATION
FLOOR/ROOF DECK SPAN
DIRECTION
ZONE FOR METAL DECK
SPECIAL WELDING PATTERNS
SLAB/ROOF DECK OPENING
GRATING SYSTEM
FLOOR DRAIN
CMU WALL
DTL
SHT
99'-6"
W 8X
/ 9
7' -4
W 8X
PIP
E
S
TD
H
SS
6X 6X
3/
BF-1
W16X26 W16X26
W16X26
W16X26
(26) C=1"
12K1
FD
18/36/97'-4"
18/6/97'-4"
STRUCTURAL ABBREVIATIONS
DTL
SHT
ABOVE FINISH FLOOR AFF
ADDITIONAL ADDL
AMERICAN INSTITUTE OF
STEEL CONSTRUCTION AISC
AMERICAN WELDING SOCIETY AWS
ANCHOR BOLT AB
AMERICAN CONC. INSTITUTE ACI
APPROXIMATE APPROX
ARCHITECT ARCH
ARCHITECTURAL ARCH
AREA DRAIN AD
AIR CONDITIONER A/C
AIR HANDLING UNIT AHU
AT @
BASEMENT BSMT
BASE PLATE B PL
BEAM BM
BEARING BRG
BELOW FINISH FLOOR BFF
BETWEEN BTWN
BLOCK BLK
BLOCKING BLKG
BOTTOM BOT
BRICK LEDGE BL
BRIDGING BRDG
BUILDING BLDG
BUILDING LINE BLDG LINE
CANTILEVER CANT
CAST-IN-PLACE CIP
CEILING CLG
CENTER LINE CL
CLEAR CLR
COLUMN COL
COLD FORMED METAL CFM
COMPRESSION,
COMPRESSIBLE COMP
CONCRETE CONC
CONCRETE MASONRY UNIT CMU
CONNECTION CONNX
CONTINUOUS CONT
CONSTRUCTION CONSTR
CONSTRUCTION JOINT CJ
CONTRACTOR CONTR
COORDINATE COORD
DEGREE DEG
DETAIL DTL
DEAD LOAD DL
DIAGONAL DIAG
DIAMETER DIA
DIMENSION DIM
DRAWING DWG
DOUBLE DBL
DOUBLE ANGLE 2L
DOWEL DWL
DOWN DN
EACH EA
EACH FACE EF
EACH WAY EW
ELEVATOR ELEV
EMBEDMENT EMBED
ENGINEER ENG
EQUAL EQ
EQUIPMENT EQUIP
EXHAUST FAN EXF
EXISTING EXIST (E)
EXPANSION JOINT EJ
EXTERIOR EXT
FABRICATOR, FABRICATE FAB
FACE OF FO
FACE TO FACE F TO F
FAR SIDE FS
FINISHED FLOOR FIN FLR
FLOOR FLR
FLOOR DRAIN FD
FOOT FT
FOOTING FTG
FOUNDATION FDN
FRAME FRM
GAGE OR GAUGE GA
GALVANIZED GALV
GENERAL GEN
GENERAL CONTRACTOR GC
GIRDER TRUSS GT
GRADER BEAM GB
HEADED STUDS HS
HEIGHT HT
HIGH HI
HIGH AND LOW HI & LO
HORIZONTAL HORIZ
INCH IN
INFORMATION INFO
INSIDE DIAMETER ID
INSIDE FACE IF
INTERIOR INT
INTERMEDIATE INTERM
JOINT JT
JOIST JST
KIPS (1000 LBS.) K
KIP PER LINEAR FOOT KLF
KIP PER SQUARE FLOOR KSF
KNOCKOUT PANEL K/O
PANEL
LIGHT WEIGHT LT WT
LIVE LOAD LL
LONGITUDINAL LONG
LONG LEG BACK TO BACK LLBB
LONG LEG HORIZONTAL LLH
LONG LEG VERTICAL LLV
LOW LO
MANUFACTURER MFR
MASONRY MAS
MATERIAL MATL
MAXIMUM MAX
MECHANICAL MECH
METAL MTL
MEZZANINE MEZZ
MIDDLE MID
MINIMUM MIN
MISCELLANEOUS MISC
MOMENT CONNECTION MC
NEAR SIDE NS
NOMINAL NOM
NORMAL WEIGHT N WT
NOT APPLICABLE NA
NOT IN CONTRACT NIC
NOT TO SCALE NTS
NUMBER NO, #
ON CENTER OC
OPENING OPNG
OPPOSITE OPP
OPPOSITE HAND OH
ORIGINAL ORIG
OUTSIDE FACE OF
OUTSIDE DIAMETER DD
PARALLEL PARAL
PAVEMENT PVMT
PERIMETER PERIM
PERPENDICULAR PERP
PLATE PL
POST-TENSION PT
POUNDS LBS
POUNDS PER CUBIC FOOT PCF
POUNDS PER SQUARE INCH PSI
PRECAST CONCRETE PC
COMPRESSIBLE JOINT FILLER CJF
PROJECTION PROJ
QUANTITY QTY
RADIUS R
RECOMMENDATIONS REC
REFER/REFERENCE REF
REINFORCED
CONCRETE PIPE RCP
REINFORCED, REINFORCING REINF
REQUIRED REQD
REQUIREMENT REQT
ROOF DRAIN RD
ROOF TOP UNIT RTU
SCHEDULE SCHED
SECTION SECT
SHEET SHT
SHORT LEG BACK TO BACK SLBB
SIMILAR SIM
SLAB ON GRADE SOG
SPACE SP
SPECIFICATION SPEC
SQUARE SQ
SQUARE FOOT/FEET SF
STAINLESS STEEL SS
STANDARD STD
STEEL STL
STEEL STUD MFR. ASSOC. SSMA
STIFFENER STIFF
STRAIGHT STR
STIRRUPS STIRR
STRUCTURAL STRUCT
SUPPORT SUPT
SYMMETRICAL SYM
TEMPERATURE TEMP
THICK THK
THREADED ROD TH RD
TONGUE AND GROOVE T&G
TOP AND BOTTOM T&B
TOP OF T/O
TOTAL LOAD TL
TRANSVERSE TRANS
TYPICAL TYP
UNLESS NOTED OTHERWISE UNO
VERTICAL VERT
WATERSTOP WS
WEIGHT WT
WELDER WIRE FABRIC WWF
WIDE FLANGE BEAM WF
WITH W/
WITHOUT W/O
WORK POINT WP
Architect of Record:
ADG
800 SW ADAMS STREET, SUITE 101
PEORIA, IL 61602
R e vi si o n s
P - 309.672.6948
Discipline:Discipline:Discipline:
P - P - P -
Discipline:
P -
PROJECT NO.
DATE
DRAWN BY
STATUS
Discipline: Owner Consultant
QSC SERVICES, LLC
PMB #69
545 BRENT LN. PENSACOLA, FL
P - 309.231.8272
OWNER ID:
Design and Construction Administration Division
ESCAMBIA COUNTY, FL
100 E. BLOUNT ST. PENSACOLA, FL 32501
ESCAMBIA COUNTY AREA TRANSIT - FACILITY:
05 - FUEL STATION BUILDING
2 CLARINDA LN
PENSACOLA, FLORIDA, 32505 S000STRUCTURAL ABBREVIATIONS AND LEGEND
MEP COMPANY NAME
KEDbluestone, PEORIA, IL 61602
707 NE JEFFERSON AVE
RLG CONSULTING ENGINEERS
12001 N CENTRAL, EXPY #300
DALLAS, TX 75243
RLG CONSULTING ENGINEERS
12001 N CENTRAL, EXPY #300
DALLAS, TX 75243
214.739.8100 214.739.8100 515.259.5957
HODGSON DOUGLAS LANDSCAPE ARCHITECTS
12001 N CENTRAL EXPY, STE 1170
DALLAS, TX 75243
214.749.0333
BID PACKAGE #2 - NOT FOR CONSTRUCTION
10/22/2026
RLG
DESIGN DATA
1. THE DESIGN OF THE STRUCTURE AND PARTS THEREOF IS IN ACCORDANCE WITH THE 8TH EDITION OF FLORIDA BUILDING
CODE, AS AMENDED AND ADOPTED BY ESCAMBIA COUNTY.
2. ROOF LIVE LOADS:
AREA UNIFORM SPECIAL COMMENTS
ROOF, GENERAL
LIVE LOAD REDUCTION
20 psf -
ROOF, EQUIP LOADS SEE ROOF PLAN
3. SNOW LOADS: NOT APPLICABLE PER FBC
FACTORED COMPONENTS AND CLADDING WALL LOADS
POSITIVE PRESSURE (psf) NEGATIVE PRESSURE (psf)
AREA (SQ FT)
LESS THAN 10
GREATER THAN 500
INTERIOR & CORNER ZONE INTERIOR ZONE CORNER ZONE
47 -52
-46
-41
-38 -37
-44
-54
-47
CORNER ZONE IS A DISTANCE OF 3'-0" FROM WALL CORNERS
LINEAR INTERPOLATE FOR LOADS BETWEEN SPECIFIED AREAS
5. SEISMIC DESIGN DATA: NOT APPLICABLE PER FBC
6. FLOOD DESIGN DATA:
THIS PROJECT IS NOT LOCATED WITHIN A FLOOD HAZARD AREA
7. SPECIAL LOADS:
VEHICULAR BARRIERS
AREA
AWNINGS & CANOPIES
UNIFORM
20 psf
6.0 ksf
CONCENTRATED
300 lbs.
IMPACT SECTION OF CODE
FBC 1607.9
FBC 1607.13.4
8. ROOF RAIN LOAD DATA:
RAIN INTENSITY (15-DURATION)
4.9 in/hr
FACTORED COMPONENTS AND CLADDING ROOF LOADS
POSITIVE PRESSURE (psf) NEGATIVE PRESSURE (psf)
AREA (SQ FT)
LESS THAN 10
GREATER THAN 500
PERIMETER ZONE, "B" IS A DISTANCE OF 17'-6" FROM EDGE OF BUILDING
CORNER ZONE, "C" IS A DISTANCE OF 6'-0" FROM EDGE OF BUILDING
ZONE 2 ZONE 3 ZONE 2
-119
-92
-83
-73
ZONE 3
-166
-111
-94
-73
LINEAR INTERPOLATE FOR LOADS BETWEEN SPECIFIED AREAS
3 3
B
C
ROOF WIND LOAD LAYOUT
YES, PER FBC 1607.14
RAIN INTENSITY (60-DURATION)
9.12 in/hr
4. WIND DESIGN DATA:
ASD WIND SPEED Vasd 121 mph
RISK CATEGORY
BASIC WIND SPEED (3 SECOND GUST)
WIND EXPOSURE
INTERNAL PRESSURE COEFFICIENT
COMPONENTS AND CLADDING
156 mph
+/- 0.00
PER ASCE 7-22
N/A
N/A
TORNADO SPEED, Vt
EFFECTIVE PLAN AREA
II
C
1. PROJECT SPECIFICATIONS ARE A PART OF THE CONTRACT DOCUMENTS. CONTRACTOR SHALL REVIEW THE SPECIFICATIONS AND NOTIFY ARCHITECT OF DISCREPANCIES BEFORE PROCEEDING WITH WORK.
2. STRUCTURAL DRAWINGS ARE AN INTEGRAL COMPONENT TO THE CONTRACT DOCUMENTS. CONTRACTOR SHALL
REVIEW AND COORDINATE ACCORDINGLY.
A. PRIOR TO FABRICATION OR INSTALLATION OF STRUCTURAL MEMBERS, CONTRACTOR SHALL COMPARE
STRUCTURAL DIMENSIONS AND SECTIONS WITH ARCHITECTURAL DIMENSIONS AND SECTIONS.
DISCREPANCIES ARE TO BE REPORTED IN WRITING TO THE ARCHITECT.
B. PRINCIPAL OPENINGS ARE SHOWN ON THESE DRAWINGS. REFER TO ARCHITECTURAL, MECHANICAL, PLUMBING AND ELECTRICAL DRAWINGS FOR OTHER OPENINGS NOT SHOWN.
C. REFER TO ARCHITECTURAL DRAWINGS FOR ELEVATIONS AND LOCATIONS OF SLAB DEPRESSIONS AND
CURBS NOT SHOWN. PROVIDE POSITIVE SLOPE TO ALL DRAINS.
D. CONTRACTOR SHALL COORDINATE PENETRATIONS, SLEEVES, CURBS, AND INSERTS REQUIRED FOR THE
CONTRACT DOCUMENTS.
E. CONTRACTOR SHALL VERIFY SIZE, WEIGHT, LOCATION, AND SUPPORT CONDITIONS OF MECHANICAL
EQUIPMENT SUPPORTED ON OR SUSPENDED FROM THE ROOF OR FLOORS.
F. CONTRACTOR SHALL COORDINATE CONSTRUCTION WITH ADJACENT STRUCTURES AND UTILITIES.
G. CONTRACTOR SHALL NOTIFY IN WRITING THE ARCHITECT & ENGINEER OF ANY DISCREPANCIES BEFORE
PROCEEDING WITH WORK.
3. TEMPORARY SHORING AND BRACING DURING CONSTRUCTION
A. CONTRACTOR SHALL PROVIDE TEMPORARY BRACING OF COMPONENTS DURING CONSTRUCTION TO MEET
REGULATORY REQUIREMENTS FOR SAFETY.
B. CONTRACTOR SHALL PROVIDE TEMPORARY SHORING AND BRACING OF WALLS AND GRADE BEAMS DURING
CONSTRUCTION. SHORE WALLS AND GRADE BEAMS DURING THE BACKFILLING AND COMPACTION PROCESS.
C. CONTRACTOR SHALL PROVIDE NECESSARY TEMPORARY BRACING AND SHORING DURING CONSTRUCTION
UNTIL STRUCTURAL FRAMING AND DIAPHRAGMS ARE COMPLETED. TEMPORARY BRACING SHALL BE
DESIGNED UNDER THE SUPERVISION OF A LICENSED ENGINEER.
4. SELECTION OF CONSTRUCTION MEANS, METHODS, TECHNIQUES, AND PROCEDURES, AS WELL AS SAFETY PRECAUTIONS AND PROGRAMS, ARE SOLELY THE CONTRACTOR’S RESPONSIBILITIES. AS SUCH, CONSTRUCTION ENGINEERING AND DESIGN RESULTING FROM THESE SELECTIONS IS THE RESPONSIBILITY OF THE CONTRACTOR.
A. EXAMPLES INCLUDE, BUT ARE NOT LIMITED TO, ENGINEERING OF SHORING AND SCAFFOLDING SYSTEMS;
LOAD CHECKS AND STRUCTURAL MODIFICATIONS FOR STORAGE, STAGING, AND CONSTRUCTION
EQUIPMENT LOADING; MEANS OF EGRESS FOR HEAVY EQUIPMENT; CRANE SELECTION, LOCATION, SUPPORT
AND BRACING; TEMPORARY HOISTS, LIFTS AND PLATFORMS.
B. CONTRACTOR SHALL ENSURE THAT APPROPRIATE ENGINEERING IS PERFORMED BY A LICENSED ENGINEER FOR THE WORK, CONSULTED WITH ON FIELD MODIFICATIONS, SPECIFY APPROPRIATE LEVELS OF
INSPECTION OF THE WORK, AND TO REVIEW INSPECTION REPORTS.
C. CONSTRUCTION ENGINEERING FEES HAVE NOT BEEN INCLUDED IN THE BASE FEE TO THE
OWNER/ARCHITECT. IF REQUESTED, THE EOR MAY CONSIDER PERFORMING THESE SERVICES AS AN
ADDITIONAL SERVICE PAID BY THE CONTRACTOR.
5. PRE-CONSTRUCTION MEETINGS SHALL BE CONDUCTED TO DISCUSS SUBGRADE PREPARATION, FOUNDATION CONSTRUCTION, WALL BACKFILL, VOID FORM SYSTEMS, CONCRETE FORMING & PLACING, AND TESTING &
INSPECTION REQUIREMENTS.
6. CONTRACTOR SHALL COMPLY WITH REQUIREMENTS AS LISTED IN THE STATEMENT OF SPECIAL INSPECTIONS.
GENERAL NOTES
1. DEFERRED SUBMITTALS ARE PORTIONS OF THE OVERALL DESIGN WHICH ARE NOT SUBMITTED AT TIME OF PERMIT
APPLICATION AND ARE TO BE SUBMITTED TO THE BUILDING OFFICIAL.
2. DEFERRED SUBMITTALS WILL BE REVIEWED FOR THE LIMITED PURPOSE OF CHECKING FOR CONFORMANCE WITH INFORMATION GIVEN IN THE CONTRACT DOCUMENTS. SUBMITTAL REVIEW WILL NOT BE CONDUCTED FOR THE PURPOSE OF DETERMINING THE ACCURACY AND COMPLETENESS OF OTHER DETAILED INFORMATION SUCH AS DIMENSIONS AND QUANTITIES, OR FOR SUBSTANTIATING INSTRUCTIONS FOR INSTALLATION OR SYSTEMS DESIGNED
BY THE CONTRACTOR WHICH REMAINS THE RESPONSIBILITY OF THE CONTRACTOR.
REVIEW SHALL NOT CONSTITUTE APPROVAL OF SAFETY PRECAUTIONS OR OF ANY CONSTRUCTION MEANS, METHODS, SEQUENCES OR PROCEDURES.
APPROVAL OF A SPECIFIC ITEM SHALL NOT INDICATE APPROVAL OF AN ASSEMBLY OF WHICH THE ITEM IS A
COMPONENT.
3. FOLLOWING DEFERRED SUBMITTALS ARE TO BE PROVIDED FOR REVIEW:
A. CONCRETE FORMWORK / RETENTION SYSTEMS
B. PRE-ENGINEERED CANOPIES
SUPPLIER’S ENGINEERS SHALL PROVIDE SIGNED AND SEALED CALCULATIONS WITH THE SUBMITTAL FOR REVIEW.
REVIEW WILL BE LIMITED TO CONFORMANCE WITH DESIGN AND PERFORMANCE CRITERIA SPECIFIED IN THE CONSTRUCTION DOCUMENTS AND THE INTERFACE BETWEEN THESE ITEMS/SYSTEMS AND THE BUILDING STRUCTURE. THE MANUFACTURER/SUPPLIER AND ITS SPECIALTY STRUCTURAL ENGINEER REMAIN RESPONSIBLE FOR THE DESIGN OF THE ITEM/SYSTEM WILL RETAIN ALL RIGHTS AND RESPONSIBILITIES FOR THE DESIGN OF THE
PRODUCT AND THE CONNECTIONS TO THE BUILDING STRUCTURE.
NO WORK ON STRUCTURAL ELEMENTS SUPPORTING OR RELATED TO THESE ITEMS IS TO PROCEED UNLESS THE REVIEW STAMP CLEARLY INDICATES "REVIEWED" OR "REVIEWED, SEE COMMENTS" BY THE ENGINEER.
4. FOLLOWING SHOP DRAWINGS ARE TO BE PROVIDED FOR APPROVAL:
A. CONCRETE MIXES
B. REINFORCING STEEL
SHOP DRAWINGS ARE TO BE DISTRIBUTED ONLY FROM RETURNED SUBMITTALS BEARING AN INITIALED REVIEW STAMP AND WORK ON THESE ITEMS SHALL NOT PROCEED UNLESS THE STAMP CLEARLY INDICATES THE DRAWINGS
ARE "APPROVED" OR "APPROVED AS NOTED."
5. CONCRETE IS A MATERIAL DESIGNED BY THE SUPPLIER TO MEET THE STRENGTH AND PERFORMANCE CRITERIA SPECIFIED IN THE CONTRACT DOCUMENTS. CONCRETE MIX DESIGNS SHALL BE IN CONFORMANCE WITH ACI 318.
SUBMIT MIX DESIGNS AND THE TESTING LAB REVIEW TO THE ARCHITECT/ENGINEER FOR REVIEW.
MANY VARIABLES, INCLUDING ENVIRONMENTAL CONDITIONS AFFECT THE QUALITY OF CONCRETE. THE CONTRACTOR IS RESPONSIBLE FOR CONTROLLING VARIABLES AND REQUESTING MIX MODIFICATIONS AND SHALL BE
SOLELY RESPONSIBLE FOR THE QUALITY OF CONCRETE DELIVERED AND PLACED ON THE SITE.
6. BEFORE SUBMISSION FOR REVIEW, GENERAL CONTRACTOR SHALL PRE-CHECK SUBMITTALS. SUBMITTALS MUST BEAR AN INITIALED REVIEW STAMP OF THE GENERAL CONTRACTOR. SUBMITTALS WITHOUT REVIEW STAMPS WILL
BE RETURNED WITHOUT REVIEW AND SHALL NOT BE CAUSE FOR CLAIMS OF DELAY.
7. SCHEDULE SUBMITTALS SUFFICIENTLY IN ADVANCE OF THE DATE REQUIRED TO ALLOW REASONABLE TIME FOR PROCESSING AND REVIEW BY THE DESIGN TEAM. THIS SHALL INCLUDE A MINIMUM OF TEN WORKING DAYS FOR ENGINEER'S PROCESSING AND REVIEW. INCLUDE TIME FOR CONTRACTOR’S RESUBMISSION AND SUBSEQUENT
REVIEW IF NECESSARY.
SHORTER REVIEW PERIODS WILL ONLY BE HONORED WITH PRIOR WRITTEN CONSENT. THESE ACCELERATED SERVICES, AND APPROPRIATE COMPENSATION, MUST BE NEGOTIATED WITH THE ENGINEER AND ARCHITECT IN
ADVANCE.
TEN DAY REVIEW PERIODS CAN NOT BE HONORED WHEN LARGE QUANTITIES OF SHOP DRAWINGS ARE SUBMITTED AT ONE TIME. WHEN THIS HAPPENS, THE CONTRACTOR SHALL SUBMIT AN ITEMIZED LIST INDICATING PRIORITIES AND
REASONABLE RETURN DATES.
REVIEW OF RESUBMITTALS WILL BE LIMITED TO ONLY EARLIER COMMENTS AND IS NOT AN EXTENSIVE REVIEW.
8. USE OF REPRODUCTIONS OF THESE CONTRACT DRAWINGS, INCLUDING THE USE OF ELECTRONIC FILES, BY ANY CONTRACTOR IN LIEU OF THE INDEPENDENT PREPARATION OF SHOP DRAWINGS, SIGNIFIES THEIR ACCEPTANCE OF ALL INFORMATION SHOWN HEREON AS CORRECT AND OBLIGATES HIMSELF TO ANY JOB EXPENSE, REAL OR IMPLIED, ARISING DUE TO ANY ERRORS THAT MAY OCCUR HEREON.
9. STRUCTURAL FRAMING WAS BASED ON PRE-BID MEP EQUIPMENT AND INITIAL ELEVATOR INFORMATION.
MODIFICATIONS MAY BE NECESSARY IF DIFFERENT EQUIPMENT IS SELECTED OR IF DIFFERENT CRITERIA ARE REQUIRED. BASED ON THE EXTENT OF THE CHANGES, ADDITIONAL SERVICES FOR STRUCTURAL REDESIGN MAY BE REQUIRED. GENERAL CONTRACTOR SHALL INCLUDE A CONTINGENCY FOR THIS REVISED DESIGN AND CONSTRUCTION WORK. COSTS OF THE DESIGN AND CONSTRUCTION REVISIONS SHALL BE BORNE BY THE
CONTRACTOR.
GENERAL CONTRACTOR TO SUBMIT FINAL WEIGHTS AND CUT-SHEETS FOR REVIEW AND APPROVAL IF EQUIPMENT
DIFFERS FROM WHAT IS SHOWN ON THE CONSTRUCTION DOCUMENTS.
DEFERRED SUBMITTALS NOTES
1. FOUNDATION DESIGN AND SUBSURFACE INFORMATION IS BASED ON GEOTECHNICAL REPORT #26-162 PREPARED FOR THIS PROJECT BY LARRY M JACOBS & ASSOCIATES, INC AND DATED MAY 1, 2026 & EMAIL RESPONSE DATED
SEPTEMBER 1, 2026.
2. GEOTECHNICAL ENGINEER OF RECORD (GER) IS SOLELY RESPONSIBLE FOR ESTABLISHING FOUNDATION, SLAB-ON- GRADE AND PAVEMENT DESIGN CRITERIA, AND FOR THE CONSTRUCTION RECOMMENDATIONS FOR EXCAVATION, SUBGRADE PREPARATION, BACKFILLING AND COMPACTION.
3. GEOTECHNICAL INFORMATION INDICATED IN THE STRUCTURAL CONSTRUCTION DOCUMENTS IS INTENDED TO REPLICATE THE RECOMMENDATIONS STATED IN THE GEOTECHNICAL ENGINEERING REPORT. PRESENTATION OF THIS INFORMATION IN THE STRUCTURAL DOCUMENTS DOES NOT DEMONSTRATE, STATE OR IMPLY GEOTECHNICAL EXPERTISE BY THE STRUCTURAL ENGINEER. CONTRACTOR SHALL OBTAIN A COPY OF THE REPORT AND COMPLY
WITH THE RECOMMENDATIONS INDICATED THEREIN.
4. IF DISCREPANCIES BETWEEN THE REPORT AND CONSTRUCTION DOCUMENTS ARE DISCOVERED, THE REPORT SHALL GOVERN. ALL CLARIFICATIONS AND INTERPRETATIONS OF THE REPORT SHALL BE MADE BY THE GER AND
REPORTED TO THE ARCHITECT FOR COORDINATION WITH THE DESIGN TEAM.
GEOTECHNICAL INFORMATION
1. BEARING STRATA SHOWN ON THE DETAILS IS NATIVE SOILS. PREPARE FOUNDATION BEARING MATERIAL PER THE
GEOTECHNICAL ENGINEER'S RECOMMENDATIONS.
2. FOUNDATION ALLOWABLE DESIGN SOIL VALUES:
CONTINUOUS FOOTING BEARING - 1.5ksf * ISOLATED FOOTING BEARING - 1.5ksf *
SOIL SLIDING RESISTANCE (NATIVE SOIL) 0.5
* IF CONTINUOUS FOOTING OR ISOLATED FOOTING WIDTH EXCESS 3FT IN DIMENSION, THE SOIL BENEATH FOOTING
SHALL HAVE ADDITIONAL 2FT OF SOIL COMPACTION PER GEOTECHNICAL REPORT.
RETAINING WALL DESIGN VALUES
SOIL DENSITY Yd- 95PCF (VERY LOOSE SLIGHTLY SILTY SAND) AT REST Ka- 0.4xYd PASSIVE PRESSURE Kp- 2.5XYd
3. ALL FOOTING EXCAVATIONS SHALL BE CLEANED TO REMOVE ALL LOOSE SOIL MATERIAL AND OTHER DEBRIS AND
SHOULD NOT BE ALLOWED TO DESICCATE PRIOR TO PLACEMENT OF CONCRETE.
4. CONCRETE FOR FOUNDATIONS SHALL BE FORMED ON THE SIDES (EARTH FORMED FOUNDATIONS WILL NOT BE
ALLOWED). PROPERLY PLACE AND COMPACT FILL MATERIAL AROUND SIDES OF FOOTINGS.
5. ALL FOUNDATION EXCAVATIONS SHALL BE INSPECTED BY THE TESTING AGENCY.
SHALLOW FOUNDATION NOTES
1. ALL CONCRETE WORK SHALL BE IN ACCORDANCE WITH ACI 318- PER GOVERNING BUILDING CODE.
2. CONCRETE IN THE FOLLOWING AREAS SHALL HAVE SAND AND GRAVEL OR CRUSHED STONE AGGREGATES AND THE DESIGNATED COMPRESSIVE STRENGTH IN 28 DAYS UNLESS NOTED OTHERWISE. NORMAL WEIGHT AGGREGATES
SHALL CONFORM TO ASTM C33.
FOOTING -------------------------------------------------------------- f'c = 4,000 psi ALL OTHER CONCRETE ---------------------------------------- f'c = 4,000 psi
3. CONCRETE PROTECTION FOR REINFORCEMENT SHALL BE AS FOLLOWS:
REFER TO ACI 318 - SECTION 7.7 FOR CONDITIONS NOT NOTED.
FOOTINGS ------------------------------------------------ 3"
WALL ------------------------------------------------------- 2"
4. MAXIMUM NOMINAL COARSE AGGREGATE SIZE SHALL BE 1 1/2" MAX FOR PIERS AND 1" MAX TYPICAL UNLESS NOTED
OTHERWISE.
5. CONCRETE SLUMPS SHALL BE AS FOLLOWS:
CONCRETE CONTAINING HRWR------ 10" MAX
ALL OTHER CONCRETE ---------------- 5" MAX, 2" MIN
6. CONCRETE EXPOSED TO WEATHER SHALL BE AIR-ENTRAINED AS FOLLOWS:
3/4" NOMINAL AGGREGATE SIZE 4% TO 8%
1" NOMINAL AGGREGATE SIZE 3.5% TO 6.5%
1 1/2" NOMINAL AGGREGATE SIZE 3% TO 6%
7. ALL CAST IN PLACE WALLS AND CONTINUOUS FOOTINGS SHALL BE FORMED ON SIDES. ALL ELEMENTS OF THE FORMS, FORMWORK, BRACING AND SHORING SHALL CONSIST OF WOOD, METAL OR OTHER MANUFACTURED PRODUCTS AS SPECIFIED. EARTH MAY NOT BE USED AS A FORM, EITHER DIRECTLY OR INDIRECTLY. NEITHER
EARTH TRENCHES NOR EARTH TRENCHES LINED WITH ANOTHER MATERIAL ARE ACCEPTABLE.
8. THERE SHALL BE NO HORIZONTAL CONSTRUCTION JOINTS IN CONCRETE POURS. ALL CONSTRUCTION JOINTS SHALL BE MADE IN THE CENTER OF SPANS WITH VERTICAL BULK HEADS. THE LOCATION OF CONSTRUCTION JOINTS SHALL
BE APPROVED BY THE STRUCTURAL ENGINEER.
9. UNLESS OTHERWISE NOTED OR DETAILED, PROVIDE (2)#5, (1) EACH FACE AROUND UNFRAMED OPENINGS IN CONCRETE WALLS AND GRADE BEAMS. PLACE BARS PARALLEL TO SIDES OF OPENINGS AND EXTEND 24 INCHES
BEYOND CORNERS.
10. PROVIDE EQUIPMENT BASES AND SUPPORTS AS REQUIRED, COMPLYING WITH APPROVED MANUFACTURERS
CERTIFIED SHOP DRAWINGS AND DETAILS.
11. SIZE AND LOCATION OF BASES AND EMBEDDED ANCHORS FOR EQUIPMENT SHALL BE COORDINATED WITH
EQUIPMENT SUPPLIER AND ALL BE IN ACCORDANCE WITH APPROVED SHOP DRAWINGS.
12. NO ALUMINUM OF ANY TYPE SHALL BE ALLOWED IN THE CONCRETE WORK, UNLESS COATED AND APPROVED BY
THE ENGINEER OR RECORD.
CONCRETE NOTES
1. ALL REINFORCING STEEL SHALL BE NEW DEFORMED BILLET STEEL CONFORMING TO ASTM A615, GRADE 60.
2. DETAILING OF REINFORCEMENT SHALL BE IN ACCORDANCE WITH THE ACI DETAILING MANUAL.
3. REINFORCING BARS MAY BE SPLICED ONLY AS SHOWN ON THE DRAWINGS EXCEPT THAT REINFORCING DESIGNATED AS "CONTINUOUS" MAY BE CONTACT LAP SPLICED WITH TENSION LAP PER ACI 318 CHAPTER 25.
4. FOR CONTINUOUS FOOTING REINFORCING, PER FOOTINGS REINFORCEMENT LAP SPLICES SCHEDULED ON S110.
5. PROVIDE CORNERS BARS OF SAME SIZE AND QUANTITY AS CONTINUOUS TOP AND BOTTOM REINFORCING OF
GRADE BEAMS AT ALL GRADE BEAM CORNERS AND INTERSECTIONS.
REINFORCING STEEL NOTES
1. POST-INSTALLED ANCHORS SHALL ONLY BE USED WHERE SPECIFIED ON THE CONSTRUCTION DOCUMENTS. THE CONTRACTOR SHALL OBTAIN APPROVAL FROM THE ENGINEER-OF-RECORD PRIOR TO INSTALLING POST-INSTALLED ANCHORS IN PLACE OF MISSING OR MISPLACED CAST-IN-PLACE ANCHORS. CARE SHALL BE TAKEN IN PLACING POST-INSTALLED ANCHORS TO AVOID CONFLICTS WITH EXISTING REINFORCING OR POST-TENSIONING.
2. SUBSTITUTION REQUESTS, FOR PRODUCTS OTHER THAN THOSE SPECIFIED BELOW, SHALL BE SUBMITTED BY THE CONTRACTOR TO THE ENGINEER-OF-RECORD ALONG WITH CALCULATIONS THAT ARE PREPARED & SEALED BY A REGISTERED PROFESSIONAL ENGINEER. THE CALCULATIONS SHALL DEMONSTRATE THAT THE SUBSTITUTED PRODUCT IS CAPABLE OF ACHIEVING EQUIVALENT PERFORMANCE VALUES (MINIMUM) OF THE SPECIFIED PRODUCT USING THE APPROPRIATE DESIGN PROCEDURE AND/OR STANDARD(S) AS REQUIRED BY THE BUILDING CODE.
3. POST-INSTALLED ANCHORS INCLUDE EXPANSION ANCHORS, UNDERCUT ANCHORS AND ADHESIVE ANCHORS.
ADHESIVE ANCHORS SHALL CONSIST OF A STRUCTURAL ADHESIVE AND STEEL INSERT. STEEL INSERTS SHALL BE EITHER ASTM F1554, GRADE 36 THREADED ROD OR ASTM A615, GRADE 60 REINFORCING STEEL UNLESS NOTED OTHERWISE ON THE DRAWINGS. PROVIDE, STORE AND INSTALL PRODUCTS IN STRICT CONFORMANCE WITH THE
MANUFACTURER'S RECOMMENDATIONS.
4. EXPANSION ANCHORS FOR USE IN CRACKED AND UNCRACKED CONCRETE SHALL HAVE BEEN TESTED AND QUALIFIED FOR USE IN ACCORDANCE WITH ACI 355.2 AND ICC-ES AC193. EXPANSION ANCHORS SHALL BE EITHER HILTI KWIK BOLT TZ ANCHORS OR SIMPSON STRONG-TIE STRONG-BOLT 2 ANCHORS, UNLESS NOTED OTHERWISE ON DRAWINGS. EXPANSION ANCHORS SHALL BE 3/4" DIAMETER WITH 4 3/4" EMBEDMENT UNLESS NOTED OTHERWISE
ON THE DRAWINGS.
5. EXPANSION ANCHORS FOR USE IN SOLID-GROUTED CONCRETE MASONRY SHALL HAVE BEEN TESTED AND QUALIFIED FOR USE IN ACCORDANCE WITH ICC-ES AC01. EXPANSION ANCHORS IN CMU SHALL BE EITHER HILTI KWIK
BOLT 3 ANCHORS OR SIMPSON STRONG-TIE WEDGE-ALL ANCHORS.
6. UNDERCUT ANCHORS FOR USE IN CRACKED AND UNCRACKED CONCRETE SHALL HAVE BEEN TESTED AND QUALIFIED FOR USE IN ACCORDANCE WITH ACI 355.2 AND ICC-ES AC193. UNDERCUT ANCHORS SHALL BE EITHER HILTI HDA ANCHORS OR SIMPSON STRONG-TIE TORQ-CUT ANCHORS, UNLESS NOTED OTHERWISE ON DRAWINGS.
7. STRUCTURAL ADHESIVES FOR USE IN CRACKED AND UNCRACKED CONCRETE SHALL HAVE BEEN TESTED AND QUALIFIED FOR USE IN ACCORDANCE WITH ACI 355.4 AND ICC-ES AC308. STRUCTURAL ADHESIVES SHALL BE HILTI HIT-RE 500-SD EPOXY, HILTI HIT-HY 200-A ADHESIVE, SIMPSON STRONG-TIE SET-XP ADHESIVE OR SIMPSON STRONG- TIE AT-XP ADHESIVE UNLESS NOTED OTHERWISE ON THE DRAWINGS. REFER TO DRAWINGS FOR SIZE AND EMBEDMENT REQUIREMENTS. ALL THREADED RODS USED IN EXTERIOR EXPOSURES SHALL BE GALVANIZED.
8. THE FOLLOWING PARAMETERS HAVE BEEN USED IN THE DESIGN OF ALL ADHESIVE ANCHORS UNLESS NOTED
OTHERWISE ON THE DRAWINGS:
A. MINIMUM AGE OF CONCRETE – 28 DAYS
B. CONCRETE TEMPERATURE RANGE FOR ANCHORS NOT EXPOSED TO THE ENVIRONMENT – MAXIMUM SHORT
TERM TEMPERATURE OF 104°F; MAXIMUM LONG TERM TEMPERATURE OF 75°F.
C. CONCRETE TEMPERATURE RANGE FOR ANCHORS EXPOSED TO THE ENVIRONMENT – MAXIMUM SHORT TERM
TEMPERATURE OF 150°F; MAXIMUM LONG TERM TEMPERATURE OF 110°F.
D. MOISTURE CONDITION OF CONCRETE AT THE TIME OF INSTALLATION – DRY CONCRETE
E. HOLE DRILLING AND PREPARATION – PER THE MANUFACTURER’S PRINTED INSTALLATION INSTRUCTIONS
9. ANCHOR CAPACITY IS DEPENDANT UPON THE SPACING BETWEEN ADJACENT ANCHORS AND THE PROXIMITY OF ANCHORS TO THE EDGE OF CONCRETE. INSTALL ANCHORS IN ACCORDANCE WITH THE SPACING AND EDGE
CLEARANCES INDICATED ON THE DRAWINGS.
10. PRIOR TO PLACEMENT, THE CONTRACTOR SHALL HAVE THE MANUFACTURER’S TECHNICAL REPRESENTATIVE VISIT THE SITE TO INSTRUCT THE CONSTRUCTION TEAM AND TESTING LAB ON PROPER STORAGE AND INSTALLATION TECHNIQUES. THE CONTRACTOR SHALL PROVIDE A LETTER FROM THE MANUFACTURER’S REPRESENTATIVE
STATING THAT SUCH A VISIT WAS CONDUCTED.
11. ALL EXPANSION ANCHORS SHALL BE INSPECTED BY AN INDEPENDENT TESTING LAB FOR THE FOLLOWING:
A. CORRECT LOCATION AND POSITION OF HOLE.
B. CORRECT HOLE DIAMETER
C. CORRECT EMBEDMENT DEPTH.
D. CORRECT BOLT TYPE AND FINISH.
E. CONDITION OF HOLE IN CONNECTION MATERIAL (NO BURNING OF HOLES ALLOWED).
F. SNUG TIGHT FIT.
12. ADHESIVE ANCHORS SHALL BE INSPECTED AND TESTED BY AN INDEPENDENT TESTING LAB AS FOLLOWS:
ALL ANCHORS SHALL BE INSPECTED FOR THE FOLLOWING:
A. CORRECT LOCATION AND POSITION OF HOLE.
B. CORRECT THREADED ROD OR REINFORCING BAR SIZE.
C. CORRECT THREADED ROD OR REINFORCING BAR TYPE AND FINISH.
D. CONDITION OF HOLE IN CONNECTION MATERIAL (NO BURNING OF HOLES ALLOWED).
E. SNUG TIGHT FIT.
F. CORRECT EMBEDMENT DEPTH.
G. HOLE PREPARATION (INCLUDING DRILL BIT TYPE WHERE CRITICAL TO MANUFACTURER) AND CLEANOUTS
PER MANUFACTURER'S RECOMMENDATIONS.
H. ADHESIVE TYPE, EXPIRATION DATE AND METHOD OF STORAGE.
I. ADHESIVE AND ANCHOR INSTALLATION PER MANUFACTURER’S RECOMMENDATIONS.
J. 10% OF EACH TYPE AND SIZE OF ANCHOR SHALL BE PROOF LOADED PER THE MANUFACTURER’S
RECOMMENDATIONS. IF 10% OF THE TESTED ANCHORS FAIL TO ACHIEVE THE SPECIFIED PROOF LOAD, ALL
ANCHORS OF THE SAME DIAMETER AND TYPE SHALL BE TESTED.
13. THE TESTING LAB SHALL PREPARE AN INSPECTION REPORT SPECIFICALLY INDICATING DEGREE OF CONFORMANCE
IN ALL CATEGORIES LISTED ABOVE.
POST-INSTALLED ANCHOR NOTES
1. ALL SUBGRADE SHALL BE PREPARED IN STRICT CONFORMANCE TO THE GEOTECHNICAL ENGINEER’S RECOMMENDATIONS. REFER TO THE GEOTECHNICAL REPORT, SUPPLEMENTARY LETTERS AND SPECIFICATIONS
FOR ADDITIONAL INFORMATION.
THE SUBGRADE SHALL BE IMPROVED TO REDUCE THE POTENTIAL FOR SUBGRADE MOVEMENT TO LESS THAN OF ONE INCH TOTAL SETTLEMENT & 1/2 INCH OF DIFFERENTIAL SETTLEMENT BY RE-COMPACTING IN-SITU SOIL AS
APPROVED BY GEOTECH ENGINEER.
THE FOLLOWING IS A SUMMARY OF THE INFORMATION CONTAINED IN THE GEOTECHNICAL ENGINEER’S
RECOMMENDATIONS:
A. THE BUILDING EXCAVATION AREA SHALL EXTEND BEYOND THE BUILDING LINE A MINIMUM OF 5 FEET IN GENERAL. AT ALL ENTRANCES AND AT AREAS WITH SIDEWALKS/PAVING DIRECTLY ADJACENT TO THE
BUILDING.
B. WITHIN THE BUILDING AREA, EXCAVATE AND REMOVE ALL FILL MATERIAL. REFER TO THE GEOTECHNICAL REPORT FOR APPROXIMATE DEPTHS OF FILL. THE TESTING LAB SHALL DETERMINE THROUGH FIELD
OBSERVATION AND TESTING THAT ALL UNACCEPTABLE FILLS HAVE BEEN REMOVED.
C. WITHIN THE BUILDING AREA, RE-COMPACT NATIVE SOIL OR IMPORTED FILL AS REQUIRED TO PROVIDE A COMPACTED MATERIAL BENEATH BUILDING AREA. FOOTING THAT HAVE A WIDTH GREATER THAN 3FT IN
WIDTH WILL REQUIRE ADDITIONAL 2FT OF SOIL COMPACTION BENEATH FOOTING.
D. SCARIFY EXPOSED NATIVE SOILS TO A DEPTH OF 12 INCHES FOR FOOTING LESS THAN 3FT IN WIDTH AND RECOMPACT TO A MINIMUM OF 95% OF MODIFIED PROCTOR (ASTM D1557) AT A MINIMUM OF +2 PERCENTAGE POINTS ABOVE THE OPTIMUM MOISTURE CONTENT FOR THE SOIL AS DIRECTED IN THE
GEOTECHNICAL REPORT.
K. SELECT FILL SHALL CONSIST OF A SLIGHTLY SILTY SAND OR SILTY/CLAYEY SAND. ALL SELECT FILL SHALL BE
APPROVED BY THE GEOTECHNICAL ENGINEER.
L. SPREAD THE SELECT FILL IN THIN LOOSE LIFTS NOT EXCEEDING 10 TO 12 INCHES THICK FOR SLIGHTLY SILTY SAND OR LIFTS NOT EXCEEDING 6 TO 8 INCHES THICK FOR SILTY/CLAYEY SAND AND UNIFORMLY COMPACT TO A MINIMUM OF 95% OF ASTM D1557 WITHIN +2 OR –2 PERCENTAGE POINTS OF THE OPTIMUM MOISTURE
CONTENT FOR THE SOIL AS RECOMMENDED IN THE GEOTECHNICAL REPORT.
M. PLACE FIRST LIFT OF SELECT FILL WET OF OPTIMUM TO PREVENT DRYING OF THE UNDERLYING SUBGRADE.
N. PROTECT FILL TO PREVENT DESICCATION PRIOR TO PLACING A SUBSEQUENT LIFT.
2. CONTACT THE GEOTECHNICAL ENGINEER FOR ANY QUESTIONS REGARDING INTERPRETATION OR CLARIFICATION OF
THE ABOVE INFORMATION.
3. FOUNDATION AND SUBGRADE PREPARATION SHALL BE MONITORED AND TESTED BY THE SOILS ENGINEER. REFER
TO SPECIFICATIONS FOR QUALITY CONTROL REQUIREMENTS.
SUBGRADE PREPARATION
1. SEE PREFABRICATED CANOPY MANUFACTURER'S DRAWINGS FOR FOUNDATIONS, BASE PLATES & A.B., COLUMN, ROOF METAL DECK, PURLINS, AND FRAMING.
2. THE GENERAL CONTRACTOR SHALL PROVIDE AND SET ANCHOR BOLTS AND EMBED PLATES AS PER
PREFABRICATED CANOPY MANUFACTURER'S DRAWINGS.
3. THE CONTRACTOR SHALL COMPARE STRUCTURAL DRAWINGS WITH PREFABRICATED CANOPY MANUFACTURER'S DRAWINGS AND REPORT ANY DISCREPANCY TO THE ENGINEER PRIOR TO FABRICATION OR INSTALLATION OF
STRUCTURAL MEMBERS.
4. PREMANUFACTURED CANOPY SHOP DRAWINGS (PLANS, DETAILS, CALCULATIONS) SHALL BEAR THE SEAL OF A
REGISTERED PROFESSIONAL ENGINEER, IN THE STATE OF THE PROJECT.
5. METAL BUILDING DESIGN LOADS SHALL BE AS FOLLOWS:
A. WIND: SEE GENERAL NOTES
LATERAL DEFLECTION LIMIT H/240
B. GRAVITY: ROOF LIVE LOAD: 20 psf REDUCIBLE PER CODE ROOF DEAD LOAD: STRUCTURE WEIGHT + 5 psf COLLATERAL +
MECHANICAL UNITS AS SHOWN.
DEFLECTION LIMITS: LL = L/360
TOTAL = L/240
PREMANUFACTURED CANOPY NOTES
Architect of Record:
ADG
800 SW ADAMS STREET, SUITE 101
PEORIA, IL 61602
R e vi si o n s
P - 309.672.6948
Discipline:Discipline:Discipline:
P - P - P -
Discipline:
P -
PROJECT NO.
DATE
DRAWN BY
STATUS
Discipline: Owner Consultant
QSC SERVICES, LLC
PMB #69
545 BRENT LN. PENSACOLA, FL
P - 309.231.8272
OWNER ID:
Design and Construction Administration Division
ESCAMBIA COUNTY, FL
100 E. BLOUNT ST. PENSACOLA, FL 32501
ESCAMBIA COUNTY AREA TRANSIT - FACILITY:
05 - FUEL STATION BUILDING
2 CLARINDA LN
PENSACOLA, FLORIDA, 32505 S001GENERAL NOTES
MEP COMPANY NAME
KEDbluestone, PEORIA, IL 61602
707 NE JEFFERSON AVE
RLG CONSULTING ENGINEERS
12001 N CENTRAL, EXPY #300
DALLAS, TX 75243
RLG CONSULTING ENGINEERS
12001 N CENTRAL, EXPY #300
DALLAS, TX 75243
214.739.8100 214.739.8100 515.259.5957
HODGSON DOUGLAS LANDSCAPE ARCHITECTS
12001 N CENTRAL EXPY, STE 1170
DALLAS, TX 75243
214.749.0333
BID PACKAGE #2 - NOT FOR CONSTRUCTION
ACI 318 CH.20,
25.2, 25.3, 26.6.1-26.6.3
- 032000, 3.02
032000, 3.02
ACI 318:17.8.2.4
X ACI 318: 17.8.2
7. INSPECT CONCRETE AND SHOTCRETE PLACEMENT
FOR PROPER APPLICATION TECHNIQUES.
8. VERIFY MAINTENANCE OF SPECIFIED
CURING TEMPERATURE AND TECHNIQUES.
X
ACI 318:
26.4.7-26.4.9
1908.9 033000, 3.03
9. VERIFICATION OF IN-SITU CONCRETE STRENGTH,
PRIOR TO STRESSING OF TENDONS IN
POST-TENSIONED CONCRETE AND PRIOR TO
REMOVAL OF SHORES AND FORMS FROM BEAMS
AND STRUCTURAL SLABS.
ACI 318:
Ch. 26.11.2
033000, 3.03;
033816, 3.04
10. INSPECT FORMWORK FOR SHAPE, LOCATION AND
DIMENSIONS OF THE CONCRETE MEMBER BEING
FORMED
X ACI 318:26.10.1(b) - 031000, 3.05
REQUIRED SPECIAL INSPECTIONS AND TESTS OF CONCRETE CONSTRUCTION
1. SPECIAL INSPECTIONS AND VERIFICATIONS FOR CONCRETE CONSTRUCTION SHALL BE AS
REQUIRED IN THE FOLLOWING TABLE.
VERIFICATION AND INSPECTION
1. INSPECT REINFORCEMENT, AND VERIFY PLACEMENT.
2. REINFORCING BAR WELDING:
C O
N T
IN
U
O U
S
P E
R
IO
D
IC
N O
T
A P
P L
IC
A
B L
E
REFERENCED
STANDARD
FBC
REFERENCE
PROJECT
SPECIFICATION
SECTION
X
a. VERIFY WELDABILITY OF REINFORCING BARS
OTHER THAN ASTM A706 X
b. INSPECT SINGLE-PASS FILLET WELDS, MAXIMUM
5/16"; AND X
c. INSPECT ALL OTHER WELDS
3. INSPECT ANCHORS CAST IN CONCRETE ACI 318: 17.8.2 -X
4. INSPECT ANCHORS POST-INSTALLED IN HARDENED
CONCRETE MEMBERS
a. ADHESIVE ANCHORS INSTALLED IN
HORIZONTALLY OR UPWARDLY INCLINED
ORIENTATIONS TO RESIST SUSTAINED
TENSION LOADS
X
b. MECHANICAL ANCHORS AND ADHESIVE ANCHORS NOT DEFINED IN 4.a
5. VERIFY USE OF REQUIRED DESIGN MIX X
ACI 318: CH. 19,
26.4.3, 26.4.4 1904.1, 1904.2 033000, 3.03
6. PRIOR TO CONCRETE PLACEMENT, FABRICATE
SPECIMENS FOR STRENGTH TESTS, PERFORM
SLUMP AND AIR CONTENT TESTS, AND DETERMINE
THE TEMPERATURE OF THE CONCRETE
X
ASTM C172,
ASTM C31, ACI
318: 26.5, 26.12
- 033000, 3.03
X ACI 318: 26.5
1908.6, 1908.7, 1908.8
X -
AWS D1.4
ACI 318: 26.6.4
X
STATEMENT OF SPECIAL INSPECTIONS
1. INFORMATION ON THIS SHEET IS BEING SUBMITTED IN ACCORDANCE WITH THE SPECIAL INSPECTIONS PROVISIONS OF THE 8TH EDITION OF FLORIDA BUILDING CODE. THIS INFORMATION CONSTITUTES THE SCHEDULE OF SPECIAL
INSPECTIONS (SSI) REQUIRED FOR THIS PROJECT.
2. THE OWNER OR THE OWNER'S AUTHORIZED AGENT, OTHER THAN THE CONTRACTOR, SHALL EMPLOY ONE OR MORE APPROVED AGENCIES TO PROVIDE SPECIAL INSPECTIONS AND TESTS DURING CONSTRUCTION ON THE
TYPES OF WORK LISTED HEREIN.
3. THE SPECIAL INSPECTOR SHALL BE A QUALIFIED PERSON WHO SHALL DEMONSTRATE COMPETENCE, TO THE SATISFACTION OF THE BUILDING OFFICIAL, FOR INSPECTION OF THE PARTICULAR TYPE OF CONSTRUCTION OR
OPERATION REQUIRING SPECIAL INSPECTION.
4. THE SPECIAL INSPECTOR SHALL FULFILL THE FOLLOWING REPORT REQUIREMENTS:
a. SPECIAL INSPECTORS SHALL KEEP RECORDS OF INSPECTIONS.
b. THE SPECIAL INSPECTOR SHALL FURNISH INSPECTION REPORTS TO THE BUILDING OFFICIAL, THE
OWNER, THE GENERAL CONTRACTOR, THE STRUCTURAL ENGINEER, AND THE ARCHITECT. IN
ADDITION, REPORTS RELATED TO GEOTECHNICAL ISSUES SHALL BE DISTRIBUTED TO THE
GEOTECHNICAL ENGINEER. WHEN TESTS OR INSPECTIONS INDICATE THAT THE WORK DOES NOT
COMPLY WITH THE CONSTRUCTION DOCUMENTS, THE SPECIAL INSPECTOR SHALL NOTIFY THE
OWNER, CONTRACTOR, ARCHITECT AND STRUCTURAL ENGINEER BY PHONE ON THE DAY OF THE
TEST OR INSPECTION AND SHALL FOLLOW THAT CALL WITH AN EXPEDITED WRITTEN REPORT WITHIN
ONE BUSINESS DAY. ALL OTHER REPORTS SHALL BE SUBMITTED WITHIN 5 BUSINESS DAYS OF
THE EVENT DOCUMENTED.
c. REPORTS SHALL INDICATE THAT WORK INSPECTED WAS OR WAS NOT COMPLETED IN
CONFORMANCE TO APPROVED CONSTRUCTION DOCUMENTS
d. DISCREPANCIES SHALL BE BROUGHT TO THE IMMEDIATE ATTENTION OF THE CONTRACTOR FOR
CORRECTION.
e. IF THE DISCREPANCIES ARE NOT CORRECTED, THE DISCREPANCIES SHALL BE BROUGHT TO THE
ATTENTION OF THE BUILDING OFFICIAL AND TO THE REGISTERED DESIGN PROFESSIONAL IN
RESPONSIBLE CHARGE WITHIN ONE BUSINESS DAY. A FINAL REPORT DOCUMENTING REQUIRED
SPECIAL INSPECTIONS AND CORRECTION OF ANY DISCREPANCIES NOTED IN THE INSPECTIONS
SHALL BE SUBMITTED BY THE SPECIAL INSPECTOR AT A POINT IN TIME AGREED UPON BY THE PERMIT
APPLICANT AND THE BUILDING OFFICIAL PRIOR TO THE START OF WORK.
g. THE SPECIAL INSPECTOR'S FINAL REPORT SHALL IDENTIFY THE FOLLOWING:
1) THE MATERIALS, SYSTEMS, COMPONENTS, AND WORK REQUIRED TO HAVE SPECIAL
INSPECTION OR TESTING BY THE BUILDING OFFICIAL OR BY THE REGISTERED DESIGN
PROFESSIONAL RESPONSIBLE FOR EACH PORTION OF THE WORK.
2) THE TYPE AND EXTENT OF EACH SPECIAL INSPECTION.
3) THE TYPE AND EXTENT OF EACH TEST.
4) ADDITIONAL REQUIREMENTS FOR SPECIAL INSPECTION OR TESTING FOR SEISMIC OR WIND
RESISTANCE AS SPECIFIED IN SECTIONS 1705.11, 1705.12 AND 1705.13.
i. WHERE SECTION 1705.12 OR 1705.13 SPECIFIES SPECIAL INSPECTION, TESTING OR
QUALIFICATION FOR SEISMIC RESISTANCE, THE STATEMENT OF SPECIAL INSPECTIONS
SHALL IDENTIFY THE DESIGNATED SEISMIC SYSTEMS AND SEISMIC FORCE-RESISTING
SYSTEMS THAT ARE SUBJECT TO SPECIAL INSPECTIONS OR TESTS.
ii. WHERE SECTION 1705.11 SPECIFIES SPECIAL INSPECTION FOR WIND REQUIREMENTS, THE STATEMENT OF SPECIAL INSPECTIONS SHALL IDENTIFY THE MAIN
WINDFORCE-RESISTING SYSTEMS AND WIND-RESISTING COMPONENTS SUBJECT TO
SPECIAL INSPECTIONS. THE REPORT SHALL BE SIGNED BY THE SPECIAL INSPECTOR
5. FOR EACH TYPE OF SPECIAL INSPECTION, IDENTIFICATION AS TO WHETHER IT WILL BE CONTINUOUS SPECIAL INSPECTION, PERIODIC SPECIAL INSPECTION OR PERFORMED IN ACCORDANCE WITH THE NOTATION USED IN THE
REFERENCED STANDARD WHERE THE INSPECTIONS ARE DEFINED.
6. REFER TO PROJECT SPECIFICATIONS FOR ADDITIONAL INFORMATION ON QUANTITY, FREQUENCY AND DETAILED
INFORMATION ON TESTING, INSPECTION AND REPORTING.
7. PRIOR TO THE START OF CONSTRUCTION, THE CONTRACTOR SHALL CONDUCT A PRE-CONSTRUCTION MEETING TO
DISCUSS THE SPECIAL INSPECTION REQUIREMENTS WITH ALL INVOLVED PARTIES.
8. THE SPECIAL INSPECTIONS PROGRAM OUTLINED HEREIN, DOES NOT RELIEVE THE CONTRACTOR OR ANY OTHER ENTITY OF ANY CONTRACTUAL DUTIES, INCLUDING QUALITY CONTROL, QUALITY ASSURANCE, OR SAFETY. THE CONTRACTOR IS SOLELY RESPONSIBLE FOR CONSTRUCTION MEANS, METHODS, AND JOB SITE SAFETY.
9. THE CONTRACTOR SHALL PAY FOR ENGINEERING SERVICES REQUIRED TO INVESTIGATE AND CORRECT WORK THAT
DOES NOT CONFORM TO THE PROJECT DOCUMENTS OR IS FOUND DEFICIENT OR DEFECTIVE.
PERMIT'S APPLICATION RESPONSIBILITIES
1. THE PERMIT APPLICANT SHALL SUBMIT THIS SHEET AS THE STATEMENT OF SPECIAL INSPECTIONS PREPARED BY THE REGISTERED DESIGN PROFESSIONAL IN RESPONSIBLE CHARGE AS A CONDITION
FOR PERMIT ISSUANCE.
2. THE PERMIT APPLICANT SHALL LIST BELOW THE INDIVIDUALS, APPROVED AGENCIES OR FIRMS
INTENDED TO BE RETAINED FOR CONDUCTING SUCH INSPECTIONS.
3. THE PERMIT APPLICANT SHALL OBTAIN ALL NECESSARY SIGNATURES INCLUDING CONTRACTOR
ACKNOWLEDGEMENT OF SPECIAL INSPECTION REQUIREMENTS.
Name or Firm Name
Name or Firm Name
Name or Firm Name
Name or Firm Name
Name or Firm Name
Name or Firm Name
a. SUBGRADE PREPARATION, DRAINAGE COURSES, WALL AND GRADE BEAM BACKFILL, DRILLED
PIERS, PILES, FOOTINGS AND OTHER
GEOTECHNICAL RELATED ELEMENTS.
b. CONCRETE
c. STRUCTURAL STEEL, STEEL JOISTS AND
JOIST GIRDERS,METAL DECK AND SPRAYED
ON FIREPROOFING
d. CMU
e. LIGHT GAUGE METAL FRAMING
f. WOOD
CONTRACTOR'S ACKNOWLEDGEMENT OF RESPONSIBILITY FOR
IMPLEMENTATION OF THE SPECIAL INSPECTIONS PLAN
1. AS PART OF THE SUBMITTAL FOR BUILDING PERMIT, THE GENERAL CONTRACTOR SHALL COMPLETE
THE FOLLOWING FORM AS A WRITTEN STATEMENT OF RESPONSIBILITY.
a. AS THE GENERAL CONTRACTOR, WE ARE AWARE OF THE REQUIREMENTS FOR SPECIAL
INSPECTIONS AS LISTED IN THE STATEMENT OF SPECIAL INSPECTIONS.
b. AS GENERAL CONTRACTOR, WE ACKNOWLEDGE THAT CONTROL MUST BE EXERCISED BY
OUR ORGANIZATION TO OBTAIN CONFORMANCE WITH THE CONSTRUCTION DOCUMENTS
APPROVED BY THE BUILDING OFFICIAL. WE ACKNOWLEDGE OUR RESPONSIBILITY TO
DISTRIBUTE UP TO DATE DOCUMENTS, INCLUDING PLANS, SPECIFICATIONS, ADDENDA,
CHANGE ORDERS, RESPONSES TO REQUESTS FOR INFORMATION, ARCHITECTURAL
SUPPLEMENTAL INSTRUCTIONS, SHOP DRAWINGS, ETC., TO ALL SUBCONTRACTORS AND
TO THE SPECIAL INSPECTORS. WE ACKNOWLEDGE OUR RESPONSIBILITY FOR CALLING THE
APPROPRIATE SPECIAL INSPECTORS AT APPROPRIATE TIMES TO FULFILL THE
REQUIREMENTS IN THE STATEMENT OF SPECIAL INSPECTIONS.
c. AS GENERAL CONTRACTOR, WE HAVE DEVELOPED PLANS AND PROCEDURES FOR EXERCISING
CONTROL WITHIN OUR ORGANIZATION, FOR THE METHOD AND FREQUENCY OF REPORTING
AND FOR THE DISTRIBUTION OF THE REPORTS.
d. THE FOLLOWING QUALIFIED INDIVIDUAL(S) WITHIN OUR FIRM WILL BE RESPONSIBLE FOR
CONTROLLING THE PLAN, PROCEDURES AND PROCESS OF THE SPECIAL INSPECTIONS PLAN:
Name
Name
Name
Name
Firm Name
Position within Firm
Position within Firm
Position within Firm
Position within Firm
2. THE GENERAL CONTRACTOR ACKNOWLEDGES OUR RESPONSIBILITIES AS STATED ABOVE.
Name Position within Firm Date
INSPECTION OF FABRICATORS
1. WHERE FABRICATION OF STRUCTURAL, LOAD-BEARING OR LATERAL LOAD-RESISTING MEMBERS OR
ASSEMBLIES IS BEING CONDUCTED ON THE PREMISES OF A FABRICATOR'S SHOP, SPECIAL
INSPECTIONS OF THE FABRICATED ITEMS SHALL BE PERFORMED DURING FABRICATION.
2. SPECIAL INSPECTIONS DURING FABRICATION ARE NOT REQUIRED WHERE THE FABRICATOR
MAINTAINS APPROVED DETAILED FABRICATION AND QUALITY CONTROL PROCEDURES THAT
PROVIDE A BASIS FOR CONTROL OF THE WORKMANSHIP AND THE FABRICATOR'S ABILITY TO
CONFORM TO APPROVED CONSTRUCTION DOCUMENTS AND THIS CODE. APPROVAL SHALL BE
BASED UPON REVIEW OF FABRICATION AND QUALITY CONTROL PROCEDURES AND PERIODIC
INSPECTION OF FABRICATION PRACTICES BY THE BUILDING OFFICIAL.
3. SPECIAL INSPECTIONS DURING FABRICATION ARE NOT REQUIRED WHERE THE WORK IS DONE ON THE PREMISES OF A FABRICATOR REGISTERED AND APPROVED TO PERFORM SUCH WORK WITHOUT SPECIAL INSPECTION. APPROVAL SHALL BE BASED UPON REVIEW OF THE FABRICATOR'S WRITTEN
PROCEDURAL AND QUALITY CONTROL MANUALS AND PERIODIC AUDITING OF FABRICATION
PRACTICES BY AN APPROVED AGENCY AT COMPLETION OF FABRICATION, THE APPROVED
FABRICATOR SHALL SUBMIT A CERTIFICATE OF COMPLIANCE TO THE OWNER OR THE OWNER'S
AUTHORIZED AGENT FOR SUBMITTAL TO THE BUILDING OFFICIAL AS SPECIFIED IN SECTION 1704.5
STATING THAT THE WORK WAS PERFORMED IN ACCORDANCE WITH THE APPROVED CONSTRUCTION
DOCUMENTS
REQUIRED VERIFICATION AND INSPECTION OF SOILS
1. VERIFICATION OF SOILS AND SPECIAL INSPECTIONS FOR SUBGRADE SHALL BE AS REQUIRED IN
THE FOLLOWING TABLE.
2. THE GEOTECHNICAL ENGINEERING REPORT, AND THE CONSTRUCTION DOCUMENTS SHALL BE
USED TO DETERMINE COMPLIANCE.
3. REFER TO PROJECT SPECIFICATIONS FOR QUANTITY AND FREQUENCY OF INSPECTIONS AND TESTS.
VERIFICATION AND INSPECTION
C O
N T
IN
U
O U
S
P E
R
IO
D
IC
N
P L
IC
A
B L
E
REFERENCED
STANDARD
FBC
REFERENCE
PROJECT
SPECIFICATION
SECTION
1. VERIFY MATERIALS BELOW SHALLOW
FOUNDATIONS ARE ADEQUATE TO ACHIEVE THE
DESIGN BEARING CAPACITY.
2. VERIFY EXCAVATIONS ARE EXTENDED TO
PROPER DEPTH AND HAVE REACHED PROPER
MATERIAL.
3. PERFORM CLASSIFICATION AND TESTING OF
COMPACTED FILL MATERIALS.
X
GEOTECHNICAL
ENGINEERING
REPORT 312303, 3.14
1705.6
DURING FILL PLACEMENT, VERIFY USE OF PROPER
MATERIALS IN ACCORDANCE WITH PROVISIONS OF THE
APPROVED GEOTECHNICAL REPORT. VERIFY DENSITY
AND LIFT THICKNESS DURING PLACEMENT AND
COMPACTION OF COMPACTED FILL.
5. PRIOR TO PLACEMENT OF COMPACTED FILL,
OBSERVE SUBGRADE AND VERIFY THAT SITE HAS
BEEN PREPARED PROPERLY.
X
X
X
X
4.
REQUIRED VERIFICATION AND INSPECTION OF THE
UNDERSLAB DRAINAGE COURSE
1. VERIFICATION OF SOILS AND SPECIAL INSPECTIONS FOR THE UNDERSLAB DRAINAGE COURSE
SHALL BE AS REQUIRED IN THE FOLLOWING TABLE.
2. THE GEOTECHNICAL ENGINEERING REPORT, AND THE APPROVED CONSTRUCTION DOCUMENTS
PREPARED BY THE REGISTERED DESIGN PROFESSIONALS, SHALL BE USED TO DETERMINE
COMPLIANCE.
3. REFER TO PROJECT SPECIFICATIONS FOR QUANTITY AND FREQUENCY OF INSPECTIONS AND TESTS.
VERIFICATION AND INSPECTION
1. SITE PREPARATION: PRIOR TO PLACEMENT OF THE
DRAINAGE COURSE, THE SPECIAL INSPECTOR
SHALL DETERMINE THAT THE SUBGRADE HAS
BEEN PREPARED IN ACCORDANCE WITH THE
APPROVED SOILS REPORT.
2. DURING DRAINAGE COURSE PLACEMENT: DURING
PLACEMENT AND COMPACTION OF THE DRAINAGE
COURSE MATERIAL, THE SPECIAL INSPECTOR
SHALL DETERMINE THAT THE MATERIAL BEING
USED, THE MAXIMUM LIFT THICKNESS, THE
OVERALL DEPTH OF MATERIAL AND THE USE OF
FILTER FABRICS COMPLY WITH THE APPROVED
GEOTECHNICAL REPORT.
3. DURING INSTALLATION OF FILTER FABRICS,
DRAINAGE MATS AND OTHER GEOTEXTILE FABRICS,
THE SPECIAL INSPECTOR SHALL CONFIRM THAT THE
MATERIALS AND METHOD OF INSTALLATION COMPLY
WITH THE APPROVED GEOTECHNICAL REPORT AND
CONSTRUCTION DOCUMENTS.
4. EVALUATION OF IN-PLACE DENSITY: THE SPECIAL
INSPECTOR SHALL DETERMINE, AT THE APPROVED
FREQUENCY, THAT THE IN-PLACE DRY DENSITY OF
THE COMPACTED MATERIAL COMPLIES WITH THE
APPROVED REPORT.
C O
N T
IN
U
O U
S
P E
R
IO
D
IC
N
P L
IC
A
B L
E
REFERENCED
STANDARD
FBC
REFERENCE
PROJECT
SPECIFICATION
SECTION
X
GEOTECHNICAL
ENGINEERING
REPORT
312303, 3.141705.6
X
X
X
REQUIRED SPECIAL INSPECTION AND TESTS OF METAL CANOPY SYSTEMS
1. INSTALLATION OF RAFTER/BEAM FLANGE
BRACES AND COLUMN FLANGE BRACES.
1. SPECIAL INSPECTION AND VERIFICATION FOR METAL CANOPY SYSTEMS SHALL BE AS REQUIRED
IN THE FOLLOWING TABLE.
VERIFICATION AND INSPECTION
C O
N T
IN
U
O U
S
P E
R
IO
D
IC
N
P L
IC
A
B L
E
REFERENCED
STANDARD
FBC
REFERENCE
PROJECT
SPECIFICATION
SECTION
X
X
X
2. INSTALLATION OF PURLINS AND GIRTS,
INCLUDING SPECIFIED LAPPING.
3. PURLIN AND GIRTS
RESTRAINT/BRIDGING/BRACING.
4. INSTALLATION OF X-BRACING, TIGHTEN TO
REMOVE ANY SAG.
1705.2.6
X
Architect of Record:
ADG
800 SW ADAMS STREET, SUITE 101
PEORIA, IL 61602
R e vi si o n s
P - 309.672.6948
Discipline:Discipline:Discipline:
P - P - P -
Discipline:
P -
PROJECT NO.
DATE
DRAWN BY
STATUS
Discipline: Owner Consultant
QSC SERVICES, LLC
PMB #69
545 BRENT LN. PENSACOLA, FL
P - 309.231.8272
OWNER ID:
Design and Construction Administration Division
ESCAMBIA COUNTY, FL
100 E. BLOUNT ST. PENSACOLA, FL 32501
ESCAMBIA COUNTY AREA TRANSIT - FACILITY:
05 - FUEL STATION BUILDING
2 CLARINDA LN
PENSACOLA, FLORIDA, 32505 S002SPECIAL INSPECTIONS
MEP COMPANY NAME
KEDbluestone, PEORIA, IL 61602
707 NE JEFFERSON AVE
RLG CONSULTING ENGINEERS
12001 N CENTRAL, EXPY #300
DALLAS, TX 75243
RLG CONSULTING ENGINEERS
12001 N CENTRAL, EXPY #300
DALLAS, TX 75243
214.739.8100 214.739.8100 515.259.5957
HODGSON DOUGLAS LANDSCAPE ARCHITECTS
12001 N CENTRAL EXPY, STE 1170
DALLAS, TX 75243
214.749.0333
BID PACKAGE #2 - NOT FOR CONSTRUCTION
BB
CC
DD
EE
FF
28'-0"
13'-6"
.3
A
A
CANOPY COLUMN
PER CANOPY MFR
CANOPY SPREAD
FOOTING PER
CANOPY MFR
CANOPY ROOF
OUTLINE - SEE
CANOPY MFR FOR
FRAMING SIZES
CANOPY COLUMN
PER CANOPY MFR
CANOPY SPREAD
FOOTING PER
CANOPY MFR
CANOPY COLUMN
PER CANOPY MFR
CANOPY SPREAD
FOOTING PER
CANOPY MFR
CANOPY COLUMN
PER CANOPY MFR
CANOPY SPREAD
FOOTING PER
CANOPY MFR
CANOPY COLUMN
PER CANOPY MFR
CANOPY SPREAD
FOOTING PER
CANOPY MFR
CANOPY ROOF
OUTLINE - SEE
CANOPY MFR FOR
FRAMING SIZES
CANOPY SPREAD
FOOTING PER
CANOPY MFR
CANOPY COLUMN
PER CANOPY MFR
CANOPY SPREAD
FOOTING PER
CANOPY MFR
CANOPY COLUMN
PER CANOPY MFR
FUEL TANK BY OTHERS
FUEL TANK BY OTHERS
FUEL TANK BY OTHERS
1'-0"
6'-0"6'-0"
9 FT LONG CONCRETE
STEM WALL - SEE 02/S110
S110
3'-0"
C L R
C L R
.6
PLAN NOTES:
1. ALL ELEVATIONS ARE REFERENCED TO LEVEL 1 FINISHED FLOOR
EL = 100'-0" (87.81'). REFERENCE SITE PLAN FOR ABSOLUTE ELEVATIONS.
2. SEE S000 SERIES FOR ABBREVIATIONS, GENERAL NOTES, AND SPECIAL
3. THE CANOPY STRUCTURE AND FOUNDATION ARE DESIGNED BY CANOPY
MANUFACTURER. SEE AUSTIN MOHAWK AS THE BASIS OF DESIGN.
GC TO COORDINATE CANOPY DIMENSION WITH ARCHITECTURAL DRAWINGS.
INSPECTIONS.
4. GC TO COORDINATE FINISH GRADE ELEVATION OF SITE PAVING ELEVATION AT
EACH CANOPY COLUMN FROM CIVIL GRADING DRAWING WITH THE CANOPY
DESIGNER.
5. GC TO SHALL REFER TO CIVIL DRAWINGS TO LOCATE CANOPY STRUCTURE
AND FUEL TANK POSITION IN SITE.
DEVELOPMENT LENGTH SCHEDULE (INCHES)
GRADE
BAR
SIZE
MIN BAR SPACING
(INCHES)
TENSION COMPRESSION
f'c (PSI)
#5
#6
#7
#8
#9
#10
#11
1.625
1.750
1.875
2.000
2.250
2.500
2.750
#4 1.5000
NOTED AS Ld ON DRAWINGS
#3 171.375 f'c (PSI)
NOTED AS Ldh ON DRAWINGS f'c (PSI)
NOTED AS Dc ON DRAWINGS
[MAX OF db+1" OR 2db]
FOOTING/MAT REINFORCEMENT
LAP SPLICE LENGTH SCHEDULE (INCHES)
GRADE
BAR
SIZE
MIN BAR SPACING
(INCHES)
TENSION (LTS)
f'c = 3 KSI f'c = 4 KSI
#4
#5
#6
#7
#8
#9
1.875 33 25
2.000 41 31
2.250 49 37
2.625 71 54
3.000 81 62
3.375 91 70 f'c = 5 KSI
TOP BARS OTHER TOP BARS OTHER TOP BARS OTHER
f'c = 6 KSI
TOP BARS OTHER
f'c = 7 KSI
TOP BARS OTHER
f'c = 8.5 KSI
TOP BARS OTHER
#10 3.750 136 105
#11 4.125 151 116
38 29
47 36
56 43
81 63
93 72
105 81
157 121
175 134
29 23
36 28
44 34
63 49
72 56
81 63
122 94
135 104
27 21
33 26
40 31
58 45
66 51
74 57
111 86
124 95
25 19
31 24
37 28
54 41
61 47
69 53
103 79
114 88
22 17
28 22
33 26
49 38
55 43
63 48
94 72
104 80
LAP SPLICE NOTES:
1. TABULATED VALUES ARE PER ACI 318-19
REQUIREMENTS FOR NORMAN WEIGHT
CONCRETE. THE VALUES ON THIS SHEET DO NOT
APPLY TO LIGHTWEIGHT CONCRETE.
2. SEE TYPICAL DETAILS FOR CLEAR COVER.
3. MINIMUM BAR SPACING DIAGRAM - "S"
4. WHERE ACTUAL CONDITIONS DIFFER FROM THE
CLEAR COVER SHOWN ON THE TYPICAL DETAILS
OR DIFFER FROM PROVIDED SCHEDULED BAR
SIZE, MINIMUM SPACING AND/OR f'c, LENGTHS
SHALL BE ADJUSTED ONLY WITH THE APPROVAL
OF THE STRUCTURAL ENGINEER OF RECORD.
5. TABULATED VALUES ARE FOR NON-EPOXY
COATED REINFORCEMENT. FOR EPOXY COATED
REINFORCEMENT MULTIPLY VALUES BY 1.3 FOR
"TOP BARS" AND 1.5 FOR ALL OTHER REINFORCEMENT
6. WHERE BARS OF DIFFERENT SIZES ARE LAP
SPLICED IN TENSION. THE LAP LENGTH SHALL
BE THE TENSION LAP SPLICE LENGTH (LTS) OF
THE SMALLER BAR.
7. WHERE BARS OF DIFFERENT SIZES ARE LAP
SPLICED IN COMPRESSION, THE COMPRESSION
LAP LENGTH (LCS) SHALL BE THE LARGER OF THE
COMPRESSION DEVELOPMENT LENGTH (Dc) OF
THE LARGER BAR OR THE COMPRESSION LAP
SPLICE LENGTH OF THE SMALLER BAR.
8. "TOP BARS" ARE DEFINED PER ACI
HORIZONTAL REINFORCEMENT SO PLACED
THAT MORE THAN 12" OF FRESH CONCRETE IS
CAST IN THE MEMBER BELOW THE
DEVELOPMENT LENGTH OR SPLICE. "OTHER
BARS ARE ALL BARS FOR WHICH THIS DOES
NOT APPLY".
9. FOUNDATION WALL LAP SPLICES ARE BASED
ON A MINIMUM 1 1/2" CLEAR COVER. IF CLEAR
COVER IS REDUCED ON INTERIOR FACE, LAP
SPLICES MUST BE REVISED.
S
FIRST BAR
SECOND BAR PLACED
OR SPLICE BAR
S
1'-0"
TYP
2" CLR
T/FTG EL
97'-6"
T/WALL EL
101'-0"
SITE PAVING -
REF CIVIL
FUEL TANK BY OTHERS
℄ STEM WALL
AND FOOTING
1/2" EXPANSION JOINT
W/ BACKER ROD AND
SEALANT
10- #6 CONT
TOP & BOT
#6 @ 12" OC TOP & BOT
(SHORT DIRECTION) W/
STD ACI HOOKS
CONC STEM WALL REINF
W #5 @ 12" OC VERT EF
(STD ACI HOOK)
#5 CONT @ 12" OC EF
6'-0"
3/4" CHAMFER
#4 CAP BAR @ 48" OC
*GC TO COORDINATE FUEL TANK ATTACHMENT WITH STEM
WALL THICKNESS WITH EOR PRIOR TO FABRICATION OF REBAR.
LOCATE CL WITH
GC TO COORD
DIMENSION TO
FUEL TANK SHOPS
LIGHT POLE BASE DETAIL
3"
L P
W
H E
R E
P O
L E
H T
I S
L E
S S
F T
P
IE
R C
O N
C
P O
L E
B A
S E
L P
W
H E
R E
G R
E A
T E
R T
H A
N
F
T L
E S
S T
H A
N
F
T
A
B O
V E
G R
A D
E A
T
V E
H
IC
U L
A R
Z O
N E
S
CONCRETE POLE BASE
TO MATCH PIER DIA
PAVEMENT OR
FINISHED GRADE
ANCHOR BOLTS (4 MIN) AND
TEMPLATE FURNISHED WITH
POLE. ALL ANCHOR BOLTS TO
FIT WITHIN THE
REINFORCEMENT CAGE
LIGHT POLE, BASE PLATE
AND ANCHOR BOLTS BY
MANUFACTURER. HOT DIP
GALVANIZE THE BASE PL,
ANCHOR BOLTS AND
LEVELING NUTS.
3/4" CHAMFER -TYP
OPTIONAL CONSTRUCTION
JOINT
LP1 = 1'-6"
LP2 = 2'-0"
CONDUIT - SIZE AS
NOTED - SEE ELEC
PIER VERT REINFORCEMENT:
LP1 = 6-#5
LP2 = 6-#6
PIER TIES REINF:
WITH #3 AT 1'-0" OC -
PROVIDE FOUR TIES TOP
AND TWO BOTTOM
FOUNDATION WALL REINFORCEMENT - VERTICAL BARS
LAP SPLICE LENGTH SCHEDULE (INCHES)
GRADE
BAR
SIZE
MIN BAR SPACING
(INCHES)
TENSION (LTS) COMPRESSION
(LCS)
f'c = 3 KSI f'c = 4 KSI f'c = 5 KSI
#5
#6
#7
#8
#9
#10
#11
2.125
2.500
2.625
3.000 72
3.375 81
3.750 121
4.125 134
#4 2.000 15 f'c = 6 KSI f'c = 7 KSI
FOUNDATION WALL REINFORCEMENT - HORIZONTAL BARS
LAP SPLICE LENGTH SCHEDULE (INCHES)
GRADE
BAR
SIZE
MIN BAR SPACING
(INCHES)
TENSION (LTS) COMPRESSION
(LCS)
f'c = 3 KSI f'c = 4 KSI f'c = 5 KSI
#5
#6
#7
#8
#9
#10
#11
#4 f'c = 6 KSI f'c = 7 KSI
2.000
2.250
2.625
3.000
3.375
3.750
4.125
1.875
Architect of Record:
ADG
800 SW ADAMS STREET, SUITE 101
PEORIA, IL 61602
R e vi si o n s
P - 309.672.6948
Discipline:Discipline:Discipli…