Other files for this federal contract opportunity
Other files attached to DRYDOCK REPAIRS FOR NOAA SHOP PISCES, newest first.
| File |
Type |
Posted |
| AMC-000-3C.pdf |
PDF |
|
| Amendment_0001.pdf |
PDF |
|
| (134)Knuckle_Boom_Crane.pdf |
PDF |
|
| (035)FoodServiceEquipment.pdf |
PDF |
|
| (015)chillwaterplant.pdf |
PDF |
|
| FP07_Compressed_Air_System_Diagram.pdf |
PDF |
|
| AMC-583-1B_General_Requirements_for_Liferaft_Inspections.pdf |
PDF |
|
| (111)telescoping_boom_crane.pdf |
PDF |
|
| dwg506-_FP02_Vents_and_Sounds_System_Diagram_(2_sheets).pdf |
PDF |
|
| AMC-997-1A _Drydocking_and_Routine_Drydock_Work_(6_pages).pdf |
PDF |
|
| HB-163_FP19_Seachest_Diagram.pdf |
PDF |
|
| Ocean_Surveyor_Installation_Guide_PN_95A-6019-00_April_2014.pdf |
PDF |
|
| Navi-Sailor_NS4000_ECDIS_Version_2.00.323_Installation_Guide.pdf |
PDF |
|
| ABS_Drydocking_Survey.pdf |
PDF |
|
| SH-461-007-REV_1_CENTERBOARD_ITI_INSTALLATION_REPAIR_(3).pdf |
PDF |
|
| IME-35210-N4.pdf |
PDF |
|
| dwg528-_FP05_Grey_and_Black_Water_Sys_Diagram_(3_sheets).pdf |
PDF |
|
| (105)StoreHandlingCrane.pdf |
PDF |
|
| HB-243_FM01-001-03ab-_Shafting_Layout___Details.pdf |
PDF |
|
| 631-3B.pdf |
PDF |
|
| FA03_Machinery_Arrangement.pdf |
PDF |
|
| (004)Anchor_Windlass_rev2.pdf |
PDF |
|
| FA17_Mission_Equip_and_Rigging_Arrangements.pdf |
PDF |
|
| (006)SternTubeBearing_and_Shaft_Seal_Resubmittal.pdf |
PDF |
|
| FP03_Fresh___Potable_Water_System_Diagram.pdf |
PDF |
|
| (048)Trawling_and_Scientific_Winch_System_Part_2.pdf |
PDF |
|
| (047)_Trawling_and_Scientific_Winch_System_Part_1.pdf |
PDF |
|
| MOC-631-2D.pdf |
PDF |
|
| ASHRAE_Standard_151_-_HVAC_Balancing___Testing.pdf |
PDF |
|
| (011)Cathodic_protection_system.pdf |
PDF |
|
| OD-581-03.pdf |
PDF |
|
| HB-085-_FA02_General_Arrangements_(6_sheets).pdf |
PDF |
|
| 009-32_Cleanin_Painting.pdf |
PDF |
|
| 256-_FP08_Main_SW_Cooling_System_Diagram_(3_sheets).pdf |
PDF |
|
| (005)Line_Shaft_and_Thrust_Bearing_Manual.pdf |
PDF |
|
| OD-581-002_Revision_C.pdf |
PDF |
|
| AMC-581-1A _Inspection_and_Preservation_of_Ground_Tackle_(4_sheets).pdf |
PDF |
|
| dwg300-_FE01_Power_One-_Line_(39_sheets).pdf |
PDF |
|
| 634-1B_DECK_COVERINGS.pdf |
PDF |
|
| AMC-505-1B _Valve_Overhaul_and_Test_(4_pages).pdf |
PDF |
|
| AMC-000-2C.pdf |
PDF |
|
| HB-524-_FP21_Egg_Sampling_System_Diagram_(1_sheet)_(1).pdf |
PDF |
|
| FV01-000-01_(HVAC_Loads) AS-BUILT_2006-09-14)ab.pdf |
PDF |
|
| dwg529-_FP01_Bilge_and_Ballast_System_Diagram_(2_sheets).pdf |
PDF |
|
| dwg524-_FP18_Scientific_SW_System_Diagram_(2_sheets).pdf |
PDF |
|
| dwg085-_FA01_Outboard_Profile.pdf |
PDF |
|
| (008)Bow_Thruster.pdf |
PDF |
|
| RFP.pdf |
PDF |
|
| RFP_ATTACHMENT_J.5.pdf |
PDF |
|
| RFP_ATTACHMENT_J.3.pdf |
PDF |
|
Show all 50
DRYDOCK REPAIRS FOR NOAA SHOP PISCES has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it.
Updated .