ABS_Drydocking_Survey.pdf

PDF 25 KB Posted

Attached to
DRYDOCK REPAIRS FOR NOAA SHOP PISCES Federal contract opportunity
Solicitation number
EA-133M-16-RP-0112
Issued by
Department of Commerce National Oceanic and Atmospheric Administration

View the file

Other files for this federal contract opportunity

Other files attached to DRYDOCK REPAIRS FOR NOAA SHOP PISCES, newest first.
File Type Posted
Amendment_0002.pdf.pdf PDF
AMC-000-3C.pdf PDF
Amendment_0001.pdf PDF
(015)chillwaterplant.pdf PDF
(134)Knuckle_Boom_Crane.pdf PDF
FV01-000-01_(HVAC_Loads) AS-BUILT_2006-09-14)ab.pdf PDF
dwg529-_FP01_Bilge_and_Ballast_System_Diagram_(2_sheets).pdf PDF
dwg524-_FP18_Scientific_SW_System_Diagram_(2_sheets).pdf PDF
dwg085-_FA01_Outboard_Profile.pdf PDF
(008)Bow_Thruster.pdf PDF
Consilium_SAL_T2_Spare_Parts_List_T2_Bottom_Part_Spares.pdf PDF
(085)fuel_oil_purifier.pdf PDF
IME-35190-P2.pdf PDF
AMC-300-1 _Overhaul_of_Electrical_Rotating_Machinery_(10_pages).pdf PDF
HB-631_FF04_Paint_Schedule.pdf PDF
(004)Anchor_Windlass_rev2.pdf PDF
FA17_Mission_Equip_and_Rigging_Arrangements.pdf PDF
(006)SternTubeBearing_and_Shaft_Seal_Resubmittal.pdf PDF
FP03_Fresh___Potable_Water_System_Diagram.pdf PDF
(048)Trawling_and_Scientific_Winch_System_Part_2.pdf PDF
(047)_Trawling_and_Scientific_Winch_System_Part_1.pdf PDF
MOC-631-2D.pdf PDF
ASHRAE_Standard_151_-_HVAC_Balancing___Testing.pdf PDF
(011)Cathodic_protection_system.pdf PDF
OD-581-03.pdf PDF
HB-085-_FA02_General_Arrangements_(6_sheets).pdf PDF
009-32_Cleanin_Painting.pdf PDF
256-_FP08_Main_SW_Cooling_System_Diagram_(3_sheets).pdf PDF
(005)Line_Shaft_and_Thrust_Bearing_Manual.pdf PDF
OD-581-002_Revision_C.pdf PDF
AMC-581-1A _Inspection_and_Preservation_of_Ground_Tackle_(4_sheets).pdf PDF
dwg300-_FE01_Power_One-_Line_(39_sheets).pdf PDF
634-1B_DECK_COVERINGS.pdf PDF
AMC-505-1B _Valve_Overhaul_and_Test_(4_pages).pdf PDF
AMC-000-2C.pdf PDF
HB-524-_FP21_Egg_Sampling_System_Diagram_(1_sheet)_(1).pdf PDF
FP07_Compressed_Air_System_Diagram.pdf PDF
AMC-583-1B_General_Requirements_for_Liferaft_Inspections.pdf PDF
(111)telescoping_boom_crane.pdf PDF
dwg506-_FP02_Vents_and_Sounds_System_Diagram_(2_sheets).pdf PDF
AMC-997-1A _Drydocking_and_Routine_Drydock_Work_(6_pages).pdf PDF
HB-163_FP19_Seachest_Diagram.pdf PDF
Ocean_Surveyor_Installation_Guide_PN_95A-6019-00_April_2014.pdf PDF
Navi-Sailor_NS4000_ECDIS_Version_2.00.323_Installation_Guide.pdf PDF
SH-461-007-REV_1_CENTERBOARD_ITI_INSTALLATION_REPAIR_(3).pdf PDF
RFP_ATTACHMENT_J.5.pdf PDF
RFP_ATTACHMENT_J.3.pdf PDF
RFP_ATTACHMENT_J.2.pdf PDF
RFP_ATTACHMENT_J.7.pdf PDF
RFP.pdf PDF
Show all 50

DRYDOCK REPAIRS FOR NOAA SHOP PISCES has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Checklist Item(s): All Description Notes

(2005) When a vessel is in drydock or on a slipway, it is to be placed on blocks of sufficient height and with the necessary staging to permit the examination of the following items which are to be cleaned, as necessary, and examined together with appendages, as applicable, and placed in satisfactory condition:

i. Keel

ii. Stem

iii. Stern frame and post

iv. (2008) Bottom Plug arrangements

v. (2005) Side and bottom plating externally. The shell plating is to be examined for excessive corrosion, or deterioration due to chafing or contact with the ground and for any undue unfairness or buckling. Plate unfairness or other deterioration which does not necessitate immediate repairs is to be recorded.

vi. (2005) Bow plating externally

viii. (2005) Visible parts of the rudder. If considered necessary by the Surveyor, the rudder is to be lifted.

ix. (2005) Visible parts of rudder shafts and couplings

x. (2014) Rudder pintles and gudgeons together with their respective securing arrangements. Inspection plates are to be removed for the examination of pintles and securing arrangements.

xi. Rudder pressure test, where applicable, as deemed necessary by the Surveyor

xii. Rudder bearing clearances are to be ascertained and reported on

xiii. (2014) Propeller nozzle

xiv. Exposed parts of the stern bearing and seal assembly. (See Note below.)

xv. The stern bearing clearance or weardown is to be ascertained and reported on.

(See Note below.)

xvi. (1 July 2015) Visible parts of the propeller. Each taper fitted propeller hub with greater than 10 years of service life is to be examined by a surface crack-detection method at each out of the water drydocking, or whenever the propeller is removed for any reason.

xvii. Controllable pitch propeller hub fastenings and tightness. (See Note below.)

xviii. Controllable pitch propeller blade fastenings and tightness. (See Note below.)

xix. The efficiency of the oil gland, if fitted, is to be ascertained and reported on. (See Note below.)

xx. Bilge keels, with special attention paid to the connection between the bilge strakes and the bilge keels

xxi. (1 July 2014) Visible parts of athwartship thrusters are to be examined. Other propulsion systems which also have maneuvering characteristics (such as directional propellers, vertical axis propellers, water jet units) are to be examined externally with focus on the condition of gear housing, propeller blades, bolt locking and other

AMERICAN BUREAU OF SHIPPING

Drydocking Survey - Drydocking CHECKLIST

Vessel Name PISCES Class Number 09161926

Checklist Date 07-Jun-2016 Blank Checklist

DD-UWILD Page 1 of 2

* This document is uncontrolled and subject to change at any time. ABS is not responsible for any omissions. Document does not relieve the client from complying with the Rules.Document is not to be further released to other parties without the consent of ABS.

Checklist Item(s): All Description Notes fastening arrangements. Sealing arrangement of propeller blades, propeller shaft and steering column shall be verified.

xxii. Sea chests and their gratings

xxiii. (2005) Sea connections and overboard discharge valves and cocks, including their attachments to the hull or sea chests, are to be externally examined. Valves and cocks need not be opened up more than once in a Special Periodical Survey period unless considered necessary by the Surveyor.

xxiv. All nonmetallic expansion pieces in the sea-water cooling and circulating systems are to be externally examined

xxv. Nonmetallic expansion pieces in the main sea-water circulating systems are to be examined both externally and internally when vessel is examined on drydock

xxvi. (1 July 2015) Special attention is to be paid to all weldments of the ESD (energy saving device) in-way-of its connection to the hull or rudder blade plating as applicable.

xxvii. (1 July 2015) The exposed steel of the tailshaft is to be protected from the action of the water by filling all spaces between cap, hub and shaft with a suitable material. Once the cap/cone is installed, bolts are to be tightened, visually examined and are to be secured using a locking mechanism.

Note: (2005) Dismantling need not be carried out unless considered necessary by the Surveyor

For Special Periodic Survey of underwater items, refer to 7-6-2/3.1.1 and 7-3-2/5.

In addition to the applicable requirements of 7-4-1/1, the Drydocking Survey (or equivalent) is also to include the following:

Underwater aluminum plating in close proximity to dissimilar metal is to be examined both internally and externally, as far as practicable.

AMERICAN BUREAU OF SHIPPING

Drydocking Survey - Drydocking CHECKLIST

Vessel Name PISCES Class Number 09161926

Checklist Date 07-Jun-2016 Blank Checklist

DD-UWILD Page 2 of 2

* This document is uncontrolled and subject to change at any time. ABS is not responsible for any omissions. Document does not relieve the client from complying with the Rules.Document is not to be further released to other parties without the consent of ABS.

File details come from the government source that posted it. Updated .