SF_30.pdf
PDF 42 KB Posted
- Attached to
- FERDINAND HASSLER Drydock FY16 Federal contract opportunity
- Solicitation number
- EA-133M-16-RP-0040
About this file
Amendment 0002 SF 30
View the file
Other files for this federal contract opportunity
Show all 50
FERDINAND HASSLER Drydock FY16 has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1. CONTRACT ID CODE PAGE OF PAGES
1 4
2. AMENDMENT/MODIFICATION NO.
3. EFFECTIVE DATE
03/03/2016
4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)
6. ISSUED BY CODE AJ930073 7. ADMINISTERED BY (If other than Item 6) CODE
NOAA/ERAD
200 GRANBY STREET
NOROFLK, VA 23510
See Block 6
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION
NO.
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NO.
EA133M-16-RP-0040
10B. DATED (SEE ITEM 13)
08/06/2015
CODE 00008411 FACILITY CODE
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE
PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
N/A
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO.
IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
SEE PAGES 3 AND 4
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
16C. DATE SIGNED
NSN 7540-01-152-8070
Previous edition unusable
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA FAR (48 CFR) 53.243
INSTRUCTIONS
Instructions for items other than those that are self-explanatory, are as follows:
(a)
(b)
Item 1 (Contract ID Code). Insert the contract type identification code that appears in the title block of the contract being modified.
Item 3 (Effective date).
(2) Accounting classification Net decrease $
NOTE: If there are changes to multiple accounting classifications that cannot be placed in block 12, insert an asterisk and the words "See continuation
(1)
(2)
(3)
For a solicitation amendment, change order, or administrative change, the effective date shall be the issue date of the amendment, change order, or administrative change.
For a supplemental agreement, the effective date shall be the date agreed to by the contracting parties.
For a modification issued as an initial or confirming notice of termination for the
(g)
(h) sheet".
Item 13. Check the appropriate box to indicate the type of modification. Insert in the corresponding blank the authority under which the modification is issued. Check whether or not contractor must sign this document. (See FAR 43.103.)
Item 14 (Description of Amendment/Modification).
(4)
(5) convenience of the Government, the effective date and the modification number of the confirming notice shall be the same as the effective date and modification number of the initial notice.
For a modification converting a termination for default to a termination for the convenience of the Government, the effective date shall be the same as the effective date of the termination for default.
For a modification confirming the contacting officer's determination of the amount due in settlement of a contract termination, the effective date shall be the same as the effective date of the initial decision.
(1)
(2)
Organize amendments or modifications under the appropriate Uniform Contract Format (UCF) section headings from the applicable solicitation or contract. The UCF table of contents, however, shall not be set forth in this document
Indicate the impact of the modification on the overall total contract price by inserting one of the following entries:
(i) Total contract price increased by $
(ii) Total contract price decreased by $
(iii) Total contract price unchanged.
(c)
(d)
(e)
(f)
Item 6 (Issued By). Insert the name and address of the issuing office. If applicable, insert the appropriate issuing office code in the code block.
Item 8 (Name and Address of Contractor). For modifications to a contract or order, enter the contractor's name, address, and code as shown in the original contract or order, unless changed by this or a previous modification.
Item 9, (Amendment of Solicitation No. - Dated), and 10, (Modification of Contract/Order No. - Dated). Check the appropriate box and in the corresponding blanks insert the number and date of the original solicitation, contract, or order.
Item 12 (Accounting and Appropriation Data).
When appropriate, indicate the impact of the modification on each affected accounting classification by inserting one of the following
(3)
(4)
(5)
(6)
State reason for modification.
When removing, reinstating, or adding funds, identify the contract items and accounting classifications.
When the SF 30 is used to reflect a determination by the contracting officer of the amount due in settlement of a contract terminated for the convenience of the Government, the entry in Item 14 of the modification may be limited to --
(i) A reference to the letter determination; and
(ii) A statement of the net amount determined to be due in settlement of the contract.
Include subject matter or short title of solicitation/contract where feasible.
entries.
(1) Accounting classification Net increase $
(i) Item 16B. The contracting officer's signature is not required on solicitation amendments. The contracting officer's signature is normally affixed last on supplemental agreements.
STANDARD FORM 30 (REV. 10-83) BACK
SF30 (continued) EA-133M-16-RP-0040 Amendment 0002
Amendment 0002 is issued to complete the following:
A. Answer questions received in response to the solicitation.
Question #1
Item 101.1 Para 7.2.3, please confirm contractor to pay all ABS cost/fees.
Answer #1
NOAA pays for the cost/fees through a separate ordering vehicle. The Contractor is only responsible for scheduling.
Question #2
Item 102 Para 7.1.4.2, Can a clearance of less than 20 feet be acceptable if all work required by specification can be accomplished without obstruction?
Answer #2
Yes, in this scenario less than 20 feet can be acceptable.
Question #3
Item 116 Para 7.4.2, is slurry blasting acceptable?
Answer #3
Yes, slurry blasting is acceptable.
Question #4
Item 306 Reference 2.3 (New ICP System Layout) appears to be missing, please advise.
Answer #4
Reference provided with this amendment, titled 2.3 (NEW ICP SYSTEM LAYOUT)
Questions #5
Please provide the following references for Item 115, Work Item 114 Buoyancy and Weight Data, ABS Loadline Letter
Answer #5
References provided with this amendment, titled; Survey for load lines, 1965 Load Line Assignment_77945789, ABS – HASSLER Load Line Certificate (25Jan2014), ABS_Cargo_Ship_Safety_Construction_Certificate_01252014, ABS_Certificate_of_Classification_01282014.
Question #6
Please provide reference 2.1.6 of work item 117 Doppler Speed Log Replacement.
Answer #6
Reference provided with this amendment, titled Ref 2.1.6 Doppler Speed Log Replacement
Question #7
Please provide Reference 2.1.1 Alfa Laval Tech Manual for work item 305, Heat Exchanger Cleaning.
Answer #7
Reference provided with this amendment, titled Ref 2.1.1 Alfa Laval Tech Manual
Question #8
Please provide Reference 2.3 (8010-100-noaahassler) for work item 306.
Answer #8
Reference provided with this amendment, titled Ref 2.3 (8010-100-noaahassler)
Question #9
Solicitation SF33 indicates a due date of March 11, 2015 instead of March 11, 2016.
Answer #9
Corrected SF33 attached with this amendment to indicate the correct date of March 11, 2016 vs.
March 11, 2015.
B. The closing date and time remains unchanged.
*****END AMENDMENT 0002*****
File details come from the government source that posted it. Updated .