1965_Load_Line_Assignment_77945789.pdf

PDF 54 KB Posted

Attached to
FERDINAND HASSLER Drydock FY16 Federal contract opportunity
Solicitation number
EA-133M-16-RP-0040
Issued by
Department of Commerce National Oceanic and Atmospheric Administration

About this file

Reference

View the file

Other files for this federal contract opportunity

Other files attached to FERDINAND HASSLER Drydock FY16, newest first.
File Type Posted
ABS_Cargo_Ship_Safety_Construction_Certificate_01252014.pdf PDF
ABS_Certificate_of_Classification_01282014.pdf PDF
Ref_2.1.6_Doppler_Speed_Log_Replacement.pdf PDF
Corrected_SF_33.pdf PDF
Survey_for_load_lines.pdf PDF
ABS_-_HASSLER_Load_Line_Certificate_(25Jan2014).pdf PDF
SF_30.pdf PDF
Ref_2.1.1_Alfa_Laval_Tech_Manual.pdf PDF
SF_30 _Amend_0001.pdf PDF
SOW_HASSLER_FY16_DD_REV_2.pdf PDF
RFP_Section_G._Revised.pdf PDF
Consilium component files.pdf PDF
M286-202-PE53-03 —
RFP_ATTACHMENT_J.4.pdf PDF
NOAA Standard Specification S4800-2 Piping Systems.pdf PDF
NOAA Standard Specification AMC-581-1A.pdf PDF
M286-085-FA02-001-15 —
RFP_ATTACHMENT_J.2.pdf PDF
NOAA Standard Specification S6900.pdf PDF
FC61 - Paint Schedule.pdf PDF
M286-085-FC05-001-02 —
M286-603-FH69-001-03 —
RFP_ATTACHMENT_J.5.pdf PDF
M286-101-FH01-001-10 —
Hassler GSSP Tank Tables.pdf PDF
M286-202-FE52-04 —
M286-581-FH20-001 ANCHOR HANDLING DETAILS 5_92385902.pdf PDF
IEEE Std 45-2002.pdf PDF
Attachment_J.6.pdf PDF
M286-117-FC40-01-02 —
NOAA Standard Specification MOC-000-1G.pdf PDF
M286-624-FH26-001-06 —
MIL-STD-1625C.pdf PDF
M286-085-FA06-001-05 —
M286-562-FM02-03 —
M286-529-FP01-10 —
J.1_Dry_Dock_FH_FY16_02022016_REV_1.pdf PDF
M286-085-FA01-001-13 —
M286-085-FA11-001-07 —
M286-524-FP13-09_Sea Water Cooling Sys-As-Built_68676862.pdf PDF
M286-PH3-FD01-00 BUOYANCY APPENDAGE Rev C.pdf PDF
M286-169-FH50-001-03 —
MIL-DTL-2845E.pdf PDF
RFP_ATTACHMENT_J.7.pdf PDF
M286-491-FE54-001-02 —
M286-117-FH04-002-05 —
M286-163-FP19-04 —
NOAA Standard Specification MOC-631-2D.pdf PDF
RFP_ATTACHMENT_J.3.pdf PDF
Specification_Drydock_HASSLER.pdf PDF
Show all 50

FERDINAND HASSLER Drydock FY16 has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ABS HOUSTON

16855 Northchase Drive, Houston, TX, 77060 USA

TEL: 1-281-877-5800 FAX: 1-281-877-5803 Email: ABSWorldhq@eagle.org www.eagle.org

DATE: 15 October 2013 PAGE: 1 of 1

TO: ABS Boston PROJECT: 3112002

ATTN: Mr. Jason Brooks - ABS Boston TASK: T1089452/WCL

FAX NO: (by email) ABS CN: 11187051

FROM: Stability & Load Line Group CC: USCG-MSC

SUBJECT: “FERDINAND R. HASSLER” Mr. Steven Laverty – ECS, Inc

VT Halter Marine, Hull 1965

37.7 M x 18.5 M x 7.01 M

Coastal Mapping Vessel [U]

1966 Load Lines – Freeboard Assignment

The 1966 type "B-Increased" freeboard assignment, corresponding to the USCG Marine Safety Center

Stability Approval letter dated August 30, 2013, is as follows:

Center of Ring below upper edge of Deck Line : 3.248 M

Deck line located opposite top of steel main deck at side

Fresh above Ring : 150 mm

No other allowances

Midship point located 480 mm AFT of Frame 25.

Load Line Length: 35.256 M

Corresponding Molded Draft: 3.767 M

Corresponding Extreme Draft: 3.775 M

The Survey Department advises that provided you have taken a status and reviewed any outstanding recommendations with your lead Surveyor, it will be in order to conduct the necessary surveys for the issuance of a Load Line certificate to the subject vessel.

Provided the form LL-11-D and the Stability Letter issued by the USCG Marine Safety Center dated

August 30, 2013 is sighted on board the vessel, a Load Line certificate may be issued to the vessel reflecting the above marks. The following comment is to be placed on the face of the Load Line certificate:

"The certificate is valid only so long as the operating restrictions in the vessel’s stability letter, issued by USCG Marine Safety Center dated August 30, 2013, are observed.”

Very truly yours, Matthew D. Tremblay

Vice President of Engineering

ABS Americas

By: __________________________

William (Bill) Leyrer

Managing Principal Engineer

Ship Engineering Department

Electronically published by ABS Houston.

Reference T1089452, dated 15-OCT-2013.

http://www.eagle.org

File details come from the government source that posted it. Updated .