Q A_3.docx

DOCX document 26 KB Posted

Attached to
Drydock and Repairs to NOAA SHIP THOMAS JEFFERSON
Solicitation number
EA-133M-13-RP-0154
Issued by

About this file

Amendment 0008 pages 2-5

View the file

Other files

File Type Posted
Amendment_0009.pdf PDF
Amendment_0008.pdf PDF
SF_30.pdf PDF
Thomas_Jefferson_Drydock_Repairs_MOA2-08(13)_dated_28_Feb_13_Revised_25_Sep_13.pdf PDF
Amendment_0006.pdf PDF
ADCP Installation Guide 95A-6019-00.pdf PDF
SmartOnline 30kVA Owners manual.pdf PDF
TJ-Camera Equipment Locations.pdf PDF
TJ-635-6634624_Insulation Layout and Details.pdf PDF
TJ-085-002C_Booklet_of_General_Plans.pdf PDF
164851ac_installation_manual_em710(s).pdf PDF
89087_main switchboard assembly.pdf PDF
C3463M-C_Spectra_IV_SE Camera System Installation Manual.pdf PDF
SVP70_71_Manual102b(s).pdf PDF
SeaBat 7125 SV2_OpMan_V5(s).pdf PDF
TJ-633-01_Cathodic Protection System.pdf PDF
TJ-301-6634669_Electrical One Line Diagram.pdf PDF
Vertiline8C_Install.pdf PDF
Battery Module.pdf PDF
Knudsen KEL571 12kHz - D241-03457-Rev1.02 1 .pdf PDF
Furuno CA50B-6B transducer drawing C2003010.pdf PDF
TJ-241-01_Reduction_Gear(s).pdf PDF
Furuno CA200B-8B transducer drawing C2003019.pdf PDF
offsets and alignmets_04-27-2008.pdf PDF
Amendment_0005.pdf PDF
TJ-512-002 HVAC ARR Details Upper Deck Above .pdf PDF
Knudsen KELA5701 3_5kHz - D241-03802-Rev1.02.pdf PDF
Airmar HMBB200_24_4_20_information_sheet.pdf PDF
TJ-529-02 Elinca Anti-Biofouling System(s).pdf PDF
SyQwerst 3_5kHz - tr109.pdf PDF
Signed_Amendment_0004.pdf PDF
Amendment_0003.pdf PDF
Amendment_0001_Signed.pdf PDF
1167_001.pdf PDF
301-6634669 Electrical One Line Diagram.pdf PDF
490-6634715_001C Transducer arrangment.pdf PDF
85110021M011-REV-A_Seabat_7125_SV2_Sea_chest.pdf PDF
528-6643786 Plumbing and Deck Drain Arrangement.pdf PDF
593-6634823 Sewage and Sanitary Sys Arrangement and Details.pdf PDF
528-6634785_Plumbing and Deck Drains.pdf PDF
644-6634942_Sanitary Equipment Schedule.pdf PDF
501-6634831_Piping Module No 3.pdf PDF
593-6634822 Sewage and Sanutary Sys Diagram.pdf PDF
TJ-528-006 Sewage Grey Water Piping Mods in Engine Room.pdf PDF
TJ-528-004 Rev D_Sewage System Modifications.pdf PDF
533-1_Potable Water Tank Disinfection.pdf PDF
TJFY14DD_2013-09-12.pdf PDF
573-2_Overhaul_Repair of Hydraulic Cylinders.pdf PDF
000-1F_General Requirements for Ship Repair Contract Work on NOAA Ships.pdf PDF
000-2C_Temporary Services at Contractor Facilities.pdf PDF
Show 40 more

Latest 50 of 114 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Dry Dock and Repairs

NOAA SHIP THOMAS JEFFERSON

EA-133M-13-RP-0154 Amendment 0008 2

Questions and Answers #3 EA-133M-13-RP-0154 “Dry-docking and Repairs, NOAA Ship Thomas Jefferson

Question 1:

1) The Contractor is directed by paragraph b. of the above referenced Work Item to design and install a bubble gauge system for measuring the ships draft while the vessel is underway.

2) Paragraph 5.4.5 states; "The following system is known to meet the bubble gauge requirements" Accubar @ Constant Flow Bubble Gauge/ Recorder 56=0133 Sutron Corporation

3) After contacting Sutron Corporation we were told that their bubble systems are not designed nor intended for a ship board installation and that they could not provide any technical support nor assist in alignment, system setup or commissioning.

4) As design and design approval without basic system components would take months we ask that the Government provides the Contractor with an approved alternative system or product vendor.

Answer 1: The Government has communicated with Sutron Corporation and Sutron Corporation has stated that Sutron Corporation will provide support to contractors for installation of a bubbler system onboard the ship. Point of Contact:

Craig Brown Sutron Corporation 22400 Davis Drive Sterling, Virginia 20164 phone: (703)406-2800 fax: (703)406-2801 sales@sutron.com

Question 2: To further understand the requirements of Work Item # 504 "Dynamic Draft Measuring System" and to provide a designed system that is in complete compliance with the intended scope this contractor has the following questions:

2a: What will "Wave" averaging will be used for?

2b: Is Dynamic Vessel draft needed or will draft readings be taken when the vessel is stopped and anchored?

2c: Would Data logging redundancy if required will be thru the HMI on an SD Card and USB flash drive?

2d: LevelCom accuracy and resolution are as follows, will this resolution be acceptable Accuracy (Full Scale) +/-0.2% FS (+/-0.75") Resolution (Full Scale) 0.1" (2.54mm)

Answer 2:

2a: This is to smooth out fluctuation in depth readings.

2b: Draft readings are to be taken while the ship is moving.

2c: Specific method of logging redundancy is manufacturer identified 2d: Accuracy 0 - 20 ft .01 ft, 20 - 57 ft 0.05%.

Question 3: ITEM 502- PARA. 5.2.3.c.1. HAVE OPTIMUM LOCATIONS BEEN SELECTED FOR EXISTING ARRAYS?

Answer 3: The requirement is for the contractor to determine the optimum location for the transducers.

Question 4:ITEM 502- RFP APPEARS TO BE MORE ROBUST THAN THE TIME FRAME ALLOTTED. LEAD TIMES WITH: PRELIMINARY DRAWING, HYDRODYNAMIC STUDY, GOV’T AND ABS DRAWING FINAL AND REVIEW CYCLES, AND THE FAIRINGS PROCUREMENT AND MANUFACTURING/FABRICATION TIMELINES ARE OF MAJOR CONCERN. CONTRACTOR RECOMMENDS TO ACCOMPLISH IN MULTIPLE PHASES; PHASE 1.) DESIGN/DEVELOPMENT (NEED 4-6 MONTH WINDOW MINIMUM. PHASE 2.) SHIPYARD AVAILABILITY FOR INSTALL AND TESTING WITH ANTICIPATION OF LONG LEAD MATERIAL

Answer 4: The Government believes that the design work for required hull appendages is less complicated than is being purported and that the design and installation can be accomplished within the allotted time frame. Furthermore, it is not uncommon for contracts to include both design and construction. In these cases installation facilities use either onsite engineering capabilities or retain the services of an engineering firm to accomplish required engineering services.

B.1 SCHEDULE OF PRICES AMENDMENT 0008

Performance Period 60 Calendar days between December 3, 2013 and March 7, 2014

FILL IN PROPOSED DATES BELOW:

MONTH/DAY/YEAR THROUGH MONTH/DAY/YEAR

BASE CLINS

CLIN
SPECIFICATION WORK ITEM
SPECIFICATION WORK ITEM TITLE
QTY
UNIT
UNIT PRICE
EXTENDED PRICE
0001
3.1
TEMPORARY SERVICES
1
JOB
$________
$___________
0002
3.2
DRYDOCKING AND ROUTINE DRYDOCK WORK
1
JOB
$________
$___________
0003
3.3
CATHODIC PROTECTION SYSTEM: INSPECT AND REPAIR
1
JOB
$________
$___________
0004
3.4
ELINCA SYSTEM: INSPECT & REPAIR
1
JOB
$________
$___________
0005
3.5
SEA VALVE OVERHAULS
1
JOB
$________
$___________
0006
3.6
UNDERWATER BODY COATING
1
JOB
$________
$___________
0007
3.7
PROPELLER SHAFT INSPECTION AND REPAIRS
1
JOB
$________
$___________
0008
3.8
PROPELLER INSPECTION AND REPAIRS
1
JOB
$________
$___________
0009
3.9
UNSHIPPING AND SHIPPING RUDDER
1
JOB
$________
$___________
0010
3.10
REDUCTION GEAR AND COUPLING INSPECTION
1
JOB
$________
$___________
0011
3.11
PIPING REPAIRS
1
JOB
$________
$___________
0012
3.12
STEEL RENEWALS
1
JOB
$________
$___________
0013
3.13
DOCK TRIALS
1
JOB
$________
$___________
0014
3.14
SEA TRIALS
1
JOB
$________
$___________
0015
3.15
CLEAN/DEGREASE ENGINE ROOM BILGE
1
JOB
$________
$___________
0016
3.16
GALLEY EXHAUST SYSTEM CLEANING AND REPAIRS

SUBTOTAL CLINS (0001 – 0016): $______________

ADDITIONAL ITEM REQUIREMENTS (AIRs): These items relate to Growth Work. The Unit Price Column will be used throughout the life of the contract if growth work is added to the scope of the contract (reference Commerce Acquisition Regulation (CAR) clause 1352.271-72). If AIRs are issued, these items will be awarded at the quantities needed via a contract modification. The quantity shown is an estimate only and may be exceeded at the unit prices offered.

0017
4.1
AIRS/Growth (estimated)

**Provide breakdown, as follows:

AIRs/Growth Labor Rate Unit Price: $________; Quantity: 2,200 ; Unit of Issue: Hour; Extended Price: $____________

AIRs/Growth Material Markup/Handling Fee Unit Price: $15,000; Quantity: 1; Unit of Issue: Percent ____%;

Extended Price: [$_____ X percentage quoted]: $______________

1
LT
$_______
$__________
0018
N/A
LAYDAYS (SEE CAR CLAUSE 1372.271-86)
EST.
DAY
$________
$_________
0019
N/A
ADDITIONAL TEMPORARY SERVICES (SEE CAR CLAUSE 1372.271-89)
EST. 1
DAY
$________
$_________

TOTAL AIRS CLINS (CLINS 0017 – 0019): $______________

OPTION CLINS

CLIN
SPECIFICATION WORK ITEM
SPECIFICATION WORK ITEM TITLE
QTY
UNIT
UNIT PRICE
EXTENDED PRICE
0020
5.1
MAIN DECK PASSAGEWAY DECK COVERING
1
JOB
$_______
$__________
5.2
MULTIBEAM SONAR SYSTEM MODIFICATIONS
1
JOB
$_______
$__________
0022
5.3
VENTILATION SYSTEM CLEANING
1
JOB
$_______
$__________
0023
5.4
DYNAMIC DRAFT SYSTEM INSTALLATION
1
JOB
$_______
$__________
0024
5.5
SECURITY CAMERA SYSTEM INSTALLATION
1
JOB
$_______
$__________
0025
5.6
GREY AND BLACK WATER PIPING RENEWALS
1
JOB
$_______
$__________
0026
5.7
30KVA UPS INSTALLATION
1
JOB
$_______
$__________
0027
5.8
ABS TANK INSPECTIONS
1
JOB
$_______
$__________

TOTAL OPTION CLINS (CLINS 0020 – 0027): $______________