533-1_Potable Water Tank Disinfection.pdf

PDF 20 KB Posted

Attached to
Drydock and Repairs to NOAA SHIP THOMAS JEFFERSON
Solicitation number
EA-133M-13-RP-0154
Issued by

About this file

7

View the file

Other files

File Type Posted
Amendment_0009.pdf PDF
Q A_3.docx DOCX document
Amendment_0008.pdf PDF
SF_30.pdf PDF
Thomas_Jefferson_Drydock_Repairs_MOA2-08(13)_dated_28_Feb_13_Revised_25_Sep_13.pdf PDF
Amendment_0006.pdf PDF
ADCP Installation Guide 95A-6019-00.pdf PDF
SmartOnline 30kVA Owners manual.pdf PDF
TJ-Camera Equipment Locations.pdf PDF
TJ-635-6634624_Insulation Layout and Details.pdf PDF
TJ-085-002C_Booklet_of_General_Plans.pdf PDF
164851ac_installation_manual_em710(s).pdf PDF
89087_main switchboard assembly.pdf PDF
C3463M-C_Spectra_IV_SE Camera System Installation Manual.pdf PDF
SVP70_71_Manual102b(s).pdf PDF
SeaBat 7125 SV2_OpMan_V5(s).pdf PDF
TJ-633-01_Cathodic Protection System.pdf PDF
TJ-301-6634669_Electrical One Line Diagram.pdf PDF
Vertiline8C_Install.pdf PDF
Battery Module.pdf PDF
Knudsen KEL571 12kHz - D241-03457-Rev1.02 1 .pdf PDF
Furuno CA50B-6B transducer drawing C2003010.pdf PDF
TJ-241-01_Reduction_Gear(s).pdf PDF
Furuno CA200B-8B transducer drawing C2003019.pdf PDF
offsets and alignmets_04-27-2008.pdf PDF
Amendment_0005.pdf PDF
TJ-512-002 HVAC ARR Details Upper Deck Above .pdf PDF
Knudsen KELA5701 3_5kHz - D241-03802-Rev1.02.pdf PDF
Airmar HMBB200_24_4_20_information_sheet.pdf PDF
TJ-529-02 Elinca Anti-Biofouling System(s).pdf PDF
SyQwerst 3_5kHz - tr109.pdf PDF
Signed_Amendment_0004.pdf PDF
Amendment_0003.pdf PDF
Amendment_0001_Signed.pdf PDF
1167_001.pdf PDF
301-6634669 Electrical One Line Diagram.pdf PDF
490-6634715_001C Transducer arrangment.pdf PDF
85110021M011-REV-A_Seabat_7125_SV2_Sea_chest.pdf PDF
528-6643786 Plumbing and Deck Drain Arrangement.pdf PDF
593-6634823 Sewage and Sanitary Sys Arrangement and Details.pdf PDF
528-6634785_Plumbing and Deck Drains.pdf PDF
644-6634942_Sanitary Equipment Schedule.pdf PDF
501-6634831_Piping Module No 3.pdf PDF
593-6634822 Sewage and Sanutary Sys Diagram.pdf PDF
TJ-528-006 Sewage Grey Water Piping Mods in Engine Room.pdf PDF
TJ-528-004 Rev D_Sewage System Modifications.pdf PDF
TJFY14DD_2013-09-12.pdf PDF
573-2_Overhaul_Repair of Hydraulic Cylinders.pdf PDF
000-1F_General Requirements for Ship Repair Contract Work on NOAA Ships.pdf PDF
000-2C_Temporary Services at Contractor Facilities.pdf PDF
Show 40 more

Latest 50 of 114 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMC-533-1

AUGUST 1991

NATIONAL OCEANIC AND ATMOSPHERIC ADMINISTRATION (NOAA)

ATLANTIC MARINE CENTER

STANDARD SPECIFICATION AMC-533-1

POTABLE WATER TANK DISINFECTION

1. SCOPE. This specification contains the general requirements for disinfecting potable water tanks on NOAA ships.

2. REFERENCES.

None

3. REQUIREMENTS.

3.1 General Requirements.

3.1.1 When introducing chlorine treatment solution to a

potable water tank, ensure that the solution is diluted and is introduced only through a sounding tube or threaded connection.

Immediately after adding the treatment solution, add a rinse consisting of at least five gallons of potable water through the same sounding tube or threaded connection.

3.1.2 Isolate the tank(s) from the rest of the potable

water service system and thoroughly rinse and drain the tank interiors.

3.2 Disinfect Procedure.

3.2.1 Fill the potable water tank with potable water until

it overflows, exercising care not to pressurize the tank. As it fills, introduce sufficient chlorine solution to provide at least 100 parts-per-million (ppm) Free Available Chlorine (FAC) content in the completely filled tank.

3.2.2 Monitor the FAC content hourly for at least four

hours. If the FAC content drops below 50 ppm at any time, add additional chlorine solution to the tank to bring the FAC content back up to 100 ppm and begin the four-hour period anew. Continue until the FAC content remains at or above 50 ppm for a four-hour period.

3.2.3 If more than one tank is to be disinfected, repeat

the above procedure for the other tank. At the contractor's discretion, the same water used to disinfect the first tank may be used, as long as the initial FAC content in the second tank is increased to 100 ppm at the start of the four-hour test period.

AMC-533-1

AUGUST 1991

3.2.4 Drain the tank(s) and refill with potable water.

Repeat the above tests, except that an initial FAC content of

1.0 ppm or greater shall be provided, the monitoring period shall be 30 minutes, and the minimum allowable FAC content shall be

0.2 ppm.

3.2.5 After successfully completing the 30-minute test

period, drain and refill the tank(s) with potable water until the total FAC content falls to 1.0 ppm or less.

END OF SPECIFICATION