573-2_Overhaul_Repair of Hydraulic Cylinders.pdf

PDF 20 KB Posted

Attached to
Drydock and Repairs to NOAA SHIP THOMAS JEFFERSON
Solicitation number
EA-133M-13-RP-0154
Issued by

About this file

TJSS 7

View the file

Other files

File Type Posted
Amendment_0009.pdf PDF
Q A_3.docx DOCX document
Amendment_0008.pdf PDF
SF_30.pdf PDF
Thomas_Jefferson_Drydock_Repairs_MOA2-08(13)_dated_28_Feb_13_Revised_25_Sep_13.pdf PDF
Amendment_0006.pdf PDF
ADCP Installation Guide 95A-6019-00.pdf PDF
SmartOnline 30kVA Owners manual.pdf PDF
TJ-Camera Equipment Locations.pdf PDF
TJ-635-6634624_Insulation Layout and Details.pdf PDF
TJ-085-002C_Booklet_of_General_Plans.pdf PDF
164851ac_installation_manual_em710(s).pdf PDF
89087_main switchboard assembly.pdf PDF
C3463M-C_Spectra_IV_SE Camera System Installation Manual.pdf PDF
SVP70_71_Manual102b(s).pdf PDF
SeaBat 7125 SV2_OpMan_V5(s).pdf PDF
TJ-633-01_Cathodic Protection System.pdf PDF
TJ-301-6634669_Electrical One Line Diagram.pdf PDF
Vertiline8C_Install.pdf PDF
Battery Module.pdf PDF
Knudsen KEL571 12kHz - D241-03457-Rev1.02 1 .pdf PDF
Furuno CA50B-6B transducer drawing C2003010.pdf PDF
TJ-241-01_Reduction_Gear(s).pdf PDF
Furuno CA200B-8B transducer drawing C2003019.pdf PDF
offsets and alignmets_04-27-2008.pdf PDF
Amendment_0005.pdf PDF
TJ-512-002 HVAC ARR Details Upper Deck Above .pdf PDF
Knudsen KELA5701 3_5kHz - D241-03802-Rev1.02.pdf PDF
Airmar HMBB200_24_4_20_information_sheet.pdf PDF
TJ-529-02 Elinca Anti-Biofouling System(s).pdf PDF
SyQwerst 3_5kHz - tr109.pdf PDF
Signed_Amendment_0004.pdf PDF
Amendment_0003.pdf PDF
Amendment_0001_Signed.pdf PDF
1167_001.pdf PDF
301-6634669 Electrical One Line Diagram.pdf PDF
490-6634715_001C Transducer arrangment.pdf PDF
85110021M011-REV-A_Seabat_7125_SV2_Sea_chest.pdf PDF
528-6643786 Plumbing and Deck Drain Arrangement.pdf PDF
593-6634823 Sewage and Sanitary Sys Arrangement and Details.pdf PDF
528-6634785_Plumbing and Deck Drains.pdf PDF
644-6634942_Sanitary Equipment Schedule.pdf PDF
501-6634831_Piping Module No 3.pdf PDF
593-6634822 Sewage and Sanutary Sys Diagram.pdf PDF
TJ-528-006 Sewage Grey Water Piping Mods in Engine Room.pdf PDF
TJ-528-004 Rev D_Sewage System Modifications.pdf PDF
533-1_Potable Water Tank Disinfection.pdf PDF
TJFY14DD_2013-09-12.pdf PDF
000-1F_General Requirements for Ship Repair Contract Work on NOAA Ships.pdf PDF
000-2C_Temporary Services at Contractor Facilities.pdf PDF
Show 40 more

Latest 50 of 114 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MOC-573-2

September 2000

National Oceanic and Atmospheric Administration Marine Operation Center

Standard Specification MOC-573-2

OVERHAUL/REPAIR OF HYDRAULIC CYLINDERS

1. SCOPE: This specification provides the minimum requirements for the overhaul and/or repair of hydraulic cylinders.

2. REFERENCES

None

3. REQUIREMENTS

3.1 Tag out system controllers and actuators to preclude

inadvertent operation and secure the movable member to prevent movement while cylinder is removed.

3.1.1 Disconnect and cap hydraulic lines from the cylinder.

Ensure containment is provided to prevent spillage of oil.

Hydraulic lines and inlet/outlet ports shall be capped or plugged with threaded fittings to prevent leakage or contamination of the system.

3.1.2 Remove the cylinder from the ship and transport to

repair facility.

3.2 Perform the following work on the removed cylinder:

3.2.1 Completely disassemble the cylinder and clean all

parts.

3.2.2 Prepare and preserve the external painted surfaces in

accordance with the identified painting specification or as original.

3.2.3 Reassemble the cylinder under clean conditions using

new "O" rings, seals, gaskets, packing, and piston rings.

Materials used shall meet or exceed original manufacturers specifications. During reassembly lubricate the above with a product equal to Hilton's Hyper-Lube, that is compatible with the system fluid.

3.2.4 Provide and install new nuts, washers, bolts, studs and inlet and outlet fittings.

3.3 Reinstall the cylinder in its original location.

MOC-573-2

September 2000

3.4 Top off hydraulic reservoir to full mark and purge all air from the system taking care to contain any fluid bled off.

3.5 Remove tag outs.

4. QUALITY ASSURANCE

4.1 After disassembly, inspect all components for trueness of bore and rod, wear, damage, corrosion or pitting. Provide a Condition Report detailing the inspection results, contractor's corrective action recommendations, and list of additional parts, material and labor not covered by this specification, required to restore the cylinder to the manufacturers specifications.

4.2 After reassembly, bench test the assembly at system working pressure to prove smoothness of operation and tightness of sealing surfaces.

4.3 Cycle the cylinder through a minimum of four evolutions to demonstrate operation and tightness of all disturbed fittings and connections. Upon satisfactory demonstration of operation and tightness apply "Denso tape" to all connections.

END OF SPECIFICATION

Page 1
Page 2

File details come from the government source that posted it. Updated .