Report_NEPA.pdf

PDF 3 MB Posted

Attached to
Great Smoky Mountains-Foothills Parkway
Solicitation number
DTFH71-17-B-00015
Issued by

About this file

Report_NEPA

View the file

Other files

File Type Posted
ROBO_-_FOOT_8E21,_F9.pdf PDF
Amend_0001_-_FOOT_8E21,_F9.pdf PDF
Plans_Sheets_T.pdf PDF
Bridge_Inspection_Rpt_STR_5460-207P.pdf PDF
Plans_Sheets_A_thru_S_&_U_thru_X_-_THREE_(Pages_251-391).pdf PDF
Plans_Sheets_A_thru_S_&_U_thru_X_-_TWO_(Pages_126-250).pdf PDF
Bridge_Inspection_Rpt_STR_5460-209P.pdf PDF
Bridge_Inspection_Rpt_STR_5460-204P.pdf PDF
IFB_Solicitation_-_FOOT_8E21_F9.pdf PDF
Bridge_Inspection_Rpt_STR_5460-214P.pdf PDF
Report_Pavement.pdf PDF
Bridge_Inspection_Rpt_STR_5460-205P.pdf PDF
ADV_Subcontracting_plan.doc DOC document
Bridge_Inspection_Rpt_STR_5460-206P.pdf PDF
As_Built_Construction_Plans_(Includes_Rev__1-14).pdf PDF
As_Built_Construction_Plans_(Includes_Rev__4).pdf PDF
IFB_Solicitation_-_FOOT_8E21_F9.pdf PDF
Plans_Sheets A thru S & U thru X —
Bridge_Inspection_Rpt_STR_5460-030P.pdf PDF
Bridge_Inspection_Rpt_STR_5460-210P.pdf PDF
ADV_Bidder's_Qualifications_Form.doc DOC document
Appendix_TDEC_NPDES_CGP.pdf PDF
Plans_Sheets_A_thru_S_&_U_thru_X_-_ONE_(Pages_1-125).pdf PDF
As_Built_Construction_Plans_(Includes_Rev__6).pdf PDF
VETS-4212.pdf PDF
Bridge_Inspection_Rpt_STR_5460-213P.pdf PDF
As_Built_Construction_Plans_(Includes_Rev__14).pdf PDF
Appendix_TDEC_NPDES_NOI.pdf PDF
FP03_Eng.pdf PDF
Synopsis_FOOT8E21-Rev.pdf PDF
Synopsis_FOOT8E21.pdf PDF
Show all 31

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Home | Parks | Project / Search | Reports | Tools | Admin | Logout

Project Home

1 Project Setup

2 Funding

3 Internal Scoping / IDT

Tasks

4 Natural/Cultural Compliance

5 Internal Documents / Comments

6 Public Communication

7 Public Documents & Comment Analysis

8 Close Project

Project Overview Page Print

GRSM

Final Construction and Surfacing of Sections 8E and 8F of the Foothills Parkway

Project ID: 40972 Other Project ID:

Project Status: Proposed Compliance Status : Closed Complete

Funding Status: Unfunded Funded Date: Unknown

Sensitive: No

Project Target Start Date: 01/02/2014 Project Creation Date: 02/07/2012

NEPA Status: CE Approved

Title: Final Construction and Surfacing of Sections 8E and 8F of the Foothills Parkway

Secondary Title:

Description: This project will construct the final asphalt surfacing of Sections E & F of the Foothills Parkway. Section E runs from MM39.1 (where it will tie into future Section D) at US 321 in Wears Valley to MM 48.8 at the Carr Creek Road Bridge. Section F runs from the Carr Creek Road Bridge to MM 55.21 at US 321 in Walland, where it will connect into existing Section G.

This work shall include full depth reclamation of the existing roadway base; placement of asphalt binder and wearing courses; final surfacing of access ramps at the Wears Valley entrance; formalization or obliteration of existing parking areas and roadside pullouts; reconstruction of the road prism at the area of a failed rock buttress (+/-MM 40.3); roadway prism clearing; shoulder work; installation of steel-backed timber guardrail; erosion control, turf establishment, drainage work, replacement of bridge expansion joints, repointing of masonry as needed; construction of new stone masonry curb and guardwalls; repairs to drainage ditches, resurfacing or replacement of old sidewalks, installation of pavement markings;

installation of regulatory (MUTCD) and NPS (Uniguide) signs; and installation of new entrance signs.

The east end of Section E was last treated with a surface treatment of liquid asphalt and aggregate in 2009. The west end of Section E was last treated in 2005, during the construction of Bridge 8. Section F was last treated in the 1970s. The existing treated surface is experiencing wear along the pavement edges, as well as encroachment of turf grasses and weeds, which will have to be removed prior to pavement rehabilitation. The roadway has areas of moderate to severe rutting and potholes. The travel surface in some areas is cracked and spalling and has become uneven and rough. Heavy construction traffic is increasingly damaging the aging paved surface. A short section of the roadway has settled at the failed rock buttress. The work to repair the settlement will include a permanent realignment of the roadway. The current proposed solution is to move the roadway to the south, by cutting into the slope opposite the failed rock buttress.

In several areas, the road is adjacent to steep rock cuts and/or steep earth fills with little shoulder width between the edge of pavement and the cuts/fills. Steel-backed timber guardrail will be installed to mitigate drop off hazards, as needed.

The stone masonry guardwalls were constructed in the 1980s and are currently in fair to good condition.

Some mortar joints have deteriorated and will require repointing. Some areas of settling may require more elaborate reconstruction.

Erosion control measures will be implemented for all work as needed. No straw will be used for erosion control devices. Some tree clearing is anticipated, including in the area of road realignment, brushing of the road prism and removal of hazard trees. Any clearing or brushing will be accomplished between November 15 and March 31 to avoid potential Indiana Bat populations. Any clearing outside of this window will require consultation with Resource Management Biologist prior to start of work.

No work on historic walls will occur without consultation without consultation with Cultural Resources.

Excavation will be minimal in most locations as it relates to post holes for guardrail or sign posts, guardwall footings, and excavation in road bed or existing parking areas to reconstruct suitable road structure. Some excavation will be required for the road realignment at the failed rock buttress.

Fill material or soil needed for the project will be imported from a Park-approved source.

Mike Tomkosky will act as co-Project Leader

Project Leader: Herbert Kupfer

NEPA Specialist: Jeff Troutman

NHPA Specialist: Erik Kreusch

IDT Team Member Phone# Extension Responsibility Erik Kreusch 865-430-0339 NHPA Specialist Herbert Kupfer 865-436-1571 Project Leader Jeff Troutman (865) 436-1245 NEPA Specialist

Project Type: Facility Rehabilitation

Project Category: Road Unpaved

External Agency:

Division/Office:

Locations

County, State District, Section Geo. Marker Other

Sevier, TN TN01

Blount, TN TN02

Admin. Record Contact:

Admin. Record Location:

Milestones

Target Project Start: 01/02/2014 Actual Project Start:

Target Project End: Actual Project End:

Target Agreement: Actual Agreement:

Target Alternatives: Actual Agreement:

Files:

Step 1 Basic Information File List

Title

(link)

Step 2 Funding File List

Title

No Link or File has been Submitted.

Step 3 Internal Scoping / IDT Task File List

Title

No Link or File has been Submitted.

Step 4 Natural/Cultural Compliance File List

Title

No Link or File has been Submitted.

Step 5 Internal Documents (* indicates peer review required)

Document Title Review Start Review End Peer Review Req.

Management Decision for Parking Areas No

Parking Area Obliteration/Formalization Plan No

Step 6 Public Documents

Document Title Review Start Review End In Review

This project has no 'public documents'.

Back to Top

Step 8 Project Closing

Document Title

This project has no 'project close documents'.

PEPC Guide - Inside NPS - NPS.gov - USA.Gov - Disclaimer - Accessibility - Privacy Policy

FOOT 8E21 Signed CE
FOOT 8E21 F9_NEPA Compliance_Complete September 2012
FOOT 8E21 F9_NEPA compliance_complete September 2012
2012-08-30 Compliance Letter
2012-08-30 PEPC40972 closed complete
FOOT_8E21_F9_PA_Oblits_Vista_Mngmnt_Signed_Oct_20_2011
FOOT8E21__F9_Parking_Areas___Sections_2011-08-12
FOOT8E21F9 Parking Areas 2011-08-12
FOOT8E21,F9 SK-1
FOOT8E21,F9 SK-2

PEPC CE Form_Signed

File details come from the government source that posted it. Updated .