BRIDGE INSPECTION REPORT
BRIDGE #9
FOOTHILLS PARKWAY OVER RAVINE
GREAT SMOKY MOUNTAINS NATIONAL PARK
LE
STRUCTURE NO. 5460-210P
INSPECTION TYPE: ROUTINE
INSPECTION DATE: 5/12/14
Report prepared by: SS
Federal Highway Administration Federal Lands Bridge Office Bridge Inspection and Management Program 21400 Ridgetop Circle Sterling, Virginia 20166 http://www.efl.fhwa.dot.gov/FLHBO/BIP http://www.efl.fhwa.dot.gov/FLHBO/BIP
STRUCTURE SUMMARY STRUCTURE NO. 5460-210P
BRIDGE #9 INSPECTION DATE: 5/12/14
BRIDGE IDENTIFICATION AND DESCRIPTION
MAIN SPAN MATERIAL:
MAIN SPAN TYPE:
# OF BEAMS, MAIN SPAN: ..
DECK TYPE:
WEARING SURFACE:
ABUT. FOUNDATIONS:
PIER FOUNDATION(S):
ABUTMENT / PIER MAT'L: ...
PROJ./PLAN REF. NO:
NPS ROAD CLASS:
STRUCTURE HISTORY:
P/S CONCRETE CONTINUOUS
SEGMENTAL BOX GIRDER
CONCRETE CAST-IN-PLACE
INTEGRAL CONCRETE
SPREAD FOOTING ON PILES / SPREAD
SPREAD FOOTING ON PILES / UNKNOW
CONCRETE
PRA-FOOT 8E12 / 136-257
6 - RESTRICTED
LOCATION
NO. OF MAIN SPANS:
NO. OF APPR. SPANS:
STRUCT. TOTAL LENGTH: ..
MAX. SPAN LENGTH:
DECK WIDTH:
CURB TO CURB WIDTH:
YEAR BUILT:
YEAR RECONSTRUCTED: ..
SKEW ANGLE:
FRACTURE CRITICAL:
480.5 FT (146.5 M)
201.3 FT (61.4 M)
38.0 FT (11.6 M)
34.7 FT (10.6 M)
N/A
0 °
NO
GREAT SMOKY MOUNTAINS NATIONAL PARK MILE POINT: ..................... 0.00 (KM PT 0.00)
STATE: ................................. TENNESSEE LOCATION: 9.4 MILES EAST OF U.S. ROUTE 321
FACILITY CARRIED: ............ FOOTHILLS PARKWAY
FEATURE INTERSECTED: .. RAVINE
STRUCTURE EVALUATION SUMMARY
This post-tensioned concrete box girder bridge is in good condition overall. No repairs are required at this time.
This bridge has not yet been opened to public traffic. Construction of the bridge railings was in progress during the inspection. Minor issues, including debris in the expansion joints, vegetation growth on the west approach parapets/wingwalls, and trees growing against the north deck overhang should be addressed when final preparations are made to open this portion of the Foothills Parkway. Additional problems to be monitored include map cracking of the deck surface over the piers; areas of spalling with exposed rebar on the deck underside over the south cheekwalls at both abutments; and several areas of hairline diagonal and horizontal cracking in the box girder webs.
It should be noted that the black paint applied on the exterior side of the box girder and the underside of the deck overhangs hinders the visual identification of cracks.
INSPECTION TEAM: C. CASTRO, H. SALAD
CONDITION ASSESSMENT:
CARLOS CASTRO, P.E., FIELD TEAM LEADER 571-434-1546
REPORT REVIEW :
MARCUS MILLER, P.E., SENIOR INSPECTION ENGINEER 703-404-6252
REPORT APPROVAL: DATE: 9/30/14
JORGOMAI CEESAY, PH.D., P.E., BIP SUPERVISORY ENGINEER 703-404-6244
RECOMMENDATIONS AND ESTIMATED COSTS STRUCTURE NO. 5460-210P
A (Critical) - Structure is closed, in imminent danger of collapse, or presents a critical safety hazard.
B (Major) - Structure is seriously deficient or presents a safety hazard, but can remain in service at reduced loads or with frequent inspections.
C (Moderate) - Structure is deficient, functionally obsolete, or requires substantial repairs to prevent a serious deficiency or unsafe condition.
D (Minor) - Structure is generally in good condition. Preventative maintenance may be required.
E (Special) - Structure is under construction or reconstruction.
D226 PRIORITY OF IMPROVEMENT
ITEM
NO.
MAINTENANCE RECOMMENDATIONS
(GENERALLY NOT FLHP ELIGIBLE)
QTY. UNIT COST
UNIT
ESTIMATE
COST
PRELIM.
PRELIM. MAINTENANCE TOTAL :
ITEM
NO.
REHABILITATION/RECONSTRUCTION
(TYPICALLY NEEDED WITHIN 5 YEARS)
QTY. UNIT
UNIT
COST ESTIMATES
PRELIM. COST
REHAB. RECONSTR.
PRELIM. REHABILITATION/RECONSTRUCTION TOTAL :
COST ESTIMATE SUMMARY
PRELIM. MAINTENANCE TOTAL:
PRELIM. REHABILITATION TOTAL:
PRELIM. RECONSTRUCTION TOTAL: ..
TOTAL ITEMIZED COSTS:
PRELIMINARY ESTIMATE TOTAL* :
(*Includes typical contract costs for mobilization, traffic control, and design/construction engineering; but does not include detour bridges, work beyond the bridge limits, or work not listed above. Estimates are approximate and are for preliminary planning purposes only; they should not be used as a complete or final engineers estimate.)
REMARKS: No repairs are required at this time.
FIELD INSPECTION REPORT STRUCTURE NO. 5460-210P
CONDITION RATING CODES FOR ITEMS 58 - 62, 222, 223
N NOT APPLICABLE
9 EXCELLENT CONDITION
8 VERY GOOD CONDITION - no problems noted.
7 GOOD CONDITION - some minor problems.
6 SATISFACTORY CONDITION - structural elements show some minor deterioration.
5 FAIR CONDITION - all primary structural elements are sound but may have minor section loss, cracking, spalling, or scour.
4 POOR CONDITION - advanced section loss, deterioration, spalling, or scour.
3 SERIOUS CONDITION - loss of section, deterioration, spalling, or scour have seriously affected primary structural components. Local failures are possible.
Fatigue cracks in steel or shear cracks in concrete may be present.
2 CRITICAL CONDITION - advanced deterioration of primary structural elements. Fatigue cracks in steel or shear cracks in concrete may be present or scour may have removed substructure support. Unless closely monitored it may be necessary to close the structure until corrective action can be taken.
1 “IMMINENT” FAILURE CONDITION - major deterioration or section loss present in critical structural components or obvious vertical or horizontal movement affecting structure stability. Structure is closed to traffic but corrective action may return structure to light service.
0 FAILED CONDITION - out of service; beyond corrective action.
CONDITION RATING CODE EQUIVALENTS FOR SUB-ELEMENTS
G = GOOD (CODES 7 - 9) F = FAIR (CODES 5 - 6) P = POOR (CODES 0 - 4)
58. DECK 7
1. DECK SLAB G
2. EXPANSION JOINTS G
3. WEARING SURFACE G
4. RIDEABILITY G
5. CURBS, SIDEWALKS, AND MEDIAN G
6. PARAPETS AND/OR RAILINGS G
7. DRAINS AND DRAINAGE G
8. UTILITIES N
9. DEFLECTION AND/OR VIBRATION G
10. OTHER (TREES) F
59. SUPERSTRUCTURE 7
1. BEARING DEVICES
2. GIRDERS OR BEAMS
3. ARCH(ES) OR SLAB(S)
4. FLOOR BEAMS AND STRINGERS
5. TRUSSES
6. DIAPHRAGMS AND BRACING
7. PAINT
8. FASCIA(E)
9. DEFLECTION AND/OR VIBRATION
10. ALIGNMENT
11. OTHER
60. SUBSTRUCTURE
ABUTMENTS
1. BREASTWALLS OR COLUMNS
2. PILE BENTS
3. CAPS AND/OR BEARING SEATS
4. BACKWALLS AND/OR BULKHEADS
5. FOUNDATIONS (CONCRETE FTG)
6. WINGWALLS
7. WEEP HOLES
8. EXPANSION JOINTS
9. EROSION AND/OR SCOUR
10. SETTLEMENT OR DEFLECTION
11. SLOPE PROTECTION
12. OTHER
PIER(S)
13. WALLS AND/OR COLUMNS
14. PILE BENTS
15. CAPS AND/OR BEARING SEATS
16. FOUNDATIONS (BURIED)
17. EROSION AND/OR SCOUR
18. SETTLEMENT OR DEFLECTION
19. OTHER
G G N N N G N N G G N
G N G G N G N N G G N N
G N G N G G N
58.1
58.2
58.3
58.5,6
58.7
58.10
59.2
ITEM REFERENCE AND REMARKS
MINOR TRANSVERSE CRACKING WITH EFFLORESCENCE ON
UNDERSIDE OF OVERHANGS. PATCHING ALONG JOINTS ON
UNDERSIDE OF DECK; SEVERAL WITH CRACKING AND
EFFLORESCENCE. 3' L X 1' W SPALLING WITH EXPOSED REBAR ON
DECK UNDERSIDE OVER SOUTH CHEEKWALLS AT BOTH
ABUTMENTS.
MODERATE DEBRIS ACCUMULATION IN BOTH JOINTS.
2" THICK INTEGRAL CONCRETE WEARING SURFACE. ISOLATED
AREAS OF HAIRLINE MAP CRACKING HAVE BEEN COATED WITH
EPOXY IN THE PAST.
CONCRETE FROM CURBS EXPOSING REBAR IS UNDERGOING FOR
BRIDGE BARRIERS CONSTRUCTION.
RIPRAP DRAINAGE CHUTE BENEATH EAST SPAN.
SEVERAL TREES GROWING AGAINST NORTH DECK OVERHANG.
DELAMINATION (9' L X 3' H) ON NORTH WEB OF BOX GIRDER,
CENTER SPAN AT ANCHOR BLOCK B91-5U. OIL STAINS IN BOX
GIRDER FROM CONSTRUCTION EQUIPMENT. HAIRLINE DIAGONAL
AND HORIZONTAL CRACKING OF WEBS, SOME EXTENDING INTO
DECK UNDERSIDE: BOTH WEBS AT B92-1U, NORTH WEB AT B92-2U,
SOUTH WEB AT B91-3U, NORTH WEB BETWEEN B91-2U AND B91-1U,
NORTH WEB JUST EAST OF B91-1U, NORTH WEB AT B91-1D, BOTH
WEBS AT B91-2D, SOUTH WEB BETWEEN B91-3D AND B91-1D, AND
NORTH WEB AT B92-10U. (NOT VERIFIED DURING THIS
INSPECTION).
BLACK PAINT ON EXTERIOR SIDES OF BOX GIRDER AND DECK
OVERHANGS HINDERS STRUCTURAL INSPECTION. STRUCTURAL
DEFECTS MIGHT BE COVERED BY PAINT.
FIELD INSPECTION REPORT STRUCTURE NO. 5460-210P
ITEM REFERENCE AND REMARKS
STREAM BED COMPOSITION : 9.
AVERAGE CLEAR OPENING 8.
NORMAL VELOCITY 7.
ADEQUACY OF OPENING 6.
OTHER 5.
WATERWAY OBSTRUCTIONS 4.
CHANNEL PROTECTION3.
EROSION AND/OR SCOUR2.
ALIGNMENT1.
61. CHANNEL N
222. APPROACHES 7
OTHER 9.
ALIGNMENT 8.
SIGNS7.
SETTLEMENT 6.
EROSION5.
SURFACING4.
APPROACH GUARDRAIL 3.
2. RELIEF JOINTS
APPROACH SLABS1. G
N N G G G G G N
223. RETAINING WALL N
OTHER 6.
SETTLEMENT OR DEFLECTION5.
EROSION AND/OR SCOUR4.
FOUNDATION3.
WEEP HOLES2.
1. WALL
36. TRAFFIC AND SAFETY FEATURES
APPROACH GUARDRAIL ENDSD.
APPROACH GUARDRAILSC.
TRANSITIONSB.
BRIDGE RAILINGSA. 0
59.6 MINOR CRACKING OF DIAPHRAGM AT EAST PIER, SOUTH SIDE OF
WEST FACE. MINOR SPALLING AT NOTCH CUT INTO DIAPHRAGM AT
NORTH SIDE OF ANCHOR BLOCK B92-5U IN CENTER SPAN.
60.5 FOOTING IS PARTIALLY EXPOSED ON SOUTH SIDE OF EAST
ABUTMENT, 12" H X 12" L. APPEARS TO BE AN AS-BUILT CONDITION.
222.1 MINOR TRANSVERSE AND LONGITUDINAL CRACKING OF APPROACH
SLABS AT ISOLATED LOCATIONS.
222.7 "AREA CLOSED DUE TO HAZARDOUS CONSTRUCTION. NO HIKERS,
BICYCLISTS, HORSE RIDERS OR OTHER USERS ALLOWED BEYOND
THIS POINT" LOCATED AT WALLAND ENTRANCE.
36.A TEMPORARY FENCE AS BRIDGE RAILING IN PLACE, DOES NOT
REST EVENLY ON TOP OF CURBS AT ISOLATED LOCATIONS.
PERMANENT RAIL TO BE INSTALLED PRIOR TO OPENING OF
STRUCTURE TO TRAFFIC.
TRAFFIC SAFETY RATING CODES
N
Does not meet standards or a safety feature is required and none is provided.
Meets currently acceptable standards.
Not applicable or a safety feature is not required.
STRUCTURE LOAD RATING STRUCTURE NO. 5460-210P
TRUCK TYPE
INVENTORY RATING (NORMAL TRAFFIC) OPERATING RATING (MAXIMUM LOAD)
TONS METRIC TONS TONS METRIC TONS
H 20 18 33 30
HS 36 33 60 55
TYPE 3 43 39 72 65
TYPE 3S2 47 42 78 71
TYPE 3-3 48 44 81 73
DESIGN LOADING: HS20 (MS18)
X CAPACITY MEETS OR EXCEEDS DESIGN LOAD
CAPACITY IS LESS THAN DESIGN LOAD
ORIGINAL LOAD RATING CALCULATION APPLICABLE
ORIGINAL LOAD RATING CALCULATION REVISED
DATE OF LOAD RATING CALCULATION:
LOAD RATING CONTROLLED BY:
REMARKS: RATING IS BASED ON DESIGN LOAD OF STRUCTURE.
STRUCTURE INVENTORY AND APPRAISAL STRUCTURE NO. 5460-210P
STRUCTURE IDENTIFICATION
(201) PARK: GREAT SMOKY MOUNTAINS NATIONAL PARK (1) STATE: ....................................... 474 - TENNESSEE (TN)
(202) STRUCTURE NAME: .......... BRIDGE #9 (2) STATE HWY. AGENCY DIST:
(203) STRUCTURE KIND: ............ 1 - BRIDGE (3) COUNTY CODE: ........................ 133 - OVERTON
(204) STRUCTURE NUMBER: ..... 5460-210P (4) CITY/PLACE CODE:
(205) NPS REGION: .................... 4 - SOUTHEAST (5) INVENTORY ROUTE:
(206) ROUTE CODE NUMBER: ... 0 (6) FEATURES INTERSECTED:....... RAVINE
(207) ROAD SECTION NO: .......... 210P (7) FACILITY CARRIED: .................. FOOTHILLS PARKWAY
(208) NPS ROAD CLASS: ............ 6 - RESTRICTED (8) STATE STRUCTURE NO: .......... 5460210P0000000
(209) WITHIN NPS BNDRY?: ....... YES (9) LOCATION: ................................ 9.4 MILES EAST OF U.S. RO
(210) OPERATING UNIT: ............. NPS (10) INV. RTE. - MIN. VERT. CLR: .. 99.99 FT (99.99 M)
(211) PROJECT NO(S): ................ PRA-FOOT 8E12 (11) MILE POINT: ............................. 0.00 (KM PT 0.00)
(212) DRAWING NUMBERS: ....... 136-257 (27) YEAR BUILT:
(21) MAINTAINED BY: ................. 66 - NATIONAL PARK SERVICE (106) YEAR RECONSTRUCTED: .... N/A
(22) OWNER: ............................... 66 - NATIONAL PARK SERVICE (20) TOLL: ........................................ 3 - FREE ROAD
(37) HISTORICAL DESIGNATION: .. 5 - NOT ELIGIBLE
STRUCTURE DESCRIPTION, FOUNDATION, AND DECK TYPE
(43A) MAIN STR. MATERIAL: ..
(43B) MAIN STR. TYPE:
(45) NO. OF MAIN SPANS:
(48) MAX. SPAN LENGTH:
(49) STRUCTURE LENGTH:
(216A) ABUTMENT #1 FDN:
(216B) ABUTMENT #2 FDN:
(217A) PREDOM. PIER FDN.: ..
(217B) SECOND. PIER FDN: ...
(107) DECK TYPE:
6 - P/S CONCRETE CONTINUOUS
21 - SEGMENTAL BOX GIRDER
201.3 FT (61.4 M)
480.5 FT (146.5 M)
3 - SPREAD FOOTING ON PILES
2 - SPREAD FTG ON BEARING MAT'L
3 - SPREAD FOOTING ON PILES
0 - UNKNOWN
1 - CONCRETE CAST-IN-PLACE
(44A) APPR. STR. MATERIAL: ........ 0 - OTHER
(44B) APPR. STR. TYPE: ................ 00 - OTHER
(46) NO. OF APPROACH SPANS: .. 0
(108) WEAR SURFACE/PROTECT SYSTEM:
A) TYPE WEARING SURFACE: .. 2 - INTEGRAL CONCRETE
B) TYPE MEMBRANE: ................. 0 - NONE
C) TYPE PROTECTION: .............. 0 - NONE
(218) IS SALT USED?: ..................... NO
LOAD RATING AND POSTING
(31) DESIGN LOAD: ................. 5 - HS20 (MS18) (41) LOAD RESTRICTION: ......... A - OPEN, NO RESTRICTION
(66) INVENTORY RATING: ...... 36.0 TONS (32.7 METRIC TONS) (70) BRIDGE POSTING: .............. 5 - NO POSTING REQUIRED
(64) OPERATING RATING: ...... 60.1 TONS (54.5 METRIC TONS)
INSPECTION DATES
(90) INSPECTION DATE: 5/14 (91) FREQ. OF INSP: 24 MONTHS (92 / 93) CRITICAL FEATURE INSPECTION (CFI):
(219) ADD. STUDIES NEEDED: N - 0 - NONE (A) FRACTURE CRITICAL: ... NO
INSP. EVERY: MONTHS - LAST INSP. : (220) SPECIAL STUDY TYPE: 0 - NONE
(B) UNDERWATER: .............. NO
(221) SPECIAL STUDY DATE: INSP. EVERY: MONTHS - LAST INSP. :
(C) SPECIAL INSPECTION: .. NO
INSP. EVERY: MONTHS - LAST INSP. :
STRUCTURE INVENTORY AND APPRAISAL STRUCTURE NO. 5460-210P
GEOMETRY, TRAFFIC, AND NAVIGATIONAL DATA
(16) LATITUDE: ............................. 35°42'50.30" (51) CURB TO CURB WIDTH: ........... 34.7 FT (10.6 M)
(17) LONGITUDE: ......................... 83°43'02.10" (52) DECK WIDTH: ............................ 38.0 FT (11.6 M)
(19) DETOUR LENGTH: ............... 199 MI (199 KM) (32) APPR. ROADWAY WIDTH: ........ 34.7 FT (10.6 M)
(28A) LANES ON STRUCT: .......... 02 (213) APPR. PAVEMENT WIDTH: ..... 34.7 FT (10.6 M)
(28B) LANES UNDER STRUCT: ... 00 LEFT SHOULDER: .................. 0.0 FT (0.0 M)
(42A) SERVICE ON: ..................... 1 - HIGHWAY RIGHT SHOULDER: ................ 0.0 FT (0.0 M)
(42B) SERVICE UNDER: .............. 0 - OTHER (33) BRIDGE MEDIAN: ....................... 0 - NO MEDIAN
(29) AVG. DAILY TRAFFIC: .......... 0 (34) SKEW ANGLE: ............................ 0 °
(30) YEAR OF ADT: ...................... 2010 (35) DECK FLARE?: ........................... NO
(114) FUTURE ADT: ..................... 0 (47) TOTAL HORIZ. CLEARANCE: .... 34.7 FT (10.6 M)
(115) YEAR OF FUTURE ADT: ..... 2030 (50) SIDEWALKS:
(101) PARALLEL STRUCTURE: ... N - NONE LEFT : ...................................... 0.0 FT (0.0 M)
(38) NAVIGATION CONTROL?: ... 0 RIGHT : ................................... 0.0 FT (0.0 M)
(39) VERTICAL CLEARANCE: ...... 0.0 FT (0.0 M) (214) BRIDGE RAIL TYPE:
(40) HORIZ. CLEARANCE: ........... 0.0 FT (0.0 M) RAIL CONFIGURATION: ......... 1 - FULL HEIGHT (NO PARAPE
(111) ABUT. OR PIER PROT: ....... MATERIAL: .............................. 4 - STEEL
DESIGN TYPE: ........................ 5 - OTHER
LATERAL UNDERCLEARANCE:
(55) RIGHT: ....................... 0.0 FT (0.0 M) (215) BRIDGE RAIL HEIGHT: ............ 3.75 FT (1.14 M)
(56) LEFT: ......................... 0.0 FT (0.0 M) (53) MIN. VRT. CLEAR. OVER DECK: 99.99 FT (99.99 M)
(54) MIN. VRT. UNDERCLEARANCE: 0.00 FT (0.00 M)
CONDITION AND APPRAISAL DATA, PROPOSED IMPROVEMENTS, AND COST
(58) DECK:
(59) SUPERSTRUCTURE:
(60) SUBSTRUCTURE:
(61) CHANNEL: .......................... N
(62) CULVERT: ........................... N
(222) APPROACHES:
(223) RETAINING WALL: ........... N
(36) TRAFFIC SAFETY FEAT: ... 0111
(75A) TYPE OF WORK:
(75B) WORK DONE BY:
(76) IMPROVEMENT LENGTH: ..
(67) STRUCTURAL EVALUATION:
(68) DECK GEOMETRY:
(69) UNDERCLEARANCES:
(71) WATERWAY ADEQUACY:
(72) APPROACH ALIGNMENT:
(113) SCOUR CRITICAL:
(225) PURPOSE OF IMPROVEMENT:
(226) PRIORITY OF IMPROVEMENT:
(227) MAINTENANCE COST:
(228) REHAB./RECONSTR. COST: ...
(229) CONSTRUCTION COST:
N
N
8 - Stable; scour above top of fo
1 - MAINTENANCE
D - MINOR
ADDITIONAL INFORMATION
(230) STRUCTURE HISTORY:
(231) ADDITIONAL CONSIDERATIONS:
KEY REQUIRED TO ACCESS THIS PORTION OF THE FOOTHILLS PARKWAY UNTIL ROAD IS OPEN TO THE PUBLIC. KEY AND 16'
LADDER ARE ALSO REQUIRED TO GAIN ACCESS TO INTERIOR OF BOX GIRDER.
(330) ADDITIONAL CONFIG. INFO.:
http:83�43'02.10 http:35�42'50.30
APPENDIX STRUCTURE NO. 5460-210P
PHOTOGRAPHS STRUCTURE NO. 5460-210P
PHOTO #1 - LOOKING WEST
PHOTO #2 - GENERAL TOP SIDE VIEW LOOKING EAST
PHOTO #3 - TYPICAL DEBRIS ACCUMULATION
IN JOINTS, JOINT OVER WEST ABUTMENT
SHOWN
PHOTO #4 - MAP CRACKING ON BRIDGE
SURFACE OVER WEST PIER
PHOTO #5 - DELAMINATION AND SPALLING AT
BRIDGE SURFACE NEAR CURBS, NORTH CURB
SHOWN; NOTE EXPOSED REBAR ALONG
CURB FOR BRIDGE BARRIER CONSTRUCTION
PHOTO #6 - TYPICAL TEMPORARY FENCE
ALONG BRIDGE SIDES, WEST END OF NORTH
RAILING SHOWN
PHOTO #7 - GENERAL VIEW OF SOUTH
PARAPET IN EAST APPROACH; NOTE
VEGETATION GROWTH ALONG PARAPET
PHOTO #8 - LACK OF SEALANT IN VERTICAL
JOINT BETWEEN APPROACH PARAPETS AND
BRIDGE
PHOTO #9 - VEGETATION GROWTH ON NORTH PARAPET OF WEST
APPROACH
PHOTO #10 - GENERAL UNDERSIDE VIEW LOOKING EAST
PHOTO #11 - GENERAL UNDERSIDE VIEW LOOKING WEST
PHOTO #12 - CRACKING AND SPALLING WITH EXPOSED REBAR ON
DECK UNDERSIDE ABOVE SOUTHWEST CHEEKWALL
PHOTO #13 - ACCESS TO BOX GIRDER NEAR EAST ABUTMENT
PHOTO #14 - GENERAL VIEW OF NORTH OVERHANGS AND SIDE OF
BOX GIRDER; NOTE TRANSVERSE CRACKING WITH EFFLORESCENCE
ON UNDERSIDE OF OVERHANGS
PHOTO #15 - TRANSVERSE CRACKING WITH
EFFLORESCENCE ON UNDERSIDE OF NORTH
OVERHANG NEAR WEST END
PHOTO #16 - GENERAL VIEW OF EAST
ABUTMENT
PHOTO #17 - NORTH BEARING AT EAST ABUTMENT
PHOTO #18 - EXPOSED FOOTING AT EAST ABUTMENT
PHOTO #19 - BEARING AREA AT WEST ABUTMENT
PHOTO #20 - GENERAL VIEW OF BEARINGS AT PIERS
PHOTO #21 - VEGETATION GROWTH ON NORTHWEST WINGWALL
PHOTO #22 - SOUTH SIDE
File details come from the government source that posted it. Updated .