MT_Mill_Creek_PROJECT_DESCRIPTION.pdf
PDF 21 KB Posted
- Solicitation number
- DTFH7017R00002
About this file
Project Description
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Q&A_1.04.2018.pdf | ||
| 2016-08-16_Mill_Creek_Rd_Br_over_Yellowstone.pdf | ||
| A003_Mill_Creek.pdf | ||
| Q&A_1.02.2018.pdf | ||
| A004_MATOC_RFP.pdf | ||
| Q&A_12.21.pdf | ||
| Q&A_12.19.2017(2).pdf | ||
| A003_MATOC_RFP.pdf | ||
| Q&A_12.19.2017.pdf | ||
| A002_Mill_Creek.pdf | ||
| Q&A_12.11.2017.pdf | ||
| A002_MATOC_RFP.pdf | ||
| A001_Mill_Creek.pdf | ||
| A001_Joshua_Tree.pdf | ||
| A001_MATOC_RFP.pdf | ||
| Q&A_12.6.2017.pdf | ||
| Plan_Request_form_Mill_Creek.pdf | ||
| RFP_WRPP_MATOC.pdf | ||
| RFP_PP_Joshua_Tree.pdf | ||
| FINAL_MT_PARK_NF486(1)_Sign-Off_Plans.pdf | ||
| JOTR_C6_RipReport.pdf | ||
| RFP_Mill_Creek.pdf | ||
| CA_Death_Valley_PROJECT_DESCRIPTION.pdf |
Show all 23
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
MT PARK NF486(1), Mill Creek Road Surface Preservation Project, Park County, Montana
The work consists of roadway surface preservation (asphalt and gravel surfaces), minor bridge deck repairs, ditch improvements, minor shoulder repairs, signage, pavement markings and other small items of work.
Project length: 12 miles
Tentative Fixed Completion Date: Summer 2018 (Once solicitation is issued, see FAR Clause 52.211-10 for exact date.)
Estimated Price Range: Between $1million and $2million
Location: 16 miles south of Livingston, MT
DESCRIPTION OF WORK in US CUSTOMARY UNITS
FP-14
One Schedule
DIVISION 150 – Project Requirements 152 Construction Survey & Staking Yes 153 Contractor Quality Control and Assurance Yes 154 Contractor Sampling & Testing Yes 155 Schedules for Construction Contracts (construction schedules) Yes 157 Soil Erosion & Sediment Control (erosion control devices) Silt Fence Fiber Roll
200 LNFT
250 LNFT
158 Watering for Dust Control 900 MGAL DIVISION 200 – Earthwork 203 Removal of Structures & Obstructions (structures, demolition) Delineators Sign
60 EACH
40 EACH
204 Excavation & Embankment 2300 CUYD DIVISION 300 – Aggregate and Base Courses 301 Untreated Aggregate Courses (crushed aggregate) 14,000 TON 302 Minor Crushed Aggregate 200 TON 303 Ditch Reconditioning 500 LNFT 312 Dust Palliative Magnesium Chloride 240 TON DIVISION 400 – Asphalt Pavements & Surface Treatments 403 Asphalt Concrete 50 TON 407 Chip Seal 107,000 SQYD 414 Asphalt Pavement Crack Sealing & Filling 5.7 MILE DIVISION 550 – Bridge Construction 569 Concrete Overlay 1,000 SQYD DIVISION 600 – Incidental Construction 622 Rental Equipment Yes 623 General Labor Yes
DESCRIPTION OF WORK in US CUSTOMARY UNITS
FP-14
One Schedule
633 Permanent Traffic Control (traffic control devices) Sign Delineator Rumble Strip
30 EACH
120 EACH
100 SQYD
634 Permanent Pavement Markings (traffic pavement markings) Solid Broken
“STOP”
62,000 LNFT
25,500 LNFT
3 EACH
635 Temporary Traffic Control – Flagger 700 FXHR 635 Temporary Traffic Control – Pilot Car 100 HR 635 Temporary Traffic Control – Cone Construction Sign
220 EACH
300 SQFT
File details come from the government source that posted it. Updated .