MT_Mill_Creek_PROJECT_DESCRIPTION.pdf

PDF 21 KB Posted

Attached to
Western Region Pavement Preservation Multiple Award Task Order Contract (MATOC)
Solicitation number
DTFH7017R00002
Issued by

About this file

Project Description

View the file

Other files

File Type Posted
Q&A_1.04.2018.pdf PDF
2016-08-16_Mill_Creek_Rd_Br_over_Yellowstone.pdf PDF
A003_Mill_Creek.pdf PDF
Q&A_1.02.2018.pdf PDF
A004_MATOC_RFP.pdf PDF
Q&A_12.21.pdf PDF
Q&A_12.19.2017(2).pdf PDF
A003_MATOC_RFP.pdf PDF
Q&A_12.19.2017.pdf PDF
A002_Mill_Creek.pdf PDF
Q&A_12.11.2017.pdf PDF
A002_MATOC_RFP.pdf PDF
A001_Mill_Creek.pdf PDF
A001_Joshua_Tree.pdf PDF
A001_MATOC_RFP.pdf PDF
Q&A_12.6.2017.pdf PDF
Plan_Request_form_Mill_Creek.pdf PDF
RFP_WRPP_MATOC.pdf PDF
RFP_PP_Joshua_Tree.pdf PDF
FINAL_MT_PARK_NF486(1)_Sign-Off_Plans.pdf PDF
JOTR_C6_RipReport.pdf PDF
RFP_Mill_Creek.pdf PDF
CA_Death_Valley_PROJECT_DESCRIPTION.pdf PDF
Show all 23

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MT PARK NF486(1), Mill Creek Road Surface Preservation Project, Park County, Montana

The work consists of roadway surface preservation (asphalt and gravel surfaces), minor bridge deck repairs, ditch improvements, minor shoulder repairs, signage, pavement markings and other small items of work.

Project length: 12 miles

Tentative Fixed Completion Date: Summer 2018 (Once solicitation is issued, see FAR Clause 52.211-10 for exact date.)

Estimated Price Range: Between $1million and $2million

Location: 16 miles south of Livingston, MT

DESCRIPTION OF WORK in US CUSTOMARY UNITS

FP-14

One Schedule

DIVISION 150 – Project Requirements 152 Construction Survey & Staking Yes 153 Contractor Quality Control and Assurance Yes 154 Contractor Sampling & Testing Yes 155 Schedules for Construction Contracts (construction schedules) Yes 157 Soil Erosion & Sediment Control (erosion control devices) Silt Fence Fiber Roll

200 LNFT

250 LNFT

158 Watering for Dust Control 900 MGAL DIVISION 200 – Earthwork 203 Removal of Structures & Obstructions (structures, demolition) Delineators Sign

60 EACH

40 EACH

204 Excavation & Embankment 2300 CUYD DIVISION 300 – Aggregate and Base Courses 301 Untreated Aggregate Courses (crushed aggregate) 14,000 TON 302 Minor Crushed Aggregate 200 TON 303 Ditch Reconditioning 500 LNFT 312 Dust Palliative Magnesium Chloride 240 TON DIVISION 400 – Asphalt Pavements & Surface Treatments 403 Asphalt Concrete 50 TON 407 Chip Seal 107,000 SQYD 414 Asphalt Pavement Crack Sealing & Filling 5.7 MILE DIVISION 550 – Bridge Construction 569 Concrete Overlay 1,000 SQYD DIVISION 600 – Incidental Construction 622 Rental Equipment Yes 623 General Labor Yes

DESCRIPTION OF WORK in US CUSTOMARY UNITS

FP-14

One Schedule

633 Permanent Traffic Control (traffic control devices) Sign Delineator Rumble Strip

30 EACH

120 EACH

100 SQYD

634 Permanent Pavement Markings (traffic pavement markings) Solid Broken

“STOP”

62,000 LNFT

25,500 LNFT

3 EACH

635 Temporary Traffic Control – Flagger 700 FXHR 635 Temporary Traffic Control – Pilot Car 100 HR 635 Temporary Traffic Control – Cone Construction Sign

220 EACH

300 SQFT

File details come from the government source that posted it. Updated .