SWPPP_Gardiner_Gateway_Phase_II_MT_PARK_2013(1)B.pdf

PDF 32 MB Posted

Attached to
MT PARK 2013(1)B Gardiner Gateway, Phase 2 Federal contract opportunity
Solicitation number
DTFH70-15-R-00014
Issued by
Department of Transportation Federal Highway Administration

About this file

SWPPP

View the file

Other files for this federal contract opportunity

Other files attached to MT PARK 2013(1)B Gardiner Gateway, Phase 2, newest first.
File Type Posted
A002_Gardiner_Gateway.pdf PDF
A001_Gardiner_Gateway.pdf PDF
Q A_for_posting_on_FBO.pdf PDF
Q A_for_posting_on_FBO.pdf PDF
Q A_for_posting_on_FBO.pdf PDF
Earthwork-data-listing-all.pdf PDF
Geotechnical_Report_06-14.pdf PDF
Plan_Request_form_GardinerGateway.pdf PDF
RFP_GardinerGateway.pdf PDF
Park_2013_1B_XS_Combined_all.pdf PDF
Plans_Gardiner_Gateway.pdf PDF
Final-Gardiner_Hydraulics_Report-combined-1r.pdf PDF
Park_2013_1B_95_.pdf PDF
Preliminary-Letter_MT_Park_2013(1)B.pdf PDF
PROJECT_DESCRIPTION_MT_PARK_20131(B).pdf PDF
Show all 15

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TAB 7: Permanent Stabilization and Revegetation Plan

CJ

·Inspection Requirements for NPDES Compliance

EPA Construction General Permit Part 4 inspection requirements for NPDES compliance:

Inspection Frequency: You must conduct inspections in accordance with one of the two schedules listed below.

You must specify in your SWPPP which schedule you will be following.

1. At least once every 7 calendar days, OR

2. At least once every 14 calendar days and within 24 hours of the end of a storm event of 0.5 inches or greater. (If this option is chosen, a rain gauge is required to be on-site. The SWPPP should also include a daily rainfall log.)

Case-by-Case Reductions in Inspection Frequency: You may reduce your inspection frequency to at least once every month if:

1. The entire site is temporarily stabilized,

2. Runoff is unlikely due to winter_conditions (e.g., site is covered with snow, ice, or the ground is frozen), or

3. Construction is occurring during seasonal arid periods in arid areas arid semi-arid areas.

Inspection Waiver for Frozen Conditions: A waiver of the inspection requirements is available until one month before thawing conditions are expected to result in a discharge· if all of the following requirements are met:

· 1. The project is located in an area where frozen conditions are anticipated to continue for extended periods of time (i.e., more than one month);

2. Land disturbance activities have been suspended; and

3. The beginning and ending dates of the waiver period are documented in the SWPPP.

Qualified Personnel: Inspections must be .conducted by qualified personnel (provided by the operator or cooperatively by multiple operators). "Qualified personnel" means a person knowledgeable in the principles and practice of erosion and sediment controls who possesses the skills to assess conditions at the construction site that could impact stormwater quality and to assess the effectiveness of any sediment and erosion control measures selected to control the quality of stormwater discharges from the construction activity. ·

Scope of Inspections: Inspections must include all areas of the site disturbed by construction activity and areas used for storage of materials that are exposed to precipitation. Inspectors niust look for evidence of, or the potential for, pollutants entering the stormwater conveyance system. Sedimentation and erosion control measures must be observed to ensure proper operation. Discharge locations must be inspected to ascertain whether erosion control measures are effective in preventing significant impacts to waters of the United States, where accessible. Where discharge locations are inaccessible, nearby downstream locations must be inspected to the extent that such inspections are practicable. Locations where vehicles enter or exit the site must be inspected for evidence of off-site sediment tracking.

All reports required by this permit, including the SWPPP, S.WPPP amendments, and inspection reports must be signed by a person described in Appendix G, Subsection 11.A (below) or by a duly authorized representative of that person.

1. For a corporation: By a responsible corporate officer. For the purpose of this Part, a responsible corporate officer means: (i) a president, secretary, treasurer, or vice-president of the corporation in charge of a principal business function, or any other person who performs similar policy- or decision-making functions for the corporation, or (ii) the manager of one or more manufacturing, production, or operating facilities, provided, the manager is authorized to make management decisions which govern the operation of the r~gulated facility including having the explicit or implicit duty of making major capital investment recommendations, and initiating and directing other comprehensive measures to assure long term environmental compliance with environmental laws and regulations; the manager can ensure that the necessary systems are established or actions taken to gather complete and accurate information for permit application requirements; and where authority to sign documents has been assigned or delegated to the manager in accordance with corporate procedures.

2. For a partnership or sole proprietorship: By a general partner or the proprietor, respectively; or

· 3. For a municipality, state, federal, or other public agency: By either a principal executiv~ officer or ranking elected official. For purposes of this Part, a principal executive officer of a federal agency includes (i) the chief executive officer of the agency, or (ii) a senior executive officer having responsibility for the overall operations of a principal geographic unit of the agency (e.g., Regional Administrator of EPA).

A person is a duly authorized representative only if:

BMP or Activity Implemented? Corrective Describe Corrective Action and Location, if Needed Action Reouired?

8 Are vehicle and 0Yes 0No 0Yes 0No equipment fueling, cleaning, and Complete by maintenance areas free Date:

of spills, leaks, or any other deleterious material?

9 Are materials that are 0Yes 0No 0Yes 0No potential stormwater Complete by contaminants stored Date:

inside or under cover?

10 Are non-stormwater 0Yes 0No 0Yes 0No discharges (e.g., wash Complete by water; dewatering) Date:

properly controlled?

Overall Site Issue Answer to Corrective Question Action Describe Corrective Action and Location, if Needed

Required?

1· At the time of 0Yes 0No 0Yes 0No inspection, are the Complete by discharge points and Date:

receiving waters free of pollutant discharges (sediment deposits, sediment plume or oil sheen)? (See continuation page for list of discharge ooints)

2 Since the last inspection, LJYes LJNo 0Yes 0No ., are the discharge points Complete by and receiving waters free Date:

of evidence that pollutants had left the project site (for example, sediment deposits, oily residue)?. (See continuation page for list of discharge points)

3 Has Spill Response kit 0Yes 0No 0Yes 0No been used since the last Complete by inspection? If yes, has Date:

stock been maintained?

4 . Are any additional 0Yes 0No DYes 0No BMPs needed? Complete by

Date:

5 (Other) 0Yes LJNo 0Yes 0No

D Complete by Date:

Pages Project Name:

Inspection Date:

Table of Contents
Tab 1
Tab 2
Tab 3
Tab 4
Tab 5
Tab 6
Tab 7
Tab 8
Tab 9
Tab 10
Tab 11
Tab 12
Tab 13
Tab 14
Tab 15
Tab 16
Tab 17
Tab 18

File details come from the government source that posted it. Updated .