A001_Gardiner_Gateway.pdf

PDF 6 MB Posted

Attached to
MT PARK 2013(1)B Gardiner Gateway, Phase 2 Federal contract opportunity
Solicitation number
DTFH70-15-R-00014
Issued by
Department of Transportation Federal Highway Administration

About this file

Amendment A0011

View the file

Other files for this federal contract opportunity

Other files attached to MT PARK 2013(1)B Gardiner Gateway, Phase 2, newest first.
File Type Posted
A002_Gardiner_Gateway.pdf PDF
Q A_for_posting_on_FBO.pdf PDF
Q A_for_posting_on_FBO.pdf PDF
Q A_for_posting_on_FBO.pdf PDF
Park_2013_1B_XS_Combined_all.pdf PDF
Plans_Gardiner_Gateway.pdf PDF
Final-Gardiner_Hydraulics_Report-combined-1r.pdf PDF
RFP_GardinerGateway.pdf PDF
Plan_Request_form_GardinerGateway.pdf PDF
Earthwork-data-listing-all.pdf PDF
Geotechnical_Report_06-14.pdf PDF
SWPPP_Gardiner_Gateway_Phase_II_MT_PARK_2013(1)B.pdf PDF
PROJECT_DESCRIPTION_MT_PARK_20131(B).pdf PDF
Preliminary-Letter_MT_Park_2013(1)B.pdf PDF
Park_2013_1B_95_.pdf PDF
Show all 15

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE

N/A

PAGE

2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE NO. 5. PROJECT NO. (If applicable)

A001 02/18/2016 N/A MT PARK 2013(1)B

Gardiner Gateway, Phase 2

6. ISSUED BY CODE N/A 7. ADMINISTERED BY (If other than Item 6) CODE N/A

Department of Transportation Federal Highway Administration 610 East Fifth Street Vancouver WA 98661-3801

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and Zip Code) 9A. AMENDMENT OF SOLICITATION NO.

X

DTFH70-15-R-00014

9B. DATED (SEE ITEM 11)

02/18/2016

10A. MODIFICATION OF CONTRACT/ORDER NO.

N/A

10B. DATED (SEE ITEM 13)

CODE: N/A FACILITY CODE: N/A N/A

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

| X | The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers (__ ) is extended, ( x ) is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

N/A

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A THIS CHANGE ORDER IS ISSUED PURSUANT TO (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN

ITEM 10A.

N/A

B THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (Such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

N/A

C THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

N/A

D OTHER (Specify type of modification and authority) N/A

E. IMPORTANT: Contractor n/a is not, n/a is required to sign this document and return n/a copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

MT PARK 2013(1)B, Gardiner Gateway, Phase 2

See page 2 for revisions.

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15a. NAME AND TITLE OF SIGNER (Type or print) 15a. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

N/A

15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED

BY_________________________________________ BY N/A___________________________ N/A (Signature of person authorized to sign) (Signature of Contracting Officer)

NSN 7540-01-152-8070

PREVIOUS EDITION NOT USABLE

30-105 STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

Amendment No. A001, dated 02-18-16 MT PARK 2013(1)B Solicitation No. DTFH70-15-R-00014 Gardiner Gateway, Phase 2

REVISIONS ARE AS FOLLOWS:

BID SCHEDULE

Page A-11. Revises Item Fence (Type 2B 5’ height) to Fence (Type 2B 4.5’ height) Page A-13. Revises Item Temporary Traffic Control Tubular Marker, Type 28-Inch to

Temporary Traffic Control Tubular Marker, Type 42-Inch Page A-19. Revises Item Fence (Type 2B 5’ height) to Fence (Type 2B 4.5’ height) Page A-22. Revises Item Temporary Traffic Control Tubular Marker, Type 28-Inch to

Temporary Traffic Control Tubular Marker, Type 42-Inch

CONTRACT CLAUSES

PLANS

Plan sheet B.3 Revises Item Fence (Type 2B 5’ height) to Fence (Type 2B 4.5’ height) Plan sheet B.5 Revises Item Temporary Traffic Control Tubular Marker, Type 28-Inch to Temporary Traffic Control Tubular Marker, Type 42-Inch Plan sheet B.8 Revises Item Fence (Type 2B 5’ height) to Fence (Type 2B 4.5’ height) Plan sheet B.12 Revises Item Temporary Traffic Control Tubular Marker, Type 28-Inch to Temporary Traffic Control Tubular Marker, Type 42-Inch Plan Sheet D.7 Revises the pay item name.

Plan Sheet D.9 Revises the pay item name.

Plan Sheet D.11 Revises the pay item name.

Plan Sheet D.13 Revises the pay item name.

Plan Sheet D.15 Revises the pay item name.

Plan Sheet D.17 Revises the pay item name.

Plan Sheet D.19 Revises the pay item name.

Plan Sheet D.21 Revises the pay item name.

Plan Sheet D.23 Revises the pay item name.

Plan Sheet E.25 Revises layout information for E25-001 and E25-002.

Plan Sheet G.6 Revises detail name from 5’ to 4.5’ and the dimension for the gate detail.

Plan Sheet J.45 Revises the layout information by deleting some extra points and updating information on others Plan Sheet J.58 Adds points ZQ025 and ZQ026 Plan Sheet K.1 Revises Item Temporary Traffic Control Tubular Marker, Type 28-Inch to

Temporary Traffic Control Tubular Marker, Type 42-Inch

ENCLOSURES

Pages:

A-7 through A-22

Plan Sheets:

B.3, B.5, B.8, B.12, D.7, D.9, D.11, D.13, D.15, D.17, D.19, D.21, D.23, E.25, G.6, J.45, J.58, K.1

Notice to Bidders: Please submit revised pages A-7 through A-22 with your bid.

A - 7

Bidder please note: Before preparing the bid, carefully read the Solicitation Provisions.

Insert a unit bid price, in figures, for each pay item for which a quantity appears in the bid schedule. Multiply the unit price by the quantity for each pay item and show the amount bid. Should any mathematical check made by the Government show a mistake in the amount bid, the corrected unit price extension shall govern.

When the word "LPSM" (Lump Sum) appears as a unit bid price, insert an amount for each lump sum pay item.

When a sum based on a fixed rate appears for any pay item in the amount bid column, include the Government inserted amount bid for the item in the total bid amount.

Total all of the amounts bid for each pay item and show the total bid amount.

Bid Schedule

Project No: MT PARK 2013(1)B

Project Name: GARDINER GATEWAY, PHASE 2

A-8

B I D S C H E D U L E Schedule A Account: ALL

Project No: MT PARK 2013(1)B

Name: Gardiner Gateway, Phase 2 CQ = "Contract Quantity"

Item No. Quantity Unit Unit Price Amount

15101-0000 Line A0020 ALL LPSM

15201-0000 Line A0040 ALL LPSM

15301-0010 Line A0060 ALL LPSM

15401-0000 Line A0080 ALL LPSM

15501-0000 Line A0100 ALL LPSM

15705-0100 Line A0120 36 LNFT $ $

15705-1500 Line A0140 535 LNFT $ $

15706-0300 Line A0160 12 EACH $ $

15706-1000 Line A0180 36 EACH $ $

20220-1000 Line A0200 1 EACH $ $

20301-0100 Line A0220 6 EACH $ $

20301-0200 Line A0240 22 EACH $ $

20301-1100 Line A0260 2 EACH $ $

20301-1100 Line A0280 1 EACH $ $

20301-1400 Line A0300 3 EACH $ $

20301-2400 Line A0320 11 EACH $ $

20301-2700 Line A0340 1 EACH $ $

20301-3400 Line A0360 4 EACH $ $

20302-0300 Line A0380 82 LNFT $ $

20302-0700

Schedule Total: ________________________

Submitted by: _________________________

REMOVAL OF SIGN

REMOVAL OF STRUCTURE(Wood walkway at Parcel 048)

REMOVAL OF WHEELSTOP

MOBILIZATION

CONSTRUCTION SURVEY AND STAKING

CONTRACTOR QUALITY CONTROL AND ASSURANCE

CONTRACTOR TESTING

CONSTRUCTION SCHEDULE

SOIL EROSION CONTROL, SILT FENCE

REMOVAL OF CURB AND GUTTER, CONCRETE

REMOVAL OF FENCE(Old Iron Park Fence)

REMOVAL OF GATE(Chain link)

REMOVAL OF GATE(Old Iron Park Fence)

REMOVAL OF INLET

SOIL EROSION CONTROL, SEDIMENT WATTLE

SOIL EROSION CONTROL, SANDBAG

SOIL EROSION CONTROL, INLET PROTECTION

REMOVAL, INDIVIDUAL TREE

REMOVAL OF BOLLARD

REMOVAL OF BOULDER

A-9

Schedule A Account: ALL

Project No: MT PARK 2013(1)B

Name: Gardiner Gateway, Phase 2 CQ = "Contract Quantity"

Item No. Quantity Unit Unit Price Amount

Schedule Total: ________________________

Submitted by: _________________________

Line A0400 546 LNFT $ $ 20302-0700

Line A0420 7 LNFT $ $ 20302-0700

Line A0440 91 LNFT $ $ 20302-0900

Line A0460 281 LNFT $ $ 20302-2100

Line A0480 61 LNFT $ $ 20303-0300

Line A0500 166 SQYD $ $ 20303-3100

Line A0520 13 SQYD $ $ 20303-3200

Line A0540 984 SQYD $ $ 20303-3600

Line A0560 10 SQYD $ $ 20303-3600

Line A0580 9 SQYD $ $ 20303-3600

Line A0600 20 SQYD $ $ 20303-3600

Line A0620 2 SQYD $ $ 20401-0000

Line A0640 8,000 CUYD $ $ 25101-1000

Line A0660 64 CUYD $ $ 25101-3000

Line A0680 51 CUYD $ $ 25120-3000

Line A0700 268 LNFT $ $ 25210-0000

Line A0720 25 SQYD $ $ 25410-0000

Line A0740 200 SQFT $ $ 30802-2000

Line A0760 3,200 TON $ $ 31006-0000

Line A0780 2,400 TON $ $

TREATED TIMBER CRIB RETAINING WALL

ROADWAY AGGREGATE, METHOD 2

RECYCLED AGGREGATE BASE

PLACED RIPRAP, CLASS 3

RIPRAP DITCH, CLASS 3

ROCKERY

REMOVAL OF WALL(railroad tie)

REMOVAL OF WALL(rockery)

REMOVAL OF WALL(concrete)

REMOVAL OF FENCE(log rail)

REMOVAL OF FENCE, CHAIN LINK(with barbed wire)

REMOVAL OF PIPE CULVERT

REMOVAL OF WALL(masonry)

ROADWAY EXCAVATION

PLACED RIPRAP, CLASS 1(basalt)

REMOVAL OF FENCE(wood)

REMOVAL OF CONCRETE

REMOVAL OF SIDEWALK, BRICK

REMOVAL OF SIDEWALK, CONCRETE

A-10

Schedule A Account: ALL

Project No: MT PARK 2013(1)B

Name: Gardiner Gateway, Phase 2 CQ = "Contract Quantity"

Item No. Quantity Unit Unit Price Amount

Schedule Total: ________________________

Submitted by: _________________________

40301-0000 Line A0800 4,200 TON $ $

41001-3000 Line A0820 2,431 SQYD $ $

41201-1000 Line A0840 17 TON $ $

60101-0000 Line A0860 4 CUYD $ $

60201-0400 Line A0880 900 LNFT $ $

60201-0600 Line A0900 950 LNFT $ $

60401-1000 Line A0920 4 EACH $ $

60401-3000 Line A0940 8 EACH $ $

60403-0000 Line A0960 22 EACH $ $

60403-0300 Line A0980 9 EACH $ $

60405-0000 Line A1000 17 EACH $ $

60406-0000 Line A1020 1 EACH $ $

60417-0000 Line A1040 2 EACH $ $

60526-0000 Line A1060 30 LNFT $ $

60901-1000 Line A1080 289 LNFT $ $

60902-1000 Line A1100 1,964 LNFT $ $

60902-1000 Line A1120 350 LNFT $ $

60902-1000 Line A1140 31 LNFT $ $

60902-1000 Line A1160 32 LNFT $ $

60902-1000

CURB AND GUTTER, CONCRETE, 12-INCH DEPTH

CURB AND GUTTER, CONCRETE, 12-INCH DEPTH(sloped)

CURB AND GUTTER, CONCRETE, 12-INCH DEPTH(Type 1B Transition)

CURB AND GUTTER, CONCRETE, 12-INCH DEPTH(Sloped to Normal Transition)

CURB AND GUTTER, CONCRETE, 12-INCH DEPTH(Type 1B)

INLET, TYPE 2

MANHOLE ADJUSTMENT

INLET ADJUSTMENT

CLEANOUT(Adjust sewer cleanout)

DRAINAGE CHASE

CURB, CONCRETE, 12-INCH DEPTH

CONCRETE(stairs)

12-INCH PIPE CULVERT

18-INCH PIPE CULVERT

MANHOLE, TYPE 1(48-inch)

MANHOLE, TYPE 3(48-inch)

INLET

HOT ASPHALT CONCRETE PAVEMENT

SLURRY SEAL, TYPE 3

TACK COAT GRADE CSS-1, CSS-1H, SS-1, OR SS-1H

A-11

Schedule A Account: ALL

Project No: MT PARK 2013(1)B

Name: Gardiner Gateway, Phase 2 CQ = "Contract Quantity"

Item No. Quantity Unit Unit Price Amount

Schedule Total: ________________________

Submitted by: _________________________

Line A1180 1,161 LNFT $ $ 60905-1000

Line A1200 138 LNFT $ $ 60920-0000

Line A1220 14 EACH $ $ 61108-1000

Line A1240 14 EACH $ $ 61109-4000

Line A1260 2 EACH $ $ 61501-0100

Line A1280 288 SQYD $ $ 61501-0100

Line A1300 1,687 SQYD $ $ 61501-0100

Line A1320 198 SQYD $ $ 61501-0100

Line A1340 359 SQYD $ $ 61501-0100

Line A1360 124 SQYD $ $ 61501-0100

Line A1380 13 SQYD $ $ 61501-1000

Line A1400 2 SQYD $ $ 61501-1100

Line A1420 172 SQYD $ $ 61501-1100

Line A1440 22 SQYD $ $ 61504-1000

Line A1460 524 SQYD $ $ 61901-0000

Line A1480 677 LNFT $ $ 61901-0000

Line A1500 10 LNFT $ $ 61901-1300

Line A1520 2,800 LNFT $ $ 61902-0000

Line A1540 2 EACH $ $ 61902-0900

Line A1560 1 EACH $ $

ACCESSIBILITY RAMP, CONCRETE(includes truncated domes)

FENCE(Type 2B, 4.5' height)

FENCE(log rail)

FENCE, CHAIN LINK(Temporary)

GATE(Iron Park Fence)

GATE, METAL(16-foot width)

SIDEWALK, CONCRETE(driveway approach with concrete tie)

SIDEWALK, CONCRETE(alley approach with asphalt tie)

SIDEWALK, CONCRETE(12-inch thick)

SIDEWALK, BRICK(remove and reset)

SIDEWALK, ASPHALT(driveway approach with asphalt tie)

SIDEWALK, ASPHALT(ramp to grade)

RESET WHEELSTOP

ADJUST WATER VALVE

RELOCATE FIRE HYDRANT

SIDEWALK, CONCRETE(driveway approach with asphalt tie)

SIDEWALK, CONCRETE(4-inch thick)

SIDEWALK, CONCRETE(6-inch thick)

GUTTER, CONCRETE(valley)

A001

A-12

Schedule A Account: ALL

Project No: MT PARK 2013(1)B

Name: Gardiner Gateway, Phase 2 CQ = "Contract Quantity"

Item No. Quantity Unit Unit Price Amount

Schedule Total: ________________________

Submitted by: _________________________

61904-0000 Line A1580 2 EACH $ $

61920-2000 Line A1600 1 EACH $ $

61921-1000 Line A1620 189 LNFT $ $

61921-1000 Line A1640 54 LNFT $ $

61921-1000 Line A1660 90 LNFT $ $

62002-0000 Line A1680 6 SQYD $ $

62010-0000 Line A1700 12 LNFT $ $

62011-5000 Line A1720 5 EACH $ $

62201-0250 Line A1740 70 HOUR $ $

62201-1000 Line A1760 40 HOUR $ $

62201-2360 Line A1780 100 HOUR $ $

62201-3000 Line A1800 50 HOUR $ $

62201-3000 Line A1820 70 HOUR $ $

62201-3400 Line A1840 50 HOUR $ $

62301-0000 Line A1860 250 HOUR $ $

62302-0000 Line A1880 40 HOUR $ $

62407-0000 Line A1900 365 CUYD (CQ) $ $

62410-0000 Line A1920 227 SQYD (CQ) $ $

62511-1000 Line A1940 29 SQYD $ $

62516-1000

SEEDING, DRY METHOD

MULCHING, DRY METHOD(2-inch additional depth at trees)

HYDRAULIC EXCAVATOR(mini, 35 HP min, 5' min blade width)

HYDRAULIC EXCAVATOR, 1 CUBIC YARD MINIMUM CAPACITY WITH THUMB ATTACHMENT

GENERAL LABOR

SPECIAL LABOR(Superintendent)

PLACING CONSERVED TOPSOIL(subsoils)

PLACING MANUFACTURED TOPSOIL(6-inch depth)

STONE MASONRY(rock face wall)

STONE MASONRY PILLAR(24-inch height)

DUMP TRUCK, 10 CUBIC YARD MINIMUM CAPACITY

WHEEL LOADER, 4 CUBIC YARD MINIMUM RATED CAPACITY

VACUUM SWEEPER

HYDRAULIC EXCAVATOR(138 HP minimum with 3740 lb minimum hammer attachement)

BOLLARD POST

REMOVE AND RESET GATE(wood)

REMOVE AND RESET FENCE(log rail)

REMOVE AND RESET FENCE(Chain link)

REMOVE AND RESET FENCE(wood)

STONE MASONRY(veneer)

A-13

Schedule A Account: ALL

Project No: MT PARK 2013(1)B

Name: Gardiner Gateway, Phase 2 CQ = "Contract Quantity"

Item No. Quantity Unit Unit Price Amount

Schedule Total: ________________________

Submitted by: _________________________

Line A1960 13 SQYD (CQ) $ $ 62516-1000

Line A1980 7,934 SQYD (CQ) $ $ 62630-0350

Line A2000 5 EACH $ $ 62630-0350

Line A2020 4 EACH $ $ 63301-1000

Line A2040 2 EACH $ $ 63302-0000

Line A2060 74 SQFT $ $ 63318-1000

Line A2080 48 EACH $ $ 63401-0300

Line A2100 8,348 LNFT $ $ 63401-0300

Line A2120 10,496 LNFT $ $ 63401-0300

Line A2140 3,112 LNFT $ $ 63401-0300

Line A2160 468 LNFT $ $ 63405-0850

Line A2180 8 EACH $ $ 63501-0000

Line A2200 ALL LPSM 63501-0000

Line A2220 ALL LPSM 63502-0600

Line A2240 4 EACH $ $ 63502-1250

Line A2260 100 EACH $ $ 63502-1300

Line A2280 50 EACH $ $ 63502-1500

Line A2300 8 EACH $ $ 63502-1700

Line A2320 50 EACH $ $ 63503-1000

Line A2340 4,880 LNFT $ $

TEMPORARY TRAFFIC CONTROL, WARNING LIGHT TYPE A

TEMPORARY TRAFFIC CONTROL, WARNING LIGHT TYPE C

TEMPORARY TRAFFIC CONTROL, PLASTIC FENCE

PAVEMENT MARKINGS, TYPE B, ACCESSIBILITY SYMBOL(White)

TEMPORARY TRAFFIC CONTROL(portable changeable message sign)

TEMPORARY TRAFFIC CONTROL(pedestrian)

TEMPORARY TRAFFIC CONTROL, BARRICADE TYPE 3

TEMPORARY TRAFFIC CONTROL, TUBULAR MARKER, TYPE 42-INCH

TEMPORARY TRAFFIC CONTROL, DRUM

SIGN SYSTEM

SNOWPOLE HOLDER

PAVEMENT MARKINGS, TYPE B, SOLID(Yellow, center, double line)

PAVEMENT MARKINGS, TYPE B, SOLID(White, Parking Stalls & ADA Striping)

PAVEMENT MARKINGS, TYPE B, SOLID(White, crosswalks & stop lines)

PAVEMENT MARKINGS, TYPE B, SOLID(Red, No Parking)

MULCHING, DRY METHOD(1-inch depth)

PLANTINGS, TREES, BALLED AND BURLAPPED(Aspens, 10'-14' height, 1" caliper)

PLANTINGS, TREES, BALLED AND BURLAPPED(Aspens, 10'-14' height, 1.5" caliper)

SIGN SYSTEM, GOVERNMENT FURNISHED SIGN(Type 2)

A-14

Schedule A Account: ALL

Project No: MT PARK 2013(1)B

Name: Gardiner Gateway, Phase 2 CQ = "Contract Quantity"

Item No. Quantity Unit Unit Price Amount

Schedule Total: ________________________

Submitted by: _________________________

63504-1000 Line A2360 879 SQFT $ $

63507-0700 Line A2380 299 DAY $ $

63509-1000 Line A2400 6,000 FIX HR RATE 45.00$ 270,000.00$

63601-2000 Line A2420 ALL LPSM

63601-3000 Line A2440 ALL LPSM

64604-1000 Line A2460 95 LNFT $ $

64620-0400 Line A2480 3 EACH $ $

SYSTEM INSTALLATION, LIGHTING

SYSTEM INSTALLATION, ELECTRICAL

FIXTURE, HANDRAIL(ADA Handrail)

REMOVE AND RESET MAILBOX

TEMPORARY TRAFFIC CONTROL, CONSTRUCTION SIGN

TEMPORARY TRAFFIC CONTROL, TRAFFIC AND SAFETY SUPERVISOR

TEMPORARY TRAFFIC CONTROL, FLAGGER

A-15

Schedule B Account: ALL

Project No: MT PARK 2013(1)B

Name: Gardiner Gateway, Phase 2 CQ = "Contract Quantity"

Item No. Quantity Unit Unit Price Amount

15101-0000 Line B0020 ALL LPSM

15201-0000 Line B0040 ALL LPSM

15301-0010 Line B0060 ALL LPSM

15401-0000 Line B0080 ALL LPSM

15501-0000 Line B0100 ALL LPSM

15705-0100 Line B0120 36 LNFT $ $

15705-1500 Line B0140 535 LNFT $ $

15706-0300 Line B0160 12 EACH $ $

15706-1000 Line B0180 36 EACH $ $

20220-1000 Line B0200 1 EACH $ $

20301-0100 Line B0220 6 EACH $ $

20301-0200 Line B0240 22 EACH $ $

20301-1100 Line B0260 2 EACH $ $

20301-1100 Line B0280 1 EACH $ $

20301-1400 Line B0300 3 EACH $ $

20301-2400 Line B0320 11 EACH $ $

20301-2700 Line B0340 1 EACH $ $

20301-3400 Line B0360 4 EACH $ $

20302-0300

MOBILIZATION

CONSTRUCTION SURVEY AND STAKING

CONTRACTOR QUALITY CONTROL AND ASSURANCE

CONTRACTOR TESTING

CONSTRUCTION SCHEDULE

SOIL EROSION CONTROL, SILT FENCE

REMOVAL OF CURB AND GUTTER, CONCRETE

REMOVAL OF GATE(Chain link)

REMOVAL OF GATE(Old Iron Park Fence)

REMOVAL OF INLET

SOIL EROSION CONTROL, SEDIMENT WATTLE

SOIL EROSION CONTROL, SANDBAG

SOIL EROSION CONTROL, INLET PROTECTION

REMOVAL, INDIVIDUAL TREE

REMOVAL OF BOLLARD

REMOVAL OF BOULDER

REMOVAL OF SIGN

REMOVAL OF STRUCTURE(Wood walkway at Parcel 048)

REMOVAL OF WHEELSTOP

Schedule Total: ________________________

Submitted by: _________________________

A-16

Schedule B Account: ALL

Project No: MT PARK 2013(1)B

Name: Gardiner Gateway, Phase 2 CQ = "Contract Quantity"

Item No. Quantity Unit Unit Price Amount

Schedule Total: ________________________

Submitted by: _________________________

Line B0380 82 LNFT $ $ 20302-0700

Line B0400 546 LNFT $ $ 20302-0700

Line B0420 7 LNFT $ $ 20302-0700

Line B0440 91 LNFT $ $ 20302-0900

Line B0460 281 LNFT $ $ 20302-2100

Line B0480 61 LNFT $ $ 20303-0300

Line B0500 166 SQYD $ $ 20303-3100

Line B0520 13 SQYD $ $ 20303-3200

Line B0540 984 SQYD $ $ 20303-3600

Line B0560 10 SQYD $ $ 20303-3600

Line B0580 9 SQYD $ $ 20303-3600

Line B0600 20 SQYD $ $ 20303-3600

Line B0620 2 SQYD $ $ 20401-0000

Line B0640 8,000 CUYD $ $ 25101-1000

Line B0660 73 CUYD $ $ 25101-3000

Line B0680 51 CUYD $ $ 25120-3000

Line B0700 268 LNFT $ $ 25125-0000

Line B0720 46 EACH $ $ 25125-0000

Line B0740 8 EACH $ $

REMOVAL OF WALL(masonry)

ROADWAY EXCAVATION

PLACED RIPRAP, CLASS 1(basalt)

REMOVAL OF FENCE(Old Iron Park Fence)

REMOVAL OF FENCE(wood)

REMOVAL OF CONCRETE

REMOVAL OF SIDEWALK, BRICK

REMOVAL OF SIDEWALK, CONCRETE

REMOVAL OF WALL(railroad tie)

REMOVAL OF WALL(rockery)

REMOVAL OF WALL(concrete)

REMOVAL OF FENCE(log rail)

REMOVAL OF FENCE, CHAIN LINK(with barbed wire)

REMOVAL OF PIPE CULVERT

BOULDER(Stone masonry boulder)

PLACED RIPRAP, CLASS 3

RIPRAP DITCH, CLASS 3

BOULDER(Placement)

A-17

Schedule B Account: ALL

Project No: MT PARK 2013(1)B

Name: Gardiner Gateway, Phase 2 CQ = "Contract Quantity"

Item No. Quantity Unit Unit Price Amount

Schedule Total: ________________________

Submitted by: _________________________

25210-0000 Line B0760 25 SQYD $ $

25410-0000 Line B0780 200 SQFT $ $

30802-2000 Line B0800 3,200 TON $ $

31006-0000 Line B0820 2,400 TON $ $

40301-0000 Line B0840 4,200 TON $ $

41001-3000 Line B0860 2,431 SQYD $ $

41201-1000 Line B0880 17 TON $ $

60101-0000 Line B0900 4 CUYD $ $

60201-0400 Line B0920 900 LNFT $ $

60201-0600 Line B0940 950 LNFT $ $

60401-1000 Line B0960 4 EACH $ $

60401-3000 Line B0980 8 EACH $ $

60403-0000 Line B1000 22 EACH $ $

60403-0300 Line B1020 9 EACH $ $

60405-0000 Line B1040 17 EACH $ $

60406-0000 Line B1060 1 EACH $ $

60417-0000 Line B1080 2 EACH $ $

60526-0000 Line B1100 30 LNFT $ $

60901-1000

ROCKERY

TREATED TIMBER CRIB RETAINING WALL

ROADWAY AGGREGATE, METHOD 2

RECYCLED AGGREGATE BASE

HOT ASPHALT CONCRETE PAVEMENT

MANHOLE, TYPE 3(48-inch)

INLET

INLET, TYPE 2

MANHOLE ADJUSTMENT

INLET ADJUSTMENT

CLEANOUT(Adjust sewer cleanout)

SLURRY SEAL, TYPE 3

TACK COAT GRADE CSS-1, CSS-1H, SS-1, OR SS-1H

CONCRETE(stairs)

12-INCH PIPE CULVERT

18-INCH PIPE CULVERT

MANHOLE, TYPE 1(48-inch)

DRAINAGE CHASE

CURB, CONCRETE, 12-INCH DEPTH

A-18

Schedule B Account: ALL

Project No: MT PARK 2013(1)B

Name: Gardiner Gateway, Phase 2 CQ = "Contract Quantity"

Item No. Quantity Unit Unit Price Amount

Schedule Total: ________________________

Submitted by: _________________________

Line B1120 289 LNFT $ $ 60902-1000

Line B1140 1,964 LNFT $ $ 60902-1000

Line B1160 350 LNFT $ $ 60902-1000

Line B1180 31 LNFT $ $ 60902-1000

Line B1200 32 LNFT $ $ 60902-1000

Line B1220 1,161 LNFT $ $ 60905-1000

Line B1240 138 LNFT $ $ 60920-0000

Line B1260 14 EACH $ $ 61108-1000

Line B1280 14 EACH $ $ 61109-4000

Line B1300 2 EACH $ $ 61110-1000

Line B1320 ALL LPSM 61501-0100

Line B1340 288 SQYD $ $ 61501-0100

Line B1360 1,905 SQYD $ $ 61501-0100

Line B1380 198 SQYD $ $ 61501-0100

Line B1400 359 SQYD $ $ 61501-0100

Line B1420 124 SQYD $ $ 61501-0100

Line B1440 13 SQYD $ $ 61501-1000

Line B1460 2 SQYD $ $ 61501-1100

Line B1480 172 SQYD $ $

CURB AND GUTTER, CONCRETE, 12-INCH DEPTH(Type 1B)

GUTTER, CONCRETE(valley)

RESET WHEELSTOP

ADJUST WATER VALVE

RELOCATE FIRE HYDRANT

IRRIGATION SYSTEM

CURB AND GUTTER, CONCRETE, 12-INCH DEPTH

CURB AND GUTTER, CONCRETE, 12-INCH DEPTH(sloped)

CURB AND GUTTER, CONCRETE, 12-INCH DEPTH(Type 1B Transition)

CURB AND GUTTER, CONCRETE, 12-INCH DEPTH(Sloped to Normal Transition)

SIDEWALK, BRICK(remove and reset)

SIDEWALK, ASPHALT(driveway approach with asphalt tie)

SIDEWALK, CONCRETE(driveway approach with asphalt tie)

SIDEWALK, CONCRETE(4-inch thick)

SIDEWALK, CONCRETE(6-inch thick)

SIDEWALK, CONCRETE(driveway approach with concrete tie)

SIDEWALK, CONCRETE(alley approach with asphalt tie)

SIDEWALK, CONCRETE(12-inch thick)

A-19

Schedule B Account: ALL

Project No: MT PARK 2013(1)B

Name: Gardiner Gateway, Phase 2 CQ = "Contract Quantity"

Item No. Quantity Unit Unit Price Amount

Schedule Total: ________________________

Submitted by: _________________________

61501-1100 Line B1500 22 SQYD $ $

61504-1000 Line B1520 524 SQYD $ $

61901-0000 Line B1540 677 LNFT $ $

61901-0000 Line B1560 10 LNFT $ $

61901-1300 Line B1580 2,800 LNFT $ $

61902-0000 Line B1600 2 EACH $ $

61902-0900 Line B1620 1 EACH $ $

61904-0000 Line B1640 2 EACH $ $

61920-2000 Line B1660 1 EACH $ $

61921-1000 Line B1680 189 LNFT $ $

61921-1000 Line B1700 54 LNFT $ $

61921-1000 Line B1720 90 LNFT $ $

62002-0000 Line B1740 6 SQYD $ $

62010-0000 Line B1760 12 LNFT $ $

62010-0000 Line B1780 42 LNFT $ $

62010-0000 Line B1800 23 LNFT $ $

62011-5000 Line B1820 5 EACH $ $

62201-0250 Line B1840 70 HOUR $ $

62201-1000

SIDEWALK, ASPHALT(ramp to grade)

ACCESSIBILITY RAMP, CONCRETE(includes truncated domes)

FENCE(Type 2B, 4.5' height)

FENCE(log rail)

REMOVE AND RESET FENCE(Chain link)

REMOVE AND RESET FENCE(wood)

STONE MASONRY(veneer)

STONE MASONRY(rock face wall)

STONE MASONRY(30-inch seat wall)

STONE MASONRY(20-inch seat wall)

FENCE, CHAIN LINK(temporary)

GATE(Iron Park Fence)

GATE, METAL(16-foot width)

BOLLARD POST

REMOVE AND RESET GATE(wood)

REMOVE AND RESET FENCE(log rail)

STONE MASONRY PILLAR(24-inch height)

DUMP TRUCK, 10 CUBIC YARD MINIMUM CAPACITY

WHEEL LOADER, 4 CUBIC YARD MINIMUM RATED CAPACITY

A-20

Schedule B Account: ALL

Project No: MT PARK 2013(1)B

Name: Gardiner Gateway, Phase 2 CQ = "Contract Quantity"

Item No. Quantity Unit Unit Price Amount

Schedule Total: ________________________

Submitted by: _________________________

Line B1860 40 HOUR $ $ 62201-2360

Line B1880 100 HOUR $ $ 62201-3000

Line B1900 50 HOUR $ $ 62201-3000

Line B1920 70 HOUR $ $ 62201-3400

Line B1940 50 HOUR $ $ 62301-0000

Line B1960 250 HOUR $ $ 62302-0000

Line B1980 50 HOUR $ $ 62302-0000

Line B2000 40 HOUR $ $ 62407-0000

Line B2020 396 CUYD (CQ) $ $ 62410-0000

Line B2040 227 SQYD (CQ) $ $ 62511-1000

Line B2060 29 SQYD $ $ 62516-1000

Line B2080 74 SQYD (CQ) $ $ 62516-1000

Line B2100 8,491 SQYD (CQ) $ $ 62630-0300

Line B2120 17 EACH $ $ 62630-0300

Line B2140 8 EACH $ $ 62630-0300

Line B2160 8 EACH $ $ 62630-0300

Line B2180 2 EACH $ $ 62630-0300

Line B2200 17 EACH $ $ 62630-0300

Line B2220 8 EACH $ $

HYDRAULIC EXCAVATOR, 1 CUBIC YARD MINIMUM CAPACITY WITH THUMB ATTACHMENT

GENERAL LABOR

SPECIAL LABOR(Stone Mason)

SPECIAL LABOR(Superintendent)

PLACING CONSERVED TOPSOIL(subsoils)

PLACING MANUFACTURED TOPSOIL(6-inch depth)

VACUUM SWEEPER

HYDRAULIC EXCAVATOR(138 HP minimum with 3740 lb minimum hammer attachement)

HYDRAULIC EXCAVATOR(mini, 35 HP min, 5' min blade width)

PLANTINGS, SEEDLINGS, CONTAINER GROWN(Sage Brush, Artemisia tridentate, #5 pot)

PLANTINGS, SEEDLINGS, CONTAINER GROWN(Basin Wild Rye, Leymus cinereus)

PLANTINGS, SEEDLINGS, CONTAINER GROWN(Indian rice grass, Achnatherum hymenoide, 3.5" pot)

SEEDING, DRY METHOD

MULCHING, DRY METHOD(2-inch additional depth at trees)

MULCHING, DRY METHOD(1-inch depth)

PLANTINGS, SEEDLINGS, CONTAINER GROWN(Rabbit Brush, Chrysothamnus nauseosus)

PLANTINGS, SEEDLINGS, CONTAINER GROWN(Sage Brush, Artemisia tridentate, #1 pot)

PLANTINGS, SEEDLINGS, CONTAINER GROWN(Sage Brush, Artemisia tridentate, #2 pot)

A-21

Schedule B Account: ALL

Project No: MT PARK 2013(1)B

Name: Gardiner Gateway, Phase 2 CQ = "Contract Quantity"

Item No. Quantity Unit Unit Price Amount

Schedule Total: ________________________

Submitted by: _________________________

62630-0300 Line B2240 8 EACH $ $

62630-0300 Line B2260 2 EACH $ $

62630-0300 Line B2280 14 EACH $ $

62630-0300 Line B2300 10 EACH $ $

62630-0300 Line B2320 5 EACH $ $

62630-0300 Line B2340 5 EACH $ $

62630-0300 Line B2360 1 EACH $ $

62630-0350 Line B2380 18 EACH $ $

62630-0350 Line B2400 17 EACH $ $

62630-0350 Line B2420 9 EACH $ $

62630-0350 Line B2440 9 EACH $ $

62650-1000 Line B2460 1 EACH $ $

63301-1000 Line B2480 2 EACH $ $

63302-0000 Line B2500 74 SQFT $ $

63318-1000 Line B2520 48 EACH $ $

63401-0300 Line B2540 8,348 LNFT $ $

63401-0300 Line B2560 10,496 LNFT $ $

63401-0300 Line B2580 3,112 LNFT $ $

63401-0300

PLANTINGS, SEEDLINGS, CONTAINER GROWN(Indian rice grass, Achnatherum hymenoide, 4.5" pot)

PLANTINGS, SEEDLINGS, CONTAINER GROWN(Indian rice grass, Achnatherum hymenoide, 6.5" pot)

PLANTINGS, SEEDLINGS, CONTAINER GROWN(Yarrow, Achillea millefolium)

PLANTINGS, TREES, BALLED AND BURLAPPED(Rocky Mountain Juniper, native Juniperus scopulorum, 4-5' height)

PLANTINGS, TREES, BALLED AND BURLAPPED(Rocky Mountain Juniper, native Juniperus scopulorum, 6-7' height)

REMOVE AND REPLANT TREE AND SHRUB

SIGN SYSTEM, GOVERNMENT FURNISHED SIGN(Type 2)

SIGN SYSTEM

SNOWPOLE HOLDER

PLANTINGS, SEEDLINGS, CONTAINER GROWN(Nodding Onion, Allium cernuum)

PLANTINGS, SEEDLINGS, CONTAINER GROWN(Sulphur Buckwheat, Eriogonum umbellatum, 3.5" pot)

PLANTINGS, SEEDLINGS, CONTAINER GROWN(Sulphur Buckwheat, Eriogonum umbellatum, 4.5" pot)

PLANTINGS, SEEDLINGS, CONTAINER GROWN(Sulphur Buckwheat, Eriogonum umbellatum, 6.5" pot)

PLANTINGS, TREES, BALLED AND BURLAPPED(Aspens, 10'-14' height, 1" caliper)

PLANTINGS, TREES, BALLED AND BURLAPPED(Aspens, 10'-14' height, 1.5" caliper)

PAVEMENT MARKINGS, TYPE B, SOLID(Yellow, center, double line)

PAVEMENT MARKINGS, TYPE B, SOLID(White, Parking Stalls & ADA Striping)

PAVEMENT MARKINGS, TYPE B, SOLID(White, crosswalks & stop lines)

PAVEMENT MARKINGS, TYPE B, SOLID(Red, No Parking)

A-22

Schedule B Account: ALL

Project No: MT PARK 2013(1)B

Name: Gardiner Gateway, Phase 2 CQ = "Contract Quantity"

Item No. Quantity Unit Unit Price Amount

Schedule Total: ________________________

Submitted by: _________________________

Line B2600 468 LNFT $ $ 63405-0850

Line B2620 8 EACH $ $ 63501-0000

Line B2640 ALL LPSM 63501-0000

Line B2660 ALL LPSM 63502-0600

Line B2680 4 EACH $ $ 63502-1250

Line B2700 100 EACH $ $ 63502-1300

Line B2720 50 EACH $ $ 63502-1500

Line B2740 8 EACH $ $ 63502-1700

Line B2760 50 EACH $ $ 63503-1000

Line B2780 4,880 LNFT $ $ 63504-1000

Line B2800 879 SQFT $ $ 63507-0700

Line B2820 299 DAY $ $ 63509-1000

Line B2840 6,000 FIX HR RATE 45.00$ 270,000.00$ 63601-2000

Line B2860 ALL LPSM 63601-3000

Line B2880 ALL LPSM 64604-1000

Line B2900 95 LNFT $ $ 64620-0400

Line B2920 3 EACH $ $

TEMPORARY TRAFFIC CONTROL(pedestrian)

TEMPORARY TRAFFIC CONTROL, BARRICADE TYPE 3

TEMPORARY TRAFFIC CONTROL, TUBULAR MARKER, TYPE 42-INCH

TEMPORARY TRAFFIC CONTROL, DRUM

TEMPORARY TRAFFIC CONTROL, WARNING LIGHT TYPE A

TEMPORARY TRAFFIC CONTROL, WARNING LIGHT TYPE C

PAVEMENT MARKINGS, TYPE B, ACCESSIBILITY SYMBOL(White)

TEMPORARY TRAFFIC CONTROL(portable changeable message sign)

FIXTURE, HANDRAIL(ADA Handrail)

REMOVE AND RESET MAILBOX

TEMPORARY TRAFFIC CONTROL, PLASTIC FENCE

TEMPORARY TRAFFIC CONTROL, CONSTRUCTION SIGN

TEMPORARY TRAFFIC CONTROL, TRAFFIC AND SAFETY SUPERVISOR

TEMPORARY TRAFFIC CONTROL, FLAGGER

SYSTEM INSTALLATION, LIGHTING

SYSTEM INSTALLATION, ELECTRICAL

Sheet and Description

Section C Section D Section E Section F Section H Section I Section K Section L Section M Section N Section O

Typical Section

Plan & Profile Site Plan Walls Drainage Erosion

Control

Temporar y Traffic Control

Permanen t Traffic Control

Electrical Utilities

Landscapin g Staging ALLOWANCE Bid

Schedule

A1220 60920-0000 RESET WHEELSTOP EACH 14 14

A1240 61108-1000 ADJUST WATER VALVE EACH 14 14

A1260 61109-4000 RELOCATE FIRE HYDRANT EACH 2 2

A1280 61501-0100 SIDEWALK, CONCRETE(driveway approach with asphalt tie) SQYD 288 288

A1300 61501-0100 SIDEWALK, CONCRETE(4-inch thick) SQYD 1,687 1,687

A1320 61501-0100 SIDEWALK, CONCRETE(6-inch thick) SQYD 198 198

A1340 61501-0100 SIDEWALK, CONCRETE(driveway approach with concrete tie) SQYD 359 359

A1360 61501-0100 SIDEWALK, CONCRETE(alley approach with asphalt tie) SQYD 124 124

A1380 61501-0100 SIDEWALK, CONCRETE(12-inch thick) SQYD 13 13

A1400 61501-1000 SIDEWALK, BRICK(remove and reset) SQYD 2 2

A1420 61501-1100 SIDEWALK, ASPHALT(driveway approach with asphalt tie) SQYD 172 172

A1440 61501-1100 SIDEWALK, ASPHALT(ramp to grade) SQYD 22 22

A1460 61504-1000 ACCESSIBILITY RAMP,

CONCRETE(includes truncated domes) SQYD 524 524

A001 A1480 61901-0000 FENCE(Type 2B, 4.5' height) LNFT 677 677

A1500 61901-0000 FENCE(log rail) LNFT 10 10

A1520 61901-1300 FENCE, CHAIN LINK(Temporary) LNFT 2,800 2,800

A1540 61902-0000 GATE(Iron Park Fence) EACH 2 2

A1560 61902-0900 GATE, METAL(16-foot width) EACH 1 1

A1580 61904-0000 BOLLARD POST EACH 2 2

A1600 61920-2000 REMOVE AND RESET GATE(wood) EACH 1 1

A1620 61921-1000 REMOVE AND RESET FENCE(log rail) LNFT 189 189

A1640 61921-1000 REMOVE AND RESET FENCE(Chain link) LNFT 54 54

A1660 61921-1000 REMOVE AND RESET FENCE(wood) LNFT 90 90

A1680 62002-0000 STONE MASONRY(veneer) SQYD 6 6

A1700 62010-0000 STONE MASONRY(rock face wall) LNFT 12 12

A1720 62011-5000 STONE MASONRY PILLAR(24-inch height) EACH 5 5

Estimated Quantities

Remarks and/or Determination of Estimated

Quantity

-F eb -2

6:

A M

I:

\C on tr ac t\

C on st ru ct io n C on tr ac ts \P

R O

JE

C

TS

\M T

PA

R K

3(

1) B

G ar di ne r G at ew ay P ha se

\P

R _L

O A _E

E\ [M

T_

PA

R K

3(

1) B E st im at e_

S ch ed ul e A

A

1.

xl sx ]S he et

3)

SUMMARY OF QUANTITIES - Schedule A

A M E N D

Line Item No.

Pay Item Number Pay Item Description Unit

STATE PROJECT

B.3PARK 2013(1)BMT

SHEET

NUMBER

Section C Section D Section E Section F Section H Section I Section K Section L Section M Section N Section O

Typical Section

Plan & Profile Site Plan Walls Drainage Erosion

Control

Temporar y Traffic Control

Permanen t Traffic Control

Electrical Utilities

Landscapin g Staging ALLOWANCE Bid

Schedule

A2140 63401-0300 PAVEMENT MARKINGS, TYPE B,

SOLID(White, crosswalks & stop lines) LNFT 3,112 3,112

A2160 63401-0300 PAVEMENT MARKINGS, TYPE B,

SOLID(Red, No Parking) LNFT 468 468

A2180 63405-0850 PAVEMENT MARKINGS, TYPE B,

ACCESSIBILITY SYMBOL(White) EACH 8 8

A2200 63501-0000 TEMPORARY TRAFFIC

CONTROL(portable changeable message sign) LPSM ALL ALL

A2220 63501-0000 TEMPORARY TRAFFIC

CONTROL(pedestrian) LPSM ALL ALL

A2240 63502-0600 TEMPORARY TRAFFIC CONTROL,

BARRICADE TYPE 3 EACH 4 4

A001 A2260 63502-1250 TEMPORARY TRAFFIC CONTROL,

TUBULAR MARKER, TYPE 42-INCH EACH 100 100

A2280 63502-1300 TEMPORARY TRAFFIC CONTROL,

DRUM EACH 50 50

A2300 63502-1500 TEMPORARY TRAFFIC CONTROL,

WARNING LIGHT TYPE A EACH 8 8

A2320 63502-1700 TEMPORARY TRAFFIC CONTROL,

WARNING LIGHT TYPE C EACH 50 50

A2340 63503-1000 TEMPORARY TRAFFIC CONTROL,

PLASTIC FENCE LNFT 4,880 4,880

A2360 63504-1000 TEMPORARY TRAFFIC CONTROL,

CONSTRUCTION SIGN SQFT 879 879

A2380 63507-0700 TEMPORARY TRAFFIC CONTROL,

TRAFFIC AND SAFETY SUPERVISOR DAY 299 299

A2400 63509-1000 TEMPORARY TRAFFIC CONTROL,

FLAGGER X HR RAT 6,000 6,000

A2420 63601-2000 SYSTEM INSTALLATION, LIGHTING LPSM ALL ALL

A2440 63601-3000 SYSTEM INSTALLATION,

ELECTRICAL LPSM ALL ALL

A2460 64604-1000 FIXTURE, HANDRAIL(ADA

Handrail) LNFT 95 95

A2480 64620-0400 REMOVE AND RESET MAILBOX EACH 3 3

Estimated Quantities

Remarks and/or Determination of Estimated

Quantity

-F eb -2

3:

P M

I:

\C on tr ac t\

C on st ru ct io n C on tr ac ts \P

R O

JE

C

TS

\M T

PA

R K

3(

1) B

G ar di ne r G at ew ay P ha se

\P

R _L

O A _E

E\ [M

T_

PA

R K

3(

1) B E st im at e_

S ch ed ul e A

A

1.

xl sx ]S he et

5)

SUMMARY OF QUANTITIES - Schedule A

A M E N D

Line Item No.

Pay Item Number Pay Item Description Unit

STATE PROJECT

B.5PARK 2013(1)BMT

Section C Section D Section E Section F Section H Section I Section K Section L Section M Section N Section O

Typical Section

Plan & Profile Site Plan Walls Drainage Erosion

Control

Temporar y Traffic Control

Permanen t Traffic Control

Electrical Utilities

Landscapin g Staging ALLOWANCE Bid

Schedule

B1220 60902-1000 CURB AND GUTTER, CONCRETE,

12-INCH DEPTH(Type 1B) LNFT 1,161 1,161

B1240 60905-1000 GUTTER, CONCRETE(valley) LNFT 138 138

B1260 60920-0000 RESET WHEELSTOP EACH 14 14

B1280 61108-1000 ADJUST WATER VALVE EACH 14 14

B1300 61109-4000 RELOCATE FIRE HYDRANT EACH 2 2

B1320 61110-1000 IRRIGATION SYSTEM LPSM ALL ALL

B1340 61501-0100 SIDEWALK, CONCRETE(driveway approach with asphalt tie) SQYD 288 288

B1360 61501-0100 SIDEWALK, CONCRETE(4-inch thick) SQYD 1,687 218 1,905

B1380 61501-0100 SIDEWALK, CONCRETE(6-inch thick) SQYD 198 198

B1400 61501-0100 SIDEWALK, CONCRETE(driveway approach with concrete tie) SQYD 359 359

B1420 61501-0100 SIDEWALK, CONCRETE(alley approach with asphalt tie) SQYD 124 124

B1440 61501-0100 SIDEWALK, CONCRETE(12-inch thick) SQYD 13 13

B1460 61501-1000 SIDEWALK, BRICK(remove and reset) SQYD 2 2

B1480 61501-1100 SIDEWALK, ASPHALT(driveway approach with asphalt tie) SQYD 172 172

B1500 61501-1100 SIDEWALK, ASPHALT(ramp to grade) SQYD 22 22

B1520 61504-1000 ACCESSIBILITY RAMP,

CONCRETE(includes truncated domes) SQYD 524 524

A001 B1540 61901-0000 FENCE(Type 2B, 4.5' height) LNFT 677 677

B1560 61901-0000 FENCE(log rail) LNFT 10 10

B1580 61901-1300 FENCE, CHAIN LINK(temporary) LNFT 2,800 2,800

B1600 61902-0000 GATE(Iron Park Fence) EACH 2 2

B1620 61902-0900 GATE, METAL(16-foot width) EACH 1 1

B1640 61904-0000 BOLLARD POST EACH 2 2

B1660 61920-2000 REMOVE AND RESET GATE(wood) EACH 1 1

B1680 61921-1000 REMOVE AND RESET FENCE(log rail) LNFT 189 189

B1700 61921-1000 REMOVE AND RESET FENCE(Chain link) LNFT 54 54

B1720 61921-1000 REMOVE AND RESET FENCE(wood) LNFT 90 90

Estimated Quantities

Remarks and/or Determination of Estimated

Quantity

-F eb -2

6:

A M

I:

\C on tr ac t\

C on st ru ct io n C on tr ac ts \P

R O

JE

C

TS

\M T

PA

R K

3(

1) B

G ar di ne r G at ew ay P ha se

\P

R _L

O A _E

E\ [M

T_

PA

R K

3(

1) B E st im at e_

S ch ed ul e B

A

1.

xl sx ]S he et

3)

SUMMARY OF QUANTITIES - Schedule B

A M E N D

Line Item No.

Pay Item Number Pay Item Description Unit

STATE PROJECT

B.8PARK 2013(1)BMT

Section C Section D Section E Section F Section H Section I Section K Section L Section M Section N Section O

Typical Section

Plan & Profile Site Plan Walls Drainage Erosion

Control

Temporar y Traffic Control

Permanen t Traffic Control

Electrical Utilities

Landscapin g Staging ALLOWANCE Bid

Schedule

A001 B2700 63502-1250 TEMPORARY TRAFFIC CONTROL,

TUBULAR MARKER, TYPE 42-INCH EACH 100 100

B2720 63502-1300 TEMPORARY TRAFFIC CONTROL,

DRUM EACH 50 50

B2740 63502-1500 TEMPORARY TRAFFIC CONTROL,

WARNING LIGHT TYPE A EACH 8 8

B2760 63502-1700 TEMPORARY TRAFFIC CONTROL,

WARNING LIGHT TYPE C EACH 50 50

B2780 63503-1000 TEMPORARY TRAFFIC CONTROL,

PLASTIC FENCE LNFT 4,880 4,880

B2800 63504-1000 TEMPORARY TRAFFIC CONTROL,

CONSTRUCTION SIGN SQFT 879 879

B2820 63507-0700 TEMPORARY TRAFFIC CONTROL,

TRAFFIC AND SAFETY SUPERVISOR DAY 299 299

B2840 63509-1000 TEMPORARY TRAFFIC CONTROL,

FLAGGER X HR RAT 6,000 6,000

B2860 63601-2000 SYSTEM INSTALLATION, LIGHTING LPSM ALL ALL

B2880 63601-3000 SYSTEM INSTALLATION,

ELECTRICAL LPSM ALL ALL

B2900 64604-1000 FIXTURE, HANDRAIL(ADA

Handrail) LNFT 95 95

B2920 64620-0400 REMOVE AND RESET MAILBOX EACH 3 3

Estimated Quantities

Remarks and/or Determination of Estimated

Quantity

-F eb -2

3:

P M

I:

\C on tr ac t\

C on st ru ct io n C on tr ac ts \P

R O

JE

C

TS

\M T

PA

R K

3(

1) B

G ar di ne r G at ew ay P ha se

\P

R _L

O A _E

E\ [M

T_

PA

R K

3(

1) B E st im at e_

S ch ed ul e B

A

1.

xl sx ]S he et

7)

SUMMARY OF QUANTITIES - Schedule B

A M E N D

Line Item No.

Pay Item Number Pay Item Description Unit

STATE PROJECT

B.12PARK 2013(1)BMT

D.7

STATE PROJECT

MT PARK 2013(1)B

P

M

F e b r u a r y

U

S S u r ft

D c m y fi le s p w p r o d u c ti o n d m t-b d g .1 .d g n

S J a c k s o

B

K u n ih is a

C h e c k e d b y e s ig n e d b

(Sheet 7 of 7)

QUANTITIES

TABULATION OF PLAN

Revised by Amendment A0011

W S

O

W

SO

W

SO

W

SO

W S

O

W S

O

NB

T

W

SO

W S

O

W S

O

W S

O

W

SO

W

SO

P I 1

.8

P I 1

.8

D.9

STATE PROJECT

NUMBER

SHEET

F e b r u a r y

U

S S u r ft m y fi le s p w p r o d u c ti o n d m t-b d g .d g

J a c k s

K u n ih

C h e c k e d b s ig n e d b

DETAIL

MAIN ST & S 4TH ST

N

M A

T C

H E

X I S

T I N

G

NOTE:

M A

T C

H L I N

E information.

See Sheet H.3 and H.11 for existing and proposed drainage construction limits.

Refer to E Sheets for Right-Of-Way plans and temporary

28 28

LEGEND:

See Sheet G.4 for details

See Sheet G.2 for details

See Sheet G.3 for details

See Sheet G.1 for details

See Sheet G.1 for details

See Sheet G.6 for details

See Sheet G.6 for details

Removal of bollard

Removal of boulder

Removal of gate (Old iron park fence)

Removal of curb and gutter, concrete

Removal of fence (Old park fence)

Removal of sidewalk, concrete

Curb and gutter, concrete, 12-inch depth

Curb and gutter, concrete, 12-inch depth (sloping)

Gutter, concrete (Valley)

Sidewalk, concrete (Driveway approach with concrete tie)

Sidewalk, concrete (Driveway approach with asphalt tie)

Sidewalk, concrete (6-inch thick) Gate (Iron park fence)

Sidewalk, concrete (4-inch thick)

Removal:

Construct:

See Sheet G.7 for details

Bollard

See Sheet G.1 for details

Curb, Concrete, 12-inch depth

Adjust fire hydrant

41 42

Curb and gutter, concrete

12-inch depth (type 1B)

Curb and gutter, concrete Curb and gutter, concrete

(Sloped to normal transition)

12-inch depth (type 1B transition)

12-inch depth

See J Sheets for details

See J Sheets for details

See Sheet G.12 for details

See Sheet G.4 for details

See Sheet G.4 for details See Sheet G.2 for details

See Sheet G.13 for details

Manhole adjustment

See Sheet G.13 for details

Adjust water valve

(Ramp to grade)

Sidewalk, asphalt

See J Sheets for details

(Includes truncated domes)

Accessibility ramp, concrete

See J Sheets for details

(Driveway approach with asphalt tie)

Sidewalk, asphalt

See J Sheets for details

(alley approach with asphalt tie)

Sidewalk, concrete

See Sheet G.1 for details 20 Sidewalk concrete (12-inch thick)

Fence (type 2b, 4.5' height)

BEGIN PROJECT

S 4th St Detail

EL=5303.73

E= 63645.07

N= 80435.42

2.

1.

14+87.74

MAIN ST

Line to be constructed

Existing Edge of Pavement

See S. 4th St. Detail

EL=5304.07

E= 63617.67

N= 80355.26

Existing edge of pavement

See Sheet G.5 for

Pavement Connection

Details

Slope stake limits

S 4TH ST

(4TH01)

CONSTRUCTION

END

Slope stake limits

Line to be constructed

MAIN ST

S

T H S

T

T H

Slope stake limits

Line to be constructed

See Sheet G.5 for

Pavement Connection Detail

40+80.00

S 4TH ST

P I

.7

PI 33+64.00

T

T

W

SO

W

SO

W

SO

W

SO

W

SO

W

SO

W

SOW

SO

UP

W A R N I N G

B U R I E D

U T I L I T Y

P O

T

.0

P O

T

.7

W MAIN ST

SHEET 1 OF 2

D.11

STATE PROJECT

NUMBER

SHEET

F e b r u a r y

U

S S u r ft m y fi le s p w p r o d u c ti o n d m t-b d i.

d g

J a c k s

K u n ih

C h e c k e d b s ig n e d b

NOTE:

information.

See Sheet H.3 and H.11 for existing and proposed drainage construction limits.

Refer to E Sheets for Right-Of-Way plans and temporary

LEGEND:

See Sheet G.4 for details

See Sheet G.2 for details

See Sheet G.3 for details

See Sheet G.1 for details

See Sheet G.1 for details

See Sheet G.6 for details

See Sheet G.6 for details

Removal of bollard

Removal of boulder

Removal of gate (Old iron park fence)

Removal of curb and gutter, concrete

Removal of fence (Old park fence)

Removal of sidewalk, concrete

Curb and gutter, concrete, 12-inch depth

Curb and gutter, concrete, 12-inch depth (sloping)

Gutter, concrete (Valley)

Sidewalk, concrete (Driveway approach with concrete tie)

Sidewalk, concrete (Driveway approach with asphalt tie)

Sidewalk, concrete (6-inch thick) Gate (Iron park fence)

Sidewalk, concrete (4-inch thick)

Removal:

Construct:

See Sheet G.7 for details

Bollard

See Sheet G.1 for details

Curb, Concrete, 12-inch depth

Adjust fire hydrant

41 42

Curb and gutter, concrete

12-inch depth (type 1B)

Curb and gutter, concrete Curb and gutter, concrete

(Sloped to normal transition)

12-inch depth (type 1B transition)

12-inch depth

See J Sheets for details

See J Sheets for details

See Sheet G.12 for details

See Sheet G.4 for details

See Sheet G.4 for details See Sheet G.2 for details

See Sheet G.13 for details

Manhole adjustment

See Sheet G.13 for details

Adjust water valve

(Ramp to grade)

Sidewalk, asphalt

See J Sheets for details

(Includes truncated domes)

Accessibility ramp, concrete

See J Sheets for details

(Driveway approach with asphalt tie)

Sidewalk, asphalt

See J Sheets for details

(alley approach with asphalt tie)

Sidewalk, concrete

See Sheet G.1 for details 20 Sidewalk, concrete (12-inch thick)

Fence (type 2b, 4.5' height) S

R D S

T

.(MAIN_E-W01)

R D

MAIN ST (E-W)

M A

T C

H L I N

E

SEE SHEET D.19

SEE SHEET D.19

Remove light pole by others of Pavement

Existing Edge

Remove light by others.

Protect pole.

A

T C

H L I

2.

1.

G G

G

W

SO

W

SO

W

SO

W

SO

W

SO

W

SO

W

SO

W

SO

W

SO

W

SO

W

SO

W

SO

W

SO

W

SO

W

SO

W

SO

W S

O

W

SO

W

SO

P I

.6

PI 33+64.00

W MAIN ST

SHEET 2 OF 2

D.13

STATE PROJECT

NUMBER

SHEET

F e b r u a r y

U

S S u r ft m y fi le s p w p r o d u c ti o n d m t-b d j.

d g

J a c k s

K u n ih

C h e c k e d b s ig n e d b information.

See Sheet H.3 and H.11 for existing and proposed drainage construction limits.

Refer to E Sheets for Right-Of-Way plans and temporary

40 4030

No work to be done.

Constructed in Phase 1.

23+55 to 24+38

Pavement Connection Details

See Sheet G.5 for

LEGEND:

See Sheet G.4 for details

See Sheet G.2 for details

See Sheet G.3 for details

See Sheet G.1 for details

See Sheet G.1 for details

See Sheet G.6 for details

See Sheet G.6 for details

Removal of bollard

Removal of boulder

Removal of gate (Old iron park fence)

Removal of curb and gutter, concrete

Removal of fence (Old park fence)

Removal of sidewalk, concrete

Curb and gutter, concrete, 12-inch depth

Curb and gutter, concrete, 12-inch depth (sloping)

Gutter, concrete (Valley)

Sidewalk, concrete (Driveway approach with concrete tie)

Sidewalk, concrete (Driveway approach with asphalt tie)

Sidewalk, concrete (6-inch thick) Gate (Iron park fence)

Sidewalk, concrete (4-inch thick)

Removal:

Construct:

See Sheet G.7 for details

Bollard

See Sheet G.1 for details

Curb, Concrete, 12-inch depth

Adjust fire hydrant

41 42

Curb and gutter, concrete

12-inch depth (type 1B)

Curb and gutter, concrete Curb and gutter, concrete

(Sloped to normal transition)

12-inch depth (type 1B transition)

12-inch depth

See J Sheets for details

See J Sheets for details

See Sheet G.12 for details

See Sheet G.4 for details

See Sheet G.4 for details See Sheet G.2 for details

See Sheet G.13 for details

Manhole adjustment

See Sheet G.13 for details

Adjust water valve

(Ramp to grade)

Sidewalk, asphalt

See J Sheets for details

(Includes truncated domes)

Accessibility ramp, concrete

See J Sheets for details

(Driveway approach with asphalt tie)

Sidewalk, asphalt

See J Sheets for details

(alley approach with asphalt tie)

Sidewalk, concrete

4 4

See Sheet G.1 for details 21 Sidewalk, concrete (12-inch thick)

Fence (type 2b, 4.5' height)

(MAIN_E-W01)

MAIN ST (E-W)

M A

T C

H L I N

E

H

W Y

S

N D S

T

Line to be constructed of Pavement

Remove light pole by others

T C

H L I

See Sheet F.2 for details and limits construct rockery.

Remove wall (rockery) and

See Sheet F.3 for details crib retaining wall construct treated timber

Remove wall (railroad ties) and

P O

T

.8

P O

T

.0

G

N B

W

SO

W

SO

W

SO

W

SO

W

SO

W

SO W

SO

W

SOW

SO

W

SO

W

SO

W

SO

W

SO

W S

O

POT 12+82.56=

POT 27+68.15

(MAIN_E-W01)

S

T

E MAIN ST

S

S T S

T

E MAIN ST

D.15

STATE PROJECT

NUMBER

SHEET

F e b r u a r y

U

S S u r ft m y fi le s p w p r o d u c ti o n d m t-b d k .d g

C h e c k e d b y S J a c k s o n

D e s ig n e d b y B

K u n ih is a

N

SEE SHEET D.17

NOTE:

See Sheet H.6 for existing and proposed drainage information.

construction limits.

Refer to E Sheets for Right-Of-Way plans and temporary

28 6

40 41

LEGEND:

See Sheet G.4 for details

See Sheet G.2 for details

See Sheet G.3 for details

See Sheet G.1 for details

See Sheet G.1 for details

See Sheet G.6 for details

See Sheet G.6 for details

Removal of bollard

Removal of boulder

Removal of gate (Old iron park fence)

Removal of curb and gutter, concrete

Removal of fence (Old park fence)

Removal of sidewalk, concrete

Curb and gutter, concrete, 12-inch depth

Curb and gutter, concrete, 12-inch depth (sloping)

Gutter, concrete (Valley)

Sidewalk, concrete (Driveway approach with concrete tie)

Sidewalk, concrete (Driveway approach with asphalt tie)

Sidewalk, concrete (6-inch thick)

Gate (Iron park fence)

Sidewalk, concrete (4-inch thick)

Removal: Construct:

See Sheet G.7 for details

Bollard

See Sheet G.1 for details

Curb, Concrete, 12-inch depth

Adjust fire hydrant

41 42

Curb and gutter, concrete

12-inch depth (type 1B)

Curb and gutter, concrete Curb and gutter, concrete

(Sloped to normal transition)

12-inch depth (type 1B transition)

12-inch depth

See J Sheets for details

See J Sheets for details

See Sheet G.12 for details

See Sheet G.4 for details

See Sheet G.4 for details See Sheet G.2 for details

See Sheet G.13 for details

Manhole adjustment

See Sheet G.13 for details

Adjust water valve

(ramp to grade)

Sidewalk, asphalt

See J Sheets for details

(Includes truncated domes)

Accessibility ramp, concrete

See J Sheets for details approach with asphalt tie)

Sidewalk, asphalt (Driveway

See J Sheets for details approach with asphalt tie)

Sidewalk, concrete (alley

See Sheet G.1 for details 20 Sidewalk, concrete (12-inch thick)

Fence (type 2b, 4.5' height)

M A

T C

H L I N

E

Remove pole by others

NorthWestern Energy

Coordinate light removal with

O

T

.5

P O

T

.0

POT 27+97.80

P O

T

.5

P O

T

.1

PO

T 13+

20.08

PC 100+

44.34

PT 100+61.67

101T T

U

PT

E M

W V

W V bp b p

G

NB

NB

P

P

W S

O

W S

O

W S

O

W S

O

W

SO

W

SO

W

SO

D

R= 90.00'

T= 48.46'

L= 88.90'

S 1ST ST

POT 27+97.80

D.17

STATE PROJECT

NUMBER

SHEET

F e b r u a r y

U

S S u r ft m y fi le s p w p r o d u c ti o n d m t-b d l.

d g

J A

C K

S O

K U

N I H I

C h e c k e d b s ig n e d b information.

See Sheet H.3 and H.11 for existing and proposed drainage construction limits.

Refer to E Sheets for Right-Of-Way plans and temporary

LEGEND:

See Sheet G.4 for details

See Sheet G.2 for details

See Sheet G.3 for details

See Sheet G.1 for details

See Sheet G.1 for details

See Sheet G.6 for details

See Sheet G.6 for details

Removal of bollard

Removal of boulder

Removal of gate (Old iron park fence)

Removal of curb and gutter, concrete

Removal of fence (Old park fence)

Removal of sidewalk, concrete

Curb and gutter, concrete, 12-inch depth

Curb and gutter, concrete, 12-inch depth (sloping)

Gutter, concrete (Valley)

Sidewalk, concrete (Driveway approach with concrete tie)

Sidewalk, concrete (Driveway approach with asphalt tie)

Sidewalk, concrete (6-inch thick) Gate (Iron park fence)

Sidewalk, concrete (4-inch thick)

Removal: Construct:

See Sheet G.7 for details

Bollard

See Sheet G.1 for details

Curb, Concrete, 12-inch depth

Adjust fire hydrant

41 42

Curb and gutter, concrete

12-inch depth (type 1B)

Curb and gutter, concrete Curb and gutter, concrete

(Sloped to normal transition)

12-inch depth (type 1B transition)

12-inch depth

See J Sheets for details

See J Sheets for details

See Sheet G.12 for details

See Sheet G.4 for details

See Sheet G.4 for details See Sheet G.2 for details

See Sheet G.13 for details

Adjust water valve

(ramp to grade)

Sidewalk, asphalt

See J Sheets for details

(Includes truncated domes)

Accessibility ramp, concrete

See J Sheets for details approach with asphalt tie)

Sidewalk, asphalt (Driveway

See J Sheets for details approach with asphalt tie)

Sidewalk, concrete (alley

See Sheet G.1 for details 20 Sidewalk, concrete (12-inch thick)

See Sheet G.13 for details

Manhole adjustment

Fence (type 2b, 4.5' height)

(1ST01)

S 1ST ST

Slope stake limits

Slope stake limits

SEE SHEET D.21

SEE SHEET D.21

SEE SHEET D.15

Protect poles

MATCH EXISTING

of Pavement

M A I N

T

PI 19+16.77

P I

.0

W V

W V

T

T

W S

O

W

SO

W

SO

W

SOW

SO

W

SO

W

SO

"D

IA

"D

IA

6" 6" 6" 6" 6" 6" 6"

" p v c

" p v c

" p v c

" p v c

C

C

C

C C

C

C

C

C

C

C

C

C

C

B

B

B

B

B

C

U P

W A

R N

I N

G B

U R

I E

D U

T I L

I T

Y

F

IB

E R O

P T

IC

M A

N H

O L E .8 ' D ia

T

T

(3RD02)

M

A I N

E

W

M A I N S

T

E

W

S 3RD ST

S 3RD ST

D.19

STATE PROJECT

NUMBER

SHEET

F e b r u a r y

U

S S u r ft m y fi le s p w p r o d u c ti o n d m t-b d m .d g

J a c k s

K u n ih

C h e c k e d b s ig n e d b

SEE SHEET D.11

SEE SHEET D.11

NOTE:

information.

See Sheet H.3 and H.11 for existing and proposed drainage construction limits.

Refer to E Sheets for Right-Of-Way plans and temporary

LEGEND:

See Sheet G.4 for details

See Sheet G.2 for details

See Sheet G.3 for details

See Sheet G.1 for details

See Sheet G.1 for details

See Sheet G.6 for details

See Sheet G.6 for details

Removal of bollard

Removal of boulder

Removal of gate (Old iron park fence)

Removal of curb and gutter, concrete

Removal of fence (Old park fence)

Removal of sidewalk, concrete

Curb and gutter, concrete, 12-inch depth

Curb and gutter, concrete, 12-inch depth (sloping)

Gutter, concrete (Valley)

Sidewalk, concrete (Driveway approach with concrete tie)

Sidewalk, concrete (Driveway approach with asphalt tie)

Sidewalk, concrete (6-inch thick) Gate (Iron park fence)

Sidewalk, concrete (4-inch thick)

Removal:

Construct:

See Sheet G.7 for details

Bollard

See Sheet G.1 for details

Curb, Concrete, 12-inch depth

Adjust fire hydrant

41 42

Curb and gutter, concrete

12-inch depth (type 1B)

Curb and gutter, concrete Curb and gutter, concrete

(Sloped to normal transition)

12-inch depth (type 1B transition)

12-inch depth

See J Sheets for details

See J Sheets for details

See Sheet G.12 for details

See Sheet G.4 for details

See Sheet G.4 for details See Sheet G.2 for details

See Sheet G.13 for details

Manhole adjustment

See Sheet G.13 for details

Adjust water valve

(Ramp to grade)

Sidewalk, asphalt

See J Sheets for details

(Includes truncated domes)

Accessibility ramp, concrete

See J Sheets for details

(Driveway approach with asphalt tie)

Sidewalk, asphalt

See J Sheets…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .