Q A_for_posting_on_FBO.pdf
PDF 77 KB Posted
- Attached to
- MT PARK 2013(1)B Gardiner Gateway, Phase 2 Federal contract opportunity
- Solicitation number
- DTFH70-15-R-00014
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| A002_Gardiner_Gateway.pdf | ||
| A001_Gardiner_Gateway.pdf | ||
| Q A_for_posting_on_FBO.pdf | ||
| Q A_for_posting_on_FBO.pdf | ||
| Park_2013_1B_XS_Combined_all.pdf | ||
| Plans_Gardiner_Gateway.pdf | ||
| Final-Gardiner_Hydraulics_Report-combined-1r.pdf | ||
| RFP_GardinerGateway.pdf | ||
| Earthwork-data-listing-all.pdf | ||
| Geotechnical_Report_06-14.pdf | ||
| SWPPP_Gardiner_Gateway_Phase_II_MT_PARK_2013(1)B.pdf | ||
| Plan_Request_form_GardinerGateway.pdf | ||
| PROJECT_DESCRIPTION_MT_PARK_20131(B).pdf | ||
| Preliminary-Letter_MT_Park_2013(1)B.pdf | ||
| Park_2013_1B_95_.pdf |
Show all 15
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PROJECT #: MT PARK 2013(1)B
PROJECT NAME: Gardiner Gateway, Phase 2
Check General (G) or Technical (T)
# G T Question Answer Date
X
The Tabulation of Drainage Quantities in the plan sheets does not specify an allowable pipe material. FP‐03 602.03 specifies to furnish the same material as existing for culvert extensions. The plans show several instances where the pipe to be installed is tying into existing stub‐outs. Does section
602.03 apply for this work? If so, please clarify the allowable pipe material and the existing pipe material.
Any compatible and appropriate pipe material having the maximum specified Manning’s Roughness coefficient should be acceptable. Most of the previously installed pipe was PVC and ADS. A new pipe material should be compatible with these types.
2/1/2016
File details come from the government source that posted it. Updated .