Park_2013_1B_95_.pdf

PDF 21 MB Posted

Attached to
MT PARK 2013(1)B Gardiner Gateway, Phase 2 Federal contract opportunity
Solicitation number
DTFH70-15-R-00014
Issued by
Department of Transportation Federal Highway Administration

View the file

Other files for this federal contract opportunity

Other files attached to MT PARK 2013(1)B Gardiner Gateway, Phase 2, newest first.
File Type Posted
A002_Gardiner_Gateway.pdf PDF
A001_Gardiner_Gateway.pdf PDF
Q A_for_posting_on_FBO.pdf PDF
Q A_for_posting_on_FBO.pdf PDF
Q A_for_posting_on_FBO.pdf PDF
Plan_Request_form_GardinerGateway.pdf PDF
RFP_GardinerGateway.pdf PDF
Earthwork-data-listing-all.pdf PDF
Geotechnical_Report_06-14.pdf PDF
SWPPP_Gardiner_Gateway_Phase_II_MT_PARK_2013(1)B.pdf PDF
Park_2013_1B_XS_Combined_all.pdf PDF
Plans_Gardiner_Gateway.pdf PDF
Final-Gardiner_Hydraulics_Report-combined-1r.pdf PDF
Preliminary-Letter_MT_Park_2013(1)B.pdf PDF
PROJECT_DESCRIPTION_MT_PARK_20131(B).pdf PDF
Show all 15

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

LENGTH 0.630 MILES

FEDERAL HIGHWAY ADMINISTRATION

U. S. DEPARTMENT OF TRANSPORTATION

Project Location

Projects, FP-03 US Customary Units of Roads and Bridges on Federal Highway

Standard Specifications for Construction

APPROVED:

DATE

FEDERAL HIGHWAY ADMINISTRATION

U.S. DEPARTMENT OF TRANSPORTATION

TYPE OF CONSTRUCTION:

DESIGN DESIGNATION:

SPECIFICATION:

Western Federal Lands Highway Division

Director, Project Delivery, C. KRATOVIL

PROJECT MANAGER

VANCOUVER, WASHINGTON

WESTERN FEDERAL LANDS HIGHWAY DIVISION

PLANS PREPARED BY

PLANS FOR PROPOSED PROJECT

MT PARK 2013(1)B

COMMITMENT TO EXCELLENCE

FEDERAL LANDS HIGHWAY

R

E N

O R

A I

N

N

ST F

R

I

D

D E P A

T

NTOFT A SP

T T

O

U

TE

ATESO

AM

E R

IC

A

M

MONTANA KEY MAP

COLUMBIA

BRITISH

ALBERTA

SASKATCHEWAN

N O

R T

H D

A K

O T

A

S O

U T

H D

A K

O T

A

WYOMING

ID

A

H O

UNITED STATES

CANADA

GLACIER

NATIONAL

PARK

YELLOWSTONE

NATIONAL

PARK

CHARLES M. RUSSELL

NATIONAL

WILDLIFE RANGE

Lake

Flathead

Elwell

Lake

M

Lake

Fort Peck

I SOS U IR

KALISPELL

MISSOULA

Anaconda

HELENA

BUTTE

BOZEMAN

Livingston

BILLINGS

City

Miles

Glendive

Point

Wolf Glasgow

HAVRE

Shelby

FALLS

GREAT

Lewistown

Dillon

E N

O T

S

WOLLEY

R E

VIR

90 15

2 2

MONTANA

REVIR

GARDINER GATEWAY, PHASE 2

95% PLANS

See Sheet A.2 for Index to Sheets

SCALE IN MILES

20 0 20 40 60

W Y

O M I N

G

I D

A H

O

MONTANA

GARDINER

Helena

Bozeman

Billings

Butte Anaconda

B e a v e rh e a d

Mts.

Centennial Mts.

Falls

Idaho

MEM. PKWY.

JOHN D. ROCKEFELLER JR.

YELLOWSTONE

NATIONAL

PARK

PROJECT AREA

Vicinity Map

See Sheet A.4 for

Roadside Development.

Grading, Base, Paving, Drainage and N

MONTANA

PARK COUNTY

YELLOWSTONE NATIONAL PARK

Design Vehicle- 45' Tour Bus e (max)

V

SADT (2035)

SADT (2015)

0.040

20 MPH

veh/day2637

2161 veh/day

A.1

STATE PROJECT

NUMBER

SHEET

MT

PARK 2013 (1)B

P

M

A u g u s t

U

S S u r ft

D c m y fi le s p w p r o d u c ti o n d m t-b a a .d g n

R J o h n s o

W

M c

Q u is to n B

K u n ih is a

C h e c k e d b y

D e s ig n e d b y

8/24/15

Prel im ina ry

Not for

C on str uc tio

INDEX TO SHEETS

INDEX TO SHEETS

INDEX TO SHEETS

INDEX TO SHEETS

K. TEMPORARY TRAFFIC CONTROL

J. LAYOUTS

I. EROSION CONTROL

H. DRAINAGE

G. ROADSIDE DEVELOPMENT

F. WALLS

E. SITE PLAN

D. MAINLINE PLAN AND PROFILES

C. TYPICAL SECTIONS

B. SUMMARIEOF QUANTITIES

A. GENERAL INFORMATION

A.2

STATE PROJECT

MT PARK 2013(1)B

A

A u g u s t

U

S S u r ft m y fi le s p w p r o d u c ti o n d m t-b a b .d

C h e c k e d b y

D e s ig n e d b y

TEMPORARY TRAFFIC CONTROL STANDARD PLANS

ADVANCED SIGNING MAP

TABULATION OF TRAFFIC CONTROL QUANTITIES

DRIVEWAY AND ALLEY LAYOUT INFORMATION

DRIVEWAY AND ALLEY APPROACH LAYOUT

ACCESSIBILITY RAMP DETAILS

ACCESSIBILITY RAMP AND BULBOUT LAYOUT

CURB AND SIDEWALK LAYOUT

RIVER ACCESS DITCH OUTLET DETAIL

EROSION CONTROL PLANS INLET PROTECTION DETAILS

SOIL EROSION AND SEDIMENT CONTROL TREATMENT DETAILS

SEDIMENT WATTLE DETAILS

SILT FENCE DETAILS

SOIL EROSION AND SEDIMENT CONTROL PLANS

TABULATION OF SOIL EROSION SEDIMENT CONTROL QUANTITIES

INLET DETAILS

CURB INLET, TYPE II

CONCRETE MANHOLE DETAILS

E PARK ST, STORM SEWER OUTFALL PLAN & SECTIONS

E PARK ST

S 4TH ST

S 3RD ST

S 1ST ST

E MAIN ST

W MAIN ST

TABULATION OF DRAINAGE QUANTITIES (SCHEDULE A & B)

FIRE HYDRANT INSTALLATION DETAILS

ADA HANDRAIL DETAILS

STAIR DETAILS

BENCH DETAILS

TRASH AND RECYCLE BASE DETAILS

DRAINAGE CHASE

BOLLARD DETAILS

FENCE DETAILS

ROADWAY DETAILS

E PARK ST / CONFLUENCE PARK PLAN

W MAIN ST 20+66 TO 20+88

W MAIN ST ROCKERY WALL

TABULATION OF WALL QUANTITIES

K.3-7

K.2

K.1

J.25-46

J.24

J.23

J.7-22

J.1-6

I.13

I.12

I.11

I.10

I.9

I.2-8

I.1

H.15

H.14

H.13

H.12

H.10-11

H.9

H.8

H.7

H.6

H.3-5

H.1-2

G.11

G.10

G.9

G.8

G.7

G.6

G.5

G.4

G.1-3

F.4

F.3

F.2

F.1

E.32

E.31

E.30

E.29

E.28

E.27

E.26

E.25

E.24

E.23

E.22

E.21

E.20

E.19

E.18

E.17

E.16

E.15

E.14

E.13

E.12

E.11

E.10

E.9

E.8

E.7

E.6

E.5

E.4

E.1-3

D.24

D.22-23

D.20-21

D.18-19

D.16-17

D.14-15

D.12-13

D.10-11

D.9

D.8

D.7

D.1-6

C.2-6

C.1

B.5-9

B.1-4

A.5

A.4

A.3

A.2

A.1

SITE PLAN PARCEL 001, 002, AND 003

SITE PLAN PARCEL 004, 005, & ACCESS WEST OF PARCEL 005

SITE PLAN PARCEL 021

SITE PLAN PARCEL 018

SITE PLAN PARCEL 006 (SOUTH SIDE)

SITE PLAN PARCEL 006 (WEST SIDE)

SITE PLAN PARCEL 026 (ALONG 1ST ST)

SITE PLAN PARCEL 007 AND 025

SITE PLAN PARCEL 026, 027, AND 028

SITE PLAN PARCEL 029 AND 030

SITE PLAN PARCEL 031 AND 032

SITE PLAN PARCEL 033

SITE PLAN PARCEL 034 AND 012C

SITE PLAN PARCEL 012B AND 035

SITE PLAN PARCEL 019B

SITE PLAN PARCEL 036A AND 036B

SITE PLAN PARCEL 037 AND 069

SITE PLAN PARCEL 055 AND 068

SITE PLAN PARCEL 067B AND 054

SITE PLAN PARCEL 066 AND 067A

SITE PLAN PARCEL 053 AND 065

SITE PLAN PARCEL 051 AND 052

SITE PLAN PARCEL 049 AND 050

SITE PLAN PARCEL 047 AND 048

SITE PLAN PARCEL 045 AND 046

SITE PLAN PARCEL 043 AND 044

SITE PLAN PARCEL 041 AND 042

SITE PLAN PARCEL 064 AND 040

E PARK ST SITE PLAN AND CONFLUENCE PARK PLAN

TABULATION OF SITE PLAN QUANTITIES

EMERGENCY ACCESS TRAIL PROFILE

E PARK ST PLAN AND PROFILE

E PARK ST PLAN AND PROFILE

S 3RD ST PLAN AND PROFILE

S 1ST ST PLAN AND PROFILE

E MAIN ST PLAN AND PROFILE

W MAIN ST PLAN AND PROFILE

W MAIN ST PLAN AND PROFILE

MAIN ST AND S 4TH STREET PROFILE

MAIN ST AND S 4TH ST PLAN

ALIGNMENT INDEX

TABULATION OF PLAN QUANTITIES

ROADWAY TYPICAL SECTIONS

TABULATION OF PAVEMENT QUANTITIES

SUMMARY OF QUANTITIES - SCHEDULE B

SUMMARY OF QUANTITIES - SCHEDULE A

PROJECT SITE PLAN

VICINITY MAP

PLAN SYMBOLS AND ABBREVIATIONS

INDEX TO SHEETS

TITLE SHEET

N.7-8

N.3-6

N.1-2

M.10-11

M.2-9

M.1

L.12-14

L.11

L.10

L.9a

L.3-9

L.1-2

N. LANDSCAPING

M. ELECTRIC UTILITIES

L. PERMANENT TRAFFIC CONTROL

LANDSCAPING DETAILS

VEGETATION PLAN

TABULATION OF LANDSCAPING QUANTITIES

LUMINAIRE DETAILS

LIGHTING UTILITY PLANS

TABULATION OF ELECTRICAL UTILITY QUANTITIES

PERMANENT TRAFFIC CONTROL STANDARD PLANS

METAL SIGN SUPPORTS

PERMANENT SIGN DETAILS

GATE DETAILS

PERMANENT TRAFFIC CONTROL PLANS

TABULATION OF PERMANENT TRAFFIC CONTROL QUANTITIES

Prel im ina ry

Not for

C on str uc

N

Lake

Rainbow

G A R D I N E RAirport

5.0 M

iles

52.0 M

iles

To Livingston e dils d n a L

C r e e k

PROJECT LOCATION

VICINITY MAP

LANOITAN

SCALE IN MILES

0 2 lanoitaN yradnuoB en ot s wo ll eY reviR

Park survey and 1984 dependent survey

National Park per 1883

North boundary Yellowstone

SERVICE BOUNDARY

NATIONAL PARK

Project Site Plan

See Sheet A.5 for

To M am m oth, W

Y

YELLOWSTONE NATIONAL PARK

A.4

STATE PROJECT

PARK 2013(1)B

a y

U

S S u r ft m y fi le s p w p r o d u c ti o n d m t-b a d .d

J o h n s

M c

Q u is to n B

K u n ih is a

C h e c k e d b y

D e s ig n e d b y

NP

NP

NP

N P

NP

NP

NP

Prel im ina ry

Not for

C on str uc t e e rt

S d r teertS kraP tsaE daoR liarT enot swoll eY s t

S tr e e t

Yellowstone River

Stone Street

Spring Street

Water Street

Schools

Gardiner

Schools

Gardiner

N

Main Street

YN

P N orth Entrance R oad th S tr e e t

W Park Street

W Park Street

PARK 2013(1)B, Gardiner Gateway Phase 2

LEGEND:

n d S tr e e t H w y

NORTH BOUNDRY

NATIONAL PARK

YELLOWSTONE

Sheet D.22

Sheet D.20

S h e e t D .1

S h e e t D .1

Sheet D.14Sheet D.10

Sheet D.8

Confluence Park

River Access Trail

SCALE IN FEET

0 500500

PROJECT SITE PLAN

A.5

STATE PROJECT

A u g u s t

U

S S u r ft m y fi le s p w p r o d u c ti o n d m t-b a e .d

J o h n s

M c

Q u is to n B

K u n ih is a

C h e c k e d b y

D e s ig n e d b y

Sheet D.12

G r a v e l D r iv e w a y S ta . 6 to

G r a v e l D r iv e w a y S ta . 6 to

C o n c r e te S id e w a lk w C .L . G a te S ta . 1

D r iv e w a y A p p r o a c h

Driveway Approach

Alley Approach

Alley Approach

Alley Approach

Concrete Stairs/Sidewalk ~ Sta. 415+22

Concrete/Gravel Driveway Approach to Garage ~ Sta. 415+39 to 415+51

G

G G

G

G

G

G

G

G

G

G

G

NB

NB

N B

N B

N B

G

Prel im ina ry

Not for

C on str uc

FOOTNOTE:

MAIN STREET

MAIN STREET

SHEET 1 of 5

TYPICAL SECTIONS

ROADWAY

2%

Head-in Parking

11'-0"

Traveled way

11'-0"

Traveled way Head-in Parking

19'-6"

2'-0"

2%

2'-0"

2%

MAIN STREET

ground

Existing

Varies

6" to Frontface of curb6" to Front face of curbMatch existing ground

2%

1 1

R .O .W

R .O .W

24+56 to 27+86

21+68 to 22+59

21+12 to 21+63

19+52 to 21+06

15+46 to 18+80

6" Bed course

4" Bed course

6" Manufactured topsoil

1" Mulch

1" Mulch

6" Manufactured topsoil 6" Bed course

4" Bed course

6" Bed course

4" Bed course

6" Bed course

4" Bed course

Profile grade and pivot point

Varies 19'-6"

80' R.O.W.

Existing ground

Match existing ground

1' (min.)

Varies 5' to 7'-9"

14+88 to 27+98

(MAIN-E-W01)

Cross-slope Cross-slope

Concrete sidewalk.

See Sheet G.1 for details Concrete sidewalk.

See Sheet G.1 for details

C le a r in g l im it s

C le a r in g l im it s

Concrete sidewalk.

See Sheet G.1 for details

Concrete sidewalk.

See Sheet G.1 for details the staking report data listing.

Clearing limits follow slope stake limits as shown in

12-inch depth (sloped).

concrete, 12-inch depth or curb and gutter, concrete, Where shown in the plans, provide either curb and gutter, curbs, gutters, manholes, and other structures.

Apply an asphalt tack coat to contact surfaces of pavements, Construct as shown in the Staking Report Data Listing.

Varies 1:2 (MAX)

Match existing ground

Varies 1:2 (MAX)

Existing ground

24+31 to 27+41

19+52 to 21+51

15+46 to 16+96

Varies 5'-0" to 8'-6"

Varies 1:2 (MAX)

Existing ground

Match existing ground

Varies (1:2 MAX)

Place in in two equal lifts

6-inch compacted depth

Hot asphalt concrete pavement, 4-inch compacted depth

Roadway aggregate, method 2, C.2

STATE PROJECT

A u g u s t

I n t_ ft m y fi le s p w p r o d u c ti o n d m t-b c b .d

J o h n s

M c

Q u is to n B

K u n ih is a

C h e c k e d b y

D e s ig n e d b y

4-inch compacted depth

Recycled aggregate base

Construct curb and gutter, concrete, 12-inch depth.

See Sheet G.2a to G.2c for details for details

(sloping). See Sheet G.2a to G.2c concrete, 12-inch depth, Construct curb and gutter, See Sheet G.2a to G.2c for details concrete, 12-inch depth.

Construct curb and gutter, See Sheet G.2a to G.2c for details concrete, 12-inch depth.

Construct curb and gutter, CSS-1h, SS-1h Tack coat, grade CSS-1, Prel im ina ry

Not for

C on str uc

See Sheet G.3 for details

Asphalt sidewalk. (Driveway approach with asphalt tie)

1ST STREET

Parallel Parking Traveled way Traveled way

10'-0"

2%

2'-0"

6" to Front face of curb

5'-0"

SHEET 2 of 5

TYPICAL SECTIONS

ROADWAY

R .O .W

R .O .W

2%

Profile grade pivot point

4" Bed course

Concrete sidewalk. See Sheet G.1 for details

6" Bed course

6" Bed course

4" Bed course

10+40 to 13+16

(1st Ø1)

5'-0"

50' R.O.W.

1' min. 6" to Front face of curb 1' min.

11'-0" 11'-0"

2%

R .O .W

6" Bed course

4" Roadway aggregate, method 2

10+48 TO 11+69

FOOTNOTE:

C le a r in g l im it s

C le a r in g l im it s

Cross-slope Cross-slope

See Sheet G.1 for details

Concrete sidewalk.

staking report data listing.

Clearing limits follow slope stake limits as shown in the

12-inch depth (sloped).

concrete, 12-inch depth or curb and gutter, concrete, Where shown in the plans, provide either curb and gutter, curbs, gutters, manholes, and other structures.

Apply an asphalt tack coat to contact surfaces of pavements, Construct as shown in the Staking Report Data Listing.

Existing ground

Match existing ground

Varies 1:2 (MAX)

Existing ground

Varies 1:2 (MAX)

Match existing ground

Varies 5'-0" to 7'-0"

Match existing ground

Existing ground

6'-10"

C.3

STATE PROJECT

A u g u s t

I n t_ ft m y fi le s p w p r o d u c ti o n d m t-b c c .d

J o h n s

M c

Q u is to n B

K u n ih is a

C h e c k e d b y

D e s ig n e d b y

Place in two equal lifts

6-inch compacted depth

Hot asphalt concrete pavement

4-inch compacted depth

Roadway aggregate, method 2

4-inch compacted depth

Recycled aggregate base

12-inch depth. See Sheet G.2a to G.2c for details

Construct curb and gutter, concrete, See Sheet G.2a to G.2c for details concrete, 12" depth.

Construct curb and gutter, 12-inch depth. See Sheet G.2a to G.2c for details

Construct curb and gutter, concrete, CSS-1h, SS-1h Tack coat, grade CSS-1, Prel im ina ry

Not for

C on str uc

SHEET 3 of 5

TYPICAL SECTIONS

ROADWAY

Parallel ParkingTraveled way

10'-0"

6" to Front face of curb

R .O .W

Match existing concrete valley gutterExisting concrete valley gutter

Traveled way

Traveled way Parallel ParkingTraveled way

10'-0"

6" to Front face of curb

Parallel Parking

R .O .W

6" to Front face of curb

10'-0" 2'-0"

Shoulder

2'-0"

Shoulder

9'-0"

3RD STREET

3RD STREET

Profile grade and pivot point

50' R.O.W.

Profile grade and pivot point

6" Bed course

4" Bed course

34+00 to 34+40

(3RDØ2)

6" Bed course

6" Bed course

4" Bed course

2%

2'-0"

R .O .W

5'-0"

1' min.

2' 11'-0" 11'-0"

31+30 to 33+20

(3RDØ2)

2%

4" Bed course

2%

50' R.O.W.

3'-6"

R .O .W

4TH STREET

40+20 to 41+06

(4THØ1)

FOOTNOTE:

Cross-slope Cross-slope

C le a r in g l im it s

C le a r in g l im it s

C le a r in g l im it s

Cross-slope Cross-slope

See Sheet G.1 for details

Concrete sidewalk.

See Sheet G.1 for details

Concrete sidewalk.

staking report data listing.

Clearing limits follow slope stake limits as shown in the

12-inch depth (sloped).

concrete, 12-inch depth or curb and gutter, concrete, Where shown in the plans, provide either curb and gutter, curbs, gutters, manholes, and other structures.

Apply an asphalt tack coat to contact surfaces of pavements, Construct as shown in the Staking Report Data Listing.

Varies 0'-0" to 9'-0" Varies 3'-6" to 5'-0"

Varies 12'-9" to 13'-0"

Varies 1:2 (MAX)

Existing ground

Match existing ground

Concrete sidewalk.

See Sheet G.1 for details

Varies 1:2 (MAX)

Existing ground

Match existing ground

Varies 1:2 (MAX) ground existing Match ground Existing

Place in two equal lifts

6-inch compacted depth

Hot asphalt concrete pavement

4-inch compacted depth

Roadway aggregate, method 2

Place in two equal lifts

6-inch compacted depth

Hot asphalt concrete pavement

4-inch compacted depth

Roadway aggregate, method 2

4-inch compacted depth

Recycled aggregate base

4-inch compacted depth

Recycled aggregate base

C.4

STATE PROJECT

A u g u s t

I n t_ ft m y fi le s p w p r o d u c ti o n d m t-b c d .d

J o h n s

M c

Q u is to n B

K u n ih is a

C h e c k e d b y

D e s ig n e d b y

12-inch depth. See G.2a to G.2c for details

Construct curb and gutter, concrete, See Sheet G.2a to G.2c for details concrete, 12-inch depth

Construct curb and gutter, See Sheet G.2a to G.2c for details concrete, 12-inch depth .

Construct curb and gutter, CSS-1h, SS-1, SS-1h Tack coat, grade CSS-1, CSS-1h, SS-1, SS-1h Tack coat, grade CSS-1, Prel im ina ry

Not for

C on str uc

EAST PARK STREET

2%

6" to Front face of curb

Varies 1'-0" to 25'-0"

Shoulder or Head-in Parking

11'-0"

Traveled way

11'-0"

Traveled way Shoulder or Parallel Parking

SHEET 4 of 5

TYPICAL SECTIONS

ROADWAY

R.O.W. Varies 22' to 33'

R .O .W

R .O .W

Varies 0" to 8"

Yellowstone National Park North Boundary

100+83 to 106+12

EPSØ2

6" Bed course

4" Bed course

Profile grade and pivot point

6" Bed course

4" Bed course

6" Bed course

Gutter, concrete, (valley)

101+40 to 102+74

5'-0"

6" to Front face of curb

FOOTNOTE:

C le a r in g l im it s

C le a r in g l im it s

Cross-slope

Concrete sidewalk. See

Sheet G.1 for details

Cross-slope

See Sheet G.1 for details

Concrete sidewalk, (6-inch depth), staking report data listing.

Clearing limits follow slope stake limits as shown in the

12-inch depth (sloped).

concrete, 12-inch depth or curb and gutter, concrete, Where shown in the plans, provide either curb and gutter, curbs, gutters, manholes, and other structures.

Apply an asphalt tack coat to contact surfaces of pavements, Construct as shown in the Staking Report Data Listing.

Varies 1:2 (MAX)

Existing ground

Match existing ground

Varies 1:2 (MAX)

Match existing ground

Existing ground

H o te l

Existing sidewalk

Varies 1'-0" to 90'-10"

Regrade existing gravel parking

3'-0"11'-0"26'-6"

Varies 0'-0" to 54'-6"

See Sheet J.5 for layout points and sidewalk locations.

See Sheet N.6 for landscape

104+70 t o 105+64

Place in two equal lifts

6-inch compacted depth

Hot asphalt concrete pavement

4-inch compacted depth

Recycled aggregate base

4-inch compacted depth

Roadway aggregate, method 2

C.5

STATE PROJECT

A u g u s t

I n t_ ft m y fi le s p w p r o d u c ti o n d m t-b c e .d

J o h n s

M c

Q u is to n B

K u n ih is a

C h e c k e d b y

D e s ig n e d b y

12-inch depth. See Sheet G.2a to G.2c for details

Construct curb and gutter, concrete, See Sheet G.2a to G.2c for details concrete, 12-inch depth.

Construct curb and gutter, CSS-1h, SS-1, SS-1h Tack coat, grade CSS-1, Prel im ina ry

Not for

C on str uc

RIVER ACCESS TRAIL

300+72 to 304+44

(RATØ1)

TYPICAL SECTIONS

ROADWAY

SHEET 5 of 5

FOOTNOTE:

Construct as shown in the Staking Report Data Listing.1 t o d e p th

6'-0"

Path, 14' min.

pivot point

Profile grade and

1:

1.

m ax

1:

m ax 2%

See Sheet H.12 for details

Placed riprap, class 3.

1:

m ax 2%

Traveled way

0' to 14'

1:2 max

6-inch compacted depth

Aggregate base, grading D

6-inch compacted depth

Aggregate base, grading D

EMERGENCY ACCESS TRAIL

400+51.53 to 400+68.01

(EATØ1)

C.6

STATE PROJECT

NUMBER

SHEET

A u g u s t

I n t_ ft m y fi le s p w p r o d u c ti o n d m t-b c f.

d g

C h e c k e d b y

D e s ig n e d b y

Prel im ina ry

Not for

C on str uc

Yellowstone River

Stone Street

Spring Street

Water Street

Schools

Gardiner

School

Gardiner

ALIGNMENT INDEX

(EPS02)

E. Park St

(1ST01)

1st St

(MAIN_E-W01)

E MAIN St

(MAIN_E-W01)

MAIN St (E-W)

(3RD02)

3rd St

(4TH01)

4th St

(4TH01)

4th St

PARK NORTH BOUNDARY

YELLOWSTONE NATIONAL

(EAT01)

Emergency Access Trail

(RAT01)

River Access Trail n d S tr e e t H

W Y

D.7

STATE PROJECT

J u ly

U

S S u r ft m y fi le s p w p r o d u c ti o n d m t-b d f.

d

J o h n s

M c

Q u is to n B

K u n ih is a

C h e c k e d b y

D e s ig n e d b y

Prel im ina ry

Not for

C on str uc

LEGEND:

See Sheet G.2a for details

See Sheet G.2c for details

See Sheet G.2a for details

See Sheet G.2b for details

See Sheet G.1 for details

See Sheet G.1 for details

See Sheet G.4 for details

See Sheet G.4 for details

Removal of bollard

Removal of boulder

Removal of gate (Old iron park fence)

Removal of curb and gutter, concrete

Removal of fence (Old park fence)

Removal of sidewalk, concrete

Curb, stone, type 1, 18-inch depth

Curb and gutter, concrete, 12-inch depth

Curb and gutter, concrete, 12-inch dpeth (sloping)

Gutter, concrete (Valley)

Sidewalk, concrete (Driveway approach with concrete tie)

Sidewalk, concrete (Driveway approach with asphalt tie)

Sidewalk, concrete (6-inch thick)

Sidewalk, concrete (alley approach with asphalt tie)

Sidewalk, asphalt (Driveway approach with asphalt tie)

Accessibility ramp, concrete (Includes truncated domes)

Fence (type 2b, 5' height)

Gate (Iron park fence)

Sidewalk, concrete (4-inch thick)

Removal: Proposed:

See Sheet G.5 for details

Bollard

See Sheet G.1 for details

Curb, Concrete, 12-inch depth

39 Accessibility Ramp, Asphalt

Adjust water valve

Adjust fire hydrant

Manhole adjustment

Curb and gutter, concrete

12-inch depth (type 1B)

Curb and gutter, concrete

Curb and gutter, concrete

(Sloped to normal transition)

12-inch depth

(type 1B transition)

12-inch depth

See J Sheets for details

See J Sheets for details

See J Sheets for details

See J Sheets for details

See J Sheets for details

See Sheet G.11 for details

See Sheet G.2c for details

See Sheet G.2c for details

See Sheet G.2a for details

WV

WV

WV

WV

WV

WF EM

WV

P

W S

O

W

SO

W

SO

W

SO

W S

O

N B

T

W S

O

W S

O

PI 15+

15.84

N

T H

P O

T

.0

P O

T

.8

BEGIN PROJECT

EL=5304.10

E= 63618.0878

N= 80331.8266

T H

N

MAIN ST

S 4th St Detail

S

T H S

T

S

T H S

T

Slope stake limits

Slope stake limits

Slope stake limits

Proposed drainage system

Existing drainage system

END CONSTRUCTION

EL=5302.29

E= 63644.84

N= 80461.42

Proposed drainage system

M A

T C

H E

X I S

T I N

G

NOTE:

2.

1.

14+88.00

MAIN ST

41+06

S 4TH ST

MAIN ST & 4TH ST DETAIL

Line to be constructed

Line to be constructed

Line to be constructed

Existing Edge of Pavement

Existing edge of pavement

T C

H L I

E

D.8

STATE PROJECT

NUMBER

SHEET

A u g u s t

U

S S u r ft m y fi le s p w p r o d u c ti o n d m t-b d g .d g

C h e c k e d b y

D e s ig n e d b y and proposed drainageinformation.

See Sheet H.3 and H.9 for existing and temporary construction limits.

Refer to E Sheets for Right-Of-Way plans

See S. 4th St. Detail

Prel im ina ry

Not for

C on str uc

,2

.3

,2

.5

0+4.00 00%

30' VC

+10 .8

8%

,3

.8

SSD = 225'

K = 24

267' VC

,3

.6

,3

.0

-1.6317%

50' VC

,3

.6

-5.4844%

-8.1384%

,2

.2

N

BEGIN PROJECT

EL=5304.10

E= 63618.0878

N= 80331.8266

Profile grade

Existing ground

CUYD

EXC.

CUYD

EMB.

40+0016+0015+0014+0013+00

5280 5280

5285 5285

5290 5290

5295 5295

5300 5300

5305 5305

5310 5310

41+00 42+00

LC

15+15.84(MAIN_E-01)

40+00 (4th01)

El = 5306.65

53155315

END CONSTRUCTION

EL=5302.29

E= 63644.84

N= 80461.42

N

14+88.00

MAIN ST

41+06

S 4TH ST

M

A T

C H E

X I S

T I N

G

Profile grade

Existing ground

134 EXC CUYD

32 EMB CUYD 8 EMB CUYD

67 EXC CUYD

D.9

STATE PROJECT

A u g u s t

U

S S u r ft m y fi le s p w p r o d u c ti o n d m t-b d g .d

C h e c k e d b y

D e s ig n e d b y

Prel im ina ry

Not for

C on str uc

22 22

LEGEND:

See Sheet G.2a for details

See Sheet G.2c for details

See Sheet G.2a for details

See Sheet G.2b for details

See Sheet G.1 for details

See Sheet G.1 for details

See Sheet G.4 for details

See Sheet G.4 for details

Removal of bollard

Removal of boulder

Removal of gate (Old iron park fence)

Removal of curb and gutter, concrete

Removal of fence (Old park fence)

Removal of sidewalk, concrete

Curb, stone, type 1, 18-inch depth

Curb and gutter, concrete, 12-inch depth

Curb and gutter, concrete, 12-inch dpeth (sloping)

Gutter, concrete (Valley)

Sidewalk, concrete (Driveway approach with concrete tie)

Sidewalk, concrete (Driveway approach with asphalt tie)

Sidewalk, concrete (6-inch thick)

Sidewalk, concrete (alley approach with asphalt tie)

Sidewalk, asphalt (Driveway approach with asphalt tie)

Accessibility ramp, concrete (Includes truncated domes)

Fence (type 2b, 5' height)

Gate (Iron park fence)

Sidewalk, concrete (4-inch thick)

Removal: Proposed:

See Sheet G.5 for details

Bollard

See Sheet G.1 for details

Curb, Concrete, 12-inch depth

39 Accessibility Ramp, Asphalt

Adjust water valve

Adjust fire hydrant

Manhole adjustment

Curb and gutter, concrete

12-inch depth (type 1B)

Curb and gutter, concrete

Curb and gutter, concrete

(Sloped to normal transition)

12-inch depth

(type 1B transition)

12-inch depth

See J Sheets for details

See J Sheets for details

See J Sheets for details

See J Sheets for details

See J Sheets for details

See Sheet G.11 for details

See Sheet G.2c for details

See Sheet G.2c for details

See Sheet G.2a for details

P I

.7

PI 33+64.00

T

T

W

SO

W

SO

W

SO

W

SO

W

SO

W

SO

W

SOW

SO

UP

W A R N I N G

B U R I E D

U T I L I T Y

N

S

R D S

T

.(MAIN_E-W01)

P O

T

.0

P O

T

.7

R D

MAIN ST (E-W)

drainage system

Proposed

M A

T C

H L I N

E

SEE SHEET D.12

SEE SHEET D.12

Remove light pole by others

W MAIN ST

SHEET 1 OF 2

Line to be constructed of Pavement

Existing Edge

Remove light by others.

Protect pole.

T C

H L I

D.10

NUMBER

SHEET

A u g u s t

U

S S u r ft m y fi le s p w p r o d u c ti o n d m t-b d i.

d g

C h e c k e d b y

D e s ig n e d b y

NOTE:

2.

1.

and proposed drainageinformation.

See Sheet H.4 for existing and temporary construction limits.

Refer to E Sheets for Right-Of-Way plans

Prel im ina ry

Not for

C on str uc

,3

.8

-0.4625%

,3

.5

-0.9118%

SSD = 225'

K = 24

267' VC

N

Profile grade

Existing ground

CUYD

EXC.

CUYD

EMB.

20+0019+0018+0017+0016+00

5300 5300

5305 5305

5310 5310

5315 5315

5320 5320

5325 5325

5330 5330

21+00 15+00

LC

Main St (E-W) 19+16.77=

3rd St 33+64.00

779 EXC CUYD

2 EMB CUYD

D.11

STATE PROJECT

A u g u s t

U

S S u r ft m y fi le s p w p r o d u c ti o n d m t-b d i2 .d

C h e c k e d b y

D e s ig n e d b y

Prel im ina ry

Not for

C on str uc

40 4030

LEGEND:

See Sheet G.2a for details

See Sheet G.2c for details

See Sheet G.2a for details

See Sheet G.2b for details

See Sheet G.1 for details

See Sheet G.1 for details

See Sheet G.4 for details

See Sheet G.4 for details

Removal of bollard

Removal of boulder

Removal of gate (Old iron park fence)

Removal of curb and gutter, concrete

Removal of fence (Old park fence)

Removal of sidewalk, concrete

Curb, stone, type 1, 18-inch depth

Curb and gutter, concrete, 12-inch depth

Curb and gutter, concrete, 12-inch dpeth (sloping)

Gutter, concrete (Valley)

Sidewalk, concrete (Driveway approach with concrete tie)

Sidewalk, concrete (Driveway approach with asphalt tie)

Sidewalk, concrete (6-inch thick)

Sidewalk, concrete (alley approach with asphalt tie)

Sidewalk, asphalt (Driveway approach with asphalt tie)

Accessibility ramp, concrete (Includes truncated domes)

Fence (type 2b, 5' height)

Gate (Iron park fence)

Sidewalk, concrete (4-inch thick)

Removal: Proposed:

See Sheet G.5 for details

Bollard

See Sheet G.1 for details

Curb, Concrete, 12-inch depth

39 Accessibility Ramp, Asphalt

Adjust water valve

Adjust fire hydrant

Manhole adjustment

Curb and gutter, concrete

12-inch depth (type 1B)

Curb and gutter, concrete

Curb and gutter, concrete

(Sloped to normal transition)

12-inch depth

(type 1B transition)

12-inch depth

See J Sheets for details

See J Sheets for details

See J Sheets for details

See J Sheets for details

See J Sheets for details

See Sheet G.11 for details

See Sheet G.2c for details

See Sheet G.2c for details

See Sheet G.2a for details

G G

G

W

SO

W

SO

W

SO

W

SO

W

SO

W

SO

W

SO

W

SO

W

SO

W

SO

W

SO

W

SO

W

SO

W

SO

W

SO

W

SO

W S

O

W

SO

W

SO

P I

.6

PI 33+64.00

N

(MAIN_E-W01)

MAIN ST (E-W)

M A

T C

H L I N

E

See Sheet F.2 for details rockery wall

Remove and reset

See Sheet F.3 for details crib retaining wall

Construct treated timber

W MAIN ST

SHEET 2 OF 2

H

W Y

S

N D S

T

Line to be constructed

Existing Edge Remove light pole by others

T C

H L I

D.12

NUMBER

SHEET

A u g u s t

U

S S u r ft m y fi le s p w p r o d u c ti o n d m t-b d j.

d g

C h e c k e d b y

D e s ig n e d b y

NOTE:

2.

1.

and proposed drainageinformation.

See Sheet H.5 for existing and temporary construction limits.

Refer to E Sheets for Right-Of-Way plans

Prel im ina ry

Not for

C on str uc

.5

-0.9118%

,3

.1

-0.1579%

,3

.8

-1.1008%

,3

.9

+2.0000%

,3

.4

-2.0000%

,3

.8

30' VC

SSD = 1219'

K = 318

240' VC

SSD = 1159'

K = 31

30' VC

N

Profile grade

Existing grade

LC

LC

Main St (E-W) 19+16.77 =

3rd St 33+64.00

Main St (E-W) 23+97.68 =

2nd St (HWY 89) 414+16.86

El=5311.47

CUYD

EXC.

CUYD

EMB.

24+0023+0022+0021+0020+00

5300 5300

5305 5305

5310 5310

5315 5315

25+00

D.13

A u g u s t

U

S S u r ft m y fi le s p w p r o d u c ti o n d m t-b d j2 .d

C h e c k e d b y

D e s ig n e d b y

1123 EXC CUYD

3 EMB CUYD

Prel im ina ry

Not for

C on str uc

28 6

40 41

LEGEND:

See Sheet G.2a for details

See Sheet G.2c for details

See Sheet G.2a for details

See Sheet G.2b for details

See Sheet G.1 for details

See Sheet G.1 for details

See Sheet G.4 for details

See Sheet G.4 for details

Removal of bollard

Removal of boulder

Removal of gate (Old iron park fence)

Removal of curb and gutter, concrete

Removal of fence (Old park fence)

Removal of sidewalk, concrete

Curb, stone, type 1, 18-inch depth

Curb and gutter, concrete, 12-inch depth

Curb and gutter, concrete, 12-inch dpeth (sloping)

Gutter, concrete (Valley)

Sidewalk, concrete (Driveway approach with concrete tie)

Sidewalk, concrete (Driveway approach with asphalt tie)

Sidewalk, concrete (6-inch thick)

Sidewalk, concrete (alley approach with asphalt tie)

Sidewalk, asphalt (Driveway approach with asphalt tie)

Accessibility ramp, concrete (Includes truncated domes)

Fence (type 2b, 5' height)

Gate (Iron park fence)

Sidewalk, concrete (4-inch thick)

Removal: Proposed:

See Sheet G.5 for details

Bollard

See Sheet G.1 for details

Curb, Concrete, 12-inch depth

39 Accessibility Ramp, Asphalt

Adjust water valve

Adjust fire hydrant

Manhole adjustment

Curb and gutter, concrete

12-inch depth (type 1B)

Curb and gutter, concrete

Curb and gutter, concrete

(Sloped to normal transition)

12-inch depth

(type 1B transition)

12-inch depth

See J Sheets for details

See J Sheets for details

See J Sheets for details

See J Sheets for details

See J Sheets for details

See Sheet G.11 for details

See Sheet G.2c for details

See Sheet G.2c for details

See Sheet G.2a for details

P O

T

.8

P O

T

.0

G

N B

W

SO

W

SO

W

SO

W

SO

W

SO

W

SO W

SO

W

SOW

SO

W

SO

W

SO

W

SO

W

SO

W S

O

POT 12+82.56=

POT 27+68.15

(MAIN_E-W01)

S

T

Existing drainage system

N

M A

T C

H L I N

E

SEE SHEET D.16

E MAIN ST

S

S T S

T

E MAIN ST

Line to be constructed

D.14

NUMBER

SHEET

A u g u s t

U

S S u r ft m y fi le s p w p r o d u c ti o n d m t-b d k .d g

C h e c k e d b y

D e s ig n e d b y

Remove pole by others.

NOTE:

2.

1.

and proposed drainageinformation.

See Sheet H.6 for existing and temporary construction limits.

Refer to E Sheets for Right-Of-Way plans

Prel im ina ry

Not for

C on str uc

+0.5614%

,3

.3

-0.3529%

,3

.0

-2.8750%

,3

.7

+0.5273%

,3

.3

+2.0000%

,3

.7

-2.0000%

,3

.1

SSD = 1200'

K = 44

40' VC

SSD = 451'

K = 19

47' VC

SSD = 203'

K = 24

80' VC

Profile grade

LC

1st St. 12+82.56

E. Main St. 27+68.15 =

N

Existing ground

CUYD

EXC.

CUYD

EMB.

29+0025+0024+00

5295 5295

5300 5300

5305 5305

5310 5310

5315 5315

5320 5320

5325 5325

26+00 27+00 28+00

D.15

STATE PROJECT

A u g u s t

U

S S u r ft m y fi le s p w p r o d u c ti o n d m t-b d k .d

C h e c k e d b y

D e s ig n e d b y

1496 EMB CUYD

20 EXC CUYD

Prel im ina ry

Not for

C on str uc

LEGEND:

See Sheet G.2a for details

See Sheet G.2c for details

See Sheet G.2a for details

See Sheet G.2b for details

See Sheet G.1 for details

See Sheet G.1 for details

See Sheet G.4 for details

See Sheet G.4 for details

Removal of bollard

Removal of boulder

Removal of gate (Old iron park fence)

Removal of curb and gutter, concrete

Removal of fence (Old park fence)

Removal of sidewalk, concrete

Curb, stone, type 1, 18-inch depth

Curb and gutter, concrete, 12-inch depth

Curb and gutter, concrete, 12-inch dpeth (sloping)

Gutter, concrete (Valley)

Sidewalk, concrete (Driveway approach with concrete tie)

Sidewalk, concrete (Driveway approach with asphalt tie)

Sidewalk, concrete (6-inch thick)

Sidewalk, concrete (alley approach with asphalt tie)

Sidewalk, asphalt (Driveway approach with asphalt tie)

Accessibility ramp, concrete (Includes truncated domes)

Fence (type 2b, 5' height)

Gate (Iron park fence)

Sidewalk, concrete (4-inch thick)

Removal: Proposed:

See Sheet G.5 for details

Bollard

See Sheet G.1 for details

Curb, Concrete, 12-inch depth

39 Accessibility Ramp, Asphalt

Adjust water valve

Adjust fire hydrant

Manhole adjustment

Curb and gutter, concrete

12-inch depth (type 1B)

Curb and gutter, concrete

Curb and gutter, concrete

(Sloped to normal transition)

12-inch depth

(type 1B transition)

12-inch depth

See J Sheets for details

See J Sheets for details

See J Sheets for details

See J Sheets for details

See J Sheets for details

See Sheet G.11 for details

See Sheet G.2c for details

See Sheet G.2c for details

See Sheet G.2a for details

P O

T

.5

P O

T

.0

POT 27+97.80

P O

T

.5

P O

T

.1

PO

T 13+

20.08

PC 100+

44.34

PT 100+61.67

101T T

U

PT

E M

W V

W V bp b p

G

NB

NB

P

P

W S

O

W S

O

W S

O

W S

O

W

SO

W

SO

W

SO

N

D

R= 90.00'

T= 48.46'

L= 88.90'

(1ST01)

S 1ST ST

Slope stake limits

Slope stake limits

SEE SHEET D.20

SEE SHEET D.20

SEE SHEET D.14

Protect poles

MATCH EXISTING

S 1ST ST

of Pavement

Line to be constructed

POT 27+97.80

E

M A I N S

T

D.16

NUMBER

SHEET

A u g u s t

U

S S u r ft m y fi le s p w p r o d u c ti o n d m t-b d l.

d g

C h e c k e d b y

D e s ig n e d b y

NOTE:

2.

1.

and proposed drainageinformation.

See Sheet H.7 for existing and temporary construction limits.

Refer to E Sheets for Right-Of-Way plans

Prel im ina ry

Not for

C on str uc

SSD = 515'

K = 27

60' VC

SSD = 1035'

K = 45

92' VC

,3

.5

,3

.3

-2.0000%

,3

.3

-4.2258%

,3

.2

-2.1922%

-6.8675%

,3

.4

SSD = 266'

K = 15

70' VC

N

Existing ground

Profile grade

LC

LC

1st St. 10+05.50 =

E. Park St. 101+06.05

El = 5318.49

1st St. 12+82.56 =

E. Main St. 27+68.05

El = 5309.33

CUYD

EXC.

CUYD

EMB.

5295 5295

5300 5300

5305 5305

5310 5310

5315 5315

5320 5320

5325 5325

5330 5330

10+00 11+00 12+00 13+00

362 EXC CUYD

1 EMB CUYD

D.17

STATE PROJECT

A u g u s t

U

S S u r ft m y fi le s p w p r o d u c ti o n d m t-b d l2 .d

C h e c k e d b y

D e s ig n e d b y

Prel im ina ry

Not for

C on str uc

LEGEND:

See Sheet G.2a for details

See Sheet G.2c for details

See Sheet G.2a for details

See Sheet G.2b for details

See Sheet G.1 for details

See Sheet G.1 for details

See Sheet G.4 for details

See Sheet G.4 for details

Removal of bollard

Removal of boulder

Removal of gate (Old iron park fence)

Removal of curb and gutter, concrete

Removal of fence (Old park fence)

Removal of sidewalk, concrete

Curb, stone, type 1, 18-inch depth

Curb and gutter, concrete, 12-inch depth

Curb and gutter, concrete, 12-inch dpeth (sloping)

Gutter, concrete (Valley)

Sidewalk, concrete (Driveway approach with concrete tie)

Sidewalk, concrete (Driveway approach with asphalt tie)

Sidewalk, concrete (6-inch thick)

Sidewalk, concrete (alley approach with asphalt tie)

Sidewalk, asphalt (Driveway approach with asphalt tie)

Accessibility ramp, concrete (Includes truncated domes)

Fence (type 2b, 5' height)

Gate (Iron park fence)

Sidewalk, concrete (4-inch thick)

Removal: Proposed:

See Sheet G.5 for details

Bollard

See Sheet G.1 for details

Curb, Concrete, 12-inch depth

39 Accessibility Ramp, Asphalt

Adjust water valve

Adjust fire hydrant

Manhole adjustment

Curb and gutter, concrete

12-inch depth (type 1B)

Curb and gutter, concrete

Curb and gutter, concrete

(Sloped to normal transition)

12-inch depth

(type 1B transition)

12-inch depth

See J Sheets for details

See J Sheets for details

See J Sheets for details

See J Sheets for details

See J Sheets for details

See Sheet G.11 for details

See Sheet G.2c for details

See Sheet G.2c for details

See Sheet G.2a for details

PI 19+16.77

P I

.0

W V

W V

T

T

W S

O

W

SO

W

SO

W

SOW

SO

W

SO

W

SO

"D

IA

"D

IA

6" 6" 6" 6" 6" 6" 6"

" p v c

" p v c

" p v c

" p v c

C

C

C

C C

C

C

C

C

C

C

C

C

C

B

B

B

B

B

C

U P

W A

R N

I N

G B

U R

I E

D U

T I L

I T

Y

F

IB

E R O

P T

IC

M A

N H

O L E .8 ' D ia

T

T

N

(3RD02)

M

A I N

E

W

M A I N S

T

E

W

EL=5321.96

E=64047.77

N=80158.59

31+64.88

EL=5311.24

E=64046.27

N= 80439.70

S 3RD ST

Slope stake limitsSlope stake limits

SEE SHEET D.10

SEE SHEET D.10

END CONSTRUCTION

BEGIN CONSTRUCTION

Existing drainage system

S 3RD ST

34+46.00

Line to be constructed of Pavement

Existing Edge

Protect pole removed by others

Pole to be

D.18

NUMBER

SHEET

A u g u s t

U

S S u r ft m y fi le s p w p r o d u c ti o n d m t-b d m .d g

C h e c k e d b y

D e s ig n e d b y by others

Pole to be relocated to be relocated by others

Telecommunication box

NOTE:

2.

1.

and proposed drainageinformation.

See Sheet H.8 for existing and temporary construction limits.

Refer to E Sheets for Right-Of-Way plans

Prel im ina ry

Not for

C on str uc

.1

-3.0424%

,3

.7

-7.7121%

,3

.4

-1.1716%

,3

.5

-10.6710%

,3

.0

-12.9587%

SSD = 244'

K = 12

60' VC

SSD = 256'

K = 11

50' VC

SSD = 76'

K = 8

50' VC

SSD = 144'

K = 6

60' VC

SSD = 492'

K = 17

40' VC

N

LC

34+46.00

CUYD

EXC.

CUYD

EMB.

31+0030+00

5295 5295

5300 5300

5305 5305

5310 5310

5315 5315

5320 5320

5325 5325

5330 5330

32+00 33+00 34+00 35+00

Profile grade

Existing ground

3rd St. 33+64.00 =

Main St. (E-W) 19+16.77

El = 5314.29 EL=5311.24

E=64040.27

N= 80439.70

END CONSTRUCTION

31+64.88

EL=5311.24

E=64040.27

N= 80439.70

BEGIN CONSTRUCTION

316 EXC CUYD

2 EMB CUYD 2 EMB CUYD

97 EXC CUYD

D.19

STATE PROJECT

PARK 2013(1)

A u g u s t

U

S S u r ft m y fi le s p w p r o d u c ti o n d m t-b d m .d

C h e c k e d b y

D e s ig n e d b y

Prel im ina ry

Not for

C on str uc

25 28

36 37

35 35

LEGEND:

See Sheet G.2a for details

See Sheet G.2c for details

See Sheet G.2a for details

See Sheet G.2b for details

See Sheet G.1 for details

See Sheet G.1 for details

See Sheet G.4 for details

See Sheet G.4 for details

Removal of bollard

Removal of boulder

Removal of gate (Old iron park fence)

Removal of curb and gutter, concrete

Removal of fence (Old park fence)

Removal of sidewalk, concrete

Curb, stone, type 1, 18-inch depth

Curb and gutter, concrete, 12-inch depth

Curb and gutter, concrete, 12-inch dpeth (sloping)

Gutter, concrete (Valley)

Sidewalk, concrete (Driveway approach with concrete tie)

Sidewalk, concrete (Driveway approach with asphalt tie)

Sidewalk, concrete (6-inch thick)

Sidewalk, concrete (alley approach with asphalt tie)

Sidewalk, asphalt (Driveway approach with asphalt tie)

Accessibility ramp, concrete (Includes truncated domes)

Fence (type 2b, 5' height)

Gate (Iron park fence)

Sidewalk, concrete (4-inch thick)

Removal: Proposed:

See Sheet G.5 for details

Bollard

See Sheet G.1 for details

Curb, Concrete, 12-inch depth

39 Accessibility Ramp, Asphalt

Adjust water valve

Adjust fire hydrant

Manhole adjustment

Curb and gutter, concrete

12-inch depth (type 1B)

Curb and gutter, concrete

Curb and gutter, concrete

(Sloped to normal transition)

12-inch depth

(type 1B transition)

12-inch depth

See J Sheets for details

See J Sheets for details

See J Sheets for details

See J Sheets for details

See J Sheets for details

See Sheet G.11 for details

See Sheet G.2c for details

See Sheet G.2c for details

See Sheet G.2a for details

S

E S

H E

E T D .2

EL=5319.25

E= 63618.0878

N= 80331.8266

END CONSTRUCTION

100+81.24

Remove light fixture by others

Protect all poles

E PARK ST

SHEET 1 OF 2

Line to be constructed of Pavement

Existing Edge

Protect pole

Protect pole and E.3 for quantities

See Sheet D.21

SEE SHEET D.16

D.20

NUMBER

SHEET

A u g u s t

U

S S u r ft m y fi le s p w p r o d u c ti o n d m t-b d n .d g

C h e c k e d b y

D e s ig n e d b y

Protect all poles Protect poles

Protect poles

Protect poles

Protect pole

Remove pole by others by others

Remove pole

Remove pole by others

NOTE:

2.

1.

and proposed drainageinformation.

See Sheet H.10 for existing and temporary construction limits.

Refer to E Sheets for Right-Of-Way plans

Curve= EPS01

D

R= 30.00'

T= 8.92'

L= 17.33'P O

T

.0

P C

.3

P T

.6

P O

T

.0

WV

WV

T

TUPTEM

WV

WV

b p

N B

P

P

W

SO

W

SOW

SO

W

SO

W

SO

W

SO

W

SO

W

SO

W

SO

W

SO W

SO

W S

O

N

S

S T S

T

S

T

E PARK ST

(EPS02)

Prel im ina ry

Not for

C on str uc

CUYD

EXC.

CUYD

EMB.

5305 5305

5310 5310

5315 5315

5320 5320

5325 5325

5330 5330

101+00 102+00 103+00 104+00 100+00 105+00 106+00 107+00

EL=5319.25

E= 63618.0878

N= 80331.8266

END CONSTRUCTION

100+81.24

1758 EXC CUYD

62 EMB CUYD

D.21

STATE PROJECT

A u g u s t

U

S S u r ft m y fi le s p w p r o d u c ti o n d m t-b d n .d

C h e c k e d b y

D e s ig n e d b y

,3

.4

,3

.7

+1.0001% -3.0997%

,3

.9

+1.4504%

,3

.0

-2.3465%

,3

.6

SSD = 288'

K = 12

50' VC

SSD = 273'

K = 55

250' VC

SSD = 324'

K = 21

80' VC

N

Existing ground

Profile grade

LC

E. Park St. 101+06.05 =

1st St. 10+06.05

El = 5318.49

Prel im ina ry

Not for

C on str uc

Relocate pole by others of Pavement

Existing Edge

Line to be constructed

Protect pole

Protect pole

(Rat01)

River access trail

Trail (EAT01)

Emergency Access

Remove pole by others

Remove pole by others

31 32

LEGEND:

See Sheet G.2a for details

See Sheet G.2c for details

See Sheet G.2a for details

See Sheet G.2b for details

See Sheet G.1 for details

See Sheet G.1 for details

See Sheet G.4 for details

See Sheet G.4 for details

Removal of bollard

Removal of boulder

Removal of gate (Old iron park fence)

Removal of curb and gutter, concrete

Removal of fence (Old park fence)

Removal of sidewalk, concrete

Curb, stone, type 1, 18-inch depth

Curb and gutter, concrete, 12-inch depth

Curb and gutter, concrete, 12-inch dpeth (sloping)

Gutter, concrete (Valley)

Sidewalk, concrete (Driveway approach with concrete tie)

Sidewalk, concrete (Driveway approach with asphalt tie)

Sidewalk, concrete (6-inch thick)

Sidewalk, concrete (alley approach with asphalt tie)

Sidewalk, asphalt (Driveway approach with asphalt tie)

Accessibility ramp, concrete (Includes truncated domes)

Fence (type 2b, 5' height)

Gate (Iron park fence)

Sidewalk, concrete (4-inch thick)

Removal: Proposed:

See Sheet G.5 for details

Bollard

See Sheet G.1 for details

Curb, Concrete, 12-inch depth

39 Accessibility Ramp, Asphalt

Adjust water valve

Adjust fire hydrant

Manhole adjustment

Curb and gutter, concrete

12-inch depth (type 1B)

Curb and gutter, concrete

Curb and gutter, concrete

(Sloped to normal transition)

12-inch depth

(type 1B transition)

12-inch depth

See J Sheets for details

See J Sheets for details

See J Sheets for details

See J Sheets for details

See J Sheets for details

See Sheet G.11 for details

See Sheet G.2c for details

See Sheet G.2c for details

See Sheet G.2a for details

UP

WV

T

W

SO

W

SOW

SO

W

SO

.1

.4

.2

P O

T

.0

P C

.7

P T

.6

P C

.7

P C

C

.3

304 PCC 304+

00.37

PT 304+44.24

304+44.24

EL=5251.43

E=65758.10

N=80092.83

END PROJECT

E PARK ST

SHEET 2 OF 2

S e e S h e e t

D .2

Curve= RAT45 D

R= 155.00' T= 69.65'

L= 130.92'

Curve= RAT46 D

R= 190.00' T= 32.14'

L= 63.68'

Curve= RAT47 D

R= 70.00'

T= 83.20'

L= 121.99'

Curve= RAT48 D

R= 392.00' T= 21.96'

L= 43.87'

D.22

STATE PROJECT

NUMBER

SHEET

A u g u s t

U

S S u r ft m y fi le s p w p r o d u c ti o n d m t-b d o .d g

C h e c k e d b y

D e s ig n e d b y

NOTE:

2.

1.

and proposed drainageinformation.

See Sheet H.11 for existing and temporary construction limits.

Refer to E Sheets for Right-Of-Way plans

E PARK ST

Prel im ina ry

Not for

C on str uc

,3

.4

,3

.7

,3

.9

,3

.9

,3

.5

-2.0002%

-1 .9

,2

.4

-1 .9

-1 .9

SSD = 77'

K = 1

20' VC

304+44.24

CUYD

EXC.

301+00 302+00 303+00 304+00 300+00 305+00

EL=5251.43

E=65758.10

N=80092.83

END PROJECT

932 EXC CUYD

29 EMB CUYD

D.23

STATE PROJECT

A u g u s t

U

S S u r ft m y fi le s p w p r o d u c ti o n d m t-b d o .d

C h e c k e d b y

D e s ig n e d b y

N

Profile grade

Existing ground

Roadside ditch grade

Prel im ina ry

Not for

C on str uc

.0

,3

.8

-2.8443%

-1 .0

40' VC

,2

.6

CUYD

EXC.

401+00 402+00 403+00 400+00

352 EXC CUYD

15 EMB CUYD

D.24

STATE PROJECT

A u g u s t

U

S S u r ft m y fi le s p w p r o d u c ti o n d m t-b d p .d

C h e c k e d b y

D e s ig n e d b y

N

Existing ground

Emergency Access Trail (EAT01)

Profile grade

Prel im ina ry

Not for

C on str uc

See Sheet D.22

River Access Trail

Curve= CONP12

R= 48.50'

D

T= 22.23'

L= 41.69'

D

Curve= CONP11

R= 48.50'

T= 48.50'

L= 76.18'

Curve= CONP13

D

R= 21.50'

T= 9.86'

L= 18.48'

Remove gate

106+89

Remove gate

106+08

Construct fixture, shelter (Kiosk)

2+49

Remove and reset fence (log rail)

106+01 to 106+33

12-inch depth (paver edging block)

Construct curb, concrete, 300+29 to 300+30

Construct sidewalk, precast concrete pavers

300+25 to 300+85

Benches (2 total)

300+39 to 300+55

Remove fence, chain link (with barbed wire)

106+07 to 106+97

CONFLUENCE PARK PLAN

E PARK ST SITE PLAN AND

NO SCALE

C h e c k e d b y

D e s ig n e d b y

E.4

STATE PROJECT

A u g u s t

I n t_ ft m y fi le s p w p r o d u c ti o n d m t-b e c .d g n

Place boulder

300+27

See N Sheets for quantity tree and shrub.

Remove and replant

E Park St

(EPS02)

See Sheet L.9a for details

Install gate, metal (16-foot)

(Stone masonry edging)

Construct curb, stone, type 1, 18-inch depth

300+72 to 300+74

(Stone masonry edging)

Construct curb, stone, type 1, 18-inch depth

300+42 to 300+59

(Stone masonry edging)

Construct curb stone, type 1, 18-inch depth

300+10 to 300+72

(Stone masonry edging) stone, type 1, 18-inch depth

Construct curb, 300+57 to 300+63

(Stone masonry edging) stone, type 1, 18-inch depth

Construct curb, 105+36 to 106+24

(Stone masonry edging) stone, type 1, 18-inch depth

Construct curb, 300+05 to 300+34

YELLOW

STONE RIVER ACCESS

S E

R V

IC

E R

O A

D

WOOD POST

X X

60X60X36

PLANT

TREATMENT

WATER

OLD

G A

T E

GATE

SHED

STE

EL F

ENCE

HOUSE

HOUSE

BRICKSR

O

C K

S

DORM

IT

ORY

XANTE

RRASTAI

RS

P O

T

.0

P O

T

.0

P C

.7

Prel im ina ry

Not for

C on str uc

N

NOTE:

See Sheet A.5 for parcel location.1.

W MAIN ST

PARCEL 064 and 040

SITE PLAN

See Section N

Construct landscaping

Face of building

Building

" 9

E.5

STATE PROJECT

NUMBER

SHEET

A u g u s t

U

S S u r ft m y fi le s p w p r o d u c ti o n d m t-b e e .d g

C h e c k e d b y

D e s ig n e d b y

See Section D for quantity

See Sheet G.1 for details.

Construct sidewalk, concrete.

Remove sidewalk, concrete.

See Section D for quantity

See Sheet G.1 for details.

Construct sidewalk, concrete.

Remove sidewalk, concrete.

See Section D for quantity

See Sheet G.1 for details.

Construct sidewalk, concrete.

Remove existing sidewalk, concrete.

See Section D for quantity

See Sheet G.1 for details.

Construct sidewalk, concrete.

Remove existing sidewalk, concrete.

See Section D for quantity

See Sheet J.24 for details.

(Driveway approach with concrete tie).

Construct sidewalk, concrete

Slope stake limits E5-001

E5-002

E5-003

E5-004

E5-005 E5-006 E5-007

E5-008 E5-009

E5-010

E5-011

E5-012

E5-013

E5-014

E5-015

E5-016

ES-017ES-018

ES-019

ES-020

See Section D for quantity

See Sheet G.2c for details.

concrete, 12-inch depth.

Construct curb and gutter, See Section D for quantity

See Sheet J.9 for details.

(includes truncated domes).

Construct accessibility ramp, concrete

G a r d in e r

M T

P O B o x

D io c e s e O f M o n ta n a

Prel im ina ry

Not for

C on str uc

041 042

NOTE:

See Sheet A.5 for parcel location.1.

W MAIN ST

PARCEL 041 AND 042

SITE PLAN

See Section N.

Construct landscaping

" 9

E.6

STATE PROJECT

NUMBER

SHEET

A u g u s t

U

S S u r ft m y fi le s p w p r o d u c ti o n d m t-b e f.

d g

C h e c k e d b y

D e s ig n e d b y

E6-001 E6-002

E6-003 E6-004

E6-005

E6-006

E6-007 E6-008

E6-009

E6-010

E6-011E6-012

See Section D for quantity

See Sheet G.1 for details.

Construct sidewalk, concrete.

Remove existing sidewalk, concrete.

See Section D for quantity

See Sheet G.1 for details.

Construct sidewalk, concrete.

Remove sidewalk, concrete.

See Section D for quantity

See Sheet G.1 for details.

Construct sidewalk, concrete.

Remove sidewalk, concrete.

See Section D for quantity

See Sheet J.26 for details.

(Driveway approach with concrete tie).

Construct sidewalk, concrete stake limits

Slope

See Section D for quantity

See Sheet G.2c for details.

concrete, 12-inch depth.

Construct curb and gutter

Prel im ina ry

Not for

C on str uc

044043

NOTE:

See Sheet A.5 for parcel location.1.

W MAIN ST

PARCEL 043 AND 044

SITE PLAN

Protect tree

Protect tree

Slope stake limits fence (chain link)

Remove and reset

18+42 to 18+75

E.7

STATE PROJECT

NUMBER

SHEET

A u g u s t

U

S S u r ft m y fi le s p w p r o d u c ti o n d m t-b e g .d g

C h e c k e d b y

D e s ig n e d b y

E7-001 E7-002

E7-003

E7-004

E7-005 E7-006

E7-007E7-008

See Section D for quantity

See Sheet G.1 for details.

Construct sidewalk, concrete.

Remove sidewalk, concrete.

See Section D for quantity

See Sheet G.1 for details.

concrete.

Cosntruct sidewalk, sidewalk, concrete.

Remove existing

See Section D for quantity

See Sheet G.1 for details.

Construct sidewalk, concrete.

Remove sidewalk, concrete.

See Section N

Construct landscaping

T H I R

D S

T R

E E

T

See Section D for quantity

See Sheet G.2c for details.

concrete, 12-inch depth.

Construct curb and gutter, Prel im ina ry

Not for

C on str uc

046045

Remove fence

19+65 to 19+66

NOTE:

See Sheet A.5 for parcel location.1.

W MAIN ST

PARCEL 045 AND 046

SITE PLAN

See Section D for quantity

Remove existing concrete sidewalk

Remove portion of fence (log rail) to property line, Remove and reset fence (log rail)

20+27 to 20+41

Remove portion of fence (log rail).

to property line.

Remove and reset fence (log rail)

19+65 to 20+23 to property line.

Remove and reset fence (log rail)

19+53 to 19+65

Remove portion of fence (log rail).

to property line.

Remove and reset fence (log rail)

33+98 to 34+48

See Section D for quantiy.

See Sheet G.1 for details.

Construct sidewalk, concrete.

Remove sidewalk, concrete.

See Section D for quantity

Remove concrete sidewalk

E.8

STATE PROJECT

NUMBER

SHEET

A u g u s t

U

S S u r ft m y fi le s p w p r o d u c ti o n d m t-b e h .d g

C h e c k e d b y

D e s ig n e d b y

3'-7"

3'-11"

" 2

E8-001 E8-002

E8-003 E8-004

E8-005 E8-006

E8-007 E8-008

Slope stake limits

See Section N

Construct landscaping

See Section D for quantity

See Sheet G.1 for details.

Construct sidewalk, concrete.

See Section D for quantity

See Sheet G.1 for details.

Construct sidewalk, concrete.

Remove sidewalk, concrete.

T H I R

D S

T R

E E

T

See Section D for quantity

See Sheet G.2c for details.

concrete, 12-inch depth.

Construct curb and gutter, Prel im ina ry

Not for

C on str uc

N

NOTE:

See Sheet A.5 for parcel location.1.

W MAIN ST

PARCEL 047 AND 048

SITE PLAN

See Section N

Cosntruct landscaping

House

Removal of individual tree

20+66

See Section N

Construct landscaping

Slope stake limits

House

See Sheet G.9 for details

Construct concrete stairs.

Remove structure (wood walkway at Parcel 048).

20+96 to 21+00

E.9

STATE PROJECT

NUMBER

SHEET

A u g u s t

U

S S u r ft m y fi le s p w p r o d u c ti o n d m t-b e i.

d g

C h e c k e d b y

D e s ig n e d b y

See Section D for quantity

Remove sidewalk, concrete.

See Section D for quantity

Remove sidewalk, concrete.

See Section D for quantity

Remove sidewalk, concrete.

See Section D for quantity

See Sheet G.1 for details.

Construct sidewalk, concrete.

See Section D for quantity

See Sheet G.1 for details.

Construct sidewalk, concrete.

See Section D for quantity

See Sheet G.1 for details.

Construct sidewalk, concrete.

E9-001 E9-002

E9-003

E9-004

E9-005

E9-006

E9-007

E9-008 to property line fence (log rail)

Remove and reset

21+01 to 21+15

(wood) to property line and reset gate

20+98 Remove to property line fence (log rail)

Remove and reset

20+69 to 20+95

See Section D for quantity

See Sheet G.2c for details.

concrete, 12-inch depth.

Construct curb and gutter, Prel im ina ry

Not for

C on str uc

N

W MAIN ST

NOTE:

See Sheet A.5 for parcel location.1.

PARCEL 049 TO 050

SITE PLAN

Slope stake limits

Building

See Sheet G.10 for details.

handrail, (ADA handrail).

Install fixture, 21+63 to 22+19

E.10

STATE PROJECT

NUMBER

SHEET

A u g u s t

U

S S u r ft m y fi le s p w p r o d u c ti o n d m t-b e j.

d g

C h e c k e d b y

D e s ig n e d b y

E10-001 E10-002

E10-003

E10-004

E10-005

E10-006 E10-007

E10-008

See Section D for quantity

See Sheet G.1 for details.

Construct sidewalk, concrete.

See Section D for quantity

Remove existing sidewalk, concrete.

See Section N

Construct landscaping

See Section D for quantity

Remove existing concrete sidewalk.

See Section D for quantity

See Sheet G.1 for details.

Construct sidewalk, concrete.

See Section D for quantity

See Sheet G.2c for details.

concrete, 12-inch depth.

Construct curb and gutter, Prel im ina ry

Not for

C on str uc

052051

W MAIN ST

NOTE:

See Sheet A.5 for parcel location.1.

PARCEL 051 TO 052

SITE PLAN

See Section D for quantity

See Sheet G.1 for details

Construct sidewalk, concrete

See Section D for quantity

See Sheet G.2c for details concrete,12-inch depth

Construct curb and gutter, See Section D for quantity

Remove existing concrete sidewalk

Building

Existing wood walkway

Existing elevated sidewalk

Building

Slope stake limits

E.11

STATE PROJECT

NUMBER

SHEET

A u g u s t

U

S S u r ft m y fi le s p w p r o d u c ti o n d m t-b e k .d g

C h e c k e d b y

D e s ig n e d b y

E11-001

E11-002

S E

C O

N D S

T R

E E

T H I G

H W

A Y

G

Prel im ina ry

Not for

C on str uc

065053

NOTE:

See Sheet A.5 for parcel location.1.

E MAIN ST

PARCEL 053 TO 065

SITE PLAN

See Section N

Construct landscaping

Slope stake limits fence (wood)

Remove and reset

24+68 to 24+99

E.12

STATE PROJECT

NUMBER

SHEET

A u g u s t

U

S S u r ft m y fi le s p w p r o d u c ti o n d m t-b e l.

d g

C h e c k e d b y

D e s ig n e d b y

" 3

E12-001

E12-002 E12-003

E12-004 E12-005

See Section D for quantity

See Sheet J.27 for details.

(Driveway approach with concrete tie).

Construct sidewalk, concrete

See Section D for quantity

See Sheet G.1 for details.

Construct sidewalk, concrete.

See Section D for quantity

Remove sidewalk, concrete.

S E

C O

N D S

T R

E E

T H I G

H W

A Y

See Section D for quantity

See Sheet G.2c for details.

concrete, 12-inch.

Construct curb and gutter, See Section D for quantity

See Sheet G.1 for details.

concrete.

Construct sidewalk, concrete.

Remove sidewalk, reset fence (wood)

Remove and

25+02 to 25+18

E12-012 E12-010

E12-009

E12-011

E12-008

E12-007

E12-006

Prel im ina ry

Not for

C on str uc

067A

N

E MAIN ST

NOTE:

See Sheet A.5 for parcel location.1.

PARCEL 066 AND 067A

SITE PLAN

See Section N

Construct landscaping

Protect tree

Protect tree

Slope stake limits fence (wood)

Remove and reset

25+18 to 25+28 fence (wood)

Remove and reset

25+31 to 25+50 fence (chain link)

Remove and reset

25+69 to 25+77 fence (chain link)

Remove and reset

25+80 to 25+93

E.13

STATE PROJECT

NUMBER

SHEET

A u g u s t

U

S S u r ft m y fi le s p w p r o d u c ti o n d m t-b e m .d g

C h e c k e d b y

D e s ig n e d b y

E13-001

E13-002

E13-003

E13-004

E13-005

E13-006

E13-007 E13-008

See Section D for quantity

See Sheet J.28 for details.

(Driveway approach with asphalt tie).

Constuct sidewalk, concrete

See Section D for quantity

Remove eixisting sidewalk, concrete.

See Section D for quantity

See Sheet J.29 for details.

(Driveway approach with concrete tie).

Constuct sidewalk, concrete

See Section D for quantity

See Sheet G.1 for details.

Construct sidewalk, concrete.

See Section D for quantity sidewalk, concrete.

Remove existing

See Section D for quantity

See Sheet G.1 for details.

Construct sidewalk, concrete.

Remove sidewalk, concrete.

See Section D for quantity

See Sheet G.1 for details.

Construct sidewalk, concrete.

Remove sidewalk, concrete.

See Section D for quantity

See Sheet G.2c for details.

concrete, 12-depth.

Consruct curb and gutter, Prel im ina ry

Not for

C on str uc

067B

N

Remove wall…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .