DTFAWA-16-R-00024 Amendment 2.pdf

PDF 143 KB Posted

Attached to
Final SIR for the Navigation Technical Assistance Contract NAVTAC) II - Amendment 3
Solicitation number
DTFAWA-16-R-00024
Issued by

About this file

DTFAWA-16-R-00024 Amendment 2 (pdf)

View the file

Other files

File Type Posted
DTFAWA-16-R-00024 Amendment 0003.pdf PDF
J-6D_GBNA SOW.pdf PDF
SECTION M updated as of 11-30-2016.pdf PDF
SECTION C updated as of 11-30-2016.pdf PDF
SECTION B - 10-27-16.pdf PDF
J-9 PAST PERFORMANCE QUESTIONNAIRE updated as of 11-30-2016.doc DOC document
DTFAWA-16-R-00024_Final SIR Questions and Comments 11-30-2016.xlsx XLSX spreadsheet
J-7 Price Proposal Bid Model updated as of 12-15-16.xlsx XLSX spreadsheet
SECTION L_ updated as of 12-15-2016.pdf PDF
SOA-01-DTFAWA-16-R-00024 Amendment 00001.pdf PDF
SECTION D--10-27-16.pdf PDF
SECTION J updated as of 11-30-2016.pdf PDF
J-10 Maste rSubcontracting Plan Template updated as of 11-30-2016.doc DOC document
J-6B- AJV-1 SOW updated as of 11-30-2016.pdf PDF
J-5 BusinessDeclaration.pdf PDF
SECTION K --10-27-16.pdf PDF
J-6C_OEG_SOW.pdf PDF
SECTION H--10-27-16.pdf PDF
SECTION I --10-27-16.pdf PDF
J-6A_MIS TO SOW.pdf PDF
SECTION E --10-27-16.pdf PDF
J- 3 ACRONYM List.pdf PDF
SECTION F --10-27-16.pdf PDF
J-2 Labor Category Descriptions updated as of 11-30-2016.pdf PDF
SECTION G -- 10-27-16.pdf PDF
J-8 Task Order Proposal Bid Model updated as of 12-15-16.xls XLS spreadsheet
Project Material Management System Document.pdf PDF
NAS_Infrastructure_Roadmaps_v10.1_Approved_April_2016.pdf PDF
SOA-01-DTFAWA-16-R-00024.pdf PDF
SECTION J updated as of 11-30-2016.pdf PDF
SECTION C updated as of 11-30-2016.pdf PDF
SECTION F --10-27-16.pdf PDF
SECTION M updated as of 11-30-2016.pdf PDF
DTFAWA-16-R-00024 Amendment 2.pdf PDF
J-6B- AJV-1 SOW updated as of 11-30-2016.pdf PDF
J-8 Task Order Proposal Bid Model updated as of 11-30-2016.xls XLS spreadsheet
J-6A_MIS TO SOW.pdf PDF
J-5 BusinessDeclaration.pdf PDF
SOA-01-DTFAWA-16-R-00024 Amendment 00001.pdf PDF
SECTION H--10-27-16.pdf PDF
J-6D_GBNA SOW.pdf PDF
J-2 Labor Category Descriptions updated as of 11-30-2016.pdf PDF
SECTION L updated as of 11-30-2016.pdf PDF
SECTION E --10-27-16.pdf PDF
SOA-01-DTFAWA-16-R-00024.pdf PDF
SECTION B - 10-27-16.pdf PDF
SECTION I --10-27-16.pdf PDF
SECTION K --10-27-16.pdf PDF
Project Material Management System Document.pdf PDF
NAS_Infrastructure_Roadmaps_v10.1_Approved_April_2016.pdf PDF
Show 40 more

Latest 50 of 288 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1. CONTRACT ID CODE

5. PROJECT NO. (If applicable)2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ.NO.

PAGE OF PAGES

6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6)

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

CODE

9A. AMENDMENT OF SOLICITATION NO.

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

Items 8 and 15, and returning is extended, is not extended.

12. ACCOUNTING AND APPROPRIATION DATA (If required.)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

(x) A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO THE AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation date, etc.) SET FORTH IN ITEM 14.

E. IMPORTANT: Contractor is not, is required to sign this document and return

ORDER NO. IN ITEM 10A.

1 3

000002 12/01/2016

AAQ340-AFN

x

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

separate letter or telegram which includes a reference to the solicitation and amendment number. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT

THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By ___________ 1 x x

DTFAWA-16-R-00024

1 copies to the issuing office.

10/28/2016

(x)

See Page 2

Period of Performance: 01/16/2017 to 01/15/2022

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. CONTRACT AUTHORITY 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

The purpose of Amendment 2 is to address outstanding comments and questions:

1. Question: There is a discrepancy between referenced Labor Categories in PDF file J-2 Labor Category Descriptions and Worksheet(s) J-7D within J-7 Price Proposal Bid Model_Final. J-7 lists 35 Labor Categories, while J-2 lists 64 Labor Categories. Which of the 2 Labor Category sets should be used as the authoritative source for the price proposal submission?

Answer: Revised Attachment J-7 to mirror Attachment J-2 Labor Category Descriptions.

2. Question: There is a circular reference error on tab “J-7.1 Historical Data” and it is also attempting to link to an outside file source. Recommend that the links be broken and that may fix the circular reference error.

Answer: Removed the circular reference. See revised Attachment J-7.

3. Question: Please confirm that offerors and subcontractors (as applicable) are expected to adjust the J-7D

Rate Build-up worksheets to reflect their accounting and estimating systems.

Answer: The FAA confirms that offerors and subcontractors are expected to adjust the J-7D Rate Build-up worksheets to reflect their accounting and estimating systems. J-7D allows expansion of columns, but not rows, to reflect cost element information.

4. Question: Section L.6.2.3.1, Paragraph (a) states “The pricing instructions are applicable to the prime contractor and all subcontractors.” Section L.6.2.3.2 Paragraph (b) states “The Offeror must propose a single fully burdened ceiling labor rate for each labor category inclusive of all contract periods, utilizing the labor category descriptions within Attachment J-2, Labor Category Descriptions.”

The Price Bid Model requirements are geared directly to offerors and not their potential teammates. As there will be one set of rates per offeror, subcontractors should not be required to submit any pricing information with the offeror’s proposal. However, subcontractors should be required to acknowledge, in accordance with Section M.6.3.3, that the FAA may require additional information or reject proposals lacking completeness, consistency or traceability, at its sole discretion. Please confirm that the intent is for the offeror to provide the Price Bid Model in Volume III and that this requirement does not apply to their subcontractors.

Answer: The FAA confirms that pricing instructions are applicable to the prime contractor and all subcontractors per Section L.6.2.3.1. Proposed subcontractors may submit required cost volume information directly to the Contracting Officer.

5. Question: Will the government consider expanding the requirement to Section M, Sub-factor 2.2 to include: “Degree to which the Professional Employee Compensation Plan required by AMS Clause 3.2.6.- 15 reflects a sound management approach and understanding of the NAVTAC requirements and has to the potential to provide uninterrupted high-quality work. Degree to which the proposed professional compensation has the potential to impact recruiting and retention, is realistic, and is consistent with the total plan for compensation.”

Answer: SIR provision L.6.2.2.2, Staffing, Recruitment, and Workforce Development, will be revised to require submission of a Compensation Plan, including fringe benefits, but not salary information. Section M, Sub-factor 2.2 will be revised to assess the degree to which the Offeror's proposed staffing and recruitment approach ensures recruitment, retention, and appropriate compensation of qualified personnel, is reflective of a sound management approach, understanding of contract requirements, and the Offeror's ability to provide uninterrupted high-quality work. SIR provision L.6.2.3.3, Price Proposal Narrative, will be revised to require a submission of a Compensation Plan setting forth salaries and fringe benefits proposed for the personnel under each required labor category under this Contract. Per SIR Section M.6.3, the Price evaluation will determine realism of proposed compensation.

6. Comment: The FAA is confirming that 25% of the contracting dollars equals to the total maximum contract limitation reflected in B.4 across all 7 years. The maximum contract limitation in B.4 includes the estimated contractor support facility. Offerors must adhere to the subcontracting goals reflected in Section L.6.2.5.

7. Comment: Amendment 001 corrected the error found in Section L.6.2.5(b) to match what was stated in

Section H.11(a) which states “the contractor must set-aside 25% of its contracting dollars for small business using the subcontract categories”. The intent for the NAVTAC II contract is a 25% small business contract set-aside. The overarching FAA small business set aside goal is 45%. All offerors are encouraged to meet or exceed the 25% subcontracting goal for the NAVTAC II contract.

The SIR closing date will not be extended.