Industry Day for PRD Change Summary.pdf

PDF 6 MB Posted

Attached to
Draft RFP - Near Earth Orbit Network Program's Sounder for Microwave-Based Applications
Solicitation number
DRFP-NEON-SMBA-2025
Issued by

About this file

This document is a presentation slide deck summarizing Amendment 18 to the SMBA (Small Microwave Sounder) Draft RFP for NASA's NEON (Near Earth Orbit Network) program, presented in January 2026.

The presentation outlines changes to the Performance Requirements Document (PRD) Revision D (NS1-SMBA-REQ-0001 Rev D) incorporating industry feedback from the Draft RFP posted April 18, 2025 (Rev B) and Amendment 13 posted September 5, 2025 (Rev C), as well as internal NASA technical discussions and program changes. Major performance requirement revisions include: modifications to hyperspectral resolution specifications; refined reprogrammable detection capabilities for all hyperspectral and RFI detection bands; fixed heritage channel center frequencies aligned with ATMS standards; new beam polarization requirements for all SMBA channels (minimum one linear polarization, twist angle <0.1 degree, cross-polarization leakage <-20dB for K, Ka, W bands and <-15dB for others); replacement of striping requirements with 1/f noise ratio (≤0.10); and addition of passband gain ripple specifications. The document reflects revised calibration uncertainty definitions, redefined radiometric sensitivity (NEDT) with thermal noise contributions only, and resolved Technical Basis Documents for Synthetic Receive Function requirements. Functional and test requirement changes include extended ground storage to 13 years, relaxed TVAC thermal balance testing, reduced TVAC cycles from 12 to 8 before instrument delivery, and elimination of CS116 EMI/EMC testing. Requirements are renumbered sequentially with sections on Safety, Mission Assurance, Contamination Control, and Instrument Simulator/Emulator moved to the SOW/CDRL. The RFP is scheduled for Q1 CY 2026 release, with proposals due 60 calendar days thereafter and award anticipated Q2 CY 2027. One-on-one industry discussions continue until RFP blackout.

View the file

Other files

File Type Posted
Amnt 25 - Technical QA for PRD Rev E.pdf PDF
Amnt 24 - SMBA PRD Rev E.pdf PDF
Amnt 23 - MS Sections L and M.pdf PDF
Amnt 22 - Acquisition Strategy Update.pdf PDF
NS1-SMBA-CDRL-0001C_01152026.pdf PDF
Draft RFP Amendment 16 Industry Day v3 01052026.pdf PDF
Amendment 16 - Acq Strategy Change and DRFP QA.pdf PDF
Amnt13 - Attachment C - Non-Technical Contract Data Requirements List.pdf PDF
Amnt13 - DRD 3 - SCV Reporting.pdf PDF
Amnt13 - Attachment E - C-SCRM Plan.pdf PDF
Amnt13 - Attachment M - Reserved.pdf PDF
Amnt13 - NS1-SMBA-REQ-0001C_NS1 SMBA PRD_08192025_revised.pdf PDF
Amnt13 - Attachment P.1 Payment Schedules (CLIN 0001).pdf PDF
Amnt13 - Enclosure 2 - Cost Exhibits 1-7.xlsx XLSX spreadsheet
Amnt13 - Enclosure 3 - Past Performance Questionnaire.pdf PDF
Amnt13 - Enclosure 4 - Financial Capability Disclosure.pdf PDF
Amnt13 - DRFP Cover Letter - 80GSFC25R7005 SMBA (Amendment 13).pdf PDF
Amnt13 - RFP - 80GSFC25R7005 SMBA (20250829).pdf PDF
Amnt13 - NS1-SMBA-SOW-0002B_NS1 SMBA SOW_08192025.pdf PDF
Amnt13 - Attachment B - Financial Management Reporting Requirements.pdf PDF
Amnt13 - Attachment G - Small Business Subcontracting Plan.pdf PDF
Amnt13 - Attachment I - Government Furnished Property.pdf PDF
Amnt13 - Attachment J - Reserved.pdf PDF
Amnt13 - Attachment K - TM Rate Matrices.pdf PDF
Amnt13 - SF33-22 - 80GSFC25R7005 SMBA.pdf PDF
SMBA DFRP QA 1-4.pdf PDF
470-LEO-ANYS-00018 - Radiation Environment.pdf PDF
ATTACHMENT J - CWBS.pdf PDF
Enclosure 4 - Financial Capability Disclosure.pdf PDF
Enclosure 1 - Performance Evaluation Plan.pdf PDF
Enclosure 3 - Past Performance Questionnaire.pdf PDF
SMBA Post-DRFP Industry Day Slides.pdf PDF
Post-DRFP Industry Day.pdf PDF
Attachment L - Contractor Proposed Enhancements.pdf PDF
Attachment D - OCI Plan.pdf PDF
Attachment C - Non-Technical Contract Data Requirements List.pdf PDF
NS1-SMA-REQ-0002B_NS1 SMBA IMAR_04092025.pdf PDF
Attachment B - Financial Management Reporting Requirements.pdf PDF
Attachment H - Requirements Statements List.pdf PDF
DRFP Cover Letter - 80GSFC25R7005 SMBA_41825.pdf PDF
NS1-SMBA-CDRL-0001A_NS1 SMBA CDRL_04102025.pdf PDF
Attachment A - NS1-SMBA-SOW-0002A_NS1 SMBA SOW_04172025.pdf PDF
Attachment G - Small Business Subcontracting Plan.pdf PDF
DRD 2 - Security Requirements for Unclassified IT Resources.pdf PDF
DRD 1 - OCI Plan.pdf PDF
Attachment J - CWBS.pdf PDF
Attachment K - Rates Matrices.pdf PDF
Attachment N - Applicable Documents List.pdf PDF
Attachment F - Safety and Health Plan.pdf PDF
Attachment I - Government Furnished Property.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .