Amnt 20 - Acquisition Strategy Update.pdf

PDF 157 KB Posted

Attached to
Draft RFP - Near Earth Orbit Network Program's Sounder for Microwave-Based Applications
Solicitation number
DRFP-NEON-SMBA-2025
Issued by

About this file

This is Amendment 20 to the Draft Request for Proposal (RFP) for Sounder for Microwave-Based Applications (80GSFC25R7005) issued by NASA Goddard Space Flight Center. The amendment updates the acquisition strategy for this space instrument procurement.

The contract structure includes four base CLINs and one option CLIN covering five flight models (FM1-FM5). CLIN 0001 is Cost Plus Fixed Fee with Schedule Incentive for FM1 non-recurring engineering, development, and production through launch plus six months. CLINs 0002 and 0003 are Firm Fixed Price and Time and Material, respectively, for FM2-FM3 production and post-acceptance support. Option CLIN 0004 is Firm Fixed Price for FM4-FM5 parts and production. Delivery dates are staggered annually from July 1, 2032 (FM1) through July 1, 2036 (FM5), with acceptance occurring at post-commissioning or launch plus six months for FM1, and post-bench acceptance test at the spacecraft vendor facility for remaining flight models.

The evaluation criteria allocate 1,000 Mission Suitability points distributed as follows: Technical Approach (500 points), Management Approach (400 points), and Small Business Utilization (100 points). The Government increased Management Approach weighting to emphasize contractor-managed processes, risk and schedule management capabilities, and vendor effectiveness. Technical Approach evaluation addresses system performance, instrument design, manufacturing/integration/test, and safety/mission assurance. The contractor must comply with Buy American and Trade Act requirements and an Economic Price Adjustment clause limited to regulatory flexibilities. Updated Statement of Work and Contract Data Requirements List accompany this amendment, with the Performance Requirements Document to follow upon approval.

View the file

Other files

File Type Posted
Amnt 23 - MS Sections L and M.pdf PDF
Amnt 22 - Acquisition Strategy Update.pdf PDF
NS1-SMBA-SOW-0002C_01152026.pdf PDF
Technical QA topics for PRD.pdf PDF
Amendment 15 - Amendment 13 QA 1 and 2.pdf PDF
Amendment 13 - Industry Day.pdf PDF
Amnt13 - DRD 1 - OCI Plan.pdf PDF
Amnt13 - DRD 2 - Security Requirements for Unclassified IT Resources.pdf PDF
Amnt13 - Attachment F - Safety and Health Plan.pdf PDF
Amnt13 - Attachment H - Requirements Statements List.pdf PDF
Amnt13 - NS1-SMBA-CDRL-0001B_NS1 SMBA CDRL_08192025.pdf PDF
Amnt13 - Enclosure 1 - Reserved.pdf PDF
Amnt13 - DRFP Cover Letter - 80GSFC25R7005 SMBA (Amendment 13).pdf PDF
Amnt13 - RFP - 80GSFC25R7005 SMBA (20250829).pdf PDF
Amnt13 - NS1-SMBA-SOW-0002B_NS1 SMBA SOW_08192025.pdf PDF
Amnt13 - Attachment B - Financial Management Reporting Requirements.pdf PDF
Amnt13 - Attachment G - Small Business Subcontracting Plan.pdf PDF
Amnt13 - Attachment I - Government Furnished Property.pdf PDF
Amnt13 - Attachment J - Reserved.pdf PDF
Amnt13 - Attachment K - TM Rate Matrices.pdf PDF
Amnt13 - SF33-22 - 80GSFC25R7005 SMBA.pdf PDF
Amnt13 - Attachment C - Non-Technical Contract Data Requirements List.pdf PDF
Amnt13 - DRD 3 - SCV Reporting.pdf PDF
Amnt13 - Attachment E - C-SCRM Plan.pdf PDF
Amnt13 - Attachment M - Reserved.pdf PDF
SMBA DFRP QA 1-4.pdf PDF
470-LEO-ANYS-00018 - Radiation Environment.pdf PDF
Enclosure 1 - Performance Evaluation Plan.pdf PDF
Enclosure 3 - Past Performance Questionnaire.pdf PDF
ATTACHMENT J - CWBS.pdf PDF
Enclosure 4 - Financial Capability Disclosure.pdf PDF
SMBA Post-DRFP Industry Day Slides.pdf PDF
Post-DRFP Industry Day.pdf PDF
Attachment L - Contractor Proposed Enhancements.pdf PDF
Attachment C - Non-Technical Contract Data Requirements List.pdf PDF
Attachment D - OCI Plan.pdf PDF
DRD 2 - Security Requirements for Unclassified IT Resources.pdf PDF
DRD 1 - OCI Plan.pdf PDF
Attachment J - CWBS.pdf PDF
Attachment K - Rates Matrices.pdf PDF
Attachment N - Applicable Documents List.pdf PDF
Attachment F - Safety and Health Plan.pdf PDF
Attachment I - Government Furnished Property.pdf PDF
NS1-SMBA-CDRL-0001A_NS1 SMBA CDRL_04102025.pdf PDF
Attachment A - NS1-SMBA-SOW-0002A_NS1 SMBA SOW_04172025.pdf PDF
Attachment G - Small Business Subcontracting Plan.pdf PDF
NS1-SMA-REQ-0002B_NS1 SMBA IMAR_04092025.pdf PDF
Attachment B - Financial Management Reporting Requirements.pdf PDF
Attachment H - Requirements Statements List.pdf PDF
DRFP Cover Letter - 80GSFC25R7005 SMBA_41825.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Draft Request for Proposal – Sounder for Microwave-Based Applications

80GSFC25R7005

Amendment 20 – Acquisition Strategy Update

Below are updates to the Acquisition Strategy for the Sounder for Microwave-Based Applications procurement. In the event of any conflict, the final Request for Proposal provisions and contract terms will take precedence.

1. CLIN Structure

Base or Option CLIN Contract Type Description Base 0001 Cost Plus Fixed Fee with Schedule Incentive for Flight Model (FM) 1

Non-Recurring Engineering, Engineering Development Program, FM1 Production through Launch + 6 Months, FM 1-3 Parts

Base 0002 Firm Fixed Price FM2 and FM3

Production through Bench Acceptance Test at the Spacecraft Vendor Facility

Base 0003 Time and Material Task Orders for: Special Studies, Post Commissioning Support (FM1), Post-Bench Acceptance Test at the Spacecraft Vendor Facility Support (Remaining FMs)

Option 0004 Firm Fixed Price FM 4 and FM5 Parts and Production

2. Mission Suitability Point Distribution

Mission Suitability Subfactors

a. Technical Approach: 500 Points

b. Management Approach: 400 Points

c. Small Business Utilization: 100 Points

d. Total: 1,000 Points

Rationale for the point increase to Management Approach:

The Management Approach is weighted more heavily than past procurements to reflect increased reliance on contractor-managed processes. As contractor processes will play a larger role in execution, the Government places greater emphasis on the quality, maturity, and proven effectiveness of those processes. Additionally, risk and schedule management are key elements of the Management Approach, and increased weighting allows for more meaningful evaluation of the vendor’s ability to identify and mitigate risk, manage schedule performance, and ensure timely and successful delivery.

3. Evaluation Criteria Structure

Solicitation

Mission Suitability

(MS)

Volume Requirement

Solicitation

Section L Numbering Nomenclature

Offeror MS Volume

Numbering Nomenclature

Offeror MS Volume Page Number

Subfactor A Technical Approach

GSFC 52.215-210, A Volume II

Technical Approach Overview

GSFC 52.215-210, A1

System Performance GSFC 52.215-210, A2

Instrument Design GSFC 52.215-210, A3

Manufacturing, Integration and Test

GSFC 52.215-210, A4

Safety and Mission Assurance

GSFC 52.215-210, A5

Subfactor B Management Approach

GSFC 52.215-210, B Volume II

Management Approach Overview

GSFC 52.215-210, B1

Risk Management GSFC 52.215-210, B2

Schedule GSFC 52.215-210, B3

Subcontracting GSFC 52.215-210, B4

Facilities GSFC 52.215-210, B5

4. Requirements Documents

The Government will post the updated Statement of Work and Contract Data Requirements List with this amendment. The Government plans on posting the updated Performance Requirements Document upon approval.

5. Delivery Dates/Acceptance Point and Transition to Time and Material Task Orders

Delivery Dates to the Spacecraft Vendor

FM1 – July 1, 2032; FM2 – July 1, 2033; FM3 – July 1, 2034; FM4 – July 1, 2035; FM5 – July 1, 2036

Acceptance Events

FM1 – Post-Commissioning or Launch + 6 months, whichever is later; Remaining FMs: Post- Bench Acceptance Test at the Spacecraft Vendor Facility

Transition Point to Time and Material Task Order Mechanism

The transition to the Time and Material Task Order mechanism will occur at the same point as the Acceptance Events described above. All work performed prior to Acceptance will be completed under the core requirements and not under Time and Material Task Orders.

6. Buy American/Trade Act Considerations

The contractor is responsible for complying with all Buy American and Trade Act clauses in the contract, as well as all applicable laws. The Government will not predetermine applicability or specify which portions of the work are covered by each requirement.

7. Economic Price Adjustment Clause

The Government will include an Economic Price Adjustment clause, limited to the flexibilities permitted by regulation. No deviations from the standard clause language or prescribed fill-ins will be considered.