Enclosure 2 - Cost Exhibits 1-7.xlsx

XLSX spreadsheet 72 KB Posted

Attached to
Draft RFP - Near Earth Orbit Network Program's Sounder for Microwave-Based Applications
Solicitation number
DRFP-NEON-SMBA-2025
Issued by

About this file

The file is a comprehensive Cost Exhibits spreadsheet (Enclosure 2) for NASA Goddard Space Flight Center's Draft RFP (DRFP #80GSFC25R7005) for the Near Earth Orbit Network (NEON) program's Sounder for Microwave-Based Applications (SMBA). The exhibits include detailed cost breakdowns across multiple fiscal years (FY26-FY34), covering labor categories, rates, productive work years, total costs, material items, funding summaries, and small business subcontracting goals. The cost exhibits provide a structured template for potential offerors to propose their pricing, with sections detailing labor hours, direct costs, overhead, and different Work Breakdown Structure (WBS) levels including Flight Models, Program Management, Systems Engineering, Mission Assurance, and various technical support areas.

The document includes specific exhibits for small business subcontracting goals, with detailed percentage and dollar amount targets for various small business categories such as Small Disadvantaged Business, Women-Owned Small Business, HUBZone, Veteran-Owned, and Service-Disabled Veteran-Owned businesses. Additional exhibits provide information for Defense Contract Audit Agency (DCAA) and Defense Contract Management Agency (DCMA) contacts, and outline the financial and administrative framework for the potential contract. The cost exhibits are marked as containing Source Selection Information and are designed to support a comprehensive proposal for the NEON SMBA instrument development and support requirement.

View the file

Other files

File Type Posted
Amnt 23 - MS Sections L and M.pdf PDF
Amnt 22 - Acquisition Strategy Update.pdf PDF
NS1-SMBA-SOW-0002C_01152026.pdf PDF
Technical QA topics for PRD.pdf PDF
Amendment 15 - Amendment 13 QA 1 and 2.pdf PDF
Amendment 13 - Industry Day.pdf PDF
Amnt13 - DRFP Cover Letter - 80GSFC25R7005 SMBA (Amendment 13).pdf PDF
Amnt13 - RFP - 80GSFC25R7005 SMBA (20250829).pdf PDF
Amnt13 - NS1-SMBA-SOW-0002B_NS1 SMBA SOW_08192025.pdf PDF
Amnt13 - Attachment B - Financial Management Reporting Requirements.pdf PDF
Amnt13 - Attachment G - Small Business Subcontracting Plan.pdf PDF
Amnt13 - Attachment I - Government Furnished Property.pdf PDF
Amnt13 - Attachment J - Reserved.pdf PDF
Amnt13 - Attachment K - TM Rate Matrices.pdf PDF
Amnt13 - SF33-22 - 80GSFC25R7005 SMBA.pdf PDF
Amnt13 - DRD 1 - OCI Plan.pdf PDF
Amnt13 - DRD 2 - Security Requirements for Unclassified IT Resources.pdf PDF
Amnt13 - Attachment F - Safety and Health Plan.pdf PDF
Amnt13 - Attachment H - Requirements Statements List.pdf PDF
Amnt13 - NS1-SMBA-CDRL-0001B_NS1 SMBA CDRL_08192025.pdf PDF
Amnt13 - Enclosure 1 - Reserved.pdf PDF
Amnt13 - Attachment C - Non-Technical Contract Data Requirements List.pdf PDF
Amnt13 - DRD 3 - SCV Reporting.pdf PDF
Amnt13 - Attachment E - C-SCRM Plan.pdf PDF
Amnt13 - Attachment M - Reserved.pdf PDF
SMBA DFRP QA 1-4.pdf PDF
470-LEO-ANYS-00018 - Radiation Environment.pdf PDF
Enclosure 1 - Performance Evaluation Plan.pdf PDF
Enclosure 3 - Past Performance Questionnaire.pdf PDF
ATTACHMENT J - CWBS.pdf PDF
Enclosure 4 - Financial Capability Disclosure.pdf PDF
SMBA Post-DRFP Industry Day Slides.pdf PDF
Post-DRFP Industry Day.pdf PDF
Attachment L - Contractor Proposed Enhancements.pdf PDF
Attachment C - Non-Technical Contract Data Requirements List.pdf PDF
Attachment D - OCI Plan.pdf PDF
NS1-SMBA-CDRL-0001A_NS1 SMBA CDRL_04102025.pdf PDF
Attachment A - NS1-SMBA-SOW-0002A_NS1 SMBA SOW_04172025.pdf PDF
Attachment G - Small Business Subcontracting Plan.pdf PDF
DRD 2 - Security Requirements for Unclassified IT Resources.pdf PDF
DRD 1 - OCI Plan.pdf PDF
Attachment J - CWBS.pdf PDF
Attachment K - Rates Matrices.pdf PDF
Attachment N - Applicable Documents List.pdf PDF
Attachment F - Safety and Health Plan.pdf PDF
Attachment I - Government Furnished Property.pdf PDF
NS1-SMA-REQ-0002B_NS1 SMBA IMAR_04092025.pdf PDF
Attachment B - Financial Management Reporting Requirements.pdf PDF
Attachment H - Requirements Statements List.pdf PDF
DRFP Cover Letter - 80GSFC25R7005 SMBA_41825.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Exhibit 1 Rates

DRFP #80GSFC25R7005
Proposing Entity:
[ ] Prime Offeror OR [ ] Significant Subcontractor
Exhibit 1
SUMMARY OF PROPOSED RATES
Rate CodeBasis of ApplicationFY 26FY 27FY 28FY 29FY 30FY 31FY 32FY 33FY 34FY etc
Direct Labor Categories
Labor Category 1
Labor Category 2
Labor Category 3, etc.
Fringe Benefit
Engineering
Manufacturing
Administration
Technician
Other -- Specify
Overhead
Engineering
Manufacturing
Administration
Technician
Other -- Specify

Material Handling

G & A
Development
Production
Other
COM
Development
Production
G&A
Award Fee
Fixed Fee for Task Orders
Labor Escalation

This exhibit contains Source Selection Information. See FAR 3.104.

Exhibit 2 Prod WY

DRFP #80GSFC25R7005
Proposing Entity:
[ ] Prime Offeror OR [ ] Significant Subcontractor
Exhibit 2
PRODUCTIVE WORK YEAR CALCULATION
FY 26FY 27FY 28FY 29FY 30FY 31FY 32FY 33FY 34FY etc
Total Possible Hours in Year
Less:
Vacation in Hours

Holidays in Hours

Sick Leave in Hours

Miscellaneous in Hours
(specifically identify)

PRODUCTIVE WORK YEAR in Hours (Hours Actually Worked)

This exhibit contains Source Selection Information. See FAR 3.104.

Exhibit 3 Total Cost By GFY

DRFP #80GSFC25R7005
Proposing Entity:
[ ] Prime Offeror OR [ ] Significant Subcontractor
Exhibit 3 (Base + All Options)
TOTAL COST SUMMARY BY ELEMENT OF COST BY GFY
FY 26FY 27FY 28FY 29FY 30FY 31FY 32FY 33FY 34FY etcTotal
Individual Labor Categories
Labor Category 1
Labor Category 2
Labor Category 3, etc.
Total Prime Hours
Individual Labor Categories
Labor Category 1
Labor Category 2
Labor Category 3, etc.
Total Prime Labor Cost
Fringe Benefits
Engineering Overhead
Manufacturing Overhead
Major/Critical Subcontractor Cost
Other Subcontractor Cost
Interdivisional Cost
Material
Material Overhead
Travel
Other Direct Costs
G&A
Subtotal Cost
Cost of Money
Total Cost
Award Fee
Fixed Fee for Task Orders
Total Cost Plus Fee
This exhibit contains Source Selection Information. See FAR 3.104.

Exhibit 3 Base Cost By GFY

DRFP #80GSFC25R7005
Proposing Entity:
[ ] Prime Offeror OR [ ] Significant Subcontractor
Exhibit 3 (Base)
BASE COST SUMMARY BY ELEMENT OF COST BY GFY
FY 26FY 27FY 28FY 29FY 30FY 31FY 32FY 33FY 34FY etcTotal
Individual Labor Categories
Labor Category 1
Labor Category 2
Labor Category 3, etc.
Total Prime Hours
Individual Labor Categories
Labor Category 1
Labor Category 2
Labor Category 3, etc.
Total Prime Labor Cost
Fringe Benefits
Engineering Overhead
Manufacturing Overhead
Major/Critical Subcontractor Cost
Other Subcontractor Cost
Interdivisional Cost
Material
Material Overhead
Travel
Other Direct Costs
G&A
Subtotal Cost
Cost of Money
Total Cost
Award Fee
Fixed Fee for Task Orders
Total Cost Plus Fee
This exhibit contains Source Selection Information. See FAR 3.104.

Exhibit 3 Opt 1 Cost By GFY

DRFP #80GSFC25R7005
Proposing Entity:
[ ] Prime Offeror OR [ ] Significant Subcontractor
Exhibit 3 (Option 1)
OPT 1 COST SUMMARY BY ELEMENT OF COST BY GFY
FY 26FY 27FY 28FY 29FY 30FY 31FY 32FY 33FY 34FY etcTotal
Individual Labor Categories
Labor Category 1
Labor Category 2
Labor Category 3, etc.
Total Prime Hours
Individual Labor Categories
Labor Category 1
Labor Category 2
Labor Category 3, etc.
Total Prime Labor Cost
Fringe Benefits
Engineering Overhead
Manufacturing Overhead
Major/Critical Subcontractor Cost
Other Subcontractor Cost
Interdivisional Cost
Material
Material Overhead
Travel
Other Direct Costs
G&A
Subtotal Cost
Cost of Money
Total Cost
Award Fee
Total Cost Plus Fee
This exhibit contains Source Selection Information. See FAR 3.104.

Exhibit 3A Total Cost by WBS

DRFP #80GSFC25R7005
Proposing Entity:
Exhibit 3A
Total Cost
Level 2 WBS
Level 3 WBSLevel 4 WBSNREFlight Model (FM1)FM2FM3FM4Task OrdersMission OpsTotal BasicOpt1 FM5Opt1 FM6Opt1 FM7Opt1 FM8Opt1 Mission OpsTotal Option 1Total
Program Management
Subtotal PM
Systems Engineering
Subtotal SE
Mission Assurance
Subtotal MA
Hardware/Software
Subtotal Hardware/Software
Integration and Test (I&T)
Subtotal I&T
Ground Support Equipment (GSE)
Subtotal GSE
Post Delivery Support (PDS)
Subtotal PDS
Launch and Post Launch Testing (PLT)
Subtotal L&PLT
Task Orders
Subtotal Task Orders
Long Term Support (LTS)

Subtotal LTS

Total Prime Cost

This exhibit contains Source Selection Information. See FAR 3.104.

Exhibit 3B Total Labor Hour

DRFP #80GSFC25R7005
Proposing Entity:
Exhibit 3B
Total Labor Hours
Level 2 WBS
Level 3 WBSLevel 4 WBSNREFlight Model (FM1)FM2FM3FM4Task OrdersMission OpsTotal BasicOpt1 FM5Opt1 FM6Opt1 FM7Opt1 FM8Opt1 Mission OpsTotal Option 1Total
Program Management
Subtotal PM
Systems Engineering
Subtotal SE
Mission Assurance
Subtotal MA
Hardware/Software
Subtotal Hardware/Software
Integration and Test (I&T)
Subtotal I&T
Ground Support Equipment (GSE)
Subtotal GSE
Post Delivery Support (PDS)
Subtotal PDS
Launch and Post Launch Testing (PLT)
Subtotal L&PLT
Task Orders
Subtotal Task Orders
Long Term Support (LTS)

Subtotal LTS

Total Prime Hours

This exhibit contains Source Selection Information. See FAR 3.104.

Exhibit 3C Total Labor $

DRFP #80GSFC25R7005
Proposing Entity:
Exhibit 3C
Total Labor Dollars
Level 2 WBS
Level 3 WBSLevel 4 WBSNREFlight Model (FM1)FM2FM3FM4Task OrdersMission OpsTotal BasicOpt1 FM5Opt1 FM6Opt1 FM7Opt1 FM8Opt1 Mission OpsTotal Option 1Total
Program Management
Subtotal PM
Systems Engineering
Subtotal SE
Mission Assurance
Subtotal MA
Hardware/Software
Subtotal Hardware/Software
Integration and Test (I&T)
Subtotal I&T
Ground Support Equipment (GSE)
Subtotal GSE
Post Delivery Support (PDS)
Subtotal PDS
Launch and Post Launch Testing (PLT)
Subtotal L&PLT
Task Orders
Subtotal Task Orders
Long Term Support (LTS)

Subtotal LTS

Total Prime Cost

This exhibit contains Source Selection Information. See FAR 3.104.

Exhibit 4 Material

DRFP #80GSFC25R7005
Proposing Entity:
[ ] Prime Offeror OR [ ] Significant Subcontractor
Exhibit 4
MATERIAL ITEMS

CONTRACT YEAR WBS(s) NOMENCLATURE PART NUMBER QUANTITY REQUIRED UNIT PRICE TOTAL PRICE

TOTAL

This exhibit contains Source Selection Information. See FAR 3.104.

Exhibit 5 Funding Summary

DRFP #80GSFC25R7005
Proposing Entity:
Exhibit 5
PRIME OFFEROR
FUNDING SUMMARY BY GOVERNMENT FY
Basic ContractOption 1
QuarterCumulative FundingCumulative CostCumulative FeeCumulative PriceMan-MonthsCumulative FundingCumulative CostCumulative FeeCumulative PriceMan-Months
FY26
FY27
FY28
FY29
FY30
FY31
FY32
FY33
FY34
FY etc

Exhibit 6A DCAA Info

DRFP #80GSFC25R7005
Proposing Entity:
[ ] Prime Offeror OR [ ] Significant Subcontractor
Exhibit 6A
Cognizant Defense Contract Audit Agency (DCAA) Office Information

DCAA Online Info http://www.dcaa.mil

Submitting Entity:DCAA Field Audit Office (FAO):
Company Name:DCAA FAO:
CAGE Code:
POC:POC:

Phone Number: Phone Number:

FAX Number: FAX Number:

E-Mail Address: E-Mail Address:

Street: Street:

P.O.Box: P.O.Box:

City: City:

State: State:

Zip Code: Zip Code:

Note: The submitting entity audit point of contact (POC) and address provided above must be at a location where auditable records supporting the proposed amounts physically reside.

This exhibit contains Source Selection Information. See FAR 3.104.

http://www.dcaa.mil/ Exhibit 6B DCMA Info

DRFP #80GSFC25R7005
Proposing Entity:
[ ] Prime Offeror OR [ ] Significant Subcontractor
EXHIBIT 6B
Cognizant Defense Contract Management Agency (DCMA) Office Information

DCMA Online Info http://www.dcma.mil

Submitting Entity:DCMA Cognizant Office:
Company Name:DCMA Office

POC: POC:

Phone Number: Phone Number:

FAX Number: FAX Number:

E-Mail Address: E-Mail Address:

Street: Street:

P.O.Box: P.O.Box:

City: City:

State: State:

Zip Code: Zip Code:

Disclosures:DateAudit Report #Status
Contractor Estimating System Review (CESR)
Contractor Purchasing System Review (CPSR)
Contractor Billing System Review
Contractor Accounting System Review
Contractor Disclosure Statement Accuracy
Contractor Executive Compensation Review
Contractor Property Management System
Forward Pricing Rate Agreements
Earned Value Management System (EVMS)
Level of CAS applicability
Determination of Cost Accounting Standards (CAS) applicability

Note: The submitting entity audit point of contact (POC) and address provided above must be at a location where auditable records supporting the proposed amounts physically reside.

This exhibit contains Source Selection Information. See FAR 3.104.

http://www.dcma.mil/ Exhibit 7A Sub Goals Basic

DRFP #80GSFC25R7005
Proposing Entity:
Exhibit 7A
SMALL BUSINESS SUBCONTRACTING PLAN GOALS
BASIC CONTRACT ONLY
SMALL BUSINESS CATEGORYPROPOSED BASE PERIOD CONTRACT GOALS BASED ON TOTAL BASE CONTRACT VALUE OF $TBPPROPOSED BASE PERIOD CONTRACT GOALS

BASED ON TOTAL PLANNED SUBCONTRACTS OF $TBP

Dollar Amount*PercentageDollar Amount*Percentage
Small Business
Small Disadvantaged Business Concerns
Women-Owned Small Business Concerns
Historically Black Colleges and Universities/ Minority Serving Institutions
HUBZone Small Business Concerns
Veteran-Owned Small Business Concerns
Service-Disabled Veteran-Owned Small Business Concerns
TOTAL SMALL BUSINESS SUBCONTRACTING
Large Business Concerns
TOTAL SUBCONTRACTING (SMALL & LARGE BUSINESS CONCERNS)

*Dollar Amount should be the same

This exhibit contains Source Selection Information. See FAR 3.104.

Exhibit 7B Sub Goals Opt

DRFP #80GSFC25R7005
Proposing Entity:
Exhibit 7B
SMALL BUSINESS SUBCONTRACTING PLAN GOALS
OPTION ONLY

SMALL BUSINESS CATEGORY PROPOSED OPTION 1 GOALS BASED ON TOTAL OPTION 1 VALUE OF $TBP PROPOSED OPTION 1 GOALS BASED ON OPTION 1 PLANNED SUBCONTRACTS OF $TBP

Dollar Amount*PercentageDollar Amount**Percentage
Small Business
Small Disadvantaged Business Concerns
Women-Owned Small Business Concerns
Historically Black Colleges and Universities/ Minority Serving Institutions
HUBZone Small Business Concerns
Veteran-Owned Small Business Concerns
Service-Disabled Veteran-Owned Small Business Concerns
TOTAL SMALL BUSINESS SUBCONTRACTING
Large Business Concerns
TOTAL SUBCONTRACTING (SMALL & LARGE BUSINESS CONCERNS)

*Dollar Amount should be the same

This exhibit contains Source Selection Information. See FAR 3.104.

Exhibit 7C Total Sub Goals

DRFP #80GSFC25R7005
Proposing Entity:
Exhibit 7C
SMALL BUSINESS SUBCONTRACTING PLAN GOALS
BASE CONTRACT PERIOD PLUS FOUR OPTION PERIODS
SMALL BUSINESS CATEGORYPROPOSED BASE PLUS 1 OPTION PERIOD CONTRACT GOALS
BASED ON TOTAL BASE VALUE PLUS 1 OPTION VALUES OF $TBPPROPOSED BASE PLUS 1 OPTION PERIOD CONTRACT GOALS

BASED ON TOTAL PLANNED SUBCONTRACTS OF $TBP

Dollar Amount*PercentageDollar Amount*Percentage
Small Business
Small Disadvantaged Business Concerns
Women-Owned Small Business Concerns
Historically Black Colleges and Universities/ Minority Serving Institutions
HUBZone Small Business Concerns
Veteran-Owned Small Business Concerns
Service-Disabled Veteran-Owned Small Business Concerns
TOTAL SMALL BUSINESS SUBCONTRACTING
Large Business Concerns
TOTAL SUBCONTRACTING (SMALL & LARGE BUSINESS CONCERNS)

*Dollar Amount should be the same

This exhibit contains Source Selection Information. See FAR 3.104.

File details come from the government source that posted it. Updated .