This document is a Facility Exhaust System Requirements Matrix that is part of a Draft Request for Proposals (RFP) for a contract opportunity at the Arnold Engineering Development Complex (AEDC).
The key requirements outlined in the document include providing an independent exhaust plant capable of meeting specified pressure, flow rate, and duct velocity parameters; maintaining fast system preparation and pump-down times; meeting OSHA emissions standards; and providing pressurized air and cooling water systems to support the exhaust system. The control system requirements specify that the exhaust system shall be internally controlled with no closed-loop control or active automation feedback to other facility systems. The document also includes detailed design conditions, constraints, standards, and utility budgets that the offeror must comply with. Overall, this matrix lays out the technical and performance requirements for the facility exhaust system that offerors must address in their proposals for the competitive acquisition.
View the file
Other files
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Facility Exhaust System
FA9101-25-R-B001
Attachment 14, L-8
OFFEROR VOLUME
REFERENCE
(volume, page and paragraph)
ID REQUIREMENT THRESHOLD VALUE
5.1.1.1 Provide an independent exhaust plant which
provides sufficient vacuum to allow for complete expansion of the nozzle free jet.
Over the range of flow rates of 1-30 lbm/sec, minimum static pressure of 0.5 psia downstream of each sub-atmospheric cooler with a maximum duct velocity of 0.3 mach.
5.1 EXHAUST SYSTEM REQUIREMENTS
Facility Exhaust System
Requirements Matrix
FA9101-25-R-B001
Attachment L-14
IRA – 6044
Controlled by: Arnold Engineering Development Center (AEDC) Controlled by: AEDC/TDX
CUI Category: Defense Distribution/Dissemination Control: D POC: Adam Vanreenan, 931-454-7674
WARNING - This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C., Sec
2751, et seq.) or the Export Administration Act of 1979 (Title 50, U.S.C., App. 2401 et seq.), as amended. Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DoD Directive 5230.25.
Destroy by any method that will prevent disclosure of contents or reconstruction of the document.
5.1.1.2 The system preparation time between tests system
shall be low enough to meet the test pace.
4 clock hours
5.1.1.3 Provide an independent exhaust plant which is
capable of expanded capacity without re-arranging or reconfiguring the system provided in 5.1.1.1.
The tie-in for expansion shall minimize existing system downtime.
Expand from 30-50 lbm/sec, minimum static pressure of 0.5 psia downstream of each sub-atmospheric cooler with a maximum duct velocity of 0.3 mach. Maximum downtime of 7 days for tie-in of expansion.
5.1.2.1 The system exhaust shall not exceed OSHA
emissions standards for hazardous air emissions for personnel safety at up to 100 feet from ground level.
OSHA personnel exposure For NO2:
8 hour time-weighted average limit: 0.2 ppm.
Short Term Exposure Limit (15 minutes): 1 ppm (time weighted average).
Ceiling : 5 ppm
Immediately Dangerous to Life and Health limit: 20 ppm
For NO:
8 hour time-weighted average: 25 ppm. Immediately Dangerous to
Life and Health : 100 ppm
DRAFT
Attachment 14, L-8
OFFEROR VOLUME
REFERENCE
(volume, page and paragraph)
ID REQUIREMENT THRESHOLD VALUE
5.1.2.2 The exhaust system run time capability. Minimum of:
53 minute minimum at 15 lbm/s, 33 min at 30 lbm/s
5.2.2.1 Dry gas system shall be provided for use as
instrument air, for shop air tool use lubrication may be added, and potentially for pneumatically operated valves.
150 psig max
40 scfm at 90 psi operational capacity
5.2 PRESSURIZED AIR SYSTEMS REQUIREMENTS
5.3 COOLING WATER SYSTEMS REQUIREMENTS
5.1.2.3 The exhaust system shall have the test chamber
pumped down 0.7 psia fast enough to maintain the required test pace after the isolation valve is opened.
8 minute maximum
5.1.2.4 The exhaust system shall be able to vacate residual
NOx from test chamber and all associated piping.
15 minutes maximum
5.1.2.5 The Exhaust system shall pump down the ductwork
downstream of the isolation valves to 0.5 psia fast enough to maintain the required test pace.
60 minute maximum
5.3.2.2 Raw water shall be strained sufficiently to prevent
fouling of equipment piping, cooling passages, etc.
1/8” mesh filter to heat exchangers, Filtering for individual use points will be determined on a case- by case basis.
5.4.1.1 The control of the Exhauster System shall be
implemented internally, no closed loop control or active automation feedback to other Facility
Systems shall be required; Automation of processes within the Exhauster Control System shall not require closed loop input from other Facility
Systems.
Implemented via internal closed loop control. Standard AEDC PLC architecture.
5.4 CONTROL SYSTEM INTERFACE REQUIREMENTS
Attachment 14, L-8
OFFEROR VOLUME
REFERENCE
(volume, page and paragraph)
ID REQUIREMENT THRESHOLD VALUE
7.0 DESIGN CONDITIONS
7.1 Outdoor temperature ranges from -20F up to 120F. Environmental Conditions
5.4.1.2 The Exhauster System Control System shall be
specified in such a manner as to simplify the implementation and control of the capability.
Control point will be measured downstream of each sub-atmospheric cooler.
The control envelope shall be specified as discrete points, not as a continuous range:
i. Control the exhaust inlet pressure to 0.5 psia for flowrates from 0-30 lbm/sec in 2 lbm/sec increments.
ii. Control the exhaust inlet pressure to 1.1 psia at flowrates from 0-30 lbm/sec in 2 lbm/sec increments.
iii. Control the exhaust inlet pressure to2.8 psia at flowrates from 0-30 lbm/sec in 2 lbm/sec increments.
7.2 Outside environmental conditions include rain, snow, hail, sleet, icing, and high humidity.
Environmental Conditions
7.3 Ducting volumes from exhaust interface “T” to test
chamber, including header, 96” to 72” transition elbow 72” isolation valve. This volume is 17,500 ft^3.
Ducting volume needed for calculations
7.4 All isolation valves may be considered FCI 70-2
Class V bidirectional.
Valve class needed for calculations
7.5 The cooling water temperature rise through the
system shall not exceed
17 degrees F
Environmental Condition
8.1 The base raw water system shall be used for
cooling the following systems: Atmospheric & Sub-
Atmospheric Exhaust
Base raw water is available for cooling.
8.0 DESIGN CONSTRAINTS
Attachment 14, L-8
OFFEROR VOLUME
REFERENCE
(volume, page and paragraph)
ID REQUIREMENT THRESHOLD VALUE
8.3 Design raw water system to a maximum flow
velocity 15 ft/s, and maximum piping pressure of
150 psig, operating pressure of 85 psig.
Water Hammer reduction and safe swapping of test cells while the pumping system is running.
8.2 Design all pressure systems using AEDC T
standards and ASME Standards
Safety of high- pressure systems
8.8 All equipment, utility connections, and existing
facility interfaces shall be designed and installed per the Arnold AFB Installation Facilities Standard
(IFS)
AEDC Real Property standards
8.14 All equipment, utility connections, and existing
facility interfaces shall be designed and installed
International Fuel Gas Code
Facility safety and quality
8.4 Raw water strainers shall be self- cleaning unless
supply is already by AEDC.
System reliability to allow the required test pace
8.5 Process Air/Nitrogen Systems maximum air flow
velocities >= to 200 psig can be up to 200 ft/sec.
Process Air/Nitrogen Systems maximum air flow velocities < 200 psig can be up to 150 ft/sec.
Shop Air Systems, under 200 psig shall be designed with the two constraints listed:
ft/s, ft/s.
Reduction of system dynamic hammer events and safe swapping of the test cells while pressurized.
8.7 All equipment associated with the independent
exhaust (with the exception of controls equipment to interface with the Facility Control System) shall not be placed in a building and shall be designed for environmental conditions shown in 7.1 and 7.2
Equipment reliability
8.17 All equipment, utility connections, and existing
facility interfaces shall be designed and installed
National Electric Code, NFPA 70
Facility safety and quality
8.18 All equipment, utility connections, and existing
facility interfaces shall be designed and installed
National Electric Safety Code, ANSI C2
Facility safety and quality
Attachment 14, L-8
OFFEROR VOLUME
REFERENCE
(volume, page and paragraph)
ID REQUIREMENT THRESHOLD VALUE
8.19 All equipment, utility connections, and existing
facility interfaces shall be designed and installed per AEDC Design Standards
Facility safety and quality
8.20 All equipment, utility connections, and existing
facility interfaces shall be designed and installed per ASCE/SEI 7-05 Minimum Design Loads for
Buildings and Other Structures
Facility safety and quality
8.22 All Lighting in the independent exhaust shall be
designed and installed per Illuminating
Engineering Society of North America, Reference and Application Lighting Handbook, 2008.
Facility safety and quality
8.26 All equipment, utility connections, and existing
facility interfaces shall be designed and installed per the Energy Policy Act.
Facility safety and quality
8.36 The duct tie-in point with facilities shall in be the
96” ducting section.”
System Requirement
8.37 Return to service time is 24 hours. System Requirement
8.32 All equipment, utility connections, and existing
facility interfaces shall be designed and installed per MIL-HDBK 1004/6 Lightning Protection 1988.
Facility safety and quality
8.35 Overall facility design has progressed assuming the
below utilities budgets for the exhaust system.
1) Raw Water 20,000 gpm, accessibility of 2 hours daily
2) Electricity 24 MW, accessibility of 24 hours daily
3) Potable water, 0 gpm, accessibility of 24 hours daily
4) Natural Gas, 100 Mcf/day accessibility of 24 hours daily
Budgeted Utilities
Attachment 14, L-8
OFFEROR VOLUME
REFERENCE
(volume, page and paragraph)
ID REQUIREMENT THRESHOLD VALUE
8.42 The status of the Exhauster System parameters
(process variable value and associated alarm status) shall be communicated via the same standardized interface to the other Facility Systems.
System Requirement
8.43 Automated permissives (collective status
determined via multiple signals that constitute a singular permissive) to or from the other Facility
Systems shall not be required. All permissives shall be determined within the other Facility Systems or the Exhauster System and be based on automation implemented within that defined system/subsystem;
Each permissive to or from other Facility Systems shall consist of a singular signal provided by that respective system.
System Requirement
8.38 ModBus, ProfiNet, “Reflective Memory (GE 5565
Compatible)” and, coupled with review of the proposals are controls interface systems.
System Requirement
8.39 Exhaust system environment temperature operating
range between 120 degF to 20 degF. If exhaust system is activated between the operating range the test must be able to be finished if the temperature moves out the range above.
System Requirement
8.40 Exhaust cooler upstream of exhaust system will
cool all exhaust gases which will guarantee exhaust system component temperatures to 120 degF.
Needed AEDC compressor temperature limitations
8.44 No automated tripping or interlocking of the
Facility shall be performed by the Exhauster
Control System; Any decisions to trip, pause operations or otherwise safe the Facility shall be performed automatically via the other Facility
Systems or manually by the Facility Operators.
System Requirement
Attachment 14, L-8
OFFEROR VOLUME
REFERENCE
(volume, page and paragraph)
ID REQUIREMENT THRESHOLD VALUE
8.46 The controllers used in the Exhauster Control
System shall be as per the AEDC hardware and software standard baseline for such Facility
Systems.
System Requirement
8.45 The Operator HMI for the Exhauster Control
System shall be implemented external to the
Exhauster System Scope of Work. Part of the spec shall include definitions of the Operator functions and the signals and formats to be sent between the other Facility Systems and the Exhauster System.
The Exhauster subcontractor can and should implement their standardized HMIs for control and maintenance of the Exhauster System, but these shall only be used by AEDC for the purposes of troubleshooting or maintenance; the HMI stations need not be implemented to the AEDC standard for controls hardware or software (assuming reliability, availability and maintainability and environmental requirements are met and will interoperate with the
Exhauster System controllers).
System Requirement
8.50 All burners supplied shall be of the low-NOx type. System Requirement
8.47 The Exhauster Control System control code shall
be implemented per AEDC software standards;
Standard point types and naming shall be used and documented according to AEDC standards, as provided by the Government.
System Requirement
8.48 Support contracts directly with the subcontractor
shall be limited in scope, as determined by the
Government during design. Subcontractor ownership shall not be retained for any portions of the system deemed modifiable by the specification within the future testing scope; no intellectual property of the subcontractor requiring licensing or support contracts shall be used for those portions of the scope.
System Requirement
8.49 Except for any intellectual property defined in Item
8.48, all hardware and software implemented for the Exhauster Control System, spares and associated documentation as well as licensing and support shall be owned by/transferred to the Government upon conclusion of commissioning and final approval of the system.
System Requirement
File details come from the government source that posted it. Updated .