DRFP Attachment 12 L-6 Relevancy Matrix.pdf
PDF 637 KB Posted
- Attached to
- Facility Exhaust System - Draft RFP
- Solicitation number
- FA910125RB001
About this file
This document is an Attachment L-6 Relevancy Matrix for a Draft Request for Proposal (DRFP) for the Facility Exhaust System (FA9101-25-R-B001) at Arnold Air Force Base, Tennessee. The matrix outlines the required technical, manufacturing, and integration capabilities that potential offerors must demonstrate, including design and analysis of air ducts, steam systems, steam ejectors, heat exchangers, and PLC-based industrial control systems. The DRFP has a proposed delivery period of 3 years from award and the Government is seeking firm-fixed-price proposals. The key objectives are to design, procure, and install an exhaust system at the facility. The Government is soliciting industry feedback on the clarity of the tasks, the proposal evaluation criteria, and the completeness of the proposal instructions in order to revise the solicitation documents and create a fair and competitive acquisition.
View the file
Other files
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ATTACHMENT L-6
RELEVANCY MATRIX
Facility Exhaust System
FA9101-25-R-B001
Attachment 12, L-6
Name of Partner (Subcontractor/Joint Venture) R ef er en ce
R ef er en ce
R ef er en ce
R ef er en ce
R ef er en ce
D1
Design and Analysis of Air duct, expansion joints, and control/process valves (≥ 72” Ø, full vacuum to 30 psig), and associated civil/structural supports and concrete foundations.
D2 Design and Analysis of Large steam systems (≥100 kpph boilers, and piping up to 14" Ø) including chemical water treatment and filtration
D3 Design and Analysis of Large steam ejector systems (>20 pps, < 0.7 psia)
D4 Design and Analysis of Large heat exchangers: water to air; shell and tube, etc.
D5 Design and Analysis of PLC-based industrial control systems
M1
Design and Analysis of Air duct, expansion joints, and control/process valves (≥ 72” Ø, full vacuum to 30 psig), and associated civil/structural supports and concrete foundations.
M2 Design and Analysis of Large steam systems (≥100 kpph boilers, and piping up to 14" Ø) including chemical water treatment and filtration
M3 Design and Analysis of Large steam ejector systems (>20 pps, < 0.7 psia)
M4 Design and Analysis of Large heat exchangers: water to air; shell and tube, etc.
Technical Capabilities
Design and Analysis Capability and Technical Resources
Manufacturing Capability
DRAFT
ATTACHMENT L-6
RELEVANCY MATRIX
Facility Exhaust System
FA9101-25-R-B001
Attachment 12, L-6 M5 Design and Analysis of PLC-based industrial control systems
I1 PLC-based industrial control systems and integrations with existing control systems
I2 Controls software development and modification
I3 Civil/Structural construction of equipment support structural supports and concrete foundations
I4
Integration of large industrial equipment such as steam boilers, steam ejectors, and large scale ducting (≥ 72” Ø) into a functioning integrated system.
I5 Integration of existing utilities to industrial equipment including raw water, electrical power, and natural gas.
I6 Control systems instrumentation design and integration
Integration Capability
DRAFT
File details come from the government source that posted it. Updated .