DRFP Attachment 13 L-7 Pricing Sheet.xlsx

XLSX spreadsheet 34 KB Posted

Attached to
Facility Exhaust System - Draft RFP
Solicitation number
FA910125RB001
Issued by

About this file

This document is an Excel pricing sheet attachment (L-7 Pricing Sheet) for a Draft Request for Proposal (DRFP) for the Facility Exhaust System acquisition (Solicitation Number FA910125RB001). The pricing sheet provides instructions for offerors to enter itemized material and labor costs for the project management, design, equipment, and installation of the facility exhaust system. Offerors are required to define material categories, provide unit prices and quantities, and calculate extended prices. The pricing sheet also includes a Total Evaluated Price (TEP) summary for the four main contract line items (CLINs). This acquisition is being conducted by the Department of the Air Force Materiel Command Test Center for the Arnold Engineering Development Complex (AEDC) at Arnold Air Force Base in Tennessee. The Government is requesting industry feedback on the clarity of the tasks, evaluation criteria, and proposal preparation instructions to finalize the solicitation documents.

View the file

Other files

Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Instructions

Facility Exhaust System

FA9101-25-R-B001

Attachment L-7 Price Matrix

Resource TypeQuantityUnit PriceExtended Price
Offerors shall enter itemized list of all materials valued at $100K or higher under 'Resource Type' and include a brief description of materials matching information from the Offeror defined 'Resource Type Glossary' tab and enter corresponding quantities with fully burdened price.Quantity (number of units). For Labor, "1" is acceptablePlease provide fully budened cost (including overhead, profit, and other surcharges)Q x P
Offerors shall develop material categories in accordance with company policy and CLIN requirements. The material categories shall be defined in the 'Resource Type Glossary' tab and include pertitent information such as material description, grade, machining/modification requirements (if any), and any unique features such that the team may evaluate the proposal for Completeness, Reasonableness, and Total Evaluated Price (TEP).
Offerors will need to link the price from the specific CLIN to the corresponding cell on the TEP tab and verify the TEP is correct.
Offerors shall treat labor costs as one unit and accordingly enter the total labor cost pertaining to the task
Offerors shall treat the costs of all subcontractor labor as a separate total labor cost (ONE unit for EACH subcontractor; i.e. 2 subcontractors result in an additional 2 total labor cost entries) when populating the Pricing Sheet.
It is acceptable to split the sheet between labor and material for each of the Tasks
Offerors are free to add or remove rows; however, it is ultimately the Offeror's responsibility to provide an accurate and complete Pricing Sheet .
It is acceptable to include supply-type materials (fasteners, paint, etc.) as a lump sum (with all applicable burdens); however, items considered capital investments (such as vehicles, forklifts, etc.), please break out separately (with all burdens).
A sample is provided in the 'Resource Type Glossary' tab on how to input material categories and capital equipment
In addition to the format provided, Offerors may include proposed milestones or an alterante CLIN structure for the Government's consideration.

&"Times New Roman,Regular"Facility Exhaust System

FA9101-25-R-B001

Attachment 13, L-7

Total Evaluated Price (TEP)

CLINDescriptionTotals
1Project Managment Support
2Design Exhaust System
3Equipment for Exhaust System
4Installation for Exhaust System

Total Evaluated Price $0.00

&"Times New Roman,Regular"Facility Exhaust System

Project Management Support

Resource TypeQuantityUnit PriceExtended Price
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
Total- 0

&"Times New Roman,Regular"Facility Exhaust System

Design Exhaust System

Resource TypeQuantityUnit PriceExtended Price
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
Total- 0

&"Times New Roman,Regular"Facility Exhaust System

Equipment for Exhaust System

Resource TypeQuantityUnit PriceExtended Price
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
Total- 0

&"Times New Roman,Regular"Facility Exhaust System

Installation of Exhaust System

Resource TypeQuantityUnit PriceExtended Price
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
- 0
Total- 0

&"Times New Roman,Regular"Facility Exhaust System

Resource Type Glossary

*THIS IS ONLY A SAMPLE: Please enter pertinent information accordingly*
Material CategoriesDescription
BeamA36, A572, A992, etc…H-Beam, I-Beam, etc..
ValveBrass, PVC, Steel, etc…Ball, Gate, Butterfly, etc…
Capital Equipment
VehicleMake, Model….
Fork LiftMake, Model….

&"Times New Roman,Regular"Facility Exhaust System

File details come from the government source that posted it. Updated .